Contractors

Deliverables Phase 5

Company

Drawings/Documents List

Line Index/Piping Line list

Tie-in Schedule

Piping Material Selection Specification/Line


class index

Piping Material Specification (Pipe Class)

Heat Tracing/Jacketing Specifications (If


applicable)

Insulation specification & Thickness Table


(Job Specification)

Special Piping Item Schedule & Data Sheets


(Strainers, Traps, etc..) (if applicable)

Spring Support Schedule and Data sheets (If


applicable)

Piping Wall thickness Calculation Sheets (All


Line Classes)

Material Take Off (1st , 2nd, 3rd or final)

Stress Reports along with Stress isometrics


for critical lines including executable
CAESAR-II input (If applicable)

4.8.2.P Piping Engineering


Index

Specification

Data Sheet

Procurement Related Documents


Long Lead Item List & Material Requisitions,
TBE, POR/PO (if applicable)

Calculations

Engineering Dwg & 3-D Model


Overall Plot Plan

Unit Area Plot Plan/Equipment Layout plan,


elevation and sectional elevation

Piping Study Drawings (Critical Piping only)

Underground piping layout Plan

Eye wash/ Safety shower location Drawings

Tie-in Location Plan & Detailed Drawings

TOTAL

Man Hours

Cost $ 250/Hr

200

50000

150

37500

250

62500

120

30000

120

30000

60

15000

60

15000

60

15000

60

15000

160

40000

400

100000

400

100000

300

75000

100

25000

del

100

25000

250

62500

300

75000

300

75000

300

75000

3690

922500

Contractors Deliverables
Phase 5

Company

F
F

A
A

F(LLE)

F
F

A
A

F(LLE)

F(LLE)

F
F(LLE)

A
A

F(LLE)

F
F

I
R

Electrical Motors/ Generators Mechanical Details

F(LLE)

List of Capital, Pre-commissioning, Commissioning


& Start-up and Operational Spare parts.

F(LLE)

List of Special Tools

F(LLE)

Inspection and Testing surveillance plan, procedures


and third party inspection scope

F(LLE)

4.8.2.G Machinery
Critical and Long lead equipment List
Drawings/Document List
Complete List of Vendor Data and Drawings in
accordance with the Vendor Data section of all
applicable Standards / SES.
General/ Project Specifications
Equipment Data Sheets
Rotating Machinery Final Selection Document
Rotating Equipment Requisitions including
completed Data Sheets
Requisitions for Packaged Units
Vendor Deviations / Exceptions
Technical Bid Tabulation/ Evaluation &
Recommendations
Machinery Painting Specification
Machinery Insulation Specification
Rotating Machinery Protective Instrumentation
(Instrumentation)
Machine Monitoring System Scope

TOTAL

Man Hours

Cost $ 250/Hr

200
500

50000
125000

500
250
700

125000
62500
175000

200

50000

500
500
125

125000
125000
31250

600
150
150

150000
37500
37500

0
300

0
75000

300

75000

300
300

75000
75000

300

75000
1468750

5875

Contractors
Deliverables
Phase 5

4.8.2.Q Stationary
General
Equipment List

Technical bid evaluation & tabulation for Critical items (based on


service and MOC) & LLE 1

Purchase Inquiry Specifications (RFQ/ MR for equipment vendors) for Critical items / LLE 1

Purchase Specification Ready for order stage for Critical items /


LLE 1

Identification of two-year operational spare parts

P
Specification

Mechanical Data Sheets (for Critical items / LLE)

Mechanical Data Sheets (for other equipment)

Project Specifications (for Critical items / LLE)

Project Specifications (for all other equipment)

Equipment Internals specifications (for Critical items / LLE)

Refractory Specifications (including MOC and types of anchors with


spacing details)

Painting Specifications (for special applications not covered by SES, if


any)

Fireproofing Specification

Rust Prevention Specification

Internal lining specification (ex. elastomers/GRP/FRP/glass etc.)

Technical specification for equipment modification

A complete Inspection Report addressing the current condition of the


pressure components and attachments

TOTAL

Cost $
250/Hr

Company

Man Hours

200

50000

600

150000

500

125000

400

100000

100

25000

700

175000

200

50000

400
200

100000
50000

800

200000

300

75000

300

75000

150

37500

150

37500

150

37500

A
R

R
R

R
R
R
R

500

125000

R
500
7200

125000
1800000