Project Brief
Mr. Bong Poh Fong is desirous of developing on lot 7424, Jalan Ciku, Mukim
Bukit Raja, Bukit Cherakah, Daerah Petaling Selangor Darul Ehsan under
Program Pemutihan Kilang Tanpa Kebenaran.
1.2
Objective
This report presents the detailed network analysis for the water supply pipeline
serving the factory includes the following:a.
b.
c.
d.
The pressure head for the proposed development is 45.0m ODL, given by
SYABAS (ref no: SYA/PTG/DPD/DEVS/DEVU/PJT3/15007/14(3)
2.0
2.1
Reference
Reference is made to the MWA design guideline.
2.2
Design Criteria
The water reticulation system consists of pipelines network designed to meet 2
criteria.
The 2 criteria are :
Case 1 : Peak Domestic Demand Condition
( 2.5 x Average Flow )
Case 2 : Average Domestic Demand and 1 Fire Flows
( Fire flow at 300 gpm at each stream )
All piping materials, valves, hydrants, and specials shall be in accordance with
British Standards and SYABASs requirement.
2.3
Item
Description
Factory
Quantity
Water demand
Total Daily
Demand
450
450
TOTAL
450
Table 1
2.4
TABLE 2 & 3
SUMMARY OF FLOW NETWORK ANALYSIS RESULT
Ground
level
Building
Height
Demand
Peak Flow
=2.5
x Pressure at
Average
node
flow
(l/s)
(m)
Residual
Pressure
(m)
(m)
(l/s)
(m)
27
45.00
18.00
27.3
4.4
0.024
0.060
45.00
13.31
27.3
45.00
17.70
27.3
45.00
17.70
Node
No.
Ground
level
Building
Height
Hydrant
Pressure at
node
Residual
Pressure
(m)
(m)
(l/s)
(l/s)
(m)
(m)
27
45.00
18.00
27.3
4.4
0.024
44.67
12.97
27.3
43.39
16.09
27.3
22.7
42.07
14.77
APPENDIX 1
RESULTS OF ANALYSIS OF PEAK FLOW
OUT
-------------------------------------------------------------------------------PIPE NETWORK ANALYSIS
-------------------------------------------------------------------------------!@
Job title : 1205
-------------------------------------------------------------------------------Number of nodes ........ 4
Number of pipes ........ 3
Minimum flow correction ...... .001 litres/sec
-------------------------------------------------------------------------------E
E
-------------------------------------------------Node data
-------------------------------------------------F
NODE NO.
DRAW OFF
HYDRAULIC HEAD
REDUCED LEVEL
RESIDUAL HEAD
litres/sec
m
m
m
-------------------------------------------------------------------------------1
0.0
45.000 C
27.0
18.000
2
0.1
45.000
31.7
13.310
3
0.0
45.000
27.3
17.700
4
0.0
45.000
27.3
17.700
-------------------------------------------------------------------------------E
-------------------------------------------------Pipe data
-------------------------------------------------F
NA NB
DIA
LGTH
C
R
FLOW
VELOCITY
HD.LOSS HY.GRAD.
mm
m
litres/sec
m/sec
m
m/1000m
-------------------------------------------------------------------------------1
2 150.
17.
100.
0.001
0.
0.00
0.000
0.000
2
3 150.
64.
100.
0.004
-0.
-0.00
-0.000
-0.000
3
4 150.
66.
100.
0.004
-0.
-0.00
-0.000
-0.000
-------------------------------------------------------------------------------NUMBER OF REITERATIONS =
69
Page 1
0.060 l/s
1
17.0 m
m
0 l/s
0 l/s
2
2
64.0 m
3
66.0 m
Pipe Network
Note:
1
APPENDIX 2
RESULTS OF ANALYSIS OF FIRE FLOW
OUT
-------------------------------------------------------------------------------PIPE NETWORK ANALYSIS
-------------------------------------------------------------------------------!@
Job title : 1205
-------------------------------------------------------------------------------Number of nodes ........ 4
Number of pipes ........ 3
Minimum flow correction ...... .001 litres/sec
-------------------------------------------------------------------------------E
-------------------------------------------------Node data
-------------------------------------------------F
NODE NO.
DRAW OFF
HYDRAULIC HEAD
REDUCED LEVEL
RESIDUAL HEAD
litres/sec
m
m
m
-------------------------------------------------------------------------------1
0.0
45.000 C
27.0
18.000
2
0.0
44.661
31.7
12.971
3
0.0
43.386
27.3
16.086
4
22.7
42.071
27.3
14.771
-------------------------------------------------------------------------------E
-------------------------------------------------Pipe data
-------------------------------------------------F
NA NB
DIA
LGTH
C
R
FLOW
VELOCITY
HD.LOSS HY.GRAD.
mm
m
litres/sec
m/sec
m
m/1000m
-------------------------------------------------------------------------------1
2 150.
17.
100.
0.001
23.
1.29
0.339
19.958
2
3 150.
64.
100.
0.004
23.
1.28
1.275
19.918
3
4 150.
66.
100.
0.004
23.
1.28
1.315
19.918
-------------------------------------------------------------------------------NUMBER OF REITERATIONS =
34
Page 1
0.024 l/s
1
17.0 m
m
0 l/s
22.7 l/s
2
2
64.0 m
3
66.0 m
Pipe Network
Note:
1
FIGURE 1
WATER RETICULATION LAYOUT PLAN