Professional Documents
Culture Documents
INTRODUCTION
1.1
Project Brief
Mr. Kong Kok Weng is desirous of developing on lot 7425, Jalan Ciku, Mukim
Bukit Raja, Bukit Cherakah, Daerah Petaling Selangor Darul Ehsan under
Program Pemutihan Kilang Tanpa Kebenaran.
1.2
Objective
This report presents the detailed network analysis for the water supply pipeline
serving the factory includes the following:a.
b.
c.
d.
The pressure head for the proposed development is 54.0m ODL, given by
SYABAS (ref no: SYA/PTG/DPD/DEVS/DEVU/PJT3/15006/14(3)
2.0
2.1
Reference
Reference is made to the MWA design guideline.
2.2
Design Criteria
The water reticulation system consists of pipelines network designed to meet 2
criteria.
The 2 criteria are :
Case 1 : Peak Domestic Demand Condition
( 2.5 x Average Flow )
Case 2 : Average Domestic Demand and 1 Fire Flows
( Fire flow at 300 gpm at each stream )
All piping materials, valves, hydrants, and specials shall be in accordance with
British Standards and SYABASs requirement.
2.3
Item
Description
Factory
Quantity
Water demand
Total Daily
Demand
600
600
TOTAL
600
Table 1
2.4
TABLE 2 & 3
SUMMARY OF FLOW NETWORK ANALYSIS RESULT
Ground
level
Building
Height
Demand
Peak Flow
=2.5
x Pressure at
Average
node
flow
(l/s)
(m)
Residual
Pressure
(m)
(m)
(l/s)
(m)
27.7
54.00
26.30
28.3
53.946
25.646
28.3
53.944
25.644
28.3
4.5
0.0052
0.013
53.944
21.094
28.3
4.5
0.0264
0.066
53.942
21.092
Node
No.
Ground
level
Building
Height
Hydrant
Pressure at
node
Residual
Pressure
(m)
(m)
(l/s)
(l/s)
(m)
(m)
28.3
4.5
0.032
53.95
21.15
28.3
22.7
52.77
24.47
28.3
54.00
25.70
APPENDIX 1
RESULTS OF ANALYSIS OF PEAK FLOW
OUT
-------------------------------------------------------------------------------PIPE NETWORK ANALYSIS
-------------------------------------------------------------------------------!@
Job title : 1205
-------------------------------------------------------------------------------Number of nodes ........ 5
Number of pipes ........ 4
Minimum flow correction ...... .001 litres/sec
-------------------------------------------------------------------------------E
-------------------------------------------------------------------------------NUMBER OF REITERATIONS =
50
E
--------------------------------------------------------------------------------------------------F
NODE NO.
DRAW OFF
HYDRAULIC HEAD
REDUCED LEVEL
RESIDUAL HEAD
litres/sec
m
m
m
-------------------------------------------------------------------------------1
0.0
54.000 C
27.7
26.300
2
0.0
53.946
28.3
25.646
3
0.0
53.944
28.3
25.644
4
0.0
53.944
32.8
21.094
5
0.1
53.942
32.8
21.092
-------------------------------------------------------------------------------E
--------------------------------------------------------------------------------------------------F
NA NB
DIA
LGTH
C
R
FLOW
VELOCITY
HD.LOSS HY.GRAD.
mm
m
litres/sec
m/sec
m
m/1000m
-------------------------------------------------------------------------------1
2
25.
17.
100.
6.314
0.
0.16
0.054
3.243
2
3
50.
22.
100.
0.287
0.
0.04
0.003
0.113
3
4
50.
6.
100.
0.081
0.
0.01
0.000
0.004
3
5
50.
17.
100.
0.226
0.
0.03
0.001
0.083
-------------------------------------------------------------------------------NUMBER OF REITERATIONS = 1150
**End of program execution**
--------------------------------------------------------NUMBER
Page 1
0.013 l/s
0.066 l/s
6.2 m
m
2
1
17.4 m
22.1 m
2
16.6 m
Pipe Network
Note:
1
APPENDIX 2
RESULTS OF ANALYSIS OF FIRE FLOW
OUT
-------------------------------------------------------------------------------PIPE NETWORK ANALYSIS
-------------------------------------------------------------------------------!@
Job title : 1205
-------------------------------------------------------------------------------Number of nodes ........ 3
Number of pipes ........ 2
Minimum flow correction ...... .001 litres/sec
-------------------------------------------------------------------------------E
-------------------------------------------------N
E
-------------------------------------------------Node data
-------------------------------------------------F
NODE NO.
DRAW OFF
HYDRAULIC HEAD
REDUCED LEVEL
RESIDUAL HEAD
litres/sec
m
m
m
-------------------------------------------------------------------------------1
0.0
54.000 C
32.8
21.150
2
22.7
52.769
28.3
24.469
3
0.0
54.000
28.3
25.700
-------------------------------------------------------------------------------E
-------------------------------------------------Pipe data
-------------------------------------------------F
NA NB
DIA
LGTH
C
R
FLOW
VELOCITY
HD.LOSS HY.GRAD.
mm
m
litres/sec
m/sec
m
m/1000m
-------------------------------------------------------------------------------1
2 150.
62.
100.
0.004
23.
1.28
1.231
19.917
1
3 150.
21.
100.
0.001
-0.
-0.00
-0.000
-0.000
-------------------------------------------------------------------------------NUMBER OF REITERATIONS =
146
Page 1
22.7 l/s
0.031 l/s
0 l/s
61.8 m
m
20.5 m
Pipe Network
Note:
1
FIGURE 1
WATER RETICULATION LAYOUT PLAN