You are on page 1of 96

Project

: Proposed AVIC Residential Development

Doc. No : CSE-DG5-CAT-R-02

Consultant

: Design Group Five International

Rev. No : 00

Structural Eng. : Civil & Structural Engineering Consultants

Date

: 26th March 2015

Author

Page

:1

: Eng. Shiromal Fernando


B.Sc. Eng. (Hons.)
MIE(SL), CEng, MPhil
Charted Engineer

Peer Reviewed : Prof. Priyan Mendis


Ph.D. (Monash University)
B.Sc. Eng. (Hons.)
FIE(Aust.), Chartered Engineer

REPORT

PILE CAP DESIGN


Reference sheet
Document number

Description

The Design Group Five International (Pvt) Ltd


No. 03, Anderson Road
Colombo 05
Sri Lanka

Civil and Structural Engineering Consultants (Pvt) Ltd


No. 64, Barnes Place
Colombo 07
Sri Lanka

Revision History

00

26th March 14

TP

FOR INFORMATION

SH

PM

Revision

Date

Prepared by

Description

Checked
by

Peer
Reviewed
by

Total no of pages [incl Att]


..CSE

Project
Approved

CONTENTS
CONTENTS .......................................................................................................................................... 2
1. INTRODUCTION .............................................................................................................................. 4
2. SUMMARY OF RESULTS................................................................................................................ 6
2.1 SUMMARY OF RESULTS OF PC3, PC4, AND PC4A .................................................................... 6
2.2 SUMMARY OF RESULTS OF PC5 .................................................................................................. 6
2.2.1 Summary of M11 and M22 moments of PC5 for all load combinations ........................................ 6
2.2.2 Summary of S13 and S23 Shear Stresses of PC5 for all load combinations ................................ 7
2.2.3 Summary of Punching Shear........................................................................................................ 7
2.3 SUMMARY OF RESULTS OF PC6 .................................................................................................. 8
2.3.1 Summary of M11 and M22 moments of PC6 for all load combinations ........................................ 8
2.3.2 Summary of S13 and S23 Shear Stresses of PC6 for all load combinations ................................ 9
2.3.3 Summary of Punching Shear........................................................................................................ 9
2.4 SUMMARY OF RESULTS OF PC7 ................................................................................................ 10
2.4.1 Summary of M11 and M22 moments of PC7 for all load combinations ...................................... 10
2.4.2 Summary of S13 and S23 Shear Stresses of PC7 for all load combinations .............................. 10
2.4.3 Summary of Punching Shear...................................................................................................... 10
2.5 SUMMARY OF RESULTS OF PC8 ................................................................................................ 11
2.5.1 Summary of M11 and M22 moments of PC8 for all load combinations ...................................... 11
2.5.2 Summary of S13 and S23 Shear Stresses of PC7 for all load combinations .............................. 11
2.5.3 Summary of Punching Shear...................................................................................................... 11
ENCLOSURE A.1 ............................................................................................................................ 12
A.1 DETAILED CALCULATION OF PC2A USING TEDDS ............................................................... 13
ENCLOSURE A.2 ............................................................................................................................ 16
A.2 DETAILED CALCULATION OF PC3 USING TEDDS ................................................................. 17
ENCLOSURE B ............................................................................................................................... 21
B.1 DETAILED CALCULATION OF PC4 USING TEDDS ................................................................. 22
ENCLOSURE C ............................................................................................................................... 26
C.1 DETAILED CALCULATION OF PC4A USING TEDDS ............................................................... 27
ENCLOSURE D ............................................................................................................................... 31
D.1 COMBINATION 2 - [1.35 DL + 1.5 LL] ........................................................................................ 32
D.5 COMBINATION 3 - [1.2 DL + 1.2 LL + 1.2 WX] .......................................................................... 34
D.6 COMBINATION 3.1 - [1.2 DL + 1.2 LL + 1.2 -WX] ...................................................................... 36
D.7 COMBINATION 4 - [1.2 DL + 1.2 LL + 1.2 WY] .......................................................................... 38
D.8 COMBINATION 4.1 - [1.2 DL + 1.2 LL + 1.2 -WY] ...................................................................... 40
D.9 COMBINATION 5 - [1.0 DL + 1.4 WX]......................................................................................... 42
D.10 COMBINATION 5.1 - [1.0 DL + 1.4 -WX] .................................................................................. 44
D.11 COMBINATION 6 - [1.0 DL + 1.4 WY]....................................................................................... 46

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 2

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.12 COMBINATION 6.1 - [1.0 DL + 1.4 -WY] .................................................................................. 48


D.13 COMBINATION 7 - [1.0 DL + 0.3 LL + 1.0 EQ(X)] RS500 ........................................................ 50
D.14 COMBINATION 8 - [1.0 DL + 0.3 LL + 1.0 EQ(Y)] RS500 ........................................................ 52
D15. CALCULATION TO DETERMINE MOMENT REINFORCEMENT ............................................. 54
D.12 CALCULATION TO DETERMINE SHEAR REINFORCEMENT ................................................ 56
D.13 PUNCHING SHEAR AT COLUMN FACE ................................................................................. 56
ENCLOSURE E ............................................................................................................................... 57
E.1 COMBINATION 2 - [1.35 DL + 1.5 LL] ........................................................................................ 58
E.2 COMBINATION 3 - [1.2 DL + 1.2 LL + 1.2 WX] .......................................................................... 60
E.3 COMBINATION 3.1 - [1.2 DL + 1.2 LL + 1.2 -WX] ...................................................................... 62
E.4 COMBINATION 4 - [1.2 DL + 1.2 LL + 1.2 WY] .......................................................................... 64
E.5 COMBINATION 4.1 - [1.2 DL + 1.2 LL + 1.2 -WY] ...................................................................... 66
E.6 COMBINATION 5 - [1.0 DL + 1.4 WX] ......................................................................................... 68
E.7 COMBINATION 5.1 - [1.0 DL + 1.4 -WX]..................................................................................... 70
E.8 COMBINATION 6 - [1.0 DL + 1.4 WY] ......................................................................................... 72
E.9 COMBINATION 6.1 - [1.0 DL + 1.4 -WY]..................................................................................... 74
E.10 COMBINATION 7 - [1.0 DL + 0.3 LL + 1.0 EQ(X)] RS500 ........................................................ 76
E.11 COMBINATION 8 - [1.0 DL + 0.3 LL + 1.0 EQ(Y)] RS500 ........................................................ 78
E12. CALCULATION TO DETERMINE MOMENT REINFORCEMENT ............................................. 80
E.13 CALCULATION TO DETERMINE SHEAR REINFORCEMENT ................................................ 82
E.13 PUNCHING SHEAR AT COLUMN FACE .................................................................................. 82
ENCLOSURE F ............................................................................................................................... 83
F.1 COMBINATION 2 - [1.35 DL + 1.5 LL] ........................................................................................ 83
F2. CALCULATION TO DETERMINE MOMENT REINFORCEMENT ............................................... 88
F.3 CALCULATION TO DETERMINE SHEAR REINFORCEMENT .................................................. 90
G.3 PUNCHING SHEAR AT COLUMN FACE ................................................................................... 90
ENCLOSURE G ............................................................................................................................... 91
G.1 COMBINATION 2 - [1.35 DL + 1.5 LL] ........................................................................................ 92
G2. CALCULATION TO DETERMINE MOMENT REINFORCEMENT .............................................. 94
G.2 CALCULATION TO DETERMINE SHEAR REINFORCEMENT .................................................. 96
G.3 PUNCHING SHEAR AT COLUMN FACE ................................................................................... 96

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 3

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

1. Introduction
Reinforced concrete pile cap design is carried out according to BS 8110 Part 1: 1997 - Structural
use of concrete: Part 2. Code of practice for design and construction. To design a two and four
pile, pile cap, subject to vertical axial loading from a concentric column, TEDDS software was
used. For the pile caps containing more than four piles, design was carried out obtaining the
critical moments from the analysis model created by the SAFE software.
For the calculations carried out by means of the TEDDS software, the calculation for tension
reinforcement is based on the truss analogy method and reinforcement provided is calculated for
one truss member between two pile heads. Combination 2 has been taken for the calculations.
Regarding the SAFE software, design was carried out obtaining the critical moments from the
analysis model created.
For the seismic combinations, a 500 year return period has been considered.
Detailed calculations of all pile caps are provided in the enclosures as listed below.
Pile Cap

Relevant Enclosure

PC2a/3

Enclosure A

PC4

Enclosure B

PC4a

Enclosure C

PC5

Enclosure D

PC6

Enclosure E

PC7

Enclosure F

PC8

Enclosure G

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 4

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Layout of piles and pile caps are shown in Figure 1.1 below.

Figure 1.1: Pile Cap Layout

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 5

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

2. Summary of Results
2.1 Summary of results of PC3, PC4, and PC4a
Table 2.1.1: Summary of PC3, PC4, and PC4a

Pile Cap Number


PC2a
PC3
PC4
PC4a

Tension R/F
1 layers T32@150
2 layers T32@200
2 layers T32@200
2 layers T32@150

Shear R/F
T10@200 (4 legs)
T10@200 (4 legs)
No links required
No links required

2.2 Summary of results of PC5


2.2.1 Summary of M11 and M22 moments of PC5 for all load combinations
Table 2.2.1: Summary of Moments of PC6
Combination
Combination
Number

Combination 2
Combination 3
Combination 3.1
Combination 4
Combination 4.1
Combination 5
Combination 5.1
Combination 6
Combination 6.1
Combination 7
Combination 8

1.35 DL + 1.5 LL
1.2 DL + 1.2 LL + 1.2 Wx
1.2 DL + 1.2 LL + 1.2 -Wx
1.2 DL + 1.2 LL + 1.2 Wy
1.2 DL + 1.2 LL + 1.2 -Wy
1.0 DL + 1.4 Wx
1.0 DL + 1.4 -Wx
1.0 DL + 1.4 Wy
1.0 DL + 1.4 -Wy
1.0 DL + 0.3 LL + 1.0 EQ(x)
1.0 DL + 0.3 LL + 1.0 EQ(y)

M11 (kNm/m)
Sagging
Hogging
13167
1600
6300
1300
7500
900
6500
700
7400
650
4400
500
5800
600
5630
500
6700
630
8100
460
6400
560

M22 (kNm/m)
Sagging
Hogging
13177
1700
9134
1563
9700
1100
9600
1200
9500
1100
6300
750
6600
1100
6400
600
7300
700
10724
610
8960
700

Hence Combination 2 was considered as the critical combination and moment reinforcement was decided
according to the moments of this combination.
Table 2.2.2: Summary of Moments Reinforcement Required

Moment
M11 Bottom
M11 Top
M22 Bottom
M22 Top

Moment Value
13167
1600
13177
1700

Required Reinforcement
2 Layers of T32@150
1 Layer of T16@125
2 Layers of T32@150
1 Layer of T16@125

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 6

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

2.2.2 Summary of S13 and S23 Shear Stresses of PC5 for all load combinations
Table 2.2.3: Summary of shear stresses of PC5

Combination

Combination Number

Combination 2
Combination 3
Combination 3.1
Combination 4
Combination 4.1
Combination 5
Combination 5.1
Combination 6
Combination 6.1
Combination 7
Combination 8

1.35 DL + 1.5 LL
1.2 DL + 1.2 LL + 1.2 Wx
1.2 DL + 1.2 LL + 1.2 -Wx
1.2 DL + 1.2 LL + 1.2 Wy
1.2 DL + 1.2 LL + 1.2 -Wy
1.0 DL + 1.4 Wx
1.0 DL + 1.4 -Wx
1.0 DL + 1.4 Wy
1.0 DL + 1.4- Wy
1.0 DL + 0.3 LL + 1.0 EQ(x)
1.0 DL + 0.3 LL + 1.0 EQ(y)

S13 (N/mm2)

S23 (N/mm2)

1.1
0.85
0.9
0.7
0.8
0.6
0.67
0.67
0.63
0.8
0.8

3.0
1.9
2.4
2.1
2.4
1.4
1.9
1.7
1.7
2.9
1.9

The enhanced design shear stress = 2.90 N/mm2


Since the shear stresses at the critical section for all combinations are lower than the enhanced design
shear stress, no shear links are required for PC5.
2.2.3 Summary of Punching Shear

Punching shear criteria is satisfied and no additional requirement is needed.

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 7

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

2.3 Summary of results of PC6


2.3.1 Summary of M11 and M22 moments of PC6 for all load combinations
Table 2.3.1: Summary of Moments of PC6
Combination
Combination
Number

Combination 2
Combination 3
Combination 3.1
Combination 4
Combination 4.1
Combination 5
Combination 5.1
Combination 6
Combination 6.1
Combination 7
Combination 8

1.35 DL + 1.5 LL
1.2 DL + 1.2 LL + 1.2 Wx
1.2 DL + 1.2 LL + 1.2 -Wx
1.2 DL + 1.2 LL + 1.2 Wy
1.2 DL + 1.2 LL + 1.2 -Wy
1.0 DL + 1.4 Wx
1.0 DL + 1.4 -Wx
1.0 DL + 1.4 Wy
1.0 DL + 1.4 -Wy
1.0 DL + 0.3 LL + 1.0 EQ(x)
1.0 DL + 0.3 LL + 1.0 EQ(y)

M11 (kNm/m)
Sagging
Hogging
6300
700
3770
400
4641
450
5117
550
5200
550
4300
450
4400
430
3700
400
3650
3200
4700
700
4300
620

M22 (kNm/m)
Sagging
Hogging
6014
600
3300
500
4200
550
4630
560
4550
520
3900
420
6600
1100
3400
350
7300
340
4100
540
3900
550

Hence Combination 2 was considered as the critical combination and moment reinforcement was decided
according to the moments of this combination.
Table 2.3.2: Summary of Moments Reinforcement Required

Moment
M11 Bottom
M11 Top
M22 Bottom
M22 Top

Moment Value
6300
700
6014
3082

Required Reinforcement
1 Layer of T32@150
1 Layer of T20@125
1 Layer of T32@150
1 Layer of T25@125

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 8

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

2.3.2 Summary of S13 and S23 Shear Stresses of PC6 for all load combinations
Table 2.3.3: Summary of Shear Stresses of PC6

Combination

Combination Number

Combination 2
Combination 3
Combination 3.1
Combination 4
Combination 4.1
Combination 5
Combination 5.1
Combination 6
Combination 6.1
Combination 7
Combination 8

1.35 DL + 1.5 LL
1.2 DL + 1.2 LL + 1.2 Wx
1.2 DL + 1.2 LL + 1.2 -Wx
1.2 DL + 1.2 LL + 1.2 Wy
1.2 DL + 1.2 LL + 1.2 -Wy
1.0 DL + 1.4 Wx
1.0 DL + 1.4 -Wx
1.0 DL + 1.4 Wy
1.0 DL + 1.4- Wy
1.0 DL + 0.3 LL + 1.0 EQ(x)
1.0 DL + 0.3 LL + 1.0 EQ(y)

S13 (N/mm2)

S23 (N/mm2)

0.6
0.6
0.5
0.58
0.57
0.47
0.45
0.43
0.43
0.4
0.44

0.7
0.7
0.6
0.68
0.67
0.57
0.55
0.53
0.53
0.5
0.54

The enhanced design shear stress = 0.88 N/mm2


Since the shear stresses at the critical section for all combinations are lower than the enhanced design
shear stress, no shear links are required for PC6.
2.3.3 Summary of Punching Shear

Punching shear criteria is satisfied and no additional requirement is needed.

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 9

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

2.4 Summary of results of PC7


2.4.1 Summary of M11 and M22 moments of PC7 for all load combinations
Table 2.4.1: Summary of Moments of PC7
Combination
Combination
Number

Combination 1

M11 (kNm/m)
Sagging
Hogging
2710
900

1.35 DL + 1.5 LL

M22 (kNm/m)
Sagging
Hogging
2100
1412

Hence Combination 2 was considered as the critical combination and moment reinforcement was decided
according to the moments of this combination.
Table 2.4.2: Summary of Moments Reinforcement Required

Moment
M11 Bottom
M11 Top
M22 Bottom
M22 Top

Moment Value

Required Reinforcement
2 layers of T32@200
1 Layer of T32@200
2 layers of T32@200
1 Layer of T32@100

2710
900
2100
1412

2.4.2 Summary of S13 and S23 Shear Stresses of PC7 for all load combinations
Table 2.4.3: Summary of Shear Stresses of PC7

Combination

Combination Number

Combination 1

1.35 DL + 1.5 LL

S13 (N/mm2)

S23 (N/mm2)

1.30

1.30

The enhanced design shear stress = 1.50 N/mm2


Since the shear stresses at the critical section for all combinations are lower than the enhanced design
shear stress, no shear links are required for PC7.
2.4.3 Summary of Punching Shear

Punching shear criteria is satisfied and no additional requirement is needed.

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 10

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

2.5 Summary of results of PC8


2.5.1 Summary of M11 and M22 moments of PC8 for all load combinations
Table 2.5.1: Summary of Moments of PC8
Combination
Combination
Number

Combination 2

M11 (kNm/m)
Sagging
Hogging
5300
2125

1.35 DL + 1.5 LL

M22 (kNm/m)
Sagging
Hogging
5200
3000

Hence Combination 2 was considered as the critical combination and moment reinforcement was decided
according to the moments of this combination.
Table 2.5.2: Summary of Moments Reinforcement Required

Moment
M11 Bottom
M11 Top
M22 Bottom
M22 Top

Moment Value

Required Reinforcement
2 layers of T32@200
1 Layer of T32@200
2 layers of T32@200
1 Layer of T32@200

5300
2125
5200
3000

2.5.2 Summary of S13 and S23 Shear Stresses of PC7 for all load combinations
Table 2.5.3: Summary of Shear Stresses of PC8

Combination

Combination Number

Combination 1

1.35 DL + 1.5 LL

S13 (N/mm2)

S23 (N/mm2)

1.1

1.1

The enhanced design shear stress = 2.57 N/mm2


Since the shear stresses at the critical section for all combinations are lower than the enhanced design
shear stress, no shear links are required for PC8.
2.5.3 Summary of Punching Shear

Punching shear criteria is satisfied and no additional requirement is needed.

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 11

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

ENCLOSURE A.1

(Detailed Calculations of Pile Cap PC2a)

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 12

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

A.1 Detailed calculation of PC2a using TEDDS

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 13

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 14

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 15

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

ENCLOSURE A.2

(Detailed Calculations of Pile Cap PC3)

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 16

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

A.2 Detailed calculation of PC3 using TEDDS

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 17

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 18

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 19

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 20

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

ENCLOSURE B

(Detailed Calculations of Pile Cap PC4)

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 21

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

B.1 Detailed calculation of PC4 using TEDDS

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 22

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 23

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 24

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 25

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

ENCLOSURE C

(Detailed Calculations of Pile Cap PC4a)

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 26

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

C.1 Detailed calculation of PC4a using TEDDS

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 27

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 28

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 29

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 30

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

ENCLOSURE D

(Detailed Calculations of Pile Cap PC5)

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 31

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.1 Combination 2 - [1.35 DL + 1.5 LL]

-1600 kNm/m

13167 kNm/m

Figure D1.1: M11 Combination 2

-1700 kNm/m

13177 kNm/m

Figure D1.2: M22 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 32

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-1.1 N/mm2

1.1 N/mm2

Figure D1.3: S13 Combination 2

3.0 N/mm2

-3.0 N/mm2

Figure D1.4: S23 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 33

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.5 Combination 3 - [1.2 DL + 1.2 LL + 1.2 Wx]

-1300 kNm/m

6300 kNm/m

Figure D2.1: M11 Combination 3

-1563kNm/m

9134 kNm/m

Figure D2.2: M22 Combination 3

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 34

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.85N/mm2

0.85 N/mm2

Figure D2.3: S13 Combination 3

1.9 N/mm2

-1.9 N/mm2

Figure D2.4: S23 Combination 3

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 35

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.6 Combination 3.1 - [1.2 DL + 1.2 LL + 1.2 -Wx]

-900 kNm/m

7500 kNm/m

Figure D3.1: M11 Combination 3.1

-1100 kNm/m

9700 kNm/m

Figure D3.2: M22 Combination 3.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 36

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.90N/mm2

0.9 N/mm2

Figure D3.3: S13 Combination 3.1

2.4 N/mm2

-2.4 N/mm2

Figure D3.4: S23 Combination 3.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 37

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.7 Combination 4 - [1.2 DL + 1.2 LL + 1.2 Wy]

-700 kNm/m

6500 kNm/m

Figure D4.1: M11 Combination 4

-1200 kNm/m
9600 kNm/m

Figure D4.2: M22 Combination 4

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 38

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.70N/mm2

0.70N/mm2

Figure D4.3: S13 Combination 4

2.1 N/mm2

-2.1 N/mm2

Figure D4.4: S23 Combination 4

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 39

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.8 Combination 4.1 - [1.2 DL + 1.2 LL + 1.2 -Wy]

-650 kNm/m

7400 kNm/m

Figure D5.1: M11 Combination 4.1

-1100 kNm/m

9500 kNm/m

Figure D5.2: M22 Combination 4.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 40

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.80N/mm2

0.80N/mm2

Figure D5.3: S13 Combination 4.1

2.4 N/mm2

-2.4 N/mm2

Figure 5.4: S23 Combination 4.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 41

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.9 Combination 5 - [1.0 DL + 1.4 Wx]

-500 kNm/m

4400kNm/m

Figure 6.1: M11 Combination 5

-750 kNm/m
6300 kNm/m

Figure 6.2: M22 Combination 5

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 42

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.60N/mm2

0.60N/mm2

Figure 6.3: S13 Combination 5

1.4 N/mm2

-1.4 N/mm2

Figure 6.4: S23 Combination 5

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 43

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.10 Combination 5.1 - [1.0 DL + 1.4 -Wx]

-600 kNm/m

5800kNm/m

Figure 7.1: M11 Combination 5.1

-1000 kNm/m

6600 kNm/m

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 44

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 7.2: M22 Combination 5.1

-0.67N/mm2

0.67N/mm2

Figure 7.3: S13 Combination 5.1

1.9 N/mm2

-1.9 N/mm2

Figure 7.4: S4213 Combination 5.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 45

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.11 Combination 6 - [1.0 DL + 1.4 Wy]

-500 kNm/m

5630kNm/m

Figure 8.1: M11 Combination 6

-600 kNm/m

6400 kNm/m

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 46

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 8.2: M22 Combination 6

-0.67N/mm2

0.67N/mm2

Figure 8.3: S13 Combination 6

1.7 N/mm2

-1.7 N/mm2

Figure 8.4: S23 Combination 6

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 47

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.12 Combination 6.1 - [1.0 DL + 1.4 -Wy]

-630 kNm/m

6700kNm/m

Figure 9.1: M11 Combination 6.1

-700 kNm/m

7300 kNm/m

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 48

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 9.2: M22 Combination 6.1

-0.63N/mm2

0.63N/mm2

Figure 9.3: S13 Combination 6.1

1.7 N/mm2

-1.7 N/mm2

Figure 9.4: S23 Combination 6.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 49

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.13 Combination 7 - [1.0 DL + 0.3 LL + 1.0 EQ(x)] RS500

-460 kNm/m

8100kNm/m

Figure 10.1: M11 Combination 7

-610 kNm/m

10724 kNm/m

Figure 10.2: M22 Combination 7

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 50

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

0.8 N/mm2

Figure 10.3: S13 Combination 7

2.6 N/mm2

Figure 10.4: S23 Combination 7

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 51

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.14 Combination 8 - [1.0 DL + 0.3 LL + 1.0 EQ(y)] RS500

-560 kNm/m

6400kNm/m

Figure 11.1: M11 Combination 8

-700 kNm/m

8960 kNm/m

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 52

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 11.2: M22 Combination 8

0.8 N/mm2

Figure 11.3: S13 Combination 8

1.9 N/mm2

Figure 11.4: S23 Combination 8

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 53

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D15. Calculation to determine Moment reinforcement

Figure 15.1 M11 Hogging

Figure 15.2 M11 Sagging

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 54

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 13.3 M22 Hogging

Figure 13.4 M22 Hogging


Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 55

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

D.12 Calculation to determine shear reinforcement


Vc = [0.79*(100As/bd)1/3*(fcu/25)1/3]/m
= [0.79*(100*11259/1000*2852)1/3*(40/25)1/3]/1.25
= 0.54 N/mm2
av = 1060 mm
The enhanced design shear stress
= ( 2*d*Vc)/av
= ( 2*2852*0.54)/1060
= 2.91 N/mm2
Since the shear stresses at the critical section for all combinations are lower than the enhanced design
shear stress, no shear links are required.

D.13 Punching Shear at column face


Shear Force (V)

= 80547 kN

Punching Shear

= V/(u*d)
= (82450*103)/(6000*2852)
= 4.8 N/mm2 > 0.8*fcu (5.06 N/mm2) or 5 N/mm2

Condition is satisfactory.

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 56

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

ENCLOSURE E

(Detailed Calculations of Pile Cap PC6)

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 57

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.1 Combination 2 - [1.35 DL + 1.5 LL]

-700 kNm/m
6300 kNm/m

Figure 1.1: M11 Combination 2

-600 kNm/m

6014 kNm/m

Figure 1.2: M22 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 58

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

0.6 N/mm2

Figure 1.3: S13 Combination 2

-0.7 N/mm2

Figure 1.4: S23 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 59

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.2 Combination 3 - [1.2 DL + 1.2 LL + 1.2 Wx]

-400 kNm/m

3770 kNm/m

Figure 2.1: M11 Combination 3

-500 kNm/m

3300 kNm/m

Figure 2.2: M22 Combination 3

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 60

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.6 N/mm2

Figure 2.3: S13 Combination 3

-0.7 N/mm2

Figure 2.4: S23 Combination 3

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 61

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.3 Combination 3.1 - [1.2 DL + 1.2 LL + 1.2 -Wx]

-450kNm/m
4641kNm/m

Figure 3.1: M11 Combination 3.1

-550 kNm/m

4200 kNm/m

Figure 3.2: M22 Combination 3.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 62

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.5 N/mm2

Figure 3.3: S13 Combination 3.1

-0.6 N/mm2

Figure 3.4: S23 Combination 3.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 63

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.4 Combination 4 - [1.2 DL + 1.2 LL + 1.2 Wy]

-550kNm/m

5117kNm/m

Figure 4.1: M11 Combination 4

-560 kNm/m

4630 kNm/m

Figure 4.2: M22 Combination 4

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 64

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.58 N/mm2

Figure 4.3: S13 Combination 4

-0.68 N/mm2

Figure 4.4: S23 Combination 4

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 65

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.5 Combination 4.1 - [1.2 DL + 1.2 LL + 1.2 -Wy]

-550kNm/m
5200 kNm/m

Figure 5.1: M11 Combination 4.1

-520 kNm/m

4550 kNm/m

Figure 5.2: M22 Combination 4.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 66

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.57 N/mm2

Figure 5.3: S13 Combination 4.1

-0.67 N/mm2

Figure 5.4: S23 Combination 4.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 67

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.6 Combination 5 - [1.0 DL + 1.4 Wx]

-450kNm/m
4300 kNm/m

Figure 6.1: M11 Combination 5

-420 kNm/m

3900 kNm/m

Figure 6.2: M22 Combination 5

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 68

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.47 N/mm2

Figure 6.3: S13 Combination 5

-0.57 N/mm2

Figure 6.4: S23 Combination 5

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 69

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.7 Combination 5.1 - [1.0 DL + 1.4 -Wx]

-430kNm/m
4400 kNm/m

Figure 7.1: M11 Combination 5.1

-410 kNm/m

3800 kNm/m

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 70

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 7.2: M22 Combination 5.1

-0.45 N/mm2

Figure 7.3: S13 Combination 5.1

-0.55 N/mm2

Figure 7.4: S23 Combination 5.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 71

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.8 Combination 6 - [1.0 DL + 1.4 Wy]

-400kNm/m
3700 kNm/m

Figure 8.1: M11 Combination 6

-350 kNm/m

3400 kNm/m

Figure 8.2: M22 Combination 6

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 72

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.43 N/mm2

Figure 8.3: S13 Combination 6

-0.53 N/mm2

Figure 8.4: S23 Combination 6

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 73

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.9 Combination 6.1 - [1.0 DL + 1.4 -Wy]

-400kNm/m
3650 kNm/m

Figure 9.1: M11 Combination 6.1

-340 kNm/m

3200 kNm/m

Figure 92: M22 Combination 6.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 74

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.43 N/mm2

Figure 9.3: S13 Combination 6.1

-0.53 N/mm2

Figure 9.4: S23 Combination 6.1

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 75

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.10 Combination 7 - [1.0 DL + 0.3 LL + 1.0 EQ(x)] RS500

-700kNm/m
4700 kNm/m

Figure 10.1: M11 Combination 7

-540 kNm/m

4100 kNm/m

Figure 10.2: M22 Combination 7

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 76

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.40 N/mm2

Figure 10.3: S13 Combination 7

-0.50 N/mm2

Figure 10.4: S23 Combination 7


Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 77

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.11 Combination 8 - [1.0 DL + 0.3 LL + 1.0 EQ(y)] RS500

-620kNm/m
4300 kNm/m

Figure 11.1: M11 Combination 8

-550 kNm/m

3900 kNm/m

Figure 11.2: M22 Combination 8

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 78

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-0.44 N/mm2

Figure 11.3: S13 Combination 8

-0.54 N/mm2

Figure 11.4: S23 Combination 8

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 79

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E12. Calculation to determine Moment reinforcement

Figure 12.1 M11 Hogging

Figure 12.2 M11 Sagging

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 80

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 12.3 M22 Hogging

Figure 12.4 M22 Sagging

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 81

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

E.13 Calculation to determine shear reinforcement


Vc = [0.79*(100As/bd)1/3*(fcu/25)1/3]/m
= [0.79*(100*5360/1000*2852)1/3*(40/25)1/3]/1.25
= 0.42 N/mm2
av = 2710 mm
The enhanced design shear stress
= ( 2*d*Vc)/av
= ( 2*2852*0.42)/2710
= 0.88 N/mm2
Since the shear stresses at the critical section for all combinations are lower than the enhanced design
shear stress, no shear links are required.

E.13 Punching Shear at column face


Shear Force (V)

= 64000 kN

Punching Shear

= V/(u*d)
= (64000*103)/(6000*2852)
= 3.74 N/mm2 < 0.8*fcu (5.06 N/mm2) or 5 N/mm2

Condition is satisfactory.

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 82

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

ENCLOSURE F

(Detailed Calculations of Pile Cap PC7)

F.1 Combination 2 - [1.35 DL + 1.5 LL]


Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 83

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

2710 kNm/m

-900 kNm/m

Figure 4.1: M11 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 84

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-1412 kNm/m

2100 kNm/m

Figure 4.2: M22 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 85

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-1.30N/mm2

Figure 4.3: S13 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 86

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-1.30N/mm2

Figure 4.4: S23 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 87

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

F2. Calculation to determine Moment reinforcement

Figure 5.1 M11 Hogging

Figure 5.2 M11 Sagging

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 88

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 5.3 M22 Hogging

Figure 5.4 M22 Sagging

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 89

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

F.3 Calculation to determine shear reinforcement


Vc = [0.79*(100As/bd)1/3*(fcu/25)1/3]/m
= [0.79*(100*8042/1000*2852)1/3*(40/25)1/3]/1.25
= 0.48 N/mm2
av = 1825 mm
The enhanced design shear stress
= ( 2*d*Vc)/av
= ( 2*2852*0.48)/1825
= 1.5 N/mm2
Since the shear stresses at the critical section for all combinations are lower than the enhanced design
shear stress, no shear links are required.

G.3 Punching Shear at column face


Shear Force (V)

= 26700 kN

Punching Shear

= V/(u*d)
= (26700*103)/(6000*2852)
= 21.56 N/mm2 < 0.8*fcu (5.06 N/mm2) or 5 N/mm2

Condition is satisfactory.

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 90

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

ENCLOSURE G

(Detailed Calculations of Pile Cap PC8)

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 91

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

G.1 Combination 2 - [1.35 DL + 1.5 LL]

5300 kNm/m

-2125 kNm/m

Figure 4.1: M11 Combination 2

5200 kNm/m
-3000 kNm/m

Figure 4.2: M22 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 92

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

-1.10N/mm2

Figure 4.3: S13 Combination 2

1.10N/mm2

Figure 4.3: S23 Combination 2

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 93

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

G2. Calculation to determine Moment reinforcement

Figure 2.1 M11 Hogging

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 94

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 2.2 M22 Hogging

Figure 2.3 M22 Hogging

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 95

Project

: Proposed AVIC Residential Development


: CSE-DG5-CAT-R-02

Figure 2.4 M22 Sagging

G.2 Calculation to determine shear reinforcement


Vc = [0.79*(100As/bd)1/3*(fcu/25)1/3]/m
= [0.79*(100*8040/1000*2852)1/3*(40/25)1/4]/1.25
= 0.48 N/mm2
av = 1064 mm
The enhanced design shear stress
= ( 2*d*Vc)/av
= ( 2*2852*0.48)/1064
= 2.57 N/mm2
Since the shear stresses at the critical section for all combinations are lower than the enhanced design
shear stress, no shear links are required.

G.3 Punching Shear at column face


Shear Force (V)

= 39500 kN

Punching Shear

= V/(u*d)
= (39500*103)/(6000*2852)
= 2.30 N/mm2 < 0.8*fcu (5.06 N/mm2) or 5 N/mm2

Condition is satisfactory.

Date

: 26th March 2015

Doc. Title : Pile Cap Design

Rev.

: 00

Doc. no.

Page : 96