Dear Mr. Kumara,


Please find attached our weekly progress report and the filled out tag request form. The receipt of valid tag-nos. is essential for us in order to prepare the
requested documents.
We push our sub supplier to complete the motor data sheet as soon as possible, but Im afraid that we will not receive all data until tomorrow. Please note that
some data will not be available till engineering, fabrication or testing has been finished. Additionally the Easter Holidays are coming up this weekend and
tomorrow is a public holiday for major parts of the population. Are there certain values which are especially important and most urgently needed?
Regarding the required documents the situation is as follows:
VEN-3764-FHNF-2-71-0004
Wiring & Termination Diagrams for PLC Panel A -> almost finished, shall be completed by 09.04.2015
VEN-3764-FHNF-2-37-0001
Cable Schedule -> will be prepared directly after PLC wiring diagram (cable numbers required)
VEN-3764-FHNF-5-15-0001
Utility List -> will be provided tomorrow, 03.04.2015
For the following documents we are waiting for input from our sub supplier:
VEN-3764-FHNF-5-12-0001
Mechanical Design Calculation for Dryer / Filter Vessels -> completion expected in 4 weeks
VEN-3764-FHNF-4-13-0001
Instrument Data Sheets for Instrument Air Compressor Package -> completion expected in 2 weeks
VEN-3764-FHNF-4-13-0002
Relief Valve Datasheets -> completion expected in 3 weeks
VEN-3764-FHNF-5-60-0001
Dryer / Filter Vessel Drawing -> completion expected in 4 weeks
VEN-3764-FHNF-5-13-0001
Equipment Data Sheets -> completion expected in 2 weeks
For the following documents valid Tag-Nos. are essential:
VEN-3764-FHNF-6-50-0001
PIPING & INSTRUMENT DIAGRAM -> we have started to revise the document, valid Tag-Nos. are essential
VEN-3764-FHNF-4-13-0001
Instrument Data Sheets for Instrument Air Compressor Package -> we have started to prepare the document, valid Tag-Nos. are
essential
Engineering Consultants Requirement:
PLC I/O list-> we will provide document VEN-3764-FHNF-4-39-0001 I/O List incl. Alarms, Trips, Set Points, scheduled for 16.04.2015
Cable block diagram
-> part of VEN-3764-FHNF-2-71-0004 Wiring & Termination Diagrams for PLC Panel A
Instrument termination diagrams
-> part of VEN-3764-FHNF-2-71-0004 Wiring & Termination Diagrams for PLC Panel A

Your comments are highly appreciated, especially for the following documents:

Doc. No.

Rev.
No.

VEN-3764-FHNF-5-25-0001

Inspection and Test Plan of IACP

17.03.2015

VEN-3764-FHNF-2-71-0002

Wiring & Termination Diagrams for Starter Panel A

05.03.2015

Document Title

Thank you!
Best regards,
Gernot Popp
Project Engineer / Technical Department Export

KAESER KOMPRESSOREN GmbH


4031 Linz/Austria, Dallingerstr. 8
Tel.: +43 732 386051-349
Fax: +43 732 386780
gernot.popp@kaeser.com
http://www.kaeser.com
Commercial register No. 83300a, LG Linz

Von: Indika Kumara [mailto:indika.kumara@roots-energy.com]

Submision Date

Gesendet: Donnerstag, 02. April 2015 08:09


An: Popp, Gernot
Cc: Ferdinand Carrillo; Ashrith Hegde; Vicente Algoso; Syed Inamdar; Yahya Chaker; Wasi Ahmed; Swamy Sannapu; Milica Radovic; vkosanovic@ep-entel.com;
iradovic@ep-entel.com; Hussein, Ahmed; Buchinger, Michaela; Joby Mathew; Hessmann, Stefan; Milica Radovic
Betreff: RE: Project No : GC14100400 NFIS IAC
Dear Mr Popp,
Please find the attached mail from EPE for the requirement of filling every part of the Motor data sheet in order to produce the Power System Study Report.
Further below documents still pending with you.
Engineering Consultants Requirement,,
PLC I/O list Cable block diagram
Instrument termination diagrams
Pending Documents
Document Number

Document name

Due date

Delay

VEN-3764-FHNF-5-12-0001 0

Mechanical Design Calculation for Dryer / Filter Vessels Mechanical


Instrument Data Sheets for Instrument Air Compressor Package
Instrumentation
Relief Valve Datasheets Instrumentation
Utility List Mechanical
Dryer / Filter Vessel Drawing Mechanical
Wiring & Termination Diagrams for PLC Panel A Electrical
Cable Schedule Electrical
Equipment Data Sheets Mechanical

27.03.2015

6days

27.03.2015
27.03.2015
10.03.2015
27.03.2015
24.03.2015
24.03.2015
16.03.2015

6 days
6 days
24 days
6 days
9days
9days
17 days

PIPING & INSTRUMENT DIAGRAM

Comment received
- Rev 0 on 11-32015

21 days- No reply

VEN-3764-FHNF-4-13-0001 0
VEN-3764-FHNF-4-13-0002 0
VEN-3764-FHNF-5-15-0001 0
VEN-3764-FHNF-5-60-0001 0
VEN-3764-FHNF-2-71-0004 0
VEN-3764-FHNF-2-37-0001 0
VEN-3764-FHNF-5-13-0001 0

VEN-3764-FHNF-6-50-0001

Best Regards,
Indika Kumara
Sr.Mechanical Engineer
Infrastructure Division
Mob

: +974 70260449

From: Milica Radovic [mailto:mradovic@ep-entel.com]


Sent: Thursday, April 02, 2015 7:22 AM
To: 'Popp, Gernot'; Indika Kumara
Cc: Vicente Algoso; Swamy Sannapu; vkosanovic@ep-entel.com; iradovic@ep-entel.com; 'Hussein, Ahmed'; 'Buchinger, Michaela'
Subject: RE: Project No : GC14100400 NFIS IAC

Dear Mr. Gernot,


Please find below our answer.
Best regards,

Milica Radovic, Dipl.Ing. E.E.


I&C Engineer
Energoprojekt-Entel Ltd.
21 st floor, Palm Tower "B", Al Dafna Area
P.O. Box 4769, Doha, Qatar
Phone: (+974) 44478571, ext. 3081
Fax: (+974) 44478572
Mobile: (+974) 55812130
E-mail: mradovic@ep-entel.com
http://www.ep-entel.com
CONFIDENTIALITY NOTICE: The information in this message and attachments is confidential and may also be legally privileged. Internet communications are not secure and therefore
ENERGOPROJEKT-ENTEL does not accept any legal responsibility neither for the contents of this message nor for the validity of the documents contained within.
Please consider the environment before printing this email. Save paper..Save Tree.. Save Planet..

From: Popp, Gernot [mailto:gernot.popp@kaeser.com]


Sent: Wednesday, April 01, 2015 7:40 PM
To: Indika Kumara

Cc: Vicente Algoso; Swamy Sannapu; Milica Radovic; vkosanovic@ep-entel.com; iradovic@ep-entel.com; Hussein, Ahmed; Buchinger, Michaela
Subject: AW: Project No : GC14100400 NFIS IAC

Dear Mr. Kumara,


In order to finalize the Wiring & Termination Diagram for PLC Panel can you please clarify the following two questions:
1.) Which type of terminal blocks shall be used? (screw type or tension clamp)
Screw type terminal block to be used.
2.) Is it acceptable to use conductor marker / wiring ferruling as shown on the last picture?
Ferrule identification shall be pre printed PVC slip on sleeves type (Raychem or equivalent).

Terminal with screwing technology

Terminal with tension clamp technology

Conductor marker / wiring ferruling (make: PHOENIX / type: UC-WMC)

Thank you very much!

Best regards,
Gernot Popp
Project Engineer / Technical Department Export

KAESER KOMPRESSOREN GmbH


4031 Linz/Austria, Dallingerstr. 8
Tel.: +43 732 386051-349
Fax: +43 732 386780
gernot.popp@kaeser.com
http://www.kaeser.com
Commercial register No. 83300a, LG Linz

Von: Indika Kumara [mailto:indika.kumara@roots-energy.com]


Gesendet: Mittwoch, 01. April 2015 09:25
An: Popp, Gernot
Cc: Ferdinand Carrillo; Ashrith Hegde; Vicente Algoso; Syed Inamdar; Yahya Chaker; Wasi Ahmed; Swamy Sannapu; Milica Radovic; vkosanovic@ep-entel.com;
iradovic@ep-entel.com; Hussein, Ahmed; Buchinger, Michaela; Hessmann, Stefan
Betreff: RE: Transmittal #008 - 31.03.2015 / Project No : GC14100400 NFIS IAC
Dear Mr Popp,
Thanks for the GA drawing for IACP, please send me the rest of pending documents as listed below,
Engineering Consultants Requirement,,
PLC I/O list Cable block diagram
Instrument termination diagrams
Pending Documents
Document Number

Document name

Due date

Delay

VEN-3764-FHNF-5-12-0001 0

Mechanical Design Calculation for Dryer / Filter Vessels Mechanical


Instrument Data Sheets for Instrument Air Compressor Package
Instrumentation
Relief Valve Datasheets Instrumentation
Utility List Mechanical
Dryer / Filter Vessel Drawing Mechanical
Wiring & Termination Diagrams for PLC Panel A Electrical
Cable Schedule Electrical
Equipment Data Sheets Mechanical

27.03.2015

5days

27.03.2015
27.03.2015
10.03.2015
27.03.2015
24.03.2015
24.03.2015
16.03.2015

5 days
5 days
23 days
5 days
8days
8 days
16 days

PIPING & INSTRUMENT DIAGRAM

Comment received
- Rev 0 on 11-32015

20 days- No reply

VEN-3764-FHNF-4-13-0001 0
VEN-3764-FHNF-4-13-0002 0
VEN-3764-FHNF-5-15-0001 0
VEN-3764-FHNF-5-60-0001 0
VEN-3764-FHNF-2-71-0004 0
VEN-3764-FHNF-2-37-0001 0
VEN-3764-FHNF-5-13-0001 0

VEN-3764-FHNF-6-50-0001

Best Regards,
Indika Kumara
Sr.Mechanical Engineer
Infrastructure Division
Mob

: +974 70260449

From: Popp, Gernot [mailto:gernot.popp@kaeser.com]


Sent: Tuesday, March 31, 2015 6:44 PM
To: Indika Kumara
Cc: Ferdinand Carrillo; Ashrith Hegde; Vicente Algoso; Syed Inamdar; Yahya Chaker; Wasi Ahmed; Swamy Sannapu; Milica Radovic; vkosanovic@ep-entel.com;
iradovic@ep-entel.com; Hussein, Ahmed; Buchinger, Michaela
Subject: AW: Transmittal #008 - 31.03.2015 / Project No : GC14100400 NFIS IAC
Dear Mr. Indika Kumara,

Sorry, wrong document attached!

Please find now attached transmittal no. 008 and said documents for your reference and action.
Please neglect the earlier email.
Thank you.
Best regards,
Gernot Popp
Project Engineer / Technical Department Export

KAESER KOMPRESSOREN GmbH


4031 Linz/Austria, Dallingerstr. 8
Tel.: +43 732 386051-349
Fax: +43 732 386780
gernot.popp@kaeser.com
http://www.kaeser.com
Commercial register No. 83300a, LG Linz

Von: Popp, Gernot


Gesendet: Dienstag, 31. Mrz 2015 17:35
An: Indika Kumara
Cc: Ferdinand Carrillo; Ashrith Hegde; Vicente Algoso; Syed Inamdar; Yahya Chaker; Wasi Ahmed; Swamy Sannapu; Milica Radovic; vkosanovic@ep-entel.com;
iradovic@ep-entel.com; Hussein, Ahmed; Buchinger, Michaela
Betreff: AW: Transmittal #008 - 31.03.2015 / Project No : GC14100400 NFIS IAC

Dear Mr. Indika Kumara,

Please find attached transmittal no. 008 and said documents for your reference and action.

Best regards,
Gernot Popp
Project Engineer / Technical Department Export

KAESER KOMPRESSOREN GmbH


4031 Linz/Austria, Dallingerstr. 8
Tel.: +43 732 386051-349
Fax: +43 732 386780
gernot.popp@kaeser.com
http://www.kaeser.com
Commercial register No. 83300a, LG Linz

You might also like