Professional Documents
Culture Documents
GENERAL
PRIMING
1.
1.
2.
3.
4.
5.
PREPARATION
2.
3.
4.
APPLICATION
1.
2.
3.
4.
5.
CURING
SYNROOF HI-BUILD
MECHANICAL PROTECTION
5.
6.
PRECAUTIONS
1.
2.
3.
4.
CLEAN-UP
As a good roofing practice, flush all hoses,
equipment and tools with water immediately after
use.
PACKING
STORAGE
1.
2.
Property
1. Solids Content, %
2. Viscosity, CPS
3. Density, Kg/l
4. Application Temp, C
5. Curing Time, at 25C
6. Service Temperature C
7. Tensile Strength, N/CM2
8. Elongation, at Break %
9. Hardness, Shore A
10. Permeability
11. Dry Peel Adhesion, lbs/sq. in.
12. Flexibility
Typical Value
64 (+/-1)
50,000-70,000
1.30 (+/0.05)
+5 (minimum)
Approx. 8 hr. for touch dry
Approx. -5 to 100
480
440
68
Pass
65
No cracking of film after 1000 hrs. accelerated
weathering conditions and flexed 180 degrees
Test Method
ASTM-D-1076
Brookfield
ASTM-D-1475-16
In-House Test
In-House Test
In-House Test
ASTM-D-412
ASTM-D-412
ASTM-D-2240
ASTM-E-398
ASTM-C-297
In-House Test
13. UV Resistance
14. Colours
15. Coverage
ASTM-D-822
ACR01
MAY04
R-00
00