DINAS PEKERJAAN UMUM


KOTA PADANG PANJANG
tahun anggaran 2014
NO.
A.

B.
I.

URAIAN

SATUAN

UPAH
1
Driver
2
Kepala Tukang
3
Mandor
4
Pekerja
5
Pembantu Driver
6
Pembantu Tukang
7
Penjaga Malam
8
Tukang Masak Aspal
9
Tukang Anyam
10
Tukang Batu
11
Tukang Besi
12
Tukang Besi Konstruksi
13
Tukang Cat
14
Tukang Gali
15
Tukang Kayu
16
Tukang Las
17
Tukang Lebur Aspal
18
Tukang Masak Aspal
19
Tukang Pelitur

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

BAHAN
Semen
1
PC Warna
2
Semen (50 kg)
3
Semen Abu-abu
4
Semen Merah
5
Semen Merah/Bata Merah Tumbuk
6
Semen Nat
7
Semen Portland
8
Semen Putih
9
Semen Putih (40 kg)
10
Semen Tahan Asam
11
Semen Warna

Kg
zak
Kg
M3
Kg
Kg
Kg
Kg
zak
Kg
Kg

II.
3
4
5
6
8
10
11

Bahan Galian, Pasangan dan Beton


Bata Berongga
Bata Kerawang
Bata Merah
Bata Pelapis Dinding
Batako
Batu Bata
Batu Bata (M3)

Bh
Bh
Bh
Bh
Bh
Bh
M3

Page 2

NO.
12
13
14

URAIAN
Batu Kali
Batu Granito
Batu Kerikil

SATUAN
M3
Kg
M3

Page 3

NO.
15
16
18
19
24
28
29
30
31
33
34
35
36
37
38
39
40
41
42
43
44
49
50
51
52
54
55
III.
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

URAIAN
Batu Koral
Batu Palimanan
Batu Tempel Hitam
Cincin Sumuran
Formtie / Penjaga Jarak Bekisting / Spacer
Hollowbrick
Kerikil Beton
Kerikil Saring
Kerikil Timbunan
Koral 2/3
Koral Beton
Kerikil Beton (kg)
Panel Beton Pracetak
Pasir Beton
Pasir Beton (kg)
Pasir Pasang
Pasir Silika
Pasir Urug
Paving Block
Pipa Beton Dia. 15 - 20 cm
Pipa Beton Dia. 30 - 100 cm
Roster/terawang
Sirtu
Split 0,5 - 1
Split 0,5 - 1
Tanah Liat
Timbunan
Bahan Kayu dan Tumbuhan
Gebalan Rumput
Ijuk
Ijuk Saringan
Kayu
Kayu 2/3 Klas IV
Kayu 2/3 Klas II
Kayu 3/4 Klas IV
Kayu 3/4 Klas II
Kayu 3/4 (Btg) Klas II
Kayu 5/7 Klas IV
Kayu 5/7 Klas II
Kayu 5/7 (BTG) Klas IV
Kayu Api
Kayu Bakar
Kayu Banio Klas I
Kayu Borneo
Kayu Borneo Balok
Kayu Borneo Damar Laut Balok
Kayu Borneo Papan
Kayu Cetakan

SATUAN
M3
M2
Bh
Bh
Bh
Bh
M3
M3
M3
M3
M3
Kg
Lbr
M3
Kg
M3
Kg
M3
Bh
Bh
Bh
Bh
M3
M3
Kg
M3
M3

M2
Kg
Kg
M3
M3
M3
Btg
M3
Btg
M3
M3
Btg
M3
M3
M3
M3
M3
M3
M3
M3

Page 4

NO.
23
24
25

URAIAN
Kayu Dolken 8-10/400 cm
Kayu Dolken -8 cm / 4 m
Kayu Dolken -8-10/4 m Galam

SATUAN
Btg
Btg
Btg

Page 5

NO.
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
IV.
1
2
3
4
5
7
8
9
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

URAIAN
Kayu Dolken -8-4-10/4 m Galam
Kayu Jati Balok
Kayu Jati Papan
Kayu Klas I Balok
Kayu Klas I Papan
Kayu Klas II Balok
Kayu Klas II Papan
Kayu Klas III Papan
Kayu Klas IV
Kayu Marsawa Klas II
Kayu Merantih
Kayu Merantih Balok
Kayu Merantih Papan
Kayu Perancah
Kayu Profil
Kayu Tiang Pancang
Kisi-kisi
Les 1 x 4
Les Kaca
List Kayu 2/4
List Kayu Profil
Bahan Allumunium, Baja, Besi dan Kawat
Alluminium Strip
Besi Angker Pembuka
Besi Begol
Besi Beton (Polos / Ulir)
Besi Beton Polos
Besi Jaring Kawat Baja
Besi Lis Kaca (1x1) cm
Besi Plat Baja
Besi Profil IWF
Besi Scuare Tube
Besi Siku L.30.30.3
Besi Strip (0,2x2)cm
Besi Strip 2 x 3
Besi Strip Tebal 5 mm
Kawat Beton
Kawat Burung
Kawat Digalvano
Kawat Duri
Kawat Harmonika
Kawat Kassa
Kawat Las
Kawat Nyamuk
Kawat Seng Polos
Paku 1 cm - 2,5 cm
Paku 1,5"
Paku 10 cm

SATUAN
Btg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M1
M1
Btg
Btg
M1
M3
M1

M1
Kg
Bh
Kg
Kg
Kg
M1
Kg
Kg
M1
Kg
Kg
M1
Kg
Kg
M2
Kg
Kg
M2
M2
Kg
M2
Kg
Kg
Kg
Kg

Page 6

NO.
29
30
31

URAIAN
Paku 12 cm
Paku 2 - 5"
Paku 2 - 6"

SATUAN
Kg
Kg
Kg

Page 7

NO.
32
33
34
35
36
37
38
39
40
41
42
43
44
V.

URAIAN
Paku
Paku
Paku
Paku
Paku
Paku
Paku
Paku
Paku
Paku
Paku
Paku
Paku

5 cm - 10 cm
5 cm - 12 cm
5 cm - 7 cm
Hak Panjang 15 cm
Pancing
Pancing 60 x 230
Pancing 60 x 230
RRC
Sekrup 1 cm - 2,5 cm
Sekrup 3,5"
Sekrup 3,5" (Kg)
Skrup 10 cm
Triplek

SATUAN
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Kg
Bh
Bh
Kg
Kg
Kg

2
3
5
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
88

Bahan Pelapis Dinding dan Lantai


Carpet
Carpet 80 % Wool, 20 % Nylon
Floor Hardener Ferrovax
Keramik 10 x 10 cm Plint Artistik
Keramik 10 x 20
Keramik 10 x 20 cm
Keramik 10 x 20 cm Artistik
Keramik 10 x 20 cm Plint Artistik
Keramik 15 x 15 cm
Keramik 20 x 20 cm
Keramik 20 x 20 Motif Timbul
Keramik 20 x 20 Polos
Keramik 20 x 25 Motif
Keramik 30 x 30 cm Granito
Keramik 30 x 30 cm Mosaik
Keramik 30 x 30 Motif
Keramik 30 x 30 Polos
Keramik 40 x 40 Polos
Keramik 60 x 60 cm Granito
Keramik 5 x 20 cm Artistik
Keramik 5 x 20 cm Plint Artistik
Wall Paper

M2
M2
Kg
Bh
Ktk
Bh
Bh
Bh
Bh
Bh
Ktk
Ktk
Ktk
Ktk
Bh
Ktk
Ktk
Ktk
Bh
Bh
Bh
M2

1
2
3
4
5
9
10
11
12
13

Bahan Pelapis Plafond


Akustik 30 x 30 cm
Akustik 30 x 60 cm
Akustik 60 x 120 cm
Akustik Arm Atrong 60 x 120 cm
Eternit
Gypsum Board (120 x 240 x 9) mm
Lambersering
Plywood Tebal 4 mm
Plywood Tebal 6 mm
Plywood Tebal 9 mm

Lbr
Lbr
Lbr
Lbr
lbr
Lbr
Lbr
Lbr
Lbr
Lbr

VI.

Page 8

NO.
14
15
16

URAIAN
Plywood Ukuran 120 x 240 x 4 mm
Plywood Ukuran 90 x 220 x 4 mm
Ramset / Dina Boft

SATUAN
Lbr
Lbr
Bh

Page 9

NO.
17
22
23
VII.
1
2
3
4
5
6
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
29
30
31
32
33
34
35
36
VIII.
1
2
3
4
5
6
7
8
9

URAIAN

SATUAN

Soft Board 4" x 8" x 4 mm


Triplek Tebal 4 mm
Triplek Tebal 6 mm

Lbr
Lbr
Lbr

Bahan Pintu dan Jendela


Door Close
Door Holder
Door Stop
Engsel Angin
Engsel Jendela
Engsel Pintu
Jendela Nako
Jendela Nako (Rangka + Kaca 5 mm)
Kaca Buram 12 mm
Kaca Cermin 12 mm
Kaca Cermin 6 mm
Kaca Cermin 8 mm
Kaca Patri 5 mm
Kaca Tebal 3 mm
Kaca Tebal 5 mm
Kaca Wireglass 5 mm
Kait Angin
Kunci Lemari
Kunci Selot
Kunci Silinder
Kunci Tanam Antik
Kunci Tanam Biasa
Kunci Tanam Kamar Mandi
Kuzen Alumunium
Pintu Alluminium
Pintu Gulung Besi
Pintu Lipat
Profil Alluminium
Profil Kaca
Rel Pintu Dorong
Roll Door Tebal 5mm
Roll Door Tebal 8mm
Rolling Door Aluminium

Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M1
M2
M3
M2
M1
M1
Bh
M2
M2
M2

Bahan Atap
Asbes 1.00 x 1.00 m
Asbes Bubungan Gelombang 0,92
Asbes Gelombang (1,50 x 1,05 m)
Asbes Gelombang (1,80 x 0,92 m)
Asbes Gelombang (1,80 x 1,08 m)
Asbes Gelombang (2,00 x 0,92 m)
Asbes Gelombang (2,10 x 1,05 m)
Asbes Gelombang (2,10 x 1,08 m)
Asbes Gelombang (2,25 x 0,92 m)

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

x
x
x
x
x
x
x

4
5
6
5
4
6
5

mm
mm
mm
mm
mm
mm
mm

Page 10

NO.
10
11
12

URAIAN
Asbes Gelombang (2,40 x 1,05 m) x 4 mm
Asbes Gelombang (2,40 x 1,08 m) x 6 mm
Asbes Gelombang (2,50 x 0,92 m) x 5 mm

SATUAN
Lbr
Lbr
Lbr

Page 11

NO.
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
37
38
39
40
41
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
IX.

URAIAN
Asbes Gelombang (2,70 x 1,05 m) x 4 mm
Asbes Gelombang (2,70 x 1,08 m) x 6 mm
Asbes Gelombang (3,00 x 1,05 m) x 4 mm
Asbes Gelombang (3,00 x 1,08 m) x 6 mm
Atap Alluminium Gelombang Tebal 0,55
Atap Seng BJLS 20
Atap Seng BJLS 20 Warna
Atap Seng BJLS 30
Bubungan Gentang Metal
Bubungan Seng BJLS 20
Genteng Aspal
Genteng Beton
Genteng Bubung Kodok
Genteng Bubung Palentong
Genteng Decra Bond
Genteng Kodok
Genteng Metal
Genteng Palentong
Genteng Palentong Super
Genteng Sirap
Nok Genteng Beton
Nok Standar 40 cm 18, swg 22
Nok Stek Gelombang 1,05 m
Nok Stek Gelombang 1,08 m
Nok Stel Rata 0,92 m
Nok Stel Rata 1,05 m
Atap Fiber
Atap Polycarbonate
Seng Gelombang 3" x 5"
Seng Gelombang 3" x 6" BJLS 20
Seng Gelombang BJLS 30
Seng Plat
Seng Plat 3" x 6" BJLS 20
Seng Plat 3" x 6" BJLS 30
Seng Plat BJLS 20
Sisalation / Alluminium foil
Waterproof Batacote
Reng / Topspan
Baut/Srew 14/20
Baut/Srew 16/16
Dynabolt
Baja Ringan Profil C. 75. 100
Baja Ringan Profil C. 75. 0.75
Reng/Topspan
Baut/Screw 14/20
Baut/Screw 16/16
Talang
Bahan Sanitasi

SATUAN
Lbr
Lbr
Lbr
Lbr
M2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
Bh
M2
Lbr
Lbr
Lbr
Lbr
Lbr
m2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M2
M2
Kg
M1
Pcs
Pcs
Pcs
M1
M1
M1
Pcs
Pcs
M1

Page 12

NO.
1
2
3

URAIAN
Bak Cuci Stainles Steel
Bak Cuci Teraso
Bak Fiberglass

SATUAN
Bh
Bh
Bh

Page 13

NO.
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
X.
3
4
5
6
7
8
9
10
11
12
13
14
15
16

URAIAN
Bak Teraso
Floor Drain Plastik
Floor Drain Stainless Steel
Kloset Duduk / Monoblok
Kloset Duduk / Otomatis
Kloset Jongkok
Kloset Jongkok Porselen
Kloset Jongkok Teraso
Kran Air (Plastik)
Kran Air (Stainless Steel)
Pipa Galvanis Dia. 0,5"
Pipa Galvanis Dia. 0,75"
Pipa Galvanis Dia. 1"
Pipa Galvanis Dia. 1,5"
Pipa Galvanis Dia. 2"
Pipa Galvanis Dia. 3"
Pipa Galvanis Dia. 4"
Pipa Hawa Dia. 0,75 "
Pipa Hawa Dia. 1,5 "
Pipa Paralon Dia. 4 "
Pipa PVC Dia. 0,5"
Pipa PVC Dia. 0,75"
Pipa PVC Dia. 1"
Pipa PVC Dia. 1,5"
Pipa PVC Dia. 2"
Pipa PVC Dia. 2,5"
Pipa PVC Dia. 3"
Pipa PVC Dia. 4"
Seal Tape
Sealent
Urinoir
Washtafel
Water Drain + Asesories
Bahan Pengecatan
Ampelas
Cat
Cat Air
Cat Antara
Cat Dasar
Cat Menie
Cat Penutup (Cat Air)
Cat Penutup (Cat Minyak)
Cat Vinil / Matex
Cat Warna
Dempul
Dempul Jadi
Dempul Wall Putih
Flincote / Meni Besi

SATUAN
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
Bh
Tube
Bh
Bh
Set

Lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Page 14

NO.
22
25
26

URAIAN
Kuas
Meni Besi
Minyak Bekisting

SATUAN
Bh
Kg
Ltr

Page 15

NO.

URAIAN

SATUAN

27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Minyak Cat
Minyak Pelumas
Pelumas
Pengencer
Plamur Tembok
Plastic Aerator
Politur
Politur Jadi
Polytur Melamide
Residu
Residu
Residu Atau Ter
Sabun
Soda Api
Solar
Spiritus
Teak Oil
Vernis

Kg
Ltr
ltr
Ltr
Kg
Bh
Ltr
Ltr
Kg
Kg
Ltr
Ltr
Kg
Kg
ltr
ltr
Ltr
Ltr

1
4
5
7
8
11

Bahan Lain
BBM
Lem Kayu
Lem Vinyl
Pagar kawat Jaring
Perekat
Tali Ijuk

Ltr
Kg
Kg
Lbr
Kg
Kg

XI.

Disetujui
Kabid. Perencanaan dan Pengawasan Teknis
Dinas Pekerjaan Umum Kota Padang Panjang

HENDRA PUTRA, SST, MT


NIP. 19700107 199003 1 003
Diketahui
Kepala Dinas Pekerjaan Umum
Kota Padang Panjang

DEFRIAL, ST
NIP. 19561206 198103 1 009

Page 16

AS PEKERJAAN UMUM

OTA PADANG PANJANG


tahun anggaran 2014
HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

KETERANGAN

79,000.00
103,000.00
100,000.00
75,000.00
75,000.00
75,000.00
75,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00

2,250.00
65,000.00
1,300.00
1,200,000.00 BJ (kg/m3) =
2,350.00
5,000.00
1,300.00
2,350.00
94,000.00
2,350.00
5,000.00

1,850.00
6,250.00
800.00
600.00
2,600.00
800.00
574,919.15 Vol 1 bh :

1,250

0.0013915

Page 17

HARGA
Rp.
Rp.
Rp.

157,500.00
3,500.00
140,000.00

KETERANGAN

Page 18

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
85,000.00
700.00
270,000.00
500.00
1,700.00
150,000.00
125,000.00
90,000.00
225,000.00
150,000.00
111.11
3,585.19
140,000.00
100.00
140,000.00
93.33
65,000.00
2,000.00
40,000.00
150,000.00
50,000.00
140,000.00
237,500.00
169.64
35,000.00
62,500.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,250.00
15,000.00
15,000.00
2,500,000.00
1,600,000.00
2,500,000.00
12,000.00
2,500,000.00
12,000.00
1,600,000.00
2,500,000.00
35,000.00
400,000.00
400,000.00
4,400,000.00
4,400,000.00
4,400,000.00
4,400,000.00
4,400,000.00
1,600,000.00

KETERANGAN

Dia 1 M

BJ (kg/m3) =

1,350

BJ (kg/m3) =

1,400

BJ (kg/m3) =

1,500

BJ (kg/m3) =

1,400

Page 19

HARGA
Rp.
Rp.
Rp.

20,000.00
20,000.00
20,000.00

KETERANGAN

Page 20

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

KETERANGAN

20,000.00
4,000,000.00
4,000,000.00
4,400,000.00
4,400,000.00
2,500,000.00
3,000,000.00
2,500,000.00
1,800,000.00
3,000,000.00
2,500,000.00
2,500,000.00
2,500,000.00
1,800,000.00
3,750.00
6,650.00
5,000.00
7,500.00
1,520.00
3,000,000.00
3,750.00

25,000.00
7,500.00
500.00
9,000.00
9,000.00
10,000.00
5,000.00
11,400.00
9,000.00
10,000.00
8,000.00 1 btg =
8,000.00
17,500.00
15,000.00
15,000.00
15,000.00
23,000.00
12,000.00 1 rol =
18,000.00
18,000.00
26,500.00
22,500.00
15,000.00
14,500.00
14,500.00
14,500.00

Rp. 45,000

120,000

Page 21

HARGA
Rp.
Rp.
Rp.

14,500.00
14,500.00
12,000.00

KETERANGAN

Page 22

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

KETERANGAN

12,000.00
12,000.00
13,000.00
16,000.00
16,000.00
16,000.00
16,000.00
22,000.00 1 KTK
100.00 1 KTK
100.00
16,000.00
16,000.00
14,000.00 1 KTK

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
200,000.00
15,000.00
800.00
58,000.00
900.00
900.00
900.00
1,000.00
2,000.00
61,000.00
62,500.00
63,000.00
95,000.00
4,000.00
46,000.00
58,000.00
63,000.00
58,333.33
450.00
450.00
12,500.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
20,000.00
80,000.00
80,000.00
16,000.00
125,000.00
17,500.00
65,000.00 Luas (M2)
85,000.00
117,500.00

isi (bh)
Luas (M2)

8,000

16,000

50
0.02

isi (bh)

25

isi (bh)
isi (bh)

20
11

isi (bh)
isi (bh)
isi (bh)
1 ktk
Luas (M2)

11
11
6
175,000
0.01

2.98

Page 23

HARGA
Rp.
Rp.
Rp.

70,000.00
37,882.65
15,000.00

KETERANGAN

Page 24

HARGA
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

KETERANGAN

70,000.00
66,000.00
85,000.00

10,000.00
10,000.00
5,000.00
15,000.00
10,000.00
24,000.00
3,300.00
75,000.00
100,000.00
125,000.00
70,000.00
85,000.00
55,000.00
50,000.00
80,000.00
60,000.00
10,000.00
12,000.00
15,000.00
80,000.00
150,000.00
55,000.00
50,000.00
55,000.00
400,000.00
200,000.00
450,000.00
55,000.00
5,000.00
100,000.00
500,000.00 Folding Gate
800,000.00
200,000.00

14,146.09
24,500.00
24,500.00
24,500.00
24,000.00
24,000.00
32,750.00
32,083.33
32,083.33

Luas (m2)

1.00

Luas
Luas
Luas
Luas
Luas
Luas

1.58
1.66
1.94
1.84
2.21
2.27

(m2)
(m2)
(m2)
(m2)
(m2)
(m2)

Page 25

HARGA
Rp.
Rp.
Rp.

KETERANGAN

36,750.00 Luas (m2)


36,666.67 Luas (m2)
36,666.67

2.52
2.59

Page 26

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

41,250.00
41,250.00
64,000.00
45,833.33
55,000.00
55,000.00
57,000.00
70,000.00
20,000.00
13,000.00
90,000.00
50,750.00
23,000.00
23,000.00
50,750.00
50,750.00
80,000.00
50,750.00
50,750.00
50,750.00
25,000.00
23,000.00
23,000.00
23,000.00
23,000.00
23,000.00
70,625.00
60,500.00
40,000.00
55,000.00
48,500.00
46,000.00
46,000.00
68,000.00
46,000.00
55,000.00
45,000.00
16,000.00
650.00
600.00
2,640.00
26,500.00
25,500.00
23,000.00
750.00
650.00
15,000.00

KETERANGAN
Luas
Luas
Luas
Luas

(m2)
(m2)
(m2)
(m2)

1.350.000,00/lmbr, excellent

2.84
2.92
3.15
3.24

Page 27

HARGA
Rp.
Rp.
Rp.

170,000.00
210,000.00
335,000.00

KETERANGAN

Page 28

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

210,000.00
10,000.00
47,500.00
475,000.00
1,650,000.00
185,000.00
185,000.00
185,000.00
10,000.00
25,000.00
10,833.33
13,750.00
18,000.00
26,000.00
30,000.00
46,500.00
65,000.00
13,750.00
26,000.00
21,250.00
4,250.00
5,000.00
6,000.00
7,500.00
9,500.00
12,500.00
16,375.00
23,125.00
2,000.00
10,000.00
650,000.00
675,000.00
35,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,000.00
45,000.00
20,000.00
42,000.00
18,000.00
19,000.00
21,600.00
45,000.00
18,000.00
45,000.00
15,000.00
15,000.00
12,000.00
15,000.00

KETERANGAN

1
1
1
1
1
1
1

btg
btg
btg
btg
btg
btg
btg

:
:
:
:
:
:
:

65,000
82,500
95,000
132,000
163,000
279,000
390,000

1
1
1
1
1
1
1
1

btg
btg
btg
btg
btg
btg
btg
btg

:
:
:
:
:
:
:
:

17,000
20,000
24,000
30,000
38,000
50,000
65,500
92,500

Lengkap

Page 29

HARGA
Rp.
Rp.
Rp.

15,000.00
22,500.00
5,000.00

KETERANGAN

Page 30

HARGA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
20,000.00
20,000.00
12,000.00
15,000.00
5,000.00
15,000.00
45,000.00
50,000.00
15,000.00
10,000.00
10,000.00
10,000.00
50,000.00
4,600.00
13,500.00
20,000.00
17,500.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,600.00
15,000.00
15,000.00
160,000.00
10,000.00
12,500.00
Padang Panjang,

KETERANGAN

Januari 2014

Dibuat oleh
Kasi Perencanaan Keciptakaryaan
Bidang Perencanaan dan Pengawasan Teknis
Dinas Pekerjaan Umum Kota Padang Panjang

HENDRI YANI, ST, MT, MSc


NIP. 19780708 200212 2 005
Diketahui
Kepala Dinas Pekerjaan Umum
Kota Padang Panjang

DEFRIAL, ST
NIP. 19561206 198103 1 009

Page 31

DAFTAR HARGA SATUAN PEKERJAAN UNTUK PEKERJAAN SIPIL B

DINAS PEKERJAAN UMUM


KOTA PADANG PANJANG
tahun anggaran 2014
NO

URAIAN

SAT

Analisa Biaya Konstruksi Pekerjaan Persiapan


1 Pagar Sementara Dari Kayu (T. 2M)
2 Pagar Sementara Dari Seng Gelombang (T.2M)
3 Pagar Sementara Dari Kawat Duri (T.1,8M)
4 Pengukuran dan Pemasangan Bouwplank
5 Pembuatan Kantor Sementara dengan Lantai Plesteran
6 Pembuatan Gudang Semen dan Alat-alat
7 Pembuatan Rumah Jaga / Konstruksi Kayu
8 Membersihkan Lapangan dan Peralatan
9 Pembuatan Bedeng Buruh
10 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm
11 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm
12 Pembuatan Jalan Sementara
13 Bongkaran Beton Bertulang
14 Bongkaran Dinding Tembok Batu Bata
15 Bongkaran Lantai Beton
16 Mengupas Plesteran Lama
17 Menurunkan Atap Genteng/Sirap
18 Bongkaran Atap Seng
19 Bongkaran Rangka Atap
20 Bongkaran Loteng Papan
21 Bongkaran Kayu Kuda-Kuda
22 Bongkaran Lantai Keramik
23 Bongkaran Pondasi
24 Bongkaran Kuzen
25 Bongkaran Jalan
26 Pasang pagar kawat Jaring Galvanis (Tinggi 1 M)
27 Pasang Pagar Beton Pracetak (5 x 50 x 213) cm

M1
M1
M1
M1
M2
M2
M2
M2
M2
M2
M2
M2
M3
M3
M2
M2
M2
M2
M2
M2
M3
M2
M3
M2
M2
M1
M1

Analisa Biaya Konstruksi Pekerjaan Tanah


28 Galian Tanah Biasa Sedalam 1 meter
29 Galian Tanah Biasa Sedalam 2 meter
30 Galian Tanah Biasa Sedalam 3 meter
31 Galian Tanah Keras Sedalam 1 meter
32 Galian Tanah Cadas Sedalam 1 meter
33 Galian Tanah Lumpur Sedalam 1 meter
34 Pekerjaan Stripping Tebing Setinggi 1 M
35 Pembuangan Tanah Sejauh 30 meter
36 Urugan Kembali
37 Pemadatan Tanah (per 20 cm)
38 Urugan Pasir
41 Pemasangan Lapisan Ijuk Tebal 10 cm
42 Urugan Sirtu Padat untuk peninggian lantai bangunan

M3
M3
M3
M3
M3
M3
M2
M3
M3
M3
M3
M2
M3

Page 32

NO

Analisa Biaya Konstruksi


43 Pasang Pondasi Batu Kali,
44 Pasang Pondasi Batu Kali,
45 Pasang Pondasi Batu Kali,
46 Pasang Pondasi Batu Kali,
47 Pasang Pondasi Batu Kali,
48 Pasang Pondasi Batu Kali,
49 Pasang Pondasi Batu Kali,

URAIAN

Pekerjaan Pondasi
1 Pc : 3 Ps
1 Pc : 4 Ps
1 Pc : 5 Ps
1 Pc : 6 Ps
1 Pc : 8 Ps
1 Kp : 1 Sm : 2 Ps
1 Pc : 3 Kp : 10 Ps

SAT

M3
M3
M3
M3
M3
M3
M3

Page 33

NO

50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
D

URAIAN

Pasang Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 Ps


Pasang Pondasi Batu Kosong (Aanstampang)
Pasang Pondasi Siklop 60 % Beton 1PC : 2PB : 3KR
Pasang Pondasi Sumuran Diameter 100 cm
Pekerjaan Cincin Sumuran Dia. 1 m'
Pekerjaan Cincin Sumuran Dia. 1,2 m'
Menurunkan Cincin Sumuran Sedalam 1 M
Menurunkan Cincin Sumuran Sedalam 2 M
Menurunkan Cincin Sumuran Sedalam 3 M
Campuran Batu Kali + Stamp Beton 1:2:3
Cyclopen Beton 1:2:3 + 40 % Batu Kali
Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 1
Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 2
Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 3
Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam
Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam
Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam

SAT

M
M
M
1M
2M
3M

Analisa Biaya Konstruksi Pekerjaan Beton


67 Pekerjaan Beton K 100
68 Pekerjaan Beton K 125
69 Pekerjaan Beton K 150
70 Pekerjaan Beton K 100 Lantai Kerja
71 Pekerjaan Beton K 175
72 Pekerjaan Beton K 200
73 Pekerjaan Beton K 225
74 Pekerjaan Beton K 250
75 Pekerjaan Beton K 275
76 Pekerjaan Beton K 300
77 Pekerjaan Beton K 325
78 Pekerjaan Beton K 350
79 Membuat Beton Kedap Air Dengan Stronox - 100
80 Memasang PVC Waterstop Lebar 150 mm
81 Memasang PVC Waterstop Lebar 200 mm
82 Memasang PVC Waterstop Lebar 230 mm - 320 mm
83 Pembesian Dengan Besi Polos Atau Besi Ulir
84 Kabel Presstressed Polos / Strands
85 Jaring Kawat Baja / Wire Mesh
86 Pasang Bekisting untuk Pondasi
87 Pasang Bekisting Untuk Sloof
88 Pasang Bekisting Untuk Kolom
89 Pasang Bekisting Untuk Balok
90 Pasang Bekisting Untuk Lantai
91 Pasang Bekisting Untuk Dinding
92 Pasang Bekisting Untuk Tangga
93 Pasangan Jembatan Pengecoran Beton

Analisa Biaya Konstruksi Pekerjaan Dinding


103 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 2 Ps

M3
M3
M3
M3
BH
BH
BH
BH
BH
M3
M3
TTK
TTK
TTK
TTK
TTK
TTK

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M1
M1
M1
Kg
Kg
Kg
M2
M2
M2
M2
M2
M2
M2
M2

M2

Page 34

NO

104
105
106
107
108
109
110
111
112

URAIAN

Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan

Batu
Batu
Batu
Batu
Batu
Batu
Batu
Batu
Batu

Bata
Bata
Bata
Bata
Bata
Bata
Bata
Bata
Bata

Tebal
Tebal
Tebal
Tebal
Tebal
Tebal
Tebal
Tebal
Tebal

1 Bata, 1 Pc : 3 Ps
1 Bata, 1 Pc : 4 Ps
1 Bata, 1 Pc : 5 Ps
1 Bata, 1 Pc : 6 Ps
1 Bata, 1 Pc : 3 Kp : 10 Ps
1/2 Bata, 1 Pc : 2 Ps
1/2 Bata, 1 Pc : 3 Ps
1/2 Bata, 1 Pc : 4 Ps
1/2 Bata, 1 Pc : 5 Ps

SAT

M2
M2
M2
M2
M2
M2
M2
M2
M2

Page 35

NO

113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
F

URAIAN

Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 6 Ps


Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 8 Ps
Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps
Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps
Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Ps
Pasangan Dinding Hollowblock (HB.20), 1PC : 3PP
Pasangan Dinding Hollowblock (HB.20), 1PC : 4PP
Pasangan Dinding Hollowblock (HB.15), 1PC : 3PP
Pasangan Dinding Hollowblock (HB.15), 1PC : 4PS
Pasangan Dinding Hollowblock (HB.10), 1PC : 3PS
Pasangan Dinding Hollowblock (HB.10), 1PC : 4PS
Pasang Dinding Roster/terawang (12 x 11 x 24) cm, 1PC : 3PP
Pasang Dinding Roster/terawang (12 x 11 x 24) cm, 1PC : 4PP
Pasang Bata Berongga Ukuran (5 x 11 x 24) cm, 1PC : 3PP
Pasang Dinding Partisi
Pasang Dinding Partisi Double
Pasang Dinding Partisi Teakwood
Pasang Dinding Partisi Teakwood Double
Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I
Pasang Teakwood Rangkap Lapis Formica, Rangka Expose Kayu Klas II
Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Klas II
Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Klas II
Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Klas II
Pasang Dinding Lambrizing Dari Papan Kayu Klas I
Pasang Dinding Lambrizing Dari Plywood (120 x 240) cm
Pasang Dinding Bilik Rangka Kayu Klas III

Analisa Biaya Konstruksi Pekerjaan Plesteran


139 Plesteran 1 Pc : 1 Ps, Tebal 15 mm
140 Plesteran 1 Pc : 2 Ps, Tebal 15 mm
141 Plesteran 1 Pc : 3 Ps, Tebal 15 mm
142 Plesteran 1 Pc : 4 Ps, Tebal 15 mm
143 Plesteran 1 Pc : 5 Ps, Tebal 15 mm
144 Plesteran 1 Pc : 6 Ps, Tebal 15 mm
145 Plesteran 1 Pc : 7 Ps, Tebal 15 mm
146 Plesteran 1 Pc : 8 Ps, Tebal 15 mm
147 Plesteran 1 Pc : 0,5 Kp : 3 Ps, Tebal 15 mm
148 Plesteran 1 Pc : 2 Kp : 8 Ps, Tebal 15 mm
149 Plesteran 1 Pc : 1 Kp : 1 Ps, Tebal 15 mm
150 Plesteran 1 Pc : 1 Kp : 2 Ps, Tebal 15 mm
151 Plesteran 1 Pc : 2 Ps, Tebal 20 mm
152 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
153 Plesteran 1 Pc : 4 Ps, Tebal 20 mm
154 Plesteran 1 Pc : 5 Ps, Tebal 20 mm
155 Plesteran 1 Pc : 6 Ps, Tebal 20 mm
156 Plesteran 1 Pc : 1 Sm : 2 Ps, Tebal 20 mm
157 Plesteran Berapen 1 Pc : 5 Ps, Tebal 15 mm
158 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm
159 Plesteran Granito, 1 Pc Warna : 2 Granito, Tebal 10 mm

SAT

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

Page 36

NO

160
161
162
163
164
165

URAIAN

Plesteran
Plesteran
Plesteran
Plesteran
Plesteran
Acian

Teraso, 1 Pc Warna : 2 Batu Teraso, Tebal 10 mm


Ciprat, 1 Pc : 2 Ps
Siar Dinding Batu Bata 20 m'
Siar Dinding Conblock 8 m'
Siar Pasangan Batu Kali, 1PC : 2PP

SAT

M2
M2
M2
M2
M2
M2

Page 37

NO

URAIAN

SAT

G
Analisa Biaya Konstruksi Kuzen, Pintu dan Jendela
166 Pasang Kusen Pintu dan Jendela Kayu Klas I
167 Pasang Kusen Pintu dan Jendela Kayu Klas II
168 Pasang Pintu Klamp Standar Kayu Klas II
169 Pasang Pintu Klamp Sederhana Kayu Klas III
170 Pasang Daun Pintu Panel Kayu Klas II
171 Pasang Pintu dan Jendela Kaca Kayu Klas II
172 Pasang Pintu dan Jendela Jalusi Kayu Klas II
173 Pasang Pintu Plywood Rangkap, Rangka Tertutup Kayu Klas II (lebar < 90 cm)
174 Pasang Pintu Plywood Rangkap, Rangka Expose Kayu Klas II
175 Pasang Jalusi Kusen Kayu Klas II
176 Pasang Jendela Besi Plat Baja Rangkap Tebal 2 mm Rangka Baja Siku
177 Pasang Rangka Jendela Besi Scuare Tube (25 x 5) cm
178 Pasang Rolling Door
179 Pasang Pintu Lipat (Folding Door)
180 Pasang Pintu Sunscreen Alluminium
181 Pasang Pintu Rolling Door Alluminium
182 Pasang Kusen Pintu Alluminium
183 Pasang Pintu Alluminium Strip Lebar 8 cm
184 Pasang Pintu Kaca Rangka Alluminium
185 Pasang Venetions Blinds
186 Pasang Vertikals Blinds
187 Pasang Terali Besi Strip (2x3) cm
188 Pasang Kawat Nyamuk
189 Pasang Jendela Nako & Tralis

M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

H
Analisa Biaya Konstruksi Pekerjaan Kunci Dan Kaca
190
Pasang Kunci Tanam Antik
191
Pasang Kunci Tanam Biasa
192
Pasang Kunci Tanam amar Mandi
193 Pasang Kunci Silinder
194 Pasang Engsel Pintu
195 Pasang Engsel Jendela Kupu-kupu
196 Pasang Engsel Angin
197 Pasang Spring Knip
198 Pasang Kait Angin
199 Pasang Door Closer
200 Pasang Kunci Selot
201 Pasang Pegangan Pintu / Door Holder
202 Pasang Door Stop
203 Pasang Rel Pintu dorong
204 Pasang Kunci Lemari
205 Pasang Kaca, Tebal 3 mm
206 Pasang Kaca, Tebal 5 mm
207 Pasang Kaca Buram, Tebal 12 mm
208 Pasang Kaca Cermin, Tebal 12 mm
209 Pasang Kaca Cermin, Tebal 6 mm
210 Pasang Kaca Cermin, Tebal 8 mm

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2

Page 38

NO

211
212
I

URAIAN

Pasang Kaca "Wireglass", Tebal 5 mm


Pasang Kaca Patri, Tebal 5 mm

Analisa Biaya Konstruksi Pekerjaan Atap


213 Pasang Rangka Kuda-kuda Baja IWF
214 Pasang Konstruksi Kuda-kuda Konvensional Kayu Klas II
215 Pasang Konstruksi Kuda-kuda Expose Kayu Klas I
216 Pasang Konstruksi Gording Kayu Klas II
217 Pasang Rangka Atap Genteng Keramik Kayu Klas II

SAT

M2
M2

Kg
M3
M3
M3
M2

Page 39

NO

218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266

URAIAN

Pasang Rangka Atap Genteng Beton Kayu Klas II


Pasang Rangka Atap Sirap Kayu Klas II
Pasangan Rangka Atap Seng
Pasang Atap Genteng Palentong Kecil
Pasang Atap Genteng Kodok / Glazzur
Pasang Atap Genteng Palentong Super / Besar
Pasang Genteng Bubung Palentong
Pasang Bubung Genteng Kodok Glazzur
Pasang Bubung Genteng Palentong Besar
Pasang Atap Fiber (180 x 90) cm
Pasang Atap Asbes Gelombang (2,50 x 0,92 m) x 5 mm
Pasang Atap Asbes Gelombang (2,25 x 0,92 m) x 5 mm
Pasang Atap Asbes Gelombang (2,00 x 0,92 m) x 5 mm
Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm
Pasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm
Pasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm
Pasang Atap Asbes Gelombang (2,40 x 1,05 m) x 4 mm
Pasang Atap Asbes Gelombang (2,10 x 1,05 m) x 4 mm
Pasang Atap Asbes Gelombang (1,5 x 1,05 m) x 4 mm
Pasang Atap Asbes Gelombang (3,00 x 1,08m) x 6 mm
Pasang Atap Asbes Gelombang (2,70 x 1,08m) x 6 mm
Pasang Atap Asbes Gelombang (2,4 x 1,08m) x 6 mm
Pasang Atap Asbes Gelombang (2,1 x 1,08m) x 6 mm
Pasang Atap Asbes Gelombang (1,80 x 1,08m) x 6 mm
Pasang Bubung Stel Gelombang 0,92
Pasang Non Stek Gelombang 1,05 m
Pasang Non Stek Gelombang 1,08 m
Pasang Nok Paten 0,92 m
Pasang Nok Paten 1,05 m
Pasang Nok Paten 1,08 m
Pasang Nok Stel Rata 0,92 m
Pasang Nok Stel Rata 1,05 m
Pasang Atap Genteng Beton
Pasang Atap Genteng Aspal
Pasang Atap Genteng Metal
Pasang Atap Sirap
Pasang Nok Genteng Beton
Pasang Nok Genteng Aspal
Pasang Nok Genteng Metal
Pasang Nok Sirap
Pasang Atap Seng Gelombang
Pasang Atap Nok Seng
Pasang Atap Alluminium
Pasang Nok Alluminium
Pasang Alluminium Foll / Sisalation
Pasang Lesplank Ukuran (3 x 20) cm, Kayu Klas II
Pasang Lesplank Ukuran (3 x 30) cm, Kayu Klas II
Pasang Talang Datar/Jurai Seng Bjls 28 Lebar 90 cm
Pasang Talang Lingkaran D15 cmSeng Bjls 30 Lebar 45 cm

SAT

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M1
M1
M1
M1
M1
M1
M1
M1
M2
M2
M2
M2
M1
M1
M1
M1
M2
M2
M2
M2
M2
M1
M1
M1
M1

Page 40

NO

267
268
269
J

URAIAN

SAT

Pasang Talang Miring, Seng Bjls 28


Memasang Rangka Atap Baja Ringan
Memasang Rangka Atap Konsul Baja Ringan

M1
M2
M2

Analisa Biaya Konstruksi Pekerjaan Langit-langit


270 Pasang Rangka Langit-langit (50 x 100) cm, Kayu Klas II
271 Pasang Rangka Langit-langit (60 x 60) cm, Kayu Klas II
272 Langit-langit Asbes Tebal 6 mm
273 Langit-langit Asbes Tebal 5 mm

M2
M2
M2
M2

Page 41

NO

274
275
276
277
278
279
280
281
282

URAIAN

Langit-langit
Langit-langit
Langit-langit
Langit-langit
Langit-langit
Langit-langit
Langit-langit
Langit-langit
Langit-langit

Asbes Tebal 4 mm
Akustik (30 x 30) cm
Akustik (30 x 60) cm
Akustik (60 x 120) cm
Plywood (120 x 240) cm, Tebal 4 mm
Lamberziring Kayu, Tebal 9 mm
Gypsum Board (120 x 240), Tebal 9 mm
Akustik (60 x 120) cm Rangka Allumunium
Kayu Profil

K
Analisa Biaya Konstruksi Pekerjaan Sanitasi
283 Memasang Kloset Duduk / Monoblok
284 Memasang Kloset Duduk Otomatis
285 Memasang Kloset Jongkok Porselen
286 Memasang Kloset Jongkok Teraso
287 Memasang Urinoir
288 Memasang Wastafel
289 Memasang Bak Mandi Teraso Volume 0,30 m3
290 Memasang Bak Mandi Fiberglass Volume 0,30 m3
291 Memasang Bak Mandi Batu Bata Volume 0,30 m3
292 Memasang Badkip Porselen
293 Memasang Bak Fiberglass Volume 1 m3 Air
294 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 cm
295 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 cm
296 Memasang Pipa Beton, Diameter 15 - 20 cm
297 Memasang Pipa Beton, Diameter 30 - 100 cm
298 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm
299 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm
300 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm
301 Memasang Pipa Galvanis Diameter 1/2"
302 Memasang Pipa Galvanis Diameter 3/4"
303 Memasang Pipa Galvanis Diameter 1"
304 Memasang Pipa Galvanis Diameter 1 1/2"
305 Memasang Pipa Galvanis Diameter 3"
306 Memasang Pipa Galvanis Diameter 4"
307 Memasang Pipa PVC Tipe AW Diameter 1/2"
308 Memasang Pipa PVC Tipe AW Diameter 3/4"
309 Memasang Pipa PVC Tipe AW Diameter 1"
310 Memasang Pipa PVC Tipe AW Diameter 1 1/2"
311 Memasang Pipa PVC Tipe AW Diameter 2"
312 Memasang Pipa PVC Tipe AW Diameter 2 1/2"
313 Memasang Pipa PVC Tipe AW Diameter 3"
314 Memasang Pipa PVC Tipe AW Diameter 4"
315 Memasang Bak Cuci Piring Stainles Steel
316 Memasang Bak Cuci Piring Teraso
317 Memasang Kran Diameter 3/4" Atau 1/2"
318 Memasang Floor Drain
319 Bak Kontrol
320 Pekerjaan Septictank Kap. 50 Orang

SAT

M2
M2
M2
M2
M2
M2
M2
M2
M1

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M1
M1
Bh
Bh
Bh
Bh
Bh
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
Bh
Bh
Bh
Bh
BH
BH

Page 42

NO

321
322

URAIAN

Pekerjaan Septictank Kap. 25 Orang


Pekerjaan Septictank Kap. 15 Orang

SAT

BH
BH

Page 43

NO

URAIAN

Analisa Biaya Konstruksi Pekerjaan Besi


323 Pasang Besi Profil
324 Pekerjaan Perakitan
325 Pengelasan Dengan Listrik
326 Pasang Kawat Harmonika
327 Pasang Kawat Kassa
328 Pasang Kawat Burung

M
Analisa Biaya Konstruksi Pekerjaan Penutup Dinding dan Lantai
329 Pasang Lantai Paving Block
330 Pasang Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm
331 Pasang Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm
332 Pasang Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm
333 Pasang Lantai Ubin Warna Ukuran 40 x 40 cm
334 Pasang Lantai Ubin Warna Ukuran 30 x 30 cm
336 Pasang Lantai Ubin Teraso Ukuran 40 x 40 cm
337 Pasang Lantai Ubin Teraso Ukuran 30 x 30 cm
338 Pasang Lantai Ubin Granito Ukuran 40 x 40 cm
339 Pasang Lantai Ubin Granito Ukuran 30 x 30 cm
340 Pasang Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm
341 Pasang Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm
342 Pasang Lantai Keramik Ukuran 60 x 60 cm Granito
343 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm
344 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm
363 Pasang Lantai Keramik Artistik 5 x 20 cm
364 Pasang Lantai Keramik 33 x 33 cm
365 Pasang Lantai Keramik 30 x 30 cm
366 Pasang Lantai Keramik 40 x 40 cm
367 Pasang Lantai Keramik 20 x 20 cm
369 Pasang Lantai Mosaik 30 x 30 cm, Camp. 1PC : 3PP
370 Pasang Plint Keramik Artistik 10 x 20 cm
371 Pasang Plint Keramik Artistik 10 x 10 cm
372 Pasang Plint Keramik Artistik 5 x 20 cm
373 Internal Cove Artistik (5 x 5 x 20) cm
375 Pasang Lantai Karpet
376 Pasang Underlyer, Tebal 6 mm
377 Pasang Lantai Parquet
378 Pasang Lantai Kayu (Gymfloor)
379 Pasang Dinding Porselin 11 x 11 cm
380 Pasang Dinding Porselin 10 x 20 cm
381 Pasang Dinding Porselin 20 x 20 cm
382 Pasang Dinding Keramik Artistik 10 x 20 cm
383 Pasang Dinding Keramik Artistik 5 x 20 cm
384 Pasang Dinding Keramik 10 x 20 cm
385 Pasang Dinding Keramik 20 x 20 cm
387 Pasang Dinding Bata Pelapis 7 x 3 x 24 cm
388 Pasang Dinding Batu Paros
389 Pasang Dinding Batu Tempel Hitam

SAT

Kg
Kg
CM
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M1
M1
M1
M1
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

Page 44

NO

390
391
392
393
394
395

URAIAN

Pasang Lantai Vinyl Karet 30 x 30 cm Klas I


Pasang Wallpaper Lebar 50 cm
Floor Hardener
Pasang Lantai Vinyl Karet 30 x 30 cm dengan lem
Pasang Plint Kayu Klas II Ukuran 2 x 10 cm
Pasang Lantai Vinyl Motif Kembang 30 x 30 cm

SAT

M2
M2
M2
M2
M3
M2

Page 45

NO

URAIAN

N
Analisa Biaya Konstruksi Pekerjaan Pengecatan
396 Mengikis / Mengorek Permukaan Cat Tembok Lama
397 Mencuci Bidang Permukaan Tembok Yang Pernah Di Cat
398 Mengorek Karat Cat Lama Permukaan Baja Dengan Cara Manual
399 Menyabun Permukaan Tembok Lama
400 Mengorek Karat Atau Cat Lama Permukaan Baja Dengan Pancar Pasir
(Sanblasting) Dengan ingkat Kebersihan sa 2 1/2
401 Mendempul Dan Menggosok Kayu
402 Pengecatan Bidang Kayu Lama
403 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat
Penutup
404 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 3 Lapis Cat
Penutup
405 Pelaburan Bidang Kayu Dengan Teak Oil
406 Pelaburan Bidang Kayu Dengan Politur
407 Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter
408 Pelaburan Bidang Kayu dengan Vernis
409
Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
410 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
411 Melabur Tembok Dengan Kalkarium
412 Melabur Tembok Dengan Kapur Sirih
413 Melabur Tembok Lama Dengan Kapur Sirih (Untuk Pemeliharaan)
414 Pemasangan Wall Paper
415 Pengecatan Permukaan Baja Dengan Meni Besi
416 Pengecatan Permukaan Baja Dengan Meni Besi Dan Perancah
417 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 4 Lapis
Cat Konvensional Dengan Tebal 200 um
418 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 1 Lapis
Cat Mutakhir Dengan Tebal 200 um
419 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 3 Lapis
Cat Konvensional Dengan Tebal 200 um
420

Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (Airless Spray)
Dengan Sistem 1 Lapis Cat Mutakhir Dengan Tebal 200 um

SAT

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

Page 46

JAAN UNTUK PEKERJAAN SIPIL BANGUNAN

KERJAAN UMUM

DANG PANJANG
anggaran 2014
HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

225,800.00
283,100.00
408,000.00
61,000.00
1,249,800.00
1,046,400.00
1,176,000.00
13,700.00
1,077,700.00
170,000.00
32,900.00
131,100.00
586,600.00
550,300.00
9,300.00
44,000.00
17,600.00
5,600.00
11,600.00
24,500.00
1,046,900.00
17,600.00
374,000.00
24,500.00
374,000.00
84,900.00
365,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

64,600.00
79,200.00
93,900.00
86,000.00
130,300.00
103,900.00
4,600.00
28,300.00
17,900.00
46,700.00
111,600.00
113,000.00
208,100.00

KETERANGAN

Page 47

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

772,900.00
722,500.00
687,600.00
663,100.00
625,900.00
686,200.00
572,400.00

KETERANGAN

Page 48

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

548,600.00
352,600.00
2,042,200.00
720,500.00
349,600.00
464,600.00
138,600.00
154,800.00
187,100.00
618,400.00
794,800.00
1,112,100.00
2,101,800.00
3,107,600.00
1,501,600.00
2,880,800.00
4,276,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

748,000.00
786,600.00
816,900.00
681,400.00
852,700.00
886,900.00
912,400.00
929,300.00
958,300.00
967,400.00
1,049,700.00
1,049,700.00
1,016,400.00
182,000.00
241,600.00
277,300.00
12,000.00
12,700.00
12,000.00
146,300.00
154,600.00
233,900.00
238,000.00
431,100.00
237,500.00
315,300.00
110,500.00

Rp.

273,600.00

KETERANGAN

Page 49

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

260,200.00
251,400.00
246,600.00
244,400.00
227,800.00
132,500.00
126,200.00
122,600.00
120,300.00

KETERANGAN

Page 50

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

119,000.00
116,500.00
115,700.00
128,500.00
105,800.00
205,400.00
227,900.00
188,900.00
187,300.00
139,100.00
137,200.00
2,041,600.00
1,709,100.00
211,100.00
194,600.00
362,500.00
200,600.00
374,500.00
485,200.00
541,000.00
144,500.00
224,300.00
232,400.00
299,100.00
42,400.00
52,500.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

59,600.00
52,600.00
49,600.00
47,500.00
46,300.00
45,400.00
44,900.00
44,300.00
43,900.00
41,300.00
35,800.00
36,500.00
69,600.00
65,600.00
62,800.00
61,300.00
60,000.00
66,500.00
32,700.00
51,700.00
104,000.00

KETERANGAN

Page 51

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

145,500.00
40,700.00
28,100.00
13,000.00
53,500.00
29,400.00

KETERANGAN

Page 52

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,205,000.00
5,972,000.00
285,100.00
263,100.00
526,000.00
386,200.00
654,900.00
399,500.00
436,900.00
344,000.00
758,700.00
265,600.00
1,118,600.00
584,600.00
177,300.00
423,800.00
107,700.00
685,000.00
311,100.00
163,100.00
163,100.00
535,000.00
47,100.00
266,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

239,700.00
114,500.00
108,500.00
141,500.00
45,000.00
23,400.00
42,400.00
84,600.00
29,600.00
73,300.00
41,400.00
73,300.00
17,900.00
184,700.00
44,300.00
79,100.00
115,400.00
152,700.00
169,900.00
103,300.00
123,400.00

KETERANGAN

Page 53

HARGA SATUAN

Rp.
Rp.

93,100.00
87,100.00

Rp.
Rp.
Rp.
Rp.
Rp.

17,600.00
5,103,700.00
7,460,400.00
4,365,500.00
161,100.00

KETERANGAN

Page 54

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

218,900.00
480,800.00
31,600.00
1,417,600.00
1,417,600.00
691,800.00
197,200.00
197,200.00
171,900.00
66,000.00
43,400.00
44,400.00
38,300.00
42,700.00
47,100.00
41,500.00
40,000.00
40,500.00
43,700.00
40,800.00
39,400.00
40,000.00
39,500.00
37,200.00
87,200.00
75,600.00
74,400.00
52,900.00
52,900.00
52,900.00
54,300.00
50,300.00
643,600.00
748,200.00
121,800.00
3,396,200.00
181,200.00
255,600.00
101,600.00
90,800.00
60,100.00
44,000.00
156,100.00
146,000.00
82,500.00
69,600.00
68,900.00
203,700.00
130,900.00

KETERANGAN

Page 55

HARGA SATUAN

Rp.
Rp.
Rp.

153,300.00
232,290.85
163,846.35

Rp.
Rp.
Rp.
Rp.

94,500.00
100,400.00
53,300.00
50,200.00

KETERANGAN

Page 56

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

53,300.00
217,900.00
135,800.00
140,200.00
47,100.00
192,100.00
66,500.00
463,000.00
15,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

958,700.00
2,328,800.00
640,400.00
505,100.00
1,148,900.00
1,120,200.00
512,700.00
938,700.00
1,551,700.00
123,100.00
1,291,600.00
82,800.00
104,400.00
101,800.00
613,800.00
573,200.00
510,600.00
780,000.00
37,100.00
42,300.00
49,900.00
76,600.00
113,200.00
153,700.00
17,600.00
19,000.00
20,800.00
23,400.00
32,100.00
32,300.00
51,900.00
63,900.00
262,800.00
368,100.00
40,500.00
65,200.00
844,900.00
9,699,000.00

KETERANGAN

Page 57

HARGA SATUAN

Rp.
Rp.

6,573,400.00
3,296,300.00

KETERANGAN

Page 58

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,600.00
72,900.00
2,800.00
46,900.00
46,900.00
43,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

105,100.00
220,200.00
136,900.00
99,500.00
227,400.00
145,200.00
227,400.00
145,200.00
227,400.00
181,100.00
227,500.00
145,200.00
263,700.00
227,400.00
145,200.00
183,700.00
188,500.00
193,300.00
200,200.00
184,000.00
184,400.00
25,800.00
30,000.00
22,100.00
138,300.00
57,800.00
108,100.00
148,100.00
149,300.00
177,800.00
185,600.00
184,100.00
188,500.00
189,400.00
188,500.00
189,900.00
207,000.00
118,000.00
118,000.00

KETERANGAN

Page 59

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

75,500.00
137,600.00
106,900.00
23,400.00
34,300.00
72,800.00

KETERANGAN

Page 60

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.

15,400.00
13,200.00
13,200.00
13,200.00
491,800.00

Rp.
Rp.

9,800.00
28,900.00

Rp.

37,600.00

Rp.

44,800.00

Rp.
Rp.
Rp.
Rp.
Rp.

25,200.00
38,000.00
12,700.00
36,300.00
19,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,100.00
9,600.00
42,600.00
57,600.00
41,700.00
28,500.00
54,100.00
15,700.00

Rp.

23,600.00

Rp.

207,400.00

Rp.

156,700.00

KETERANGAN

Page 61
DAFTAR ANALISA HARGA SATUAN PEKERJAAN UNTUK

DINAS PEKERJAAN U

KOTA PADANG PANJAN


tahun anggaran 201
NO
A

URAIAN
Analisa Biaya Konstruksi Pekerjaan Persiapan

M1 Pagar Sementara Dari


0.0200 OH
0.0200 OH
0.2000 OH
0.4000 OH
1.2500 Btg
2.5000 Kg
0.0050 M3
0.0090 M3
0.0720 M3
0.0600 Kg
0.4000 Kg

Kayu (T. 2M)


Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kayu Dolken 8-10/400 cm
Semen Portland
Pasir Beton
Kerikil Beton
Kayu 5/7 Klas IV
Paku 5 cm - 10 cm
Residu

M1 Pagar Sementara Dari


0.0200 OH
0.0200 OH
0.2000 OH
0.4000 OH
1.2500 Btg
2.5000 Kg
1.2000 Lbr
0.0050 M3
0.0090 M3
0.0720 M3
0.0600 Kg
0.4500 Kg

Seng Gelombang (T.2M)


Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kayu Dolken 8-10/400 cm
Semen Portland
Seng Gelombang 3" x 5"
Pasir Beton
Kerikil Beton
Kayu 5/7 Klas IV
Paku 5 cm - 10 cm
Meni Besi

M1 Pagar Sementara Dari


0.0200 OH
0.0200 OH
0.2000 OH
0.3000 OH
1.0000 Btg
2.0000 Kg
25.0000 Kg
0.0050 M3
0.0090 M3
0.0600 Kg

Kawat Duri (T.1,8M)


Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kayu Dolken 8-10/400 cm
Semen Portland
Kawat Duri
Pasir Beton
Kerikil Beton
Paku 5 cm - 10 cm

M1 Pengukuran dan Pemasangan Bouwplank


0.0050 OH
Mandor
0.0100 OH
Kepala Tukang

Page 62

NO

URAIAN
0.1000
0.1000
0.0120
0.0200
0.0070

OH
OH
M3
Kg
M3

Tukang Kayu
Pekerja
Kayu 5/7 Klas IV
Paku 5 cm - 10 cm
Kayu Klas III Papan

M2 Pembuatan Kantor Sementara dengan Lantai Plesteran


0.0500 OH
Mandor
0.3000 OH
Kepala Tukang
2.0000 OH
Tukang Kayu
1.0000 OH
Tukang Batu
2.0000 OH
Pekerja
1.2500 Btg
Kayu Dolken 8-10/400 cm
0.1800 M3
Kayu
0.8500 Kg
Paku 5 cm - 10 cm
1.1000 Kg
Besi Strip Tebal 5 mm
35.0000 Kg
Semen Portland
0.1500 M3
Pasir Pasang
0.1000 M3
Pasir Beton
0.1500 M3
Kerikil Beton
30.0000 Bh
Batu Bata
0.2500 Lbr
Seng Plat
2.0000 Bh
Jendela Nako
0.0800 M2
Kaca Tebal 5 mm
0.1500 Bh
Kunci Tanam Biasa
0.0600 Lbr
Plywood Tebal 4 mm

M2 Pembuatan Gudang Semen dan Alat-alat


0.0500 OH
Mandor
0.2000 OH
Kepala Tukang
2.0000 OH
Tukang Kayu
1.0000 OH
Pekerja
1.7000 Btg
Kayu Dolken 8-10/400 cm
0.2100 M3
Kayu
0.3000 Kg
Paku 5 cm - 10 cm
10.5000 Kg
Semen Portland
0.0300 M3
Pasir Beton
0.0500 M3
Kerikil Beton
1.5000 Lbr
Seng Gelombang BJLS 30

M2 Pembuatan Rumah Jaga / Konstruksi Kayu


0.0500 OH
Mandor
0.1500 OH
Kepala Tukang
1.5000 OH
Tukang Kayu
1.0000 OH
Pekerja
3.0000 Btg
Kayu Dolken 8-10/400 cm
0.2760 M3
Kayu
0.7000 Kg
Paku 5 cm - 10 cm
1.5000 Lbr
Seng Gelombang BJLS 30

Page 63

NO

URAIAN

M2 Membersihkan Lapangan dan Peralatan


0.0500 OH
Mandor
0.1000 OH
Pekerja

M2 Pembuatan Bedeng Buruh


0.0500 OH
Mandor
0.2000 OH
Kepala Tukang
2.0000 OH
Tukang Kayu
1.0000 OH
Pekerja
1.2500 Btg
Kayu Dolken 8-10/400 cm
0.1860 M3
Kayu
0.3000 Kg
Paku 5 cm - 10 cm
18.0000 Kg
Semen Portland
0.0300 M3
Pasir Beton
0.0500 M3
Kerikil Beton
1.5000 Lbr
Seng Gelombang BJLS 30
1.3500 Lbr
Plywood Tebal 4 mm

10

M2 Pembuatan Bak
0.0015
0.3000
0.0360
0.0800
1.0000

11

M2 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm


0.0130 OH
Mandor
0.0020 OH
Kepala Tukang
0.0170 OH
Tukang Kayu
0.2500 OH
Pekerja
1.0000 Btg
Bambu 6-8/600 cm
0.2500 Kg
Tali Ijuk

12

M2 Pembuatan Jalan Sementara


0.0500 OH
Mandor
1.0000 OH
Pekerja
0.1500 M3
Batu Kali
0.0900 M3
Batu Kali
0.0100 M3
Pasir Pasang

13

M3 Bongkaran Beton Bertulang


0.3330 OH
Mandor
6.6670 OH
Pekerja

Adukan Ukuran (40 x 50 x 20) cm


OH
Mandor
OH
Tukang Kayu
M3
Kayu Merantih
Kg
Paku 5 cm - 10 cm
Btg
Kayu 5/7 (btg) Klas IV

Page 64

NO

URAIAN

14

M3 Bongkaran Dinding Tembok Batu Bata


0.0030 OH
Mandor
6.6670 OH
Pekerja

15

M2 Bongkaran Lantai Beton


0.1000 OH
Pekerja
0.0100 OH
Mandor

16

M2 Mengupas Plesteran Lama


0.5000 OH
Pekerja
0.0250 OH
Mandor

17

M2 Menurunkan Atap Genteng/Sirap


0.2000 OH
Pekerja
0.0100 OH
Mandor

18

M2 Bongkaran Atap Seng


0.0500 OH
Tukang Besi
0.0050 OH
Pekerja

19

M2 Bongkaran Rangka Atap


0.1000 OH
Pekerja
0.0050 OH
Mandor
0.0250 OH
Tukang Kayu
0.0025 OH
Kepala Tukang

20

M2 Bongkaran Loteng Papan


0.2000 OH
Pekerja
0.0100 OH
Mandor
0.0600 OH
Tukang Kayu
0.0060 OH
Kepala Tukang

21

M3 Bongkaran Kayu
4.0000
0.2000
6.0000
0.6000

Kuda-Kuda
OH
Pekerja
OH
Mandor
OH
Tukang Kayu
OH
Kepala Tukang

Page 65

NO

URAIAN

22

M2 Bongkaran Lantai Keramik


0.2000 OH
Pekerja
0.0100 OH
Mandor

23

M3 Bongkaran Pondasi
4.0000 OH
0.4000 OH

Pekerja
Mandor

M2 Bongkaran Kuzen
0.0600 OH
0.0060 OH
0.2000 OH
0.0100 OH

Tukang Kayu
Kepala Tukang
Pekerja
Mandor

M2 Bongkaran Jalan
4.0000 OH
0.4000 OH

Pekerja
Mandor

24

25

26

M1 Pasang pagar kawat Jaring Galvanis (Tinggi 1 M)


0.0020 OH
Mandor
0.0040 OH
Kepala Tukang
0.0420 OH
Tukang Kayu
0.0420 OH
Pekerja
0.4340 Lbr
Pagar kawat Jaring

27

M1 Pasang Pagar Beton Pracetak (5 x 50 x 213) cm


0.0190 OH
Mandor
0.0120 OH
Kepala Tukang
0.1250 OH
Tukang Batu
0.3750 OH
Pekerja
0.9860 Lbr
Panel Beton Pracetak
0.5250 Btg
Kolom Beton Pracetak
0.0740 M3
Pasir Beton
0.1460 M3
Koral 2/3
45.0000 Kg
Semen Abu-abu

B
28

Analisa Biaya Konstruksi Pekerjaan Tanah


1

M3 Galian Tanah Biasa Sedalam 1 meter


0.0250 OH
Mandor
0.7500 OH
Pekerja

Page 66

NO

URAIAN

29

M3 Galian Tanah Biasa Sedalam 2 meter


0.0450 OH
Mandor
0.9000 OH
Pekerja

30

M3 Galian Tanah Biasa Sedalam 3 meter


0.0670 OH
Mandor
1.0500 OH
Pekerja

31

M3 Galian Tanah Keras Sedalam 1 meter


0.0320 OH
Mandor
1.0000 OH
Pekerja

32

M3 Galian Tanah Cadas Sedalam 1 meter


0.0600 OH
Mandor
1.5000 OH
Pekerja

33

M3 Galian Tanah Lumpur Sedalam 1 meter


0.0450 OH
Mandor
1.2000 OH
Pekerja

34

M2 Pekerjaan Stripping Tebing Setinggi 1 M


0.0050 OH
Mandor
0.0500 OH
Pekerja

35

M3 Pembuangan Tanah Sejauh 30 meter


0.0100 OH
Mandor
0.3300 OH
Pekerja

36

M3 Urugan Kembali
0.0190 OH
0.1920 OH

37

Mandor
Pekerja

M3 Pemadatan Tanah (per 20 cm)


0.0500 OH
Mandor
0.5000 OH
Pekerja

Page 67

NO
38

URAIAN
1

M3 Urugan Pasir
0.0100 OH
0.3000 OH
1.2000 M3

Mandor
Pekerja
Pasir Urug

41

M2 Pemasangan Lapisan Ijuk Tebal 10 cm


0.0150 OH
Mandor
0.1500 OH
Pekerja
6.0000 Kg
Ijuk

42

M3 Urugan Sirtu Padat untuk peninggian lantai bangunan


0.0250 OH
Mandor
0.2500 OH
Pekerja
1.2000 M3
Sirtu

Analisa Biaya Konstruksi Pekerjaan Pondasi

43

M3 Pasang Pondasi
0.0750
0.0600
0.6000
1.5000
1.2000
202.0000
0.4850

Batu Kali, 1 Pc : 3 Ps
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Semen Portland
M3
Pasir Pasang

44

M3 Pasang Pondasi
0.0750
0.0600
0.6000
1.5000
1.2000
163.0000
0.5200

Batu Kali, 1 Pc : 4 Ps
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Semen Portland
M3
Pasir Pasang

45

M3 Pasang Pondasi
0.0750
0.0600
0.6000
1.5000
1.2000
136.0000
0.5440

Batu Kali, 1 Pc : 5 Ps
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Semen Portland
M3
Pasir Pasang

Page 68

NO

URAIAN

46

M3 Pasang Pondasi
0.0750
0.0600
0.6000
1.5000
1.2000
117.0000
0.5610

Batu Kali, 1 Pc : 6 Ps
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Semen Portland
M3
Pasir Pasang

47

M3 Pasang Pondasi
0.0750
0.0600
0.6000
1.5000
1.2000
91.0000
0.5610

Batu Kali, 1 Pc : 8 Ps
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Semen Portland
M3
Pasir Pasang

48

M3 Pasang Pondasi
0.0750
0.0600
0.6000
1.5000
1.2000
0.1700
0.1700
0.3400

Batu Kali, 1 Kp : 1 Sm : 2 Ps
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Kapur Pasang
M3
Semen Merah
M3
Pasir Pasang

49

M3 Pasang Pondasi
0.0750
0.0600
0.6000
1.5000
1.2000
61.0000
0.1470
0.4920

Batu Kali, 1 Pc : 3 Kp : 10 Ps
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Semen Portland
Kg
Kapur Pasang
M3
Pasir Pasang

50

M3 Pasang Pondasi
0.0750
0.0600
0.6000
1.5000
1.2000
41.0000
0.1310
0.5230

Batu Kali, 1/4 Pc : 1 Kp : 4 Ps


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Semen Portland
Kg
Kapur Pasang
M3
Pasir Pasang

Page 69

NO

URAIAN

51

M3 Pasang Pondasi
0.0390
0.0390
0.3900
0.7800
1.2000
0.4320

Batu Kosong (Aanstampang)


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
M3
Pasir Urug

52

M3 Pasang Pondasi
0.1500
0.0850
0.8500
3.0000
126.0000
194.0000
0.3120
0.4680
1.8000

Siklop
OH
OH
OH
OH
Kg
Kg
M3
M3
Kg

53

M3 Pasang Pondasi
0.0800
0.0300
0.3000
2.3800
0.4500
194.0000
0.3120
0.4680

Sumuran Diameter 100 cm


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Batu Kali
Kg
Semen Portland
M3
Pasir Beton
M3
Kerikil Beton

54

BH

Pekerjaan Cincin Sumuran Dia. 1 m'


0.3500 M3
Pekerjaan Beton K 225
0.2075 M2
Pasang Bekisting untuk Pondasi

55

BH

Pekerjaan Cincin Sumuran Dia. 1,2 m'


0.5000 M3
Pekerjaan Beton K 225
0.0575 M2
Pasang Bekisting untuk Pondasi

56

BH

Menurunkan Cincin Sumuran Sedalam 1 M


0.7500 OH
Pekerja
0.0250 OH
Mandor
0.5000 OH
Tukang Batu
0.0500 OH
Kepala Tukang

60 % Beton 1PC : 2PB : 3KR


Mandor
Kepala Tukang
Tukang Batu
Pekerja
Besi Beton Polos
Semen Portland
Pasir Beton
Kerikil Beton
Kawat Beton

1.250 x
1.250 x

Page 70

NO
57

58

URAIAN
1

BH

BH

Menurunkan Cincin Sumuran Sedalam 2 M


0.7500 OH
Pekerja
0.0250 OH
Mandor
0.5000 OH
Tukang Batu
0.0500 OH
Kepala Tukang

Menurunkan Cincin Sumuran Sedalam 3 M


0.7500 OH
Pekerja
0.0250 OH
Mandor
0.5000 OH
Tukang Batu
0.0500 OH
Kepala Tukang

1.500 x
1.500 x

2.000 x
2.000 x

59

M3 Campuran Batu Kali + Stamp Beton 1:2:3


1.2000 M3
Batu Kali
0.4500 M3
Pekerjaan Beton K 225

60

M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali


0.6000 M3
Pekerjaan Beton K 225
0.4000 M3
Campuran Batu Kali + Stamp Beton 1:2:3

61

TTK Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 1 M


1.0000 BH
Pekerjaan Cincin Sumuran Dia. 1 m'
1.0000 BH
Menurunkan Cincin Sumuran Sedalam 1 M
0.7850 M3
Cyclopen Beton 1:2:3 + 40 % Batu Kali

62

TTK Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 2 M


2.0000 BH
Pekerjaan Cincin Sumuran Dia. 1 m'
1.0000 BH
Menurunkan Cincin Sumuran Sedalam 2 M
1.5700 M3
Cyclopen Beton 1:2:3 + 40 % Batu Kali

63

TTK Pekerjaan Pondasi Sumuran Dia. 1 M Kedalamam 3 M


3.0000 BH
Pekerjaan Cincin Sumuran Dia. 1 m'
1.0000 BH
Menurunkan Cincin Sumuran Sedalam 3 M
2.3550 M3
Cyclopen Beton 1:2:3 + 40 % Batu Kali

64

TTK Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 1 M


1.0000 BH
Pekerjaan Cincin Sumuran Dia. 1,2 m'
1.0000 BH
Menurunkan Cincin Sumuran Sedalam 1 M
1.1304 M3
Cyclopen Beton 1:2:3 + 40 % Batu Kali

Page 71

NO

URAIAN

65

TTK Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 2 M


2.0000 BH
Pekerjaan Cincin Sumuran Dia. 1,2 m'
1.0000 BH
Menurunkan Cincin Sumuran Sedalam 2 M
2.2608 M3
Cyclopen Beton 1:2:3 + 40 % Batu Kali

66

TTK Pekerjaan Pondasi Sumuran Dia. 1,2 M Kedalamam 3 M


3.0000 BH
Pekerjaan Cincin Sumuran Dia. 1,2 m'
1.0000 BH
Menurunkan Cincin Sumuran Sedalam 3 M
3.3912 M3
Cyclopen Beton 1:2:3 + 40 % Batu Kali

Analisa Biaya Konstruksi Pekerjaan Beton

67

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
247.0000
869.0000
999.0000

K 100
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

68

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
276.0000
828.0000
1,012.0000

K 125
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

69

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
299.0000
799.0000
1,017.0000

K 150
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

70

M3 Pekerjaan Beton
0.0600
0.0200
0.2000
1.2000

K 100 Lantai Kerja


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja

Page 72

NO

URAIAN
230.0000 Kg
893.0000 Kg
1,027.0000 Kg

Semen Portland
Pasir Beton (kg)
Kerikil Beton (kg)

71

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
326.0000
760.0000
1,029.0000

K 175
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

72

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
352.0000
731.0000
1,031.0000

K 200
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

73

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
371.0000
698.0000
1,047.0000

K 225
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

74

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
384.0000
692.0000
1,039.0000

K 250
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

75

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
406.0000

K 275
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland

Page 73

NO

URAIAN
684.0000 Kg
1,026.0000 Kg

Pasir Beton (kg)


Kerikil Beton (kg)

76

M3 Pekerjaan Beton
0.0830
0.0280
0.2750
1.6500
413.0000
681.0000
1,021.0000

K 300
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

77

M3 Pekerjaan Beton
0.1050
0.0350
0.3500
2.1000
439.0000
670.0000
1,006.0000

K 325
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

78

M3 Pekerjaan Beton
0.1050
0.0350
0.3500
2.1000
439.0000
670.0000
1,006.0000

K 350
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
Kg
Pasir Beton (kg)
Kg
Kerikil Beton (kg)

79

M3 Membuat Beton
0.1050
0.0350
0.3500
2.1000
400.0000
0.4800
0.8000
1.2000

Kedap Air Dengan Stronox - 100


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Beton
M3
Kerikil Beton
Kg
Stronox - 100

80

M1 Memasang PVC Waterstop Lebar 150 mm


0.0030 OH
Mandor
0.0030 OH
Kepala Tukang
0.0300 OH
Tukang Batu
0.0600 OH
Pekerja
1.0500 M1
Waterstop Lebar 150 mm

Page 74

NO

URAIAN

81

M1 Memasang PVC Waterstop Lebar 200 mm


0.0070 OH
Mandor
0.0040 OH
Kepala Tukang
0.0350 OH
Tukang Batu
0.0700 OH
Pekerja
1.0500 M1
Waterstop Lebar 200 mm

82

M1 Memasang PVC Waterstop Lebar 230 mm - 320 mm


0.0040 OH
Mandor
0.0040 OH
Kepala Tukang
0.0400 OH
Tukang Batu
0.0800 OH
Pekerja
1.0500 M1
Waterstop Lebar 230 mm

83

Kg

Pembesian Dengan Besi Polos Atau Besi Ulir


0.0004 OH
Mandor
0.0007 OH
Kepala Tukang
0.0070 OH
Tukang Besi
0.0070 OH
Pekerja
1.0500 Kg
Besi Beton (Polos / Ulir)
0.0150 Kg
Kawat Beton

84

Kg

Kabel Presstressed Polos / Strands


0.0003 OH
Mandor
0.0005 OH
Kepala Tukang
0.0050 OH
Tukang Besi
0.0050 OH
Pekerja
1.0500 Kg
Besi Presstressed Polos
0.0100 Kg
Kawat Beton

85

Kg

Jaring Kawat Baja / Wire Mesh


0.0001 OH
Mandor
0.0025 OH
Kepala Tukang
0.0025 OH
Tukang Besi
0.0025 OH
Pekerja
1.0200 Kg
Besi Jaring Kawat Baja
0.0050 Kg
Kawat Beton

86

M2 Pasang Bekisting untuk Pondasi


0.0260 OH
Mandor
0.0260 OH
Kepala Tukang
0.2600 OH
Tukang Besi
0.5200 OH
Pekerja

Page 75

NO

URAIAN
0.0400 M3
0.3000 Kg
0.1000 Ltr

Kayu Klas II Papan


Paku 5 cm - 10 cm
Minyak Bekisting

87

M2 Pasang Bekisting Untuk Sloof


0.0260 OH
Mandor
0.0260 OH
Kepala Tukang
0.2600 OH
Tukang Besi
0.5200 OH
Pekerja
0.0450 M3
Kayu Klas II Papan
0.3000 Kg
Paku 5 cm - 10 cm
0.1000 Ltr
Minyak Bekisting

88

M2 Pasang Bekisting Untuk Kolom


0.0330 OH
Mandor
0.0330 OH
Kepala Tukang
0.3300 OH
Tukang Kayu
0.6600 OH
Pekerja
0.0400 M3
Kayu Klas II Papan
0.4000 Kg
Paku 5 cm - 10 cm
0.2000 Ltr
Minyak Bekisting
0.0150 M3
Kayu Klas II Balok
0.3500 Lbr
Plywood Tebal 9 mm
2.0000 Btg
Kayu Dolken -8-10/4 m Galam

89

M2 Pasang Bekisting Untuk Balok


0.0330 OH
Mandor
0.0330 OH
Kepala Tukang
0.3300 OH
Tukang Kayu
0.6600 OH
Pekerja
0.0400 M3
Kayu Klas II Papan
0.4000 Kg
Paku 5 cm - 10 cm
0.2000 Ltr
Minyak Bekisting
0.0180 M3
Kayu Klas II Balok
0.3500 Lbr
Plywood Tebal 9 mm
2.0000 Btg
Kayu Dolken -8-10/4 m Galam

90

M2 Pasang Bekisting Untuk Lantai


0.0330 OH
Mandor
0.0330 OH
Kepala Tukang
0.3300 OH
Tukang Kayu
0.6600 OH
Pekerja
0.0400 M3
Kayu Klas III Papan
0.4000 Kg
Paku 5 cm - 10 cm
0.2000 Ltr
Minyak Bekisting

Page 76

NO

URAIAN
0.0150 M3
0.3500 Lbr
6.0000 Btg

Kayu Klas II Balok


Plywood Tebal 9 mm
Kayu Dolken -8-10/4 m Galam

91

M2 Pasang Bekisting Untuk Dinding


0.0330 OH
Mandor
0.0330 OH
Kepala Tukang
0.3300 OH
Tukang Kayu
0.6600 OH
Pekerja
0.0300 M3
Kayu Klas II Papan
0.4000 Kg
Paku 5 cm - 10 cm
0.2000 Ltr
Minyak Bekisting
0.0200 M3
Kayu Klas II Balok
0.3500 Lbr
Plywood Tebal 9 mm
3.0000 Btg
Kayu Dolken -8-10/4 m Galam
4.0000 Bh
Formtie / Penjaga Jarak Bekisting / Spacer

92

M2 Pasang Bekisting Untuk Tangga


0.0330 OH
Mandor
0.0330 OH
Kepala Tukang
0.3300 OH
Tukang Kayu
0.6600 OH
Pekerja
0.0300 M3
Kayu Klas III Papan
0.4000 Kg
Paku 5 cm - 10 cm
0.1500 Ltr
Minyak Bekisting
0.0150 M3
Kayu Klas II Balok
0.3500 Lbr
Plywood Tebal 9 mm
2.0000 Btg
Kayu Dolken -8-10/4 m Galam

93

M2 Pasangan Jembatan Pengecoran Beton


0.0080 OH
Mandor
0.0050 OH
Kepala Tukang
0.0500 OH
Tukang Kayu
0.1500 OH
Pekerja
0.0264 M3
Kayu Klas III Papan
0.6000 Kg
Paku 5 cm - 12 cm
0.5000 Btg
Kayu Dolken -8-10/4 m Galam

E
103

Analisa Biaya Konstruksi Pekerjaan Dinding


1

M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 2 Ps


0.0300 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Batu
0.6000 OH
Pekerja
140.0000 Bh
Batu Bata
43.5000 Kg
Semen Portland
0.0800 M3
Pasir Pasang

Page 77

NO

URAIAN

104

M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Ps


0.0300 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Batu
0.6000 OH
Pekerja
140.0000 Bh
Batu Bata
32.9500 Kg
Semen Portland
0.0910 M3
Pasir Pasang

105

M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 4 Ps


0.0300 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Batu
0.6000 OH
Pekerja
140.0000 Bh
Batu Bata
26.5500 Kg
Semen Portland
0.0930 M3
Pasir Pasang

106

M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 5 Ps


0.0300 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Batu
0.6000 OH
Pekerja
140.0000 Bh
Batu Bata
22.2000 Kg
Semen Portland
0.1020 M3
Pasir Pasang

107

M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 6 Ps


0.0300 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Batu
0.6000 OH
Pekerja
140.0000 Bh
Batu Bata
18.5000 Kg
Semen Portland
0.1220 M3
Pasir Pasang

108

M2 Pasangan Batu Bata Tebal 1 Bata, 1 Pc : 3 Kp : 10 Ps


0.0300 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Batu
0.6000 OH
Pekerja
140.0000 Bh
Batu Bata
10.0800 Kg
Semen Portland
0.0925 M3
Pasir Pasang
0.0275 Kg
Kapur Pasang

Page 78

NO

URAIAN

109

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
18.9500 Kg
Semen Portland
0.0380 M3
Pasir Pasang

110

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
14.3700 Kg
Semen Portland
0.0400 M3
Pasir Pasang

111

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 4 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
11.5000 Kg
Semen Portland
0.0430 M3
Pasir Pasang

112

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 5 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
9.6800 Kg
Semen Portland
0.0450 M3
Pasir Pasang

113

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 6 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
8.3200 Kg
Semen Portland
0.0490 M3
Pasir Pasang

Page 79

NO

URAIAN

114

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 8 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
6.5000 Kg
Semen Portland
0.0500 M3
Pasir Pasang

115

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
4.5000 Kg
Semen Portland
0.0500 M3
Pasir Pasang
0.0150 M3
Kapur padam

116

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
0.0180 M3
Semen Merah
0.0180 M3
Pasir Pasang
0.0180 M3
Kapur padam

117

M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Ps


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
70.0000 Bh
Batu Bata
0.0140 Kg
Semen Portland
0.0280 M3
Pasir Pasang
0.0140 M3
Kapur padam

118

M2 Pasangan Dinding Hollowblock (HB.20), 1PC : 3PP


0.0150 OH
Mandor
0.0150 OH
Kepala Tukang
0.1500 OH
Tukang Batu
0.3000 OH
Pekerja
12.5000 Bh
Hollow Block (HB.20)
13.5000 Kg
Semen Portland

Page 80

NO

URAIAN
0.7280 M3
0.2800 Kg

Pasir Pasang
Besi Beton Polos

119

M2 Pasangan Dinding Hollowblock (HB.20), 1PC : 4PP


0.0150 OH
Mandor
0.0150 OH
Kepala Tukang
0.1500 OH
Tukang Batu
0.3000 OH
Pekerja
12.5000 Bh
Hollow Block (HB.20)
24.5000 Kg
Semen Portland
0.7720 M3
Pasir Pasang
0.2800 Kg
Besi Beton Polos

120

M2 Pasangan Dinding Hollowblock (HB.15), 1PC : 3PP


0.0180 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.3600 OH
Pekerja
12.5000 Bh
Hollow Block (HB.15)
22.7400 Kg
Semen Portland
0.5500 M3
Pasir Pasang
0.2800 Kg
Besi Beton Polos

121

M2 Pasangan Dinding Hollowblock (HB.15), 1PC : 4PS


0.0180 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.3600 OH
Pekerja
12.5000 Bh
Hollow Block (HB.15)
18.2000 Kg
Semen Portland
0.5820 M3
Pasir Pasang
0.2800 Kg
Besi Beton Polos

122

M2 Pasangan Dinding Hollowblock (HB.10), 1PC : 3PS


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Batu
0.3000 OH
Pekerja
12.5000 Bh
Hollow Block (HB.10)
15.1600 Kg
Semen Portland
0.3640 M3
Pasir Pasang
0.2800 Kg
Besi Beton Polos

123

M2 Pasangan Dinding Hollowblock (HB.10), 1PC : 4PS


0.0150 OH
Mandor
0.0100 OH
Kepala Tukang

Page 81

NO

URAIAN
0.1000
0.3000
12.5000
12.1300
0.3800
0.2800

OH
OH
Bh
Kg
M3
Kg

Tukang Batu
Pekerja
Hollow Block (HB.10)
Semen Portland
Pasir Pasang
Besi Beton Polos

124

M2 Pasang Dinding
0.0150
0.0100
0.1000
0.3000
36.0000
12.8000
0.0350

Roster/terawang (12 x 11 x 24) cm, 1PC : 3PP


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Roster/terawang
Kg
Semen Portland
M3
Pasir Pasang

125

M2 Pasang Dinding
0.0150
0.0100
0.1000
0.3000
30.0000
11.0000
0.0350

Roster/terawang (12 x 11 x 24) cm, 1PC : 4PP


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Roster/terawang
Kg
Semen Portland
M3
Pasir Pasang

126

M2 Pasang Bata Berongga


0.0150 OH
0.0150 OH
0.1500 OH
0.3000 OH
70.0000 Bh
14.0000 Kg
0.0320 M3

Ukuran (5 x 11 x 24) cm, 1PC : 3PP


Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bata Berongga
Semen Portland
Pasir Pasang

127

M2 Pasang Dinding
0.6000
0.0600
1.2000
0.0350
0.0050

Partisi
OH
OH
Lbr
M3
Kg

Tukang Kayu
Kepala Tukang
Plywood Tebal 4 mm
Kayu Merantih Balok
Paku Triplek

M2 Pasang Dinding
1.8000
0.1800
2.4000
0.0350

Partisi
OH
OH
Lbr
M3

Double
Tukang Kayu
Kepala Tukang
Plywood Tebal 4 mm
Kayu Merantih Balok

128

0.336 x

0.336 x

Page 82

NO

URAIAN
0.0100 Kg

Paku Triplek

129

M2 Pasang Dinding
0.6000
0.0600
1.2000
0.0350
0.0050

Partisi
OH
OH
M2
M3
Kg

Teakwood
Tukang Kayu
Kepala Tukang
Teackwood
Kayu Merantih Balok
Paku Triplek

130

M2 Pasang Dinding
1.8000
0.1800
2.4000
0.0350
0.0100

Partisi
OH
OH
M2
M3
Kg

Teakwood Double
Tukang Kayu
Kepala Tukang
Teackwood
Kayu Merantih Balok
Paku Triplek

131

M2 Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I


0.0400 OH
Mandor
0.2000 OH
Kepala Tukang
2.0000 OH
Tukang Kayu
0.8000 OH
Pekerja
0.0250 M3
Kayu Klas I Papan
0.0300 Kg
Paku 1 cm - 2,5 cm
0.3000 Kg
Lem Kayu
1.0000 Lbr
Teakwood Ukuran 90 x 220 x 4 mm

132

M2 Pasang Teakwood Rangkap Lapis Formica, Rangka Expose Kayu Klas II


0.0400 OH
Mandor
0.2500 OH
Kepala Tukang
2.5000 OH
Tukang Kayu
0.8000 OH
Pekerja
0.0250 M3
Kayu Klas II Papan
0.0300 Kg
Paku 1 cm - 2,5 cm
0.8000 Kg
Lem Kayu
1.0000 Lbr
Teakwood Ukuran 90 x 220 x 4 mm
0.5000 Lbr
Formica

133

M2 Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Klas II


0.0080 OH
Mandor
0.0450 OH
Kepala Tukang
0.4500 OH
Tukang Kayu
0.1500 OH
Pekerja
0.0280 M3
Kayu Klas II Balok
0.1500 Kg
Paku 5 cm - 7 cm

Page 83

NO

URAIAN

134

M2 Pasang Dinding
0.0800
0.0450
0.4500
0.1500
0.0280
0.1500
0.8600

Pemisah Teakwood Rangkap, Rangka Kayu Klas II


OH
Mandor
OH
Kepala Tukang
OH
Tukang Kayu
OH
Pekerja
M3
Kayu Klas II Balok
Kg
Paku 5 cm - 7 cm
Lbr
Teakwood Ukuran 120 x 240 x 4 mm

135

M2 Pasang Dinding
0.0100
0.0600
0.6000
0.2000
0.0280
0.1500
0.8600

Pemisah Plywood Rangkap, Rangka Kayu Klas II


OH
Mandor
OH
Kepala Tukang
OH
Tukang Kayu
OH
Pekerja
M3
Kayu Klas II Balok
Kg
Paku 5 cm - 7 cm
Lbr
Plywood Ukuran 120 x 240 x 4 mm

136

M2 Pasang Dinding
0.0300
0.1800
1.8000
0.6000
0.0070
0.1000
0.1500

Lambrizing Dari Papan Kayu Klas I


OH
Mandor
OH
Kepala Tukang
OH
Tukang Kayu
OH
Pekerja
M3
Kayu Klas I Balok
Kg
Paku 5 cm - 10 cm
Kg
Paku Skrup 10 cm

137

M2 Pasang Dinding
0.0013
0.0075
0.0750
0.0250
0.4000
0.0500

Lambrizing Dari Plywood (120 x 240) cm


OH
Mandor
OH
Kepala Tukang
OH
Tukang Kayu
OH
Pekerja
Lbr
Plywood Ukuran 120 x 240 x 4 mm
Kg
Paku 1 cm - 2,5 cm

138

M2 Pasang Dinding
0.0050
0.0050
0.0500
0.1000
1.5000
0.0140
0.0050

Bilik Rangka Kayu Klas III


OH
Mandor
OH
Kepala Tukang
OH
Tukang Kayu
OH
Pekerja
M2
Bilik Bambu
M3
Kayu 5/7 Klas IV
Kg
Paku 5 cm - 7 cm

Analisa Biaya Konstruksi Pekerjaan Plesteran

Page 84

NO

URAIAN

139

M2 Plesteran 1 Pc :
0.0100
0.0150
0.1500
0.2000
15.5040
0.0160

1 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

140

M2 Plesteran 1 Pc :
0.0100
0.0150
0.1500
0.2000
10.2240
0.0200

2 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

141

M2 Plesteran 1 Pc :
0.0100
0.0150
0.1500
0.2000
7.7760
0.0230

3 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

142

M2 Plesteran 1 Pc :
0.0100
0.0150
0.1500
0.2000
6.2400
0.0240

4 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

143

M2 Plesteran 1 Pc :
0.0100
0.0150
0.1500
0.2000
5.1840
0.0260

5 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

144

M2 Plesteran 1 Pc :
0.0100
0.0150
0.1500
0.2000
4.4160

6 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland

Page 85

NO

URAIAN
0.0270 M3

Pasir Pasang

145

M2 Plesteran 1 Pc :
0.0100
0.0150
0.1500
0.2000
3.9360
0.0280

7 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

146

M2 Plesteran 1 Pc :
0.0100
0.0150
0.1500
0.2000
3.4560
0.0290

8 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

147

M2 Plesteran 1 Pc :
0.0110
0.0120
0.1200
0.2200
5.7600
0.0030
0.0130

0,5 Kp : 3 Ps, Tebal 15 mm


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Kapur Padam
M3
Pasir Pasang

148

M2 Plesteran 1 Pc :
0.0110
0.0120
0.1200
0.2200
3.0000
0.0050
0.0200

2 Kp : 8 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Kapur Padam
M3
Pasir Pasang

149

M2 Plesteran 1 Pc :
0.0110
0.0120
0.1200
0.2200
0.0090
0.0090
0.0090

1 Kp : 1 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Kapur Padam
M3
Pasir Pasang

Page 86

NO

URAIAN

150

M2 Plesteran 1 Pc :
0.0110
0.0120
0.1200
0.2200
0.0070
0.0070
0.0150

1 Kp : 2 Ps, Tebal 15 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Kapur Padam
M3
Pasir Pasang

151

M2 Plesteran 1 Pc :
0.0130
0.0200
0.2000
0.2600
13.6320
0.0270

2 Ps, Tebal 20 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

152

M2 Plesteran 1 Pc :
0.0130
0.0200
0.2000
0.2600
10.3680
0.0310

3 Ps, Tebal 20 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

153

M2 Plesteran 1 Pc :
0.0130
0.0200
0.2000
0.2600
8.3200
0.0320

4 Ps, Tebal 20 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

154

M2 Plesteran 1 Pc :
0.0130
0.0200
0.2000
0.2600
6.9120
0.0350

5 Ps, Tebal 20 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Kg
Semen Portland
M3
Pasir Pasang

155

M2 Plesteran 1 Pc :
0.0130
0.0200
0.2000

6 Ps, Tebal 20 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu

Page 87

NO

URAIAN
0.2600 OH
5.8880 Kg
0.0360 M3

Pekerja
Semen Portland
Pasir Pasang

156

M2 Plesteran 1 Pc :
0.0140
0.0220
0.2200
0.2860
0.0090
0.0090
0.0180

1 Sm : 2 Ps, Tebal 20 mm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M3
Semen Merah
M3
Kapur Padam
M3
Pasir Pasang

157

M2 Plesteran Berapen 1 Pc : 5 Ps, Tebal 15 mm


0.0080 OH
Mandor
0.0070 OH
Kepala Tukang
0.0700 OH
Tukang Batu
0.1500 OH
Pekerja
5.1840 Kg
Semen Portland
0.0260 M3
Pasir Pasang

158

M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm


0.0030 OH
Mandor
0.0380 OH
Kepala Tukang
0.3800 OH
Tukang Batu
0.0570 OH
Pekerja
0.5000 Kg
Semen Portland
0.0130 M3
Pasir Pasang

159

M2 Plesteran Granito, 1 Pc Warna : 2 Granito, Tebal 10 mm


0.0250 OH
Mandor
0.0020 OH
Kepala Tukang
0.0200 OH
Tukang Batu
0.2000 OH
Pekerja
10.0000 Kg
PC Warna
15.0000 Kg
Batu Granito

160

M2 Plesteran Teraso, 1 Pc
0.0250 OH
0.0200 OH
0.2000 OH
0.4500 OH
10.0000 Kg
15.0000 Kg

Warna : 2 Batu Teraso, Tebal 10 mm


Mandor
Kepala Tukang
Tukang Batu
Pekerja
PC Warna
Batu Granito

Page 88

NO

URAIAN

161

M2 Plesteran Ciprat, 1 Pc
0.0130 OH
0.0100 OH
0.1000 OH
0.2500 OH
4.3200 Kg
0.0060 M3

162

M2 Plesteran Siar Dinding


0.0080 OH
0.0070 OH
0.0700 OH
0.1500 OH
3.1080 Kg
0.0150 M3

Batu Bata 20 m'


Mandor
Kepala Tukang
Tukang Batu
Pekerja
Semen Portland
Pasir pasang

163

M2 Plesteran Siar Dinding


0.0040 OH
0.0040 OH
0.0350 OH
0.0750 OH
1.6000 Kg

Conblock 8 m'
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Semen Portland

164

M2 Plesteran Siar Pasangan Batu Kali, 1PC : 2PP


0.0150 OH
Mandor
0.0140 OH
Kepala Tukang
0.1400 OH
Tukang Batu
0.3000 OH
Pekerja
6.3400 Kg
Semen Portland
0.0120 M3
Pasir pasang

165

M2 Acian
0.0080
0.0100
0.1000
0.1500
3.2500

G
166

OH
OH
OH
OH
Kg

: 2 Ps
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Semen Portland
Pasir pasang

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Semen Portland

Analisa Biaya Konstruksi Kuzen, Pintu dan Jendela


1

M3 Pasang Kusen Pintu dan Jendela Kayu Klas I


0.3000 OH
Mandor
2.0000 OH
Kepala Tukang
20.0000 OH
Tukang Kayu
6.0000 OH
Pekerja

Page 89

NO

URAIAN
1.1000 M3
1.2500 Kg
1.0000 Kg

Kayu Klas I Balok


Paku 10 cm
Lem Kayu

167

M3 Pasang Kusen Pintu dan Jendela Kayu Klas II


0.3000 OH
Mandor
2.0000 OH
Kepala Tukang
18.0000 OH
Tukang Kayu
6.0000 OH
Pekerja
1.2000 M3
Kayu Klas II Balok
1.2500 Kg
Paku 10 cm
1.0000 Kg
Lem Kayu

168

M2 Pasang Pintu Klamp Standar Kayu Klas II


0.0180 OH
Mandor
0.1050 OH
Kepala Tukang
1.0500 OH
Tukang Kayu
0.3500 OH
Pekerja
0.0400 M3
Kayu Klas II Papan
0.0500 Kg
Paku 5 cm - 7 cm

169

M2 Pasang Pintu Klamp Sederhana Kayu Klas III


0.0180 OH
Mandor
0.1050 OH
Kepala Tukang
1.0500 OH
Tukang Kayu
0.3500 OH
Pekerja
0.0400 M3
Kayu Klas III Papan
0.0500 Kg
Paku 5 cm - 7 cm

170

M2 Pasang Daun Pintu Panel Kayu Klas II


0.0500 OH
Mandor
0.2500 OH
Kepala Tukang
2.5000 OH
Tukang Kayu
1.0000 OH
Pekerja
0.0400 M3
Kayu Klas II Papan
1.0000 Kg
Lem Kayu

171

M2 Pasang Pintu dan Jendela Kaca Kayu Klas II


0.0400 OH
Mandor
0.2000 OH
Kepala Tukang
2.0000 OH
Tukang Kayu
0.8000 OH
Pekerja
0.0240 M3
Kayu Klas II Papan
0.3000 Kg
Lem Kayu

Page 90

NO

URAIAN

172

M2 Pasang Pintu dan Jendela Jalusi Kayu Klas II


0.0500 OH
Mandor
0.3000 OH
Kepala Tukang
3.0000 OH
Tukang Kayu
1.0000 OH
Pekerja
0.0640 M3
Kayu Klas II Papan
0.5000 Kg
Lem Kayu

173

M2 Pasang Pintu Plywood


0.0300 OH
0.2000 OH
2.0000 OH
0.6000 OH
0.0196 M3
0.0300 Kg
0.5000 Kg
1.0000 Lbr

Rangkap, Rangka Tertutup Kayu Klas II (lebar < 90 cm)


Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kayu Klas II Papan
Paku 1 cm - 2,5 cm
Lem Kayu
Plywood Ukuran 90 x 220 x 4 mm

174

M2 Pasang Pintu Plywood


0.0400 OH
0.2000 OH
2.0000 OH
0.8000 OH
0.0256 M3
0.0300 Kg
0.5000 Kg
1.0000 Lbr

Rangkap, Rangka Expose Kayu Klas II


Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kayu Klas II Papan
Paku 1 cm - 2,5 cm
Lem Kayu
Plywood Ukuran 90 x 220 x 4 mm

175

M2 Pasang Jalusi Kusen Kayu Klas II


0.0250 OH
Mandor
0.2000 OH
Kepala Tukang
2.0000 OH
Tukang Kayu
0.5000 OH
Pekerja
0.0200 M3
Kayu Klas II Papan
0.1500 Kg
Paku 1 cm - 2,5 cm

176

M2 Pasang Jendela Besi Plat Baja Rangkap Tebal 2 mm Rangka Baja Siku
0.0520 OH
Mandor
0.1050 OH
Kepala Tukang
1.0500 OH
Tukang Besi Konstruksi
1.0500 OH
Pekerja
15.0000 Kg
Besi Siku L.30.30.3
32.8000 Kg
Besi Plat Baja
0.0500 Kg
Kawat Las

Page 91

NO

URAIAN

177

M2 Pasang Rangka Jendela Besi Scuare Tube (25 x 5) cm


0.0320 OH
Mandor
0.0650 OH
Kepala Tukang
0.6500 OH
Tukang Besi Konstruksi
0.6500 OH
Pekerja
4.7600 M1
Besi Scuare Tube
4.5220 M1
Besi Lis Kaca (1x1) cm
20.0000 CM
Pengelasan Dengan Listrik

178

M2 Pasang Rolling Door


0.0060 OH
0.1200 OH
1.2000 OH
1.2000 OH
1.0000 M2

Mandor
Kepala Tukang
Tukang Besi
Pekerja
Roll Door Tebal 8mm

179

M2 Pasang Pintu Lipat (Folding Door)


0.0220 OH
Mandor
0.0440 OH
Kepala Tukang
0.4400 OH
Tukang Besi Konstruksi
0.4400 OH
Pekerja
1.0000 M2
Pintu Lipat

180

M2 Pasang Pintu Sunscreen Alluminium


0.0040 OH
Mandor
0.0800 OH
Kepala Tukang
0.0800 OH
Tukang Besi
0.8000 OH
Pekerja
1.0000 M2
Sunscreen Alluminium

181

M2 Pasang Pintu Rolling Door Alluminium


0.0500 OH
Mandor
0.1000 OH
Kepala Tukang
1.0000 OH
Tukang Besi
1.0000 OH
Pekerja
1.0000 M2
Rolling Door Aluminium

182

M2 Pasang Kusen Pintu Alluminium


0.0021 OH
Mandor
0.0043 OH
Kepala Tukang
0.0430 OH
Tukang Besi
0.0430 OH
Pekerja
1.0000 M1
Profil Alluminium
1.0000 M1
Alluminium Strip
1.0000 Tube Sealent

Page 92

NO

URAIAN

183

M2 Pasang Pintu Alluminium Strip Lebar 8 cm


0.0042 OH
Mandor
0.0085 OH
Kepala Tukang
0.0850 OH
Tukang Besi
0.0850 OH
Pekerja
4.4000 M1
Profil Alluminium
14.6000 M1
Alluminium Strip

184

M2 Pasang Pintu Kaca Rangka Alluminium


0.0040 OH
Mandor
0.0080 OH
Kepala Tukang
0.0850 OH
Tukang Besi
0.0850 OH
Pekerja
4.4000 M1
Profil Alluminium
4.5000 M1
Profil Kaca
0.2700 Tube Sealent

185

M2 Pasang Venetions Blinds


0.0018 OH
Mandor
0.0350 OH
Kepala Tukang
0.3500 OH
Tukang Kayu
0.3500 OH
Pekerja
1.0000 M2
Venetions Blinds

186

M2 Pasang Vertikals Blinds


0.0018 OH
Mandor
0.0350 OH
Kepala Tukang
0.3500 OH
Tukang Kayu
0.3500 OH
Pekerja
1.0000 M2
Vertikals Blinds

187

M2 Pasang Terali Besi Strip (2x3) cm


0.0830 OH
Mandor
0.1670 OH
Kepala Tukang
1.6700 OH
Tukang Las
1.6700 OH
Pekerja
6.1770 M1
Besi Strip 2 x 3
27.0800 CM
Pengelasan Dengan Listrik

188

M2 Pasang Kawat Nyamuk


0.0005 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Kayu
0.1000 OH
Pekerja

Page 93

NO

URAIAN
1.1000 M2
0.0200 CM
0.0018 Kg

189

Kawat Nyamuk
Pengelasan Dengan Listrik
Besi Strip (0,2x2)cm

M2 Pasang Jendela Nako & Tralis


0.0010 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Kayu
0.2000 OH
Pekerja
1.1000 M2
Jendela Nako (Rangka + Kaca 5 mm)
10.0000 Bh
Paku Sekrup 1 cm - 2,5 cm
7.0000 M1
Besi Strip 2 x 3

Analisa Biaya Konstruksi Pekerjaan Kunci Dan Kaca

190

Bh

Pasang Kunci Tanam Antik


0.0030 OH
Mandor
0.0600 OH
Kepala Tukang
0.6000 OH
Tukang Kayu
0.0600 OH
Pekerja
1.0000 Bh
Kunci Tanam Antik

191

Bh

Pasang Kunci Tanam Biasa


0.0050 OH
Mandor
0.0100 OH
Kepala Tukang
0.5000 OH
Tukang Kayu
0.0010 OH
Pekerja
1.0000 Bh
Kunci Tanam Biasa

192

Bh

Pasang Kunci Tanam amar Mandi


0.0025 OH
Mandor
0.0050 OH
Kepala Tukang
0.5000 OH
Tukang Kayu
0.0050 OH
Pekerja
1.0000 Bh
Kunci Tanam Kamar Mandi

193

Bh

194

Bh

Pasang Kunci Silinder


0.0025 OH
0.0050 OH
0.5000 OH
0.0050 OH
1.0000 Bh

Pasang Engsel Pintu

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
kunci Silinder

Page 94

NO

URAIAN
0.0008
0.0150
0.1500
0.0150
1.0000

OH
OH
OH
OH
Bh

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Engsel Pintu

195

Bh

Pasang Engsel Jendela


0.0005 OH
0.0100 OH
0.1000 OH
0.0100 OH
1.0000 Bh

Kupu-kupu
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Engsel Jendela

196

Bh

Pasang Engsel Angin


0.0100 OH
0.0200 OH
0.2000 OH
0.0200 OH
1.0000 Bh

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Engsel Angin

Pasang Spring Knip


0.0008 OH
0.0150 OH
0.1500 OH
0.0150 OH
1.0000 Bh

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Spring Knip

Pasang Kait Angin


0.0008 OH
0.0150 OH
0.1500 OH
0.0150 OH
1.0000 Bh

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kait Angin

Pasang Door Closer


0.0025 OH
0.0500 OH
0.5000 OH
0.0500 OH
1.0000 Bh

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Door Close

Pasang Kunci Selot


0.0010 OH
0.0200 OH

Mandor
Kepala Tukang

197

198

199

200

Bh

Bh

Bh

Bh

Page 95

NO

URAIAN
0.2000 OH
0.0200 OH
1.0000 Bh

Tukang Kayu
Pekerja
Kunci Selot

201

Bh

Pasang Pegangan Pintu / Door Holder


0.0025 OH
Mandor
0.0500 OH
Kepala Tukang
0.5000 OH
Tukang Kayu
0.0500 OH
Pekerja
1.0000 Bh
Door Holder

202

Bh

Pasang Door Stop


0.0005 OH
0.0100 OH
0.1000 OH
0.0100 OH
1.0000 Bh

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Door Stop

203

Bh

Pasang Rel Pintu dorong


0.0030 OH
Mandor
0.0600 OH
Kepala Tukang
0.6000 OH
Tukang Kayu
0.0600 OH
Pekerja
1.0000 Bh
Rel Pintu Dorong

204

Bh

Pasang Kunci Lemari


0.0013 OH
0.0250 OH
0.2500 OH
0.0250 OH
1.0000 Bh

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kunci Lemari

205

M2 Pasang Kaca, Tebal 3 mm


0.0008 OH
Mandor
0.0150 OH
Kepala Tukang
0.1500 OH
Tukang Kayu
0.0150 OH
Pekerja
1.1000 M2
Kaca Tebal 3 mm

206

M2 Pasang Kaca, Tebal 5 mm


0.0008 OH
Mandor
0.0150 OH
Kepala Tukang
0.1500 OH
Tukang Kayu
0.0150 OH
Pekerja

Page 96

NO

URAIAN
1.1000 M2

Kaca Tebal 5 mm

207

M2 Pasang Kaca Buram, Tebal 12 mm


0.0013 OH
Mandor
0.0250 OH
Kepala Tukang
0.2500 OH
Tukang Kayu
0.0250 OH
Pekerja
1.1000 M2
Kaca Buram 12 mm
0.0500 Tube Sealent

208

M2 Pasang Kaca Cermin, Tebal 12 mm


0.0008 OH
Mandor
0.0150 OH
Kepala Tukang
0.1500 OH
Tukang Kayu
0.0150 OH
Pekerja
1.1000 M2
Kaca Cermin 12 mm

209

M2 Pasang Kaca Cermin, Tebal 6 mm


0.0008 OH
Mandor
0.0150 OH
Kepala Tukang
0.1500 OH
Tukang Kayu
0.0150 OH
Pekerja
1.1000 M2
Kaca Cermin 6 mm

210

M2 Pasang Kaca Cermin, Tebal 8 mm


0.0008 OH
Mandor
0.0165 OH
Kepala Tukang
0.1650 OH
Tukang Kayu
0.0165 OH
Pekerja
1.1000 M2
Kaca Cermin 8 mm

211

M2 Pasang Kaca "Wireglass", Tebal 5 mm


0.0008 OH
Mandor
0.0165 OH
Kepala Tukang
0.1650 OH
Tukang Kayu
0.0165 OH
Pekerja
1.1000 M2
Kaca Wireglass 5 mm

212

M2 Pasang Kaca Patri, Tebal 5 mm


0.0008 OH
Mandor
0.0165 OH
Kepala Tukang
0.1650 OH
Tukang Kayu
0.0165 OH
Pekerja
1.1000 M2
Kaca Patri 5 mm

Page 97

NO

URAIAN

Analisa Biaya Konstruksi Pekerjaan Atap

213

Kg

Pasang Rangka Kuda-kuda Baja IWF


0.0003 OH
Mandor
0.0060 OH
Kepala Tukang
0.0060 OH
Tukang Besi
0.0600 OH
Pekerja
1.1500 Kg
Besi Profil IWF

214

M3 Pasang Konstruksi Kuda-kuda Konvensional Kayu Klas II


0.2000 OH
Mandor
1.2000 OH
Kepala Tukang
12.0000 OH
Tukang Kayu
4.0000 OH
Pekerja
1.1000 M3
Kayu Klas II Balok
15.0000 Kg
Besi Strip Tebal 5 mm
5.6000 Kg
Paku 12 cm

215

M3 Pasang Konstruksi Kuda-kuda Expose Kayu Klas I


0.3000 OH
Mandor
2.0000 OH
Kepala Tukang
10.0000 OH
Tukang Kayu
6.0000 OH
Pekerja
1.1000 M3
Kayu Klas I Balok
15.0000 Kg
Besi Strip Tebal 5 mm
5.6000 Kg
Paku 12 cm

216

M3 Pasang Konstruksi Gording Kayu Klas II


0.1200 OH
Mandor
0.7200 OH
Kepala Tukang
7.2000 OH
Tukang Kayu
2.4000 OH
Pekerja
1.1000 M3
Kayu Klas II Balok
15.0000 Kg
Besi Strip Tebal 5 mm
3.0000 Kg
Paku 12 cm

217

M2 Pasang Rangka Atap Genteng Keramik Kayu Klas II


0.0050 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Kayu
0.1000 OH
Pekerja
0.0140 M3
Kayu 5/7 Klas II
0.0360 M3
Kayu 2/3 Klas II
0.2500 Kg
Paku 5 cm - 10 cm

Page 98

NO

URAIAN

218

M2 Pasang Rangka Atap Genteng Beton Kayu Klas II


0.0050 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Kayu
0.1000 OH
Pekerja
0.0140 M3
Kayu 5/7 Klas II
0.0570 M3
Kayu 2/3 Klas II
0.2500 Kg
Paku 5 cm - 10 cm

219

M2 Pasang Rangka Atap Sirap Kayu Klas II


0.0060 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Kayu
0.1200 OH
Pekerja
0.1650 M3
Kayu Klas II Balok
0.2000 Kg
Paku 5 cm - 10 cm

220

M2 Pasangan Rangka Atap Seng


0.1500 org
Pekerja
0.0075 org
Mandor
0.1000 org
Tukang Kayu
0.0100 org
Kepala Tukang
0.0019 m3
Kayu Klas II Balok
0.1000 kg
Paku 1,5"

221

M2 Pasang Atap Genteng


0.0080 OH
0.0080 OH
0.0750 OH
0.1500 OH
25.0000 Bh

Palentong Kecil
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Genteng Palentong

222

M2 Pasang Atap Genteng


0.0080 OH
0.0080 OH
0.0750 OH
0.1500 OH
25.0000 Bh

Kodok / Glazzur
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Genteng Kodok

223

M2 Pasang Atap Genteng


0.0080 OH
0.0080 OH
0.0750 OH
0.1500 OH

Palentong Super / Besar


Mandor
Kepala Tukang
Tukang Kayu
Pekerja

Page 99

NO

URAIAN
12.0000 Bh

Genteng Palentong Super

224

M2 Pasang Genteng
0.0020
0.0020
0.2000
0.4000
5.0000
8.0000
0.0320

Bubung Palentong
OH
Mandor
OH
Kepala Tukang
OH
Tukang Kayu
OH
Pekerja
Bh
Genteng Bubung Palentong
Kg
Semen Portland
M3
Pasir Pasang

225

M2 Pasang Bubung Genteng Kodok Glazzur


0.0020 OH
Mandor
0.0020 OH
Kepala Tukang
0.2000 OH
Tukang Kayu
0.4000 OH
Pekerja
5.0000 Bh
Genteng Bubung Kodok
8.0000 Kg
Semen Portland
0.0320 M3
Pasir Pasang

226

M2 Pasang Bubung Genteng Palentong Besar


0.0020 OH
Mandor
0.0020 OH
Kepala Tukang
0.2000 OH
Tukang Kayu
0.4000 OH
Pekerja
4.0000 Bh
Genteng Bubung Palentong
8.0000 Kg
Semen Portland
0.0320 M3
Pasir Pasang

227

M2 Pasang Atap Fiber (180 x 90) cm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0600 OH
Tukang Kayu
0.1400 OH
Pekerja
0.6000 Lbr
Atap Fiber
0.0050 Kg
Paku 1 cm - 2,5 cm

228

M2 Pasang Atap Asbes Gelombang (2,50 x 0,92 m) x 5 mm


0.0080 OH
Mandor
0.0080 OH
Kepala Tukang
0.0750 OH
Tukang Kayu
0.1400 OH
Pekerja
0.5000 Lbr
Asbes Gelombang (2,50 x 0,92 m) x 5 mm
0.1200 Kg
Paku Pancing 60 x 230

Page 100

NO

URAIAN

229

M2 Pasang Atap Asbes Gelombang (2,25 x 0,92 m) x 5 mm


0.0080 OH
Mandor
0.0080 OH
Kepala Tukang
0.0750 OH
Tukang Kayu
0.1400 OH
Pekerja
0.6000 Lbr
Asbes Gelombang (2,25 x 0,92 m) x 5 mm
0.1200 Kg
Paku Pancing 60 x 230

230

M2 Pasang Atap Asbes Gelombang (2,00 x 0,92 m) x 5 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0700 OH
Tukang Kayu
0.1400 OH
Pekerja
0.6000 Lbr
Asbes Gelombang (2,00 x 0,92 m) x 5 mm
0.1200 Kg
Paku Pancing 60 x 230

231

M2 Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0700 OH
Tukang Kayu
0.1400 OH
Pekerja
0.7500 Lbr
Asbes Gelombang (1,80 x 0,92 m) x 5 mm
0.1200 Kg
Paku Pancing 60 x 230

232

M2 Pasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0700 OH
Tukang Kayu
0.1400 OH
Pekerja
0.3500 Lbr
Asbes Gelombang (3,00 x 1,05 m) x 4 mm
0.1200 Kg
Paku Pancing

233

M2 Pasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0700 OH
Tukang Kayu
0.1400 OH
Pekerja
0.4200 Lbr
Asbes Gelombang (2,70 x 1,05 m) x 4 mm
0.1200 Kg
Paku Pancing

234

M2 Pasang Atap Asbes Gelombang (2,40 x 1,05 m) x 4 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0670 OH
Tukang Kayu
0.1400 OH
Pekerja

Page 101

NO

URAIAN
0.4400 Lbr
0.1200 Kg

Asbes Gelombang (2,40 x 1,05 m) x 4 mm


Paku Pancing

235

M2 Pasang Atap Asbes Gelombang (2,10 x 1,05 m) x 4 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0670 OH
Tukang Kayu
0.1400 OH
Pekerja
0.5100 Lbr
Asbes Gelombang (2,10 x 1,05 m) x 4 mm
0.1200 Kg
Paku Pancing

236

M2 Pasang Atap Asbes Gelombang (1,5 x 1,05 m) x 4 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0670 OH
Tukang Kayu
0.1400 OH
Pekerja
0.8000 Lbr
Asbes Gelombang (1,50 x 1,05 m) x 4 mm
0.1200 Kg
Paku Pancing

237

M2 Pasang Atap Asbes Gelombang (3,00 x 1,08m) x 6 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0670 OH
Tukang Kayu
0.1400 OH
Pekerja
0.3700 Lbr
Asbes Gelombang (3,00 x 1,08 m) x 6 mm
0.1200 Kg
Paku Pancing

238

M2 Pasang Atap Asbes Gelombang (2,70 x 1,08m) x 6 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0670 OH
Tukang Kayu
0.1400 OH
Pekerja
0.3800 Lbr
Asbes Gelombang (2,70 x 1,08 m) x 6 mm
0.1200 Kg
Paku Pancing

239

M2 Pasang Atap Asbes Gelombang (2,4 x 1,08m) x 6 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0670 OH
Tukang Kayu
0.1400 OH
Pekerja
0.4600 Lbr
Asbes Gelombang (2,40 x 1,08 m) x 6 mm
0.1200 Kg
Paku Pancing

240

M2 Pasang Atap Asbes Gelombang (2,1 x 1,08m) x 6 mm

Page 102

NO

URAIAN
0.0070
0.0070
0.0670
0.1400
0.4900
0.1200

OH
OH
OH
OH
Lbr
Kg

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Asbes Gelombang (2,10 x 1,08 m) x 6 mm
Paku Pancing

241

M2 Pasang Atap Asbes Gelombang (1,80 x 1,08m) x 6 mm


0.0070 OH
Mandor
0.0070 OH
Kepala Tukang
0.0670 OH
Tukang Kayu
0.1400 OH
Pekerja
0.5700 Lbr
Asbes Gelombang (1,80 x 1,08 m) x 6 mm
0.1200 Kg
Paku Pancing

242

M1 Pasang Bubung Stel Gelombang 0,92


0.0040 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Kayu
0.0840 OH
Pekerja
2.4000 Lbr
Asbes Bubungan Gelombang 0,92
6.0000 Bh
Paku sekrup 3,5"

243

M1 Pasang Non Stek Gelombang 1,05 m


0.0040 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Kayu
0.0840 OH
Pekerja
2.1000 Lbr
Nok Stek Gelombang 1,05 m
6.0000 Bh
Paku sekrup 3,5"

244

M1 Pasang Non Stek Gelombang 1,08 m


0.0040 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Kayu
0.0840 OH
Pekerja
2.0500 Lbr
Nok Stek Gelombang 1,08 m
6.0000 Bh
Paku sekrup 3,5"

245

M1 Pasang Nok Paten 0,92 m


0.0040 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Kayu
0.0840 OH
Pekerja
1.2000 Lbr
Nok Paten 0,92 m
6.0000 Bh
Paku sekrup 3,5"

Page 103

NO

URAIAN

246

M1 Pasang Nok Paten 1,05 m


0.0040 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Kayu
0.0840 OH
Pekerja
1.2000 Lbr
Nok Paten 1,05 m
6.0000 Bh
Paku sekrup 3,5"

247

M1 Pasang Nok Paten 1,08 m


0.0040 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Kayu
0.0840 OH
Pekerja
1.2000 Lbr
Nok Paten 1,08 m
6.0000 Bh
Paku sekrup 3,5"

248

M1 Pasang Nok Stel


0.0040
0.0130
0.1500
0.1000
1.1000
6.0000

Rata
OH
OH
OH
OH
Lbr
Bh

0,92 m
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Nok Stel Rata 0,92 m
Paku sekrup 3,5"

249

M1 Pasang Nok Stel


0.0040
0.0130
0.1250
0.0840
1.1000
6.0000

Rata
OH
OH
OH
OH
Lbr
Bh

1,05 m
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Nok Stel Rata 1,05 m
Paku sekrup 3,5"

250

M2 Pasang Atap Genteng


0.0100 OH
0.0100 OH
0.1000 OH
0.2000 OH
11.0000 Bh
0.0300 Kg

251

M2 Pasang Atap Genteng Aspal


0.0100 OH
Mandor
0.0100 OH
Kepala Tukang

Beton
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Genteng Beton
Paku 5 cm - 7 cm

Page 104

NO

URAIAN
0.1000
0.2000
6.9000
0.3500
0.0300
0.5000

OH
OH
Lbr
Lbr
Kg
Bh

252

M2 Pasang Atap Genteng


0.0100 OH
0.0100 OH
0.1000 OH
0.2000 OH
1.0200 M2
0.2000 Kg

253

M2 Pasang Atap Sirap


0.0080 OH
0.0250 OH
0.2500 OH
0.1660 OH
60.0000 Bh
0.2000 Kg

Tukang Kayu
Pekerja
Genteng Aspal
Plywood Tebal 6 mm
Paku 1 cm - 2,5 cm
Plastic Aerator

Metal
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Genteng Metal
Paku 5 cm - 7 cm

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Genteng Sirap
Paku 1 cm - 2,5 cm

254

M1 Pasang Nok Genteng Beton


0.0200 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Kayu
0.4000 OH
Pekerja
3.5000 Bh
Nok Genteng Beton
0.0500 Kg
Paku 5 cm - 7 cm
10.8000 Kg
Semen Abu-abu
0.0320 M3
Pasir Pasang
1.0000 Kg
Semen Warna

255

M1 Pasang Nok Genteng Aspal


0.0060 OH
Mandor
0.0250 OH
Kepala Tukang
0.2500 OH
Tukang Kayu
0.1250 OH
Pekerja
2.0000 Lbr
Genteng Aspal
0.0500 Kg
Paku 1 cm - 2,5 cm
0.0035 M3
Kayu Borneo Balok

256

M1 Pasang Nok Genteng Metal


0.0130 OH
Mandor
0.0150 OH
Kepala Tukang

Page 105

NO

URAIAN
0.1500
0.2500
1.1000
0.0500

257

OH
OH
Bh
Kg

M1 Pasang Nok Sirap


0.0060 OH
0.0250 OH
0.2500 OH
0.1250 OH
0.4000 Lbr
0.0600 Kg
0.0500 Kg
0.0040 M3

Tukang Kayu
Pekerja
Genteng Decra Bond
Paku 1 cm - 2,5 cm

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Seng Plat 3" x 6" BJLS 30
Paku 1 cm - 2,5 cm
Paku 5 cm - 7 cm
Kayu Borneo Papan

258

M2 Pasang Atap Seng Gelombang


0.0060 OH
Mandor
0.0060 OH
Kepala Tukang
0.0600 OH
Tukang Kayu
0.1200 OH
Pekerja
0.7000 Lbr
Seng Gelombang 3" x 6" BJLS 20
0.0200 Kg
Paku 1 cm - 2,5 cm

259

M2 Pasang Atap Nok Seng


0.0060 OH
0.0080 OH
0.0700 OH
0.1500 OH
0.3000 Lbr
0.0200 Kg

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Seng Plat 3" x 6" BJLS 30
Paku 1 cm - 2,5 cm

260

M2 Pasang Atap Alluminium


0.0060 OH
Mandor
0.0080 OH
Kepala Tukang
0.7500 OH
Tukang Kayu
0.1500 OH
Pekerja
1.0500 M2
Atap Alluminium Gelombang Tebal 0,55
0.0200 Kg
Paku Hak Panjang 15 cm

261

M2 Pasang Nok Alluminium


0.0100 OH
Mandor
0.0100 OH
Kepala Tukang
1.0000 OH
Tukang Kayu
0.1000 OH
Pekerja
1.2000 M2
Nok Standar 40 cm 18, swg 22
0.0400 Kg
Paku Hak Panjang 15 cm

Page 106

NO

URAIAN

262

M2 Pasang Alluminium Foll / Sisalation


0.0080 OH
Mandor
0.0050 OH
Kepala Tukang
0.0500 OH
Tukang Kayu
0.1500 OH
Pekerja
1.0500 M2
Sisalation / Alluminium foil

263

M1 Pasang Lesplank Ukuran (3 x 20) cm, Kayu Klas II


0.0050 OH
Mandor
0.0250 OH
Kepala Tukang
0.2000 OH
Tukang Kayu
0.1000 OH
Pekerja
0.0108 M3
Kayu Klas II Papan
0.1000 Kg
Paku 5 cm - 7 cm

264

M1 Pasang Lesplank Ukuran (3 x 30) cm, Kayu Klas II


0.0050 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Kayu
0.1000 OH
Pekerja
0.0110 M3
Kayu Klas II Papan
0.0500 Kg
Paku 5 cm - 7 cm

265

M1 Pasang Talang Datar/Jurai Seng Bjls 28 Lebar 90 cm


0.0100 OH
Mandor
0.0250 OH
Kepala Tukang
0.4000 OH
Tukang Kayu
0.2000 OH
Pekerja
1.0500 Lbr
Seng Plat 3" x 6" BJLS 30
0.0150 Kg
Paku 1 cm - 2,5 cm
0.0190 M3
Kayu Klas II Papan

266

M1 Pasang Talang Lingkaran D15 cmSeng Bjls 30 Lebar 45 cm


0.0070 OH
Mandor
0.0300 OH
Kepala Tukang
0.3000 OH
Tukang Kayu
0.1500 OH
Pekerja
1.0500 Lbr
Seng Plat 3" x 6" BJLS 30
0.0100 Kg
Paku 1 cm - 2,5 cm
0.5000 Kg
Besi Strip (0,2x2)cm

267

M1 Pasang Talang Miring, Seng Bjls 28


0.0013 OH
Mandor

Page 107

NO

URAIAN
0.0250
0.4000
0.0400
0.5000
0.0150
0.0190
0.3000

OH
OH
OH
Lbr
Kg
M3
Kg

Kepala Tukang
Tukang Kayu
Pekerja
Seng Plat 3" x 6" BJLS 30
Paku 1 cm - 2,5 cm
Kayu Klas II Papan
Flincote / Meni Besi

Analisa Biaya Konstruksi Pekerjaan Langit-langit

270

M2 Pasang Rangka Langit-langit (50 x 100) cm, Kayu Klas II


0.0750 OH
Mandor
0.0250 OH
Kepala Tukang
0.2500 OH
Tukang Kayu
0.1500 OH
Pekerja
0.0154 M3
Kayu 5/7 Klas II
0.2000 Kg
Paku 5 cm - 10 cm

271

M2 Pasang Rangka Langit-langit (60 x 60) cm, Kayu Klas II


0.0100 OH
Mandor
0.0300 OH
Kepala Tukang
0.3000 OH
Tukang Kayu
0.2000 OH
Pekerja
0.0163 M3
Kayu 5/7 Klas II
0.2500 Kg
Paku 5 cm - 10 cm

272

M2 Langit-langit Asbes Tebal 6 mm


0.0020 OH
Mandor
0.0070 OH
Kepala Tukang
0.0700 OH
Tukang Kayu
0.0300 OH
Pekerja
1.1000 Lbr
Pelat Asbes Tebal 6 mm
0.0100 Kg
Paku Triplek

273

M2 Langit-langit Asbes Tebal 5 mm


0.0020 OH
Mandor
0.0070 OH
Kepala Tukang
0.0700 OH
Tukang Kayu
0.0300 OH
Pekerja
1.1000 Lbr
Pelat Asbes Tebal 5 mm
0.0100 Kg
Paku Triplek

274

M2 Langit-langit Asbes Tebal 4 mm


0.0020 OH
Mandor
0.0070 OH
Kepala Tukang
0.0700 OH
Tukang Kayu
0.0300 OH
Pekerja

Page 108

NO

URAIAN
1.1000 Lbr
0.0100 Kg

Pelat Asbes Tebal 6 mm


Paku Triplek

275

M2 Langit-langit Akustik (30 x 30) cm


0.0030 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Kayu
0.0600 OH
Pekerja
12.0000 Lbr
Akustik 30 x 30 cm
0.0500 Kg
Paku Triplek

276

M2 Langit-langit Akustik (30 x 60) cm


0.0030 OH
Mandor
0.0100 OH
Kepala Tukang
0.0100 OH
Tukang Kayu
0.0600 OH
Pekerja
5.8000 Lbr
Akustik 30 x 60 cm
0.0500 Kg
Paku Triplek

277

M2 Langit-langit Akustik (60 x 120) cm


0.0030 OH
Mandor
0.0100 OH
Kepala Tukang
0.0100 OH
Tukang Kayu
0.0600 OH
Pekerja
1.5000 Lbr
Akustik 60 x 120 cm
0.0500 Kg
Paku Triplek

278

M2 Langit-langit Plywood
0.0040 OH
0.0100 OH
0.1000 OH
0.0700 OH
0.3750 Lbr
0.0300 Kg

279

M2 Langit-langit Lamberziring Kayu, Tebal 9 mm


0.0030 OH
Mandor
0.0800 OH
Kepala Tukang
0.8000 OH
Tukang Kayu
0.6000 OH
Pekerja
0.0150 M3
Kayu Klas II Papan
0.0100 Kg
Paku Triplek

280

M2 Langit-langit Gypsum Board (120 x 240), Tebal 9 mm

(120 x 240) cm, Tebal 4 mm


Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Plywood Ukuran 120 x 240 x 4 mm
Paku Triplek

Page 109

NO

URAIAN
0.0050
0.0050
0.0500
0.1000
0.3640
0.1100

OH
OH
OH
OH
Lbr
Kg

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Gypsum Board (120 x 240 x 9) mm
Paku Skrup 10 cm

281

M2 Langit-langit Akustik (60 x 120) cm Rangka Allumunium


0.0080 OH
Mandor
0.0500 OH
Kepala Tukang
0.5000 OH
Tukang Kayu
0.1500 OH
Pekerja
3.6000 M1
Profil Alluminium
1.5000 Kg
Kawat Beton
1.0500 Bh
Ramset / Dina Boft
1.5000 Lbr
Akustik 60 x 120 cm

282

M1 Langit-langit Kayu Profil


0.0030 OH
Mandor
0.0100 OH
Kepala Tukang
0.0500 OH
Tukang Kayu
0.0500 OH
Pekerja
1.0500 M1
List Kayu Profil
0.0100 Kg
Paku Triplek

Analisa Biaya Konstruksi Pekerjaan Sanitasi

283

Bh

Memasang Kloset Duduk / Monoblok


0.1600 OH
Mandor
0.0010 OH
Kepala Tukang
1.1000 OH
Tukang Batu
3.3000 OH
Pekerja
1.0000 Bh
Kloset Duduk / Monoblok
0.0600 Set
Perlengkapan

284

Bh

Memasang Kloset Duduk Otomatis


0.1600 OH
Mandor
0.0010 OH
Kepala Tukang
1.1000 OH
Tukang Batu
3.3000 OH
Pekerja
1.0000 Bh
Kloset Duduk / Otomatis
0.0600 Set
Perlengkapan

285

Bh

Memasang Kloset Jongkok Porselen


0.1600 OH
Mandor
1.5000 OH
Kepala Tukang
1.5000 OH
Tukang Batu

Page 110

NO

URAIAN
1.0000
1.0000
6.0000
0.0100

OH
Bh
Kg
M3

Pekerja
Kloset Jongkok Porselen
Semen Portland
Pasir Pasang

286

Bh

Memasang Kloset Jongkok Teraso


0.1100 OH
Mandor
0.3000 OH
Kepala Tukang
1.5000 OH
Tukang Batu
1.0000 OH
Pekerja
1.0000 Bh
kloset Jongkok Teraso
7.0000 Bh
Batu Bata
6.0000 Kg
Semen Portland
0.0100 M3
Pasir Pasang

287

Bh

Memasang Urinoir
0.1000 OH
0.1000 OH
1.0000 OH
1.0000 OH
1.0000 Bh
0.3000 Set
6.0000 Kg
0.0100 M3

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Urinoir
Perlengkapan
Semen Portland
Pasir Pasang

Memasang Wastafel
0.1000 OH
0.1500 OH
1.4500 OH
1.2000 OH
1.0000 Bh
0.1200 Set
6.0000 Kg
0.0100 M3

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Washtafel
Perlengkapan
Semen Abu-abu
Pasir Pasang

288

Bh

289

Bh

Memasang Bak Mandi


0.1100 OH
0.0700 OH
0.7500 OH
2.1000 OH
1.0000 Bh
6.0000 Kg
0.0100 M3

Teraso Volume 0,30 m3


Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bak Teraso
Semen Portland
Pasir Pasang

290

Bh

Memasang Bak Mandi Fiberglass Volume 0,30 m3


0.1100 OH
Mandor

Page 111

NO

URAIAN
0.5400
2.7000
1.8000
1.0000
0.1800

OH
OH
OH
Bh
Set

Kepala Tukang
Tukang Batu
Pembantu Tukang
Bak Fiberglass
Perlengkapan

291

Bh

Memasang Bak Mandi


0.3000 OH
0.3000 OH
3.0000 OH
6.0000 OH
0.4000 M3
120.0000 Kg
0.3000 M3
360.0000 Bh
6.0000 Kg

Batu Bata Volume 0,30 m3


Mandor
Kepala Tukang
Tukang Batu
Pekerja
Batu Bata (M3)
Semen Portland
Pasir Pasang
Porselin 11 x 11 cm
Semen Nat

292

Bh

Memasang Badkip Porselen


0.2500 OH
Mandor
0.7500 OH
Kepala Tukang
0.0750 OH
Tukang Batu
1.0000 Bh
Badkip
0.2000 Set
Perlengkapan

293

Bh

Memasang Bak Fiberglass Volume 1 m3 Air


0.9000 OH
Mandor
0.9000 OH
Kepala Tukang
4.5000 OH
Tukang Batu
3.0000 OH
Pekerja
1.0000 Bh
Bak Fiberglass
0.1200 Set
Perlengkapan

294

M1 Memasang pipa
0.0025
0.0030
0.0300
0.0600
1.6000
0.6800
0.0130
0.0110

Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 cm


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Pipa Tanah Dia. 15 cm
Kg
Semen Portland
M3
Pasir Pasang
M3
Pasir urug

295

M1 Memasang pipa
0.0070
0.0040
0.0400

Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 cm


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu

Page 112

NO

URAIAN
0.0800
1.6000
0.8700
0.0140
0.0140

OH
Bh
Kg
M3
M3

Pekerja
Pipa Tanah Dia. 20 cm
Semen Portland
Pasir Pasang
Pasir urug

296

Bh

Memasang Pipa
0.0070
0.0070
0.0700
0.1400
1.1000
0.0270
3.9200
0.0560
0.0240

Beton, Diameter 15 - 20 cm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Pipa Beton Dia. 15 - 20 cm
M3
Batu Bata (M3)
Kg
Semen Portland
M3
Pasir Pasang
M3
Pasir urug

297

Bh

Memasang Pipa
0.0190
0.0190
0.1900
0.3800
1.1000
0.5500
10.3000
0.0610
0.0690

Beton, Diameter 30 - 100 cm


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Pipa Beton Dia. 30 - 100 cm
M3
Batu Bata (M3)
Kg
Semen Portland
M3
Pasir Pasang
M3
Pasir urug

298

Bh

Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm


0.0160 OH
Mandor
0.0015 OH
Kepala Tukang
1.0150 OH
Tukang Batu
3.2000 OH
Pekerja
0.1450 M3
Batu Bata (M3)
44.0000 Kg
Semen Portland
0.0700 M3
Pasir Pasang
0.0700 M3
Batu Kerikil
1.6000 Kg
Besi Beton Polos
0.0600 M3
Pasir Beton

299

Bh

Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm


0.0710 OH
Mandor
0.0470 OH
Kepala Tukang
0.4730 OH
Tukang Batu
1.4200 OH
Pekerja
0.2500 M3
Batu Bata (M3)
77.0000 Kg
Semen Portland
0.1300 M3
Pasir Pasang
0.0200 M3
Batu Kerikil

Page 113

NO

URAIAN
2.6000 Kg
0.0900 M3

Besi Beton Polos


Pasir Beton

300

Bh

Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm


0.1080 OH
Mandor
0.0720 OH
Kepala Tukang
0.7200 OH
Tukang Batu
0.1000 OH
Tukang Gali
2.1600 OH
Pekerja
0.3710 M3
Batu Bata (M3)
114.0000 Kg
Semen Portland
0.1840 M3
Pasir Pasang
0.0330 M3
Batu Koral
4.8500 Kg
Besi Beton Polos
0.1200 M3
Pasir Beton

301

M1 Memasang Pipa
0.0270
0.0090
0.0900
0.0540
1.2000
0.3500

Galvanis Diameter 1/2"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa Galvanis Dia. 0,5"
Set
Perlengkapan

302

M1 Memasang Pipa
0.0270
0.0090
0.0900
0.0540
1.2000
0.3500

Galvanis Diameter 3/4"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa Galvanis Dia. 0,75"
Set
Perlengkapan

303

M1 Memasang Pipa
0.0270
0.0090
0.0900
0.0540
1.2000
0.3500

Galvanis Diameter 1"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa Galvanis Dia. 1"
Set
Perlengkapan

304

M1 Memasang Pipa
0.0054
0.0180
0.1800
0.1080
1.2000

Galvanis Diameter 1 1/2"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa Galvanis Dia. 1,5"

Page 114

NO

URAIAN
0.3500 Set

Perlengkapan

305

M1 Memasang Pipa
0.0054
0.0180
0.1800
0.1080
1.2000
0.3500

Galvanis Diameter 3"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa Galvanis Dia. 3"
Set
Perlengkapan

306

M1 Memasang Pipa
0.0068
0.0225
0.2250
0.1350
1.2000
0.3500

Galvanis Diameter 4"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa Galvanis Dia. 4"
Set
Perlengkapan

307

M1 Memasang Pipa
0.0018
0.0060
0.0600
0.0360
1.2000
0.3500

PVC Tipe AW Diameter 1/2"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa PVC Dia. 0,5"
Set
Perlengkapan

308

M1 Memasang Pipa
0.0018
0.0060
0.0600
0.0360
1.2000
0.3500

PVC Tipe AW Diameter 3/4"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa PVC Dia. 0,75"
Set
Perlengkapan

309

M1 Memasang Pipa
0.0018
0.0060
0.0600
0.0360
1.2000
0.3500

PVC Tipe AW Diameter 1"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa PVC Dia. 1"
Set
Perlengkapan

310

M1 Memasang Pipa PVC Tipe AW Diameter 1 1/2"


0.0018 OH
Mandor

Page 115

NO

URAIAN
0.0060
0.0600
0.0360
1.2000
0.3500

OH
OH
OH
M1
Set

Kepala Tukang
Tukang Batu
Pekerja
Pipa PVC Dia. 1,5"
Perlengkapan

311

M1 Memasang Pipa
0.0027
0.0090
0.0900
0.0540
1.2000
0.3500

PVC Tipe AW Diameter 2"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa PVC Dia. 2"
Set
Perlengkapan

312

M1 Memasang Pipa
0.0018
0.0060
0.0600
0.0360
1.2000
0.3500

PVC Tipe AW Diameter 2 1/2"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa PVC Dia. 2,5"
Set
Perlengkapan

313

M1 Memasang Pipa
0.0041
0.0135
0.1350
0.0810
1.2000
0.3500

PVC Tipe AW Diameter 3"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa PVC Dia. 3"
Set
Perlengkapan

314

M1 Memasang Pipa
0.0041
0.0135
0.1350
0.0810
1.2000
0.3500

PVC Tipe AW Diameter 4"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
M1
Pipa PVC Dia. 4"
Set
Perlengkapan

315

Bh

Memasang Bak Cuci Piring Stainles Steel


0.0015 OH
Mandor
0.0300 OH
Kepala Tukang
0.3000 OH
Tukang Batu
0.0300 OH
Pekerja
1.0000 Bh
Bak Cuci Stainles Steel
1.0000 Set
Water Drain + Asesories

Page 116

NO

URAIAN

316

Bh

Memasang Bak Cuci Piring Teraso


0.0025 OH
Mandor
0.0500 OH
Kepala Tukang
0.5000 OH
Tukang Batu
0.0500 OH
Pekerja
1.0000 Bh
Bak Cuci Teraso
1.0000 Set
Water Drain + Asesories
20.0000 Kg
Semen Portland
0.0500 M3
Pasir Pasang

317

Bh

Memasang Kran
0.0050
0.0100
0.1000
0.0100
1.0000
0.0250

318

Bh

Memasang Floor Drain


0.0050 OH
0.0100 OH
0.1000 OH
0.0100 OH
1.0000 Bh

319

320

BH

BH

Bak Kontrol
0.3000
0.0300
1.0000
0.4500
0.1000
0.1000
0.8333
0.0500
5.0000
0.5000
3.0000
0.4440

Diameter 3/4" Atau 1/2"


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Kran Air (Stainless Steel)
Bh
Seal Tape

OH
OH
OH
OH
M3
M3
M2
M3
Kg
M2
M2
Kg

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Floor Drain Stainless Steel

Tukang Batu
Kepala Tukang
Pekerja
Mandor
Pasang Pondasi Batu Kali, 1 Pc : 3 Ps
Pasir Urug
Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps

Pekerjaan Beton K 225


Pembesian Dengan Besi Polos Atau Besi Ulir
Pasang Bekisting Untuk Lantai
Plesteran 1 Pc : 2 Ps, Tebal 15 mm
Besi Beton Polos

Pekerjaan Septictank Kap. 50 Orang


14.8000 M3
Galian Tanah Biasa Sedalam 2 meter
3.6000 M3
Urugan Kembali
0.5000 M3
Pekerjaan Beton K 100
20.8333 M2
Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps
20.7200 M2
Plesteran 1 Pc : 2 Ps, Tebal 15 mm
0.5000 M3
Pekerjaan Beton K 225

Page 117

NO

URAIAN
50.0000
5.0000
2.5000
2.0000
5.0000
3.0000
20.0000

Kg
M2
M3
M3
M1
M1
Kg

Pembesian Dengan Besi Polos Atau Besi Ulir


Pasang Bekisting Untuk Lantai
Kerikil Saring
Abu Batu / Pasir Saring
Pipa PVC Dia. 4"
Pipa PVC Dia. 0,75"
Ijuk Saringan

321

BH

Pekerjaan Septictank Kap. 25 Orang


6.3200 M3
Galian Tanah Biasa Sedalam 2 meter
1.6000 M3
Urugan Kembali
0.2000 M3
Pekerjaan Beton K 100
16.1667 M2
Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps
16.5000 M2
Plesteran 1 Pc : 2 Ps, Tebal 15 mm
0.3000 M3
Pekerjaan Beton K 225
30.0000 Kg
Pembesian Dengan Besi Polos Atau Besi Ulir
3.0000 M2
Pasang Bekisting Untuk Lantai
2.0000 M3
Kerikil Saring
2.0000 M3
Abu Batu / Pasir Saring
5.0000 M1
Pipa PVC Dia. 4"
3.0000 M1
Pipa PVC Dia. 0,75"
20.0000 Kg
Ijuk Saringan

322

BH

Pekerjaan Septictank Kap. 15 Orang


2.9000 M3
Galian Tanah Biasa Sedalam 2 meter
0.8000 M3
Urugan Kembali
0.1400 M3
Pekerjaan Beton K 100
8.5833 M2
Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps
2.2500 M2
Plesteran 1 Pc : 2 Ps, Tebal 15 mm
0.1400 M3
Pekerjaan Beton K 225
14.0000 Kg
Pembesian Dengan Besi Polos Atau Besi Ulir
1.4000 M2
Pasang Bekisting Untuk Lantai
2.0000 M3
Kerikil Saring
2.0000 M3
Abu Batu / Pasir Saring
5.0000 M1
Pipa PVC Dia. 4"
3.0000 M1
Pipa PVC Dia. 0,75"
10.0000 Kg
Ijuk Saringan

L
323

324

Analisa Biaya Konstruksi Pekerjaan Besi


1

Kg

100 Kg

Pasang Besi Profil


0.0003 OH
0.0060 OH
0.0060 OH
0.0600 OH
1.1500 Kg

Mandor
Kepala Tukang
Tukang Besi
Pekerja
Besi Profil IWF

Pekerjaan Perakitan
0.0050 OH

Mandor

Page 118

NO

URAIAN
0.0010
0.1000
0.1000
0.1000
0.1000
1.1500

OH
OH
OH
Ltr
Ltr
Jam

Kepala Tukang
Tukang Besi
Pekerja
BBM
Minyak Pelumas
Sewa Alat Konsruksi

325

CM Pengelasan Dengan Listrik


0.0002 OH
Mandor
0.0002 OH
Kepala Tukang
0.0020 OH
Tukang Besi
0.0040 OH
Pekerja
0.0400 Kg
Kawat Las
0.0300 Ltr
BBM
0.0040 Ltr
Minyak Pelumas
0.0170 Jam
Sewa Alat Konsruksi

326

M2 Pasang Kawat Harmonika


0.0005 OH
Mandor
0.0100 OH
Kepala Tukang
0.1000 OH
Tukang Kayu
0.1000 OH
Pekerja
1.1000 M2
Kawat Harmonika
0.0200 Kg
Paku 1 cm - 2,5 cm
0.0018 M3
Kayu Merantih Papan

327

M2 Pasang Kawat Kassa


0.0005 OH
0.0100 OH
0.1000 OH
0.1000 OH
1.1000 M2
0.0200 Kg
0.0018 M3

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kawat Kassa
Paku 1 cm - 2,5 cm
Kayu Merantih Papan

M2 Pasang Kawat Burung


0.0005 OH
0.0100 OH
0.1000 OH
0.1000 OH
1.1000 M2
0.0200 Kg
0.0018 M3

Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Kawat Burung
Paku 1 cm - 2,5 cm
Kayu Merantih Papan

328

M
329

Analisa Biaya Konstruksi Pekerjaan Penutup Dinding dan Lantai


1

M2 Pasang Lantai Paving Block

Page 119

NO

URAIAN
0.2000
0.0600
35.0000
0.0350

OH
OH
Bh
M3

Pekerja
Tukang Batu
Paving Block
Pasir Pasang

330

M2 Pasang Lantai Ubin PC


0.0130 OH
0.0120 OH
0.1200 OH
0.2500 OH
6.6300 Bh
9.8000 Kg
0.0450 M3

Abu-abu Ukuran 40 x 40 cm
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Ubin 40 x 40 cm Abu-abu
Semen Portland
Pasir Pasang

331

M2 Pasang Lantai Ubin PC


0.0130 OH
0.0130 OH
0.1250 OH
0.2600 OH
11.8700 Bh
10.0000 Kg
0.0450 M3

Abu-abu Ukuran 30 x 30 cm
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Ubin 30 x 30 cm Abu-abu
Semen Portland
Pasir Pasang

332

M2 Pasang Lantai Ubin PC


0.0140 OH
0.0130 OH
0.1300 OH
0.2700 OH
26.5000 Bh
10.4000 Kg
0.0135 M3

Abu-abu Ukuran 20 x 20 cm
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Ubin 20 x 20 cm Abu-abu
Semen Portland
Pasir Pasang

333

M2 Pasang Lantai Ubin Warna Ukuran 40 x 40 cm


0.0130 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.2500 OH
Pekerja
6.6300 Bh
Ubin 40 x 40 cm Warna
9.8000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.3000 Kg
Semen Warna

334

M2 Pasang Lantai Ubin Warna Ukuran 30 x 30 cm


0.0130 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Batu

Page 120

NO

URAIAN
0.2600
11.8700
10.0000
0.0450
1.5000

OH
Bh
Kg
M3
Kg

Pekerja
Ubin 30 x 30 cm Warna
Semen Portland
Pasir Pasang
Semen Warna

336

M2 Pasang Lantai Ubin Teraso Ukuran 40 x 40 cm


0.0130 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.2500 OH
Pekerja
6.6300 Bh
Ubin 40 x 40 cm Teraso
9.8000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.3000 Kg
Semen Warna

337

M2 Pasang Lantai Ubin Teraso Ukuran 30 x 30 cm


0.0130 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Batu
0.2600 OH
Pekerja
11.8700 Bh
Ubin 30 x 30 cm Teraso
10.0000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.5000 Kg
Semen Warna

338

M2 Pasang Lantai Ubin Granito Ukuran 40 x 40 cm


0.0130 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.2500 OH
Pekerja
6.6300 Bh
Ubin 40 x 40 cm Granito
9.8000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.3000 Kg
Semen Warna

339

M2 Pasang Lantai Ubin Granito Ukuran 30 x 30 cm


0.0130 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Batu
0.2600 OH
Pekerja
11.8700 Bh
Ubin 30 x 30 cm Granito
10.0000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.5000 Kg
Semen Warna

340

M2 Pasang Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm

Page 121

NO

URAIAN
0.0130
0.0130
0.1200
0.2500
6.6300
9.8000
0.0450
1.3000

OH
OH
OH
OH
Bh
Kg
M3
Kg

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Ubin 40 x 40 cm Teralux Kerang
Semen Portland
Pasir Pasang
Semen Warna

341

M2 Pasang Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm


0.0130 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Batu
0.2600 OH
Pekerja
11.8700 Bh
Ubin 30 x 30 cm Teralux Kerang
10.0000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.5000 Kg
Semen Warna

342

M2 Pasang Lantai Keramik Ukuran 60 x 60 cm Granito


0.0130 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.2500 OH
Pekerja
3.1000 Bh
Keramik 60 x 60 cm Granito
9.6000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.5000 Kg
Semen Warna

343

M2 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm


0.0130 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.2500 OH
Pekerja
6.6300 Bh
Ubin 40 x 40 cm Teralux Marmer
9.8000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.3000 Kg
Semen Warna

344

M2 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm


0.0130 OH
Mandor
0.0130 OH
Kepala Tukang
0.1250 OH
Tukang Batu
0.2600 OH
Pekerja
11.8700 Bh
Ubin 30 x 30 cm Teralux Marmer
10.0000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.5000 Kg
Semen Warna

Page 122

NO

URAIAN

363

M2 Pasang Lantai Keramik Artistik 5 x 20 cm


0.0300 OH
Mandor
0.0350 OH
Kepala Tukang
0.3500 OH
Tukang Batu
0.6200 OH
Pekerja
106.0000 Bh
Ubin 5 x 20 cm Keramik Artistik
8.1900 Kg
Semen Portland
0.0450 M3
Pasir Pasang
3.2000 Kg
Semen Warna

364

M2 Pasang Lantai Keramik 33 x 33 cm


0.0300 OH
Mandor
0.0350 OH
Kepala Tukang
0.3500 OH
Tukang Batu
0.6200 OH
Pekerja
10.0000 Bh
Ubin 33 x 33 cm Keramik
8.1900 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.6200 Kg
Semen Warna

365

M2 Pasang Lantai Keramik 30 x 30 cm


0.0300 OH
Mandor
0.0350 OH
Kepala Tukang
0.3500 OH
Tukang Batu
0.6200 OH
Pekerja
11.8700 Bh
Keramik 30 x 30 Polos
10.0000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.5000 Kg
Semen Warna

366

M2 Pasang Lantai Keramik 40 x 40 cm


0.0300 OH
Mandor
0.0350 OH
Kepala Tukang
0.3500 OH
Tukang Batu
0.6200 OH
Pekerja
6.5625 Bh
Keramik 40 x 40 Polos
10.0000 Kg
Semen Portland
0.0450 M3
Pasir Pasang
1.5000 Kg
Semen Warna

367

M2 Pasang Lantai Keramik 20 x 20 cm


0.0300 OH
Mandor
0.0350 OH
Kepala Tukang
0.3500 OH
Tukang Batu
0.6200 OH
Pekerja
26.5000 Bh
Keramik 20 x 20 cm

Page 123

NO

URAIAN
10.4000 Kg
0.0450 M3
1.6200 Kg

Semen Portland
Pasir Pasang
Semen Warna

369

M2 Pasang Lantai Mosaik


0.0300 OH
0.0350 OH
0.3500 OH
0.6200 OH
11.8700 Bh
14.1500 Kg
0.0390 M3
2.0000 Kg

30 x 30 cm, Camp. 1PC : 3PP


Mandor
Kepala Tukang
Tukang Batu
Pekerja
Keramik 30 x 30 cm Mosaik
Semen Portland
Pasir Pasang
Semen Warna

370

M1 Pasang Plint Keramik Artistik 10 x 20 cm


0.0050 OH
Mandor
0.0090 OH
Kepala Tukang
0.0900 OH
Tukang Batu
0.0900 OH
Pekerja
5.3000 Bh
Keramik 10 x 20 cm Plint Artistik
1.1400 Kg
Semen Portland
0.0030 M3
Pasir Pasang
0.0250 Kg
Semen Warna

371

M1 Pasang Plint Keramik Artistik 10 x 10 cm


0.0050 OH
Mandor
0.0090 OH
Kepala Tukang
0.0900 OH
Tukang Batu
0.0900 OH
Pekerja
10.6000 Bh
Keramik 10 x 10 cm Plint Artistik
1.1400 Kg
Semen Portland
0.0030 M3
Pasir Pasang
0.0500 Kg
Semen Warna

372

M1 Pasang Plint Keramik Artistik 5 x 20 cm


0.0050 OH
Mandor
0.0090 OH
Kepala Tukang
0.0900 OH
Tukang Batu
0.0900 OH
Pekerja
5.3000 Bh
Keramik 5 x 20 cm Plint Artistik
0.5700 Kg
Semen Portland
0.0015 M3
Pasir Pasang
0.0130 Kg
Semen Warna

373

M1 Internal Cove Artistik (5 x 5 x 20) cm


0.0380 OH
Mandor

Page 124

NO

URAIAN
0.0450
0.4500
0.7500
5.3000
1.1400
0.0030
0.1000

375

OH
OH
OH
Bh
Kg
M3
Kg

M2 Pasang Lantai Karpet


0.0090 OH
0.0170 OH
0.1700 OH
0.1700 OH
1.0500 M2
0.3500 Kg

Kepala Tukang
Tukang Batu
Pekerja
Internal Cove (5 x 5 x 20) cm
Semen Portland
Pasir Pasang
Semen Warna

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Carpet
Lem Vinyl

376

M2 Pasang Underlyer, Tebal 6 mm


0.0060 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.1200 OH
Pekerja
1.0500 M2
Underlyer Tebal 6 mm / Rubber Corrugated
0.3500 Kg
Lem Vinyl

377

M2 Pasang Lantai Parquet


0.0330 OH
0.0350 OH
0.3500 OH
0.6500 OH
1.0500 M2
0.6000 Kg

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Parquet Jati
Lem Vinyl

378

M2 Pasang Lantai Kayu (Gymfloor)


0.0330 OH
Mandor
0.0350 OH
Kepala Tukang
0.3500 OH
Tukang Batu
0.6650 OH
Pekerja
1.0500 M2
Gymfloor
0.6000 Kg
Lem Vinyl

379

M2 Pasang Dinding
0.0300
0.0500
0.5000
0.6200
86.0000

Porselin 11 x 11 cm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Porselin 11 x 11 cm

Page 125

NO

URAIAN
9.3000 Kg
0.0180 M3
1.5000 Kg

Semen Portland
Pasir Pasang
Semen Warna

380

M2 Pasang Dinding
0.0300
0.0450
0.4500
0.6000
53.0000
9.3000
0.0180
2.7500

Porselin 10 x 20 cm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Porselin 10 x 20 cm Warna
Kg
Semen Portland
M3
Pasir Pasang
Kg
Semen Warna

381

M2 Pasang Dinding
0.0300
0.0450
0.4500
0.6000
26.5000
9.3000
0.0180
1.9400

Porselin 20 x 20 cm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Porselin 20 x 20 cm Warna
Kg
Semen Portland
M3
Pasir Pasang
Kg
Semen Warna

382

M2 Pasang Dinding
0.0300
0.0450
0.4500
0.6000
53.0000
9.3000
0.0180
2.7500

Keramik Artistik 10 x 20 cm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Keramik 10 x 20 cm Artistik
Kg
Semen Abu-abu
M3
Pasir Pasang
Kg
Semen Warna

383

M2 Pasang Dinding
0.0300
0.0450
0.4500
0.6000
106.0000
9.3000
0.0180
2.9000

Keramik Artistik 5 x 20 cm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Keramik 5 x 20 cm Artistik
Kg
Semen Abu-abu
M3
Pasir Pasang
Kg
Semen Warna

384

M2 Pasang Dinding Keramik 10 x 20 cm


0.0300 OH
Mandor

Page 126

NO

URAIAN
0.0450
0.4500
0.6000
53.0000
9.3000
0.0180
2.7500

OH
OH
OH
Bh
Kg
M3
Kg

Kepala Tukang
Tukang Batu
Pekerja
Keramik 10 x 20 cm
Semen Abu-abu
Pasir Pasang
Semen Warna

385

M2 Pasang Dinding
0.0300
0.0450
0.4500
0.6000
26.5000
9.3000
0.0180
1.9400

Keramik 20 x 20 cm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Keramik 20 x 20 cm
Kg
Semen Abu-abu
M3
Pasir Pasang
Kg
Semen Warna

387

M2 Pasang Dinding
0.0300
0.0500
0.5000
0.6500
63.0000
12.4400
0.0250
2.7500

Bata Pelapis 7 x 3 x 24 cm
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Batu Bata
Kg
Semen Abu-abu
M3
Pasir Pasang
Kg
Semen Warna

388

M2 Pasang Dinding
0.0300
0.0350
0.3500
0.6200
1.1000
11.7500
0.0350

Batu Paros
OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Batu Paros
Kg
Semen Abu-abu
M3
Pasir Pasang

389

M2 Pasang Dinding
0.0300
0.0350
0.3500
0.6200
1.1000
11.7500
0.0350

Batu Tempel Hitam


OH
Mandor
OH
Kepala Tukang
OH
Tukang Batu
OH
Pekerja
Bh
Batu Tempel Hitam
Kg
Semen Abu-abu
M3
Pasir Pasang

390

M2 Pasang Lantai Vinyl Karet 30 x 30 cm Klas I

Page 127

NO

URAIAN
0.0080
0.0150
0.1500
0.1500
11.8700
0.3500

OH
OH
OH
OH
Bh
Kg

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Vinyl Karet 30 x 30 cm KL I
Lem Vinyl

391

M2 Pasang Wallpaper Lebar 50 cm


0.0400 OH
Mandor
0.1700 OH
Kepala Tukang
0.1700 OH
Tukang Batu
0.7500 OH
Pekerja
2.2000 M2
Wall Paper
0.2500 Kg
Lem Vinyl

392

M2 Floor Hardener
0.0060
0.0120
0.1200
0.1200
5.0000

OH
OH
OH
OH
Kg

Mandor
Kepala Tukang
Tukang Batu
Pekerja
Floor Hardener Ferrovax

393

M2 Pasang Lantai Vinyl Karet 30 x 30 cm dengan lem


0.0040 OH
Mandor
0.0080 OH
Kepala Tukang
0.0800 OH
Tukang Batu
0.0800 OH
Pekerja
1.7600 Bh
Vinyl Karet 30 x 30 cm KL I
0.0800 Kg
Lem Vinyl

394

M3 Pasang Plint Kayu Klas II Ukuran 2 x 10 cm


0.0060 OH
Mandor
0.0120 OH
Kepala Tukang
0.1200 OH
Tukang Batu
0.1200 OH
Pekerja
0.0030 M3
Kayu Klas II Papan
0.0500 Bh
Paku Sekrup 3,5"

395

M2 Pasang Lantai Vinyl Motif Kembang 30 x 30 cm


0.0075 OH
Mandor
0.0150 OH
Kepala Tukang
0.1500 OH
Tukang Batu
0.1500 OH
Pekerja
11.0500 Bh
Vinyl Motif Kembang Ex DN
0.3500 Kg
Lem Vinyl

Page 128

NO

URAIAN

Analisa Biaya Konstruksi Pekerjaan Pengecatan

396

M2 Mengikis / Mengorek Permukaan Cat Tembok Lama


0.0025 OH
Mandor
0.1500 OH
Pekerja
0.0500 Kg
Soda Api

397

M2 Mencuci Bidang
0.0025
0.1500
0.0500

Permukaan Tembok Yang Pernah Di Cat


OH
Mandor
OH
Pekerja
Kg
Sabun

398

M2 Mengorek Karat
0.0025
0.1500
0.0500

Cat Lama Permukaan Baja Dengan Cara Manual


OH
Mandor
OH
Pekerja
Kg
Sabun

399

M2 Menyabun Permukaan
0.0025 OH
0.1500 OH
0.0500 Kg

400

M2 Mengorek Karat
0.5000
0.8000
1.0000
1.6000
40.0000
10.0000
0.2000

Atau Cat Lama Permukaan Baja Dengan Pancar Pasir (Sanblast


OH
Mandor
OH
Kepala Tukang
OH
Tukang Cat
OH
Pekerja
Kg
Pasir Silika
Ltr
BBM
Hari Kompresor, Blasting Pot, Selang Dan Nozzle

401

M2 Mendempul Dan
0.0025
0.0040
0.0400
0.0400
0.0800
0.0200
0.0100

Menggosok Kayu
OH
Mandor
OH
Kepala Tukang
OH
Tukang Cat
OH
Pekerja
Kg
Dempul Jadi
Kg
Minyak Cat
Kg
Batu Apung

402

M2 Pengecatan Bidang Kayu Lama


0.0025 OH
Mandor

Tembok Lama
Mandor
Pekerja
Sabun

Page 129

NO

URAIAN
0.0075
0.0750
0.0700
0.1500
0.1700
0.1700

OH
OH
OH
Kg
Kg
Kg

Kepala Tukang
Tukang Cat
Pekerja
Plamur Tembok
Cat Dasar
Cat Penutup (Cat Minyak)

403

M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Pe
0.0025 OH
Mandor
0.0075 OH
Kepala Tukang
0.0750 OH
Tukang Cat
0.0700 OH
Pekerja
0.2000 Kg
Cat Menie
0.1500 Kg
Plamur Tembok
0.1700 Kg
Cat Dasar
0.2600 Kg
Cat Penutup (Cat Minyak)

404

M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 3 Lapis Cat Pe
0.0025 OH
Mandor
0.0040 OH
Kepala Tukang
0.1050 OH
Tukang Cat
0.0700 OH
Pekerja
0.2000 Kg
Cat Menie
0.1500 Kg
Plamur Tembok
0.1700 Kg
Cat Dasar
0.3500 Kg
Cat Penutup (Cat Minyak)

405

M2 Pelaburan Bidang Kayu Dengan Teak Oil


0.0025 OH
Mandor
0.0630 OH
Kepala Tukang
0.0630 OH
Tukang Cat
0.0400 OH
Pekerja
0.3600 Ltr
Teak Oil

406

M2 Pelaburan Bidang Kayu Dengan Politur


0.0025 OH
Mandor
0.0160 OH
Kepala Tukang
0.0600 OH
Tukang Cat
0.1500 Ltr
Politur
0.3720 Ltr
Politur Jadi
2.0000 Lbr
Ampelas

407

M2 Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter


0.0060 OH
Mandor
0.1000 OH
Pekerja
0.3500 Ltr
Residu Atau Ter

Page 130

NO

URAIAN

408

M2 Pelaburan Bidang Kayu dengan Vernis


0.0025 OH
Mandor
0.0160 OH
Kepala Tukang
0.1600 OH
Tukang Cat
0.1600 OH
Pekerja
0.1500 Ltr
Vernis
0.0500 Kg
Dempul
0.1000 Lbr
Ampelas
0.0100 Bh
Kuas

409

M2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
0.0025 OH
Mandor
0.0063 OH
Kepala Tukang
0.0630 OH
Tukang Cat
0.0200 OH
Pekerja
0.1000 Kg
Plamur Tembok
0.1000 Kg
Cat Dasar
0.2600 Kg
Cat Penutup (Cat Air)

410

M2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)


0.0025 OH
Mandor
0.0042 OH
Kepala Tukang
0.0420 OH
Tukang Cat
0.0280 OH
Pekerja
0.1200 Kg
Cat Dasar
0.1800 Kg
Cat Penutup (Cat Air)

411

M2 Melabur Tembok
0.0025
0.0042
0.0420
0.0280
0.1000

Dengan Kalkarium
OH
Mandor
OH
Kepala Tukang
OH
Tukang Cat
OH
Pekerja
Kg
Kalkarium

412

M2 Melabur Tembok
0.0025
0.0001
0.0010
0.1500
0.1000
0.2500
0.0020
0.1500

Dengan Kapur Sirih


OH
Mandor
OH
Kepala Tukang
OH
Tukang Cat
OH
Pekerja
Lbr
Ampelas
Ikat
Alang-alang
M3
Kayu Perancah
M3
Kapur Sirih

Page 131

NO

URAIAN

413

M2 Melabur Tembok
0.0025
0.0005
0.0050
0.0400
0.0020
0.3000

Lama
OH
OH
OH
OH
M3
M3

Dengan Kapur Sirih (Untuk Pemeliharaan)


Mandor
Kepala Tukang
Tukang Cat
Pekerja
Kayu Perancah
Kapur Sirih

414

M2 Pemasangan Wall Paper


0.0025 OH
Mandor
0.0020 OH
Kepala Tukang
0.2000 OH
Tukang Cat
0.0200 OH
Pekerja
1.2000 M2
Wall Paper
0.2000 Kg
Perekat

415

M2 Pengecatan Permukaan Baja Dengan Meni Besi


0.0100 OH
Mandor
0.0200 OH
Kepala Tukang
0.2000 OH
Tukang Cat
0.0200 OH
Pekerja
0.1000 Kg
Meni Besi
0.0100 Bh
Kuas

416

M2 Pengecatan Permukaan Baja Dengan Meni Besi Dan Perancah


0.0075 OH
Mandor
0.0225 OH
Kepala Tukang
0.2250 OH
Tukang Cat
0.2500 OH
Pekerja
0.1000 Kg
Meni Besi
0.0100 Bh
Kuas
0.0020 M3
Kayu Perancah

417

M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 4 Lapis
0.0075 OH
Mandor
0.0225 OH
Kepala Tukang
0.0060 OH
Tukang Cat
0.0060 OH
Pekerja
0.1000 Kg
Meni (Read Lead) A
0.1000 Kg
Meni (Read Lead) B
0.0400 Kg
Aluminium C
0.0400 Kg
Aluminium B
0.0100 Ltr
Pengencer
0.0020 M3
Kayu Perancah

Page 132

NO

URAIAN

418

M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 1 Lapis
0.0060 OH
Mandor
0.0120 OH
Kepala Tukang
0.0600 OH
Tukang Cat
0.0060 OH
Pekerja
0.3000 Kg
Cat

419

M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 3 Lapis
0.5000 OH
Mandor
0.8000 OH
Kepala Tukang
0.3000 OH
Tukang Cat
0.2000 OH
Pekerja
0.1100 Kg
Cat Dasar
0.1700 Kg
Cat Antara
0.0800 Kg
Cat Penutup (Cat Minyak)

420

M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (Airless Spray) Denga
0.2000 OH
Mandor
0.2000 OH
Kepala Tukang
0.7000 OH
Tukang Cat
0.4000 OH
Pekerja
0.3000 Kg
Cat Dasar

Page 133

N PEKERJAAN UNTUK PEKERJAAN SIPIL BANGUNAN

PEKERJAAN UMUM

PADANG PANJANG
un anggaran 2014
H. SATUAN

UPAH

BAHAN
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00
1,300.00
140,000.00
150,000.00
1,600,000.00
12,000.00
15,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

225,800.00

Rp.
25,000.00
Rp.
3,250.00
Rp.
700.00
Rp.
1,350.00
Rp.
115,200.00
Rp.
720.00
Rp.
6,000.00
53,060.00 Rp.
152,220.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

205,280.00
20,528.00
225,808.00

2,000.00
2,060.00
19,000.00
30,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00
1,300.00
40,000.00
140,000.00
150,000.00
1,600,000.00
12,000.00
22,500.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

283,100.00

Rp.
25,000.00
Rp.
3,250.00
Rp.
48,000.00
Rp.
700.00
Rp.
1,350.00
Rp.
115,200.00
Rp.
720.00
Rp.
10,125.00
53,060.00 Rp.
204,345.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

257,405.00
25,740.50
283,145.50

2,000.00
2,060.00
19,000.00
30,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00
1,300.00
12,000.00
140,000.00
150,000.00
12,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

408,000.00

Rp.
20,000.00
Rp.
2,600.00
Rp.
300,000.00
Rp.
700.00
Rp.
1,350.00
Rp.
720.00
45,560.00 Rp.
325,370.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

370,930.00
37,093.00
408,023.00

2,000.00
2,060.00
19,000.00
22,500.00

Dibulatkan
Rp.
Rp.

100,000.00
103,000.00

Rp.
Rp.

PEKERJAAN

500.00
1,030.00

Rp.

61,000.00

Page 134

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.

95,000.00
75,000.00
1,600,000.00
12,000.00
2,500,000.00

UPAH
Rp.
Rp.

Rp.

BAHAN

9,500.00
7,500.00
Rp.
19,200.00
Rp.
240.00
Rp.
17,500.00
18,530.00 Rp.
36,940.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
95,000.00
75,000.00
20,000.00
2,500,000.00
12,000.00
15,000.00
1,300.00
140,000.00
140,000.00
150,000.00
800.00
46,000.00
3,300.00
80,000.00
55,000.00
65,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00
2,500,000.00
12,000.00
1,300.00
140,000.00
150,000.00
48,500.00

Rp.
Rp.
Rp.
Rp.

Rp.

1,249,800.00

Rp.
25,000.00
Rp.
450,000.00
Rp.
10,200.00
Rp.
16,500.00
Rp.
45,500.00
Rp.
21,000.00
Rp.
14,000.00
Rp.
22,500.00
Rp.
24,000.00
Rp.
11,500.00
Rp.
6,600.00
Rp.
6,400.00
Rp.
8,250.00
Rp.
3,900.00
470,900.00 Rp.
665,350.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,136,250.00
113,625.00
1,249,875.00

5,000.00
30,900.00
190,000.00
95,000.00
150,000.00

Rp.

1,046,400.00

Rp.
34,000.00
Rp.
525,000.00
Rp.
3,600.00
Rp.
13,650.00
Rp.
4,200.00
Rp.
7,500.00
Rp.
72,750.00
290,600.00 Rp.
660,700.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

951,300.00
95,130.00
1,046,430.00

5,000.00
20,600.00
190,000.00
75,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00
2,500,000.00
12,000.00
48,500.00

Rp.
Rp.
Rp.
Rp.

Rp.

55,470.00
5,547.00
61,017.00

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

1,176,000.00

Rp.
60,000.00
Rp.
690,000.00
Rp.
8,400.00
Rp.
72,750.00
237,950.00 Rp.
831,150.00 Rp.
Overhead 10 % .. Rp.

1,069,100.00
106,910.00

5,000.00
15,450.00
142,500.00
75,000.00

Page 135

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Jumlah ..Rp.
Dibulatkan
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
75,000.00

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00
2,500,000.00
12,000.00
1,300.00
140,000.00
150,000.00
48,500.00
65,000.00

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
95,000.00
2,500,000.00
12,000.00
35,000.00

Rp.

13,700.00

5,000.00
7,500.00
12,500.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

12,500.00
1,250.00
13,750.00

Rp.

1,077,700.00

Rp.
25,000.00
Rp.
465,000.00
Rp.
3,600.00
Rp.
23,400.00
Rp.
4,200.00
Rp.
7,500.00
Rp.
72,750.00
Rp.
87,750.00
290,600.00 Rp.
689,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

979,800.00
97,980.00
1,077,780.00

Dibulatkan

5,000.00
20,600.00
190,000.00
75,000.00

Rp.

170,000.00

Rp.
Rp.

150.00
28,500.00

Rp.

Rp.
90,000.00
Rp.
960.00
Rp.
35,000.00
28,650.00 Rp.
125,960.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

154,610.00
15,461.00
170,071.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
5,000.00
12,500.00

Rp.

32,900.00

Rp.
Rp.
Rp.
Rp.

1,300.00
206.00
1,615.00
18,750.00

Rp.

Rp.
5,000.00
Rp.
3,125.00
21,871.00 Rp.
8,125.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

29,996.00
2,999.60
32,995.60

Rp.

131,100.00

Rp.
Rp.

5,000.00
75,000.00

Rp.

Rp.
23,625.00
Rp.
14,175.00
Rp.
1,400.00
80,000.00 Rp.
39,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

119,200.00
11,920.00
131,120.00

Rp.

586,600.00

33,300.00
500,025.00
533,325.00 Rp.
- Rp.
Overhead 10 % .. Rp.

533,325.00
53,332.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

100,000.00
75,000.00
157,500.00
157,500.00
140,000.00

100,000.00
75,000.00

1,176,010.00

Rp.
Rp.
Rp.

Page 136

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Jumlah ..Rp.
Dibulatkan
Rp.
Rp.

Rp.
Rp.

Rp.
Rp.

Rp.
Rp.

Rp.
Rp.

100,000.00
75,000.00

75,000.00
100,000.00

75,000.00
100,000.00

75,000.00
100,000.00

95,000.00
75,000.00

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.

550,300.00

300.00
500,025.00
500,325.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

500,325.00
50,032.50
550,357.50

Dibulatkan

Rp.

9,300.00

7,500.00
1,000.00
8,500.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

8,500.00
850.00
9,350.00

Dibulatkan
Rp.
37,500.00
2,500.00
40,000.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

44,000.00

Dibulatkan
Rp.
15,000.00
1,000.00
16,000.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

17,600.00

Dibulatkan
Rp.
4,750.00
375.00
5,125.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

5,600.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
95,000.00
103,000.00

75,000.00
100,000.00
95,000.00
103,000.00

75,000.00
100,000.00
95,000.00
103,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

586,657.50

40,000.00
4,000.00
44,000.00

16,000.00
1,600.00
17,600.00

5,125.00
512.50
5,637.50

Rp.

11,600.00

7,500.00
500.00
2,375.00
257.50
10,632.50 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

10,632.50
1,063.25
11,695.75

Dibulatkan
Rp.
15,000.00
1,000.00
5,700.00
618.00
22,318.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

24,500.00

Dibulatkan
Rp.
300,000.00
20,000.00
570,000.00
61,800.00
951,800.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,046,900.00

22,318.00
2,231.80
24,549.80

951,800.00
95,180.00
1,046,980.00

Page 137

H. SATUAN
Rp.
Rp.

Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

75,000.00
100,000.00

75,000.00
100,000.00

95,000.00
103,000.00
75,000.00
100,000.00

75,000.00
100,000.00

UPAH
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

BAHAN

Dibulatkan
Rp.
15,000.00
1,000.00
16,000.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

17,600.00

Dibulatkan
Rp.
300,000.00
40,000.00
340,000.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

374,000.00

Dibulatkan
Rp.
5,700.00
618.00
15,000.00
1,000.00
22,318.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

24,500.00

Dibulatkan
Rp.
300,000.00
40,000.00
340,000.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

374,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
160,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,585.19
350,000.00
140,000.00
225,000.00
1,300.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
75,000.00

Rp.
Rp.
Rp.

340,000.00
34,000.00
374,000.00

22,318.00
2,231.80
24,549.80

340,000.00
34,000.00
374,000.00

Rp.

84,900.00

Rp.
69,440.00
7,752.00 Rp.
69,440.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

77,192.00
7,719.20
84,911.20

Rp.

365,300.00

Rp.
3,535.00
Rp.
183,750.00
Rp.
10,360.00
Rp.
32,850.00
Rp.
58,500.00
43,136.00 Rp.
288,995.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

332,131.00
33,213.10
365,344.10

1,900.00
1,236.00
11,875.00
28,125.00

Dibulatkan
Rp.
Rp.

16,000.00
1,600.00
17,600.00

200.00
412.00
3,990.00
3,150.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

64,600.00

2,500.00
56,250.00
58,750.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

58,750.00
5,875.00
64,625.00

Page 138

H. SATUAN
Rp.
Rp.

Rp.
Rp.

Rp.
Rp.

100,000.00
75,000.00

100,000.00
75,000.00

100,000.00
75,000.00

UPAH
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

BAHAN

Dibulatkan
Rp.
4,500.00
67,500.00
72,000.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

79,200.00

Dibulatkan
Rp.
6,700.00
78,750.00
85,450.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

93,900.00

Dibulatkan
Rp.
3,200.00
75,000.00
78,200.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

86,000.00

Dibulatkan
Rp.
Rp.

100,000.00
75,000.00

Rp.
Rp.
Rp.

Rp.
Rp.

Rp.
Rp.

Rp.
Rp.

Rp.
Rp.

100,000.00
75,000.00

100,000.00
75,000.00

100,000.00
75,000.00

100,000.00
75,000.00

100,000.00
75,000.00

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

72,000.00
7,200.00
79,200.00

85,450.00
8,545.00
93,995.00

78,200.00
7,820.00
86,020.00

Rp.

130,300.00

6,000.00
112,500.00
118,500.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

118,500.00
11,850.00
130,350.00

Dibulatkan
Rp.
Rp.

PEKERJAAN

Rp.

103,900.00

4,500.00
90,000.00
94,500.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

94,500.00
9,450.00
103,950.00

Dibulatkan
Rp.
500.00
3,750.00
4,250.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

4,600.00

Dibulatkan
Rp.
1,000.00
24,750.00
25,750.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

28,300.00

Dibulatkan
Rp.
1,900.00
14,400.00
16,300.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

17,900.00

Dibulatkan
Rp.
5,000.00
37,500.00
42,500.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

46,700.00

4,250.00
425.00
4,675.00

25,750.00
2,575.00
28,325.00

16,300.00
1,630.00
17,930.00

42,500.00
4,250.00
46,750.00

Page 139

H. SATUAN

UPAH

BAHAN
Dibulatkan

Rp.
Rp.
Rp.

100,000.00
75,000.00
65,000.00

Rp.
Rp.
Rp.

Rp.

111,600.00

Rp.
78,000.00
23,500.00 Rp.
78,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

101,500.00
10,150.00
111,650.00

1,000.00
22,500.00

Dibulatkan
Rp.
Rp.
Rp.

100,000.00
75,000.00
15,000.00

Rp.
Rp.
Rp.

Rp.

113,000.00

Rp.
90,000.00
12,750.00 Rp.
90,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

102,750.00
10,275.00
113,025.00

1,500.00
11,250.00

Dibulatkan
Rp.
Rp.
Rp.

100,000.00
75,000.00
140,000.00

Rp.
Rp.
Rp.

Rp.

208,100.00

Rp.
168,000.00
21,250.00 Rp.
168,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

189,250.00
18,925.00
208,175.00

2,500.00
18,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
1,300.00
140,000.00

Rp.

772,900.00

Rp.

702,680.00

Overhead 10 % .. Rp.
Jumlah ..Rp.

70,268.00
772,948.00

Rp.
Rp.
Rp.
Rp.

7,500.00
6,180.00
57,000.00
112,500.00

Rp.

Rp.
Rp.
Rp.
183,180.00 Rp.

189,000.00
262,600.00
67,900.00
519,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
1,300.00
140,000.00

Rp.

722,500.00

Rp.
Rp.
Rp.
Rp.

7,500.00
6,180.00
57,000.00
112,500.00

Rp.

Rp.
189,000.00
Rp.
211,900.00
Rp.
72,800.00
183,180.00 Rp.
473,700.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

656,880.00
65,688.00
722,568.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
1,300.00
140,000.00

PEKERJAAN

Rp.

687,600.00

Rp.
Rp.
Rp.
Rp.

7,500.00
6,180.00
57,000.00
112,500.00

Rp.

Rp.
189,000.00
Rp.
176,800.00
Rp.
76,160.00
183,180.00 Rp.
441,960.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

625,140.00
62,514.00
687,654.00

Page 140

H. SATUAN

UPAH

BAHAN
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
1,300.00
140,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

663,100.00

Rp.
189,000.00
Rp.
152,100.00
Rp.
78,540.00
183,180.00 Rp.
419,640.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

602,820.00
60,282.00
663,102.00

7,500.00
6,180.00
57,000.00
112,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
1,300.00
140,000.00

Rp.

625,900.00

Rp.
Rp.
Rp.
Rp.

7,500.00
6,180.00
57,000.00
112,500.00

Rp.

Rp.
189,000.00
Rp.
118,300.00
Rp.
78,540.00
183,180.00 Rp.
385,840.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

569,020.00
56,902.00
625,922.00

Rp.
Rp.
Rp.
Rp.

7,500.00
6,180.00
57,000.00
112,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
281.25
1,200,000.00
140,000.00

Rp.

Rp.

686,200.00

Rp.
189,000.00
Rp.
47.81
Rp.
204,000.00
Rp.
47,600.00
183,180.00 Rp.
440,647.81 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

623,827.81
62,382.78
686,210.59

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
1,300.00
281.25
140,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

572,400.00

Rp.
189,000.00
Rp.
79,300.00
Rp.
41.34
Rp.
68,880.00
183,180.00 Rp.
337,221.34 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

520,401.34
52,040.13
572,441.48

7,500.00
6,180.00
57,000.00
112,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
1,300.00
281.25
140,000.00

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

7,500.00
6,180.00
57,000.00
112,500.00

Rp.

Rp.
Rp.
Rp.
Rp.
183,180.00 Rp.

189,000.00
53,300.00
36.84
73,220.00
315,556.84

Rp.

548,600.00

Rp.

498,736.84

Page 141

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
65,000.00

Rp.

352,600.00

Rp.

Rp.
189,000.00
Rp.
28,080.00
103,467.00 Rp.
217,080.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

320,547.00
32,054.70
352,601.70

Rp.
Rp.
Rp.
Rp.

15,000.00
8,755.00
80,750.00
225,000.00

Rp.
Rp.
Rp.
Rp.

3,900.00
4,017.00
37,050.00
58,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
9,000.00
1,300.00
140,000.00
150,000.00
15,000.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
157,500.00
1,300.00
140,000.00
150,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.
Rp.

829,454.55
133,000.00
Rp.

Rp.
Rp.

829,454.55
133,000.00
Rp.

Rp.

2,042,200.00

Rp.
1,134,000.00
Rp.
252,200.00
Rp.
43,680.00
Rp.
70,200.00
Rp.
27,000.00
329,505.00 Rp.
1,527,080.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,856,585.00
185,658.50
2,042,243.50

Dibulatkan

Rp.

720,500.00

Rp.
70,875.00
Rp.
252,200.00
Rp.
43,680.00
Rp.
70,200.00
218,090.00 Rp.
436,955.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

655,045.00
65,504.50
720,549.50

8,000.00
3,090.00
28,500.00
178,500.00

Dibulatkan
Rp.
Rp.
290,309.09
Rp.
27,597.50
- Rp.
317,906.59 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

349,600.00

Dibulatkan
Rp.
Rp.
414,727.27
Rp.
7,647.50
- Rp.
422,374.77 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

464,600.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
95,000.00
103,000.00

49,873.68
548,610.53

Rp.
Rp.
Rp.
Rp.
Rp.

317,906.59
31,790.66
349,697.25

422,374.77
42,237.48
464,612.25

Rp.

138,600.00

70,312.50
3,125.00
47,500.00
5,150.00
126,087.50 Rp.
- Rp.
Overhead 10 % .. Rp.

126,087.50
12,608.75

Page 142

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
95,000.00
103,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

154,800.00

84,375.00
3,750.00
47,500.00
5,150.00
140,775.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

140,775.00
14,077.50
154,852.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

75,000.00
100,000.00
95,000.00
103,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

157,500.00
829,454.55
Rp.

Rp.
Rp.

829,454.55
562,181.82
Rp.

Rp.
Rp.
Rp.

317,818.18
126,000.00
722,545.45

Rp.

Rp.
Rp.
Rp.

317,818.18
140,727.27
722,545.45

317,818.18
170,090.91
722,545.45

Rp.

422,363.64
126,000.00
722,545.45

112,500.00
5,000.00
47,500.00
5,150.00
170,150.00 Rp.
- Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

170,150.00
17,015.00
187,165.00

Dibulatkan
Rp.
Rp.
189,000.00
Rp.
373,254.55
- Rp.
562,254.55 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

618,400.00

Dibulatkan
Rp.
Rp.
497,672.73
Rp.
224,872.73
- Rp.
722,545.45 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

794,800.00

Rp.

562,254.55
56,225.45
618,480.00

722,545.45
72,254.55
794,800.00

Rp.

1,112,100.00

Rp.
567,196.03
126,000.00 Rp.
885,014.21 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,011,014.21
101,101.42
1,112,115.63

126,000.00

Rp.

2,101,800.00

Rp.
1,134,396.36
140,727.27 Rp.
1,770,032.73 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,910,760.00
191,076.00
2,101,836.00

140,727.27

Dibulatkan
Rp.
953,454.55

Rp.

Rp.
Rp.
Rp.

187,100.00

Dibulatkan
Rp.
635,636.36

Rp.

Rp.
Rp.
Rp.

Rp.

Dibulatkan
Rp.
317,818.18
Rp.

138,696.25

Rp.

3,107,600.00

Rp.
1,701,594.55
170,090.91 Rp.
2,655,049.09 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

2,825,140.00
282,514.00
3,107,654.00

170,090.91

Dibulatkan
Rp.
422,363.64
Rp.

126,000.00

Rp.

Rp.
126,000.00 Rp.

816,765.38
1,239,129.02

Rp.

1,501,600.00

Rp.

1,365,129.02

Page 143

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.
Rp.
Rp.

422,363.64
140,727.27
722,545.45

Dibulatkan
Rp.
844,727.27
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

422,363.64
170,090.91 Rp.
722,545.45
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

Rp.

2,880,800.00

Rp.
1,633,530.76
140,727.27 Rp.
2,478,258.04 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

2,618,985.31
261,898.53
2,880,883.84

140,727.27

Dibulatkan
Rp.
Rp.
1,267,090.91

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

Rp.
2,450,296.15
170,090.91 Rp.
3,717,387.05 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

3,887,477.96
388,747.80
4,276,225.76

Dibulatkan

Rp.

748,000.00

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00

Rp.

Rp.
321,100.00
Rp.
86,900.00
Rp.
111,000.00
161,059.00 Rp.
519,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

680,059.00
68,005.90
748,064.90

Rp.

786,600.00

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00

Rp.

Rp.
358,800.00
Rp.
82,800.00
Rp.
112,444.44
161,059.00 Rp.
554,044.44 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

715,103.44
71,510.34
786,613.79

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

Rp.

816,900.00

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00

Rp.

Rp.
388,700.00
Rp.
79,900.00
Rp.
113,000.00
161,059.00 Rp.
581,600.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

742,659.00
74,265.90
816,924.90

Dibulatkan
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00

4,276,200.00

170,090.91

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

136,512.90
1,501,641.92

Rp.
Rp.
Rp.
Rp.

6,000.00
2,060.00
19,000.00
90,000.00

Rp.

681,400.00

Page 144

H. SATUAN
Rp.
Rp.
Rp.

UPAH

1,300.00
100.00
111.11

BAHAN

Rp.

Rp.
299,000.00
Rp.
89,300.00
Rp.
114,111.11
117,060.00 Rp.
502,411.11 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.

852,700.00

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00

Rp.

Rp.
423,800.00
Rp.
76,000.00
Rp.
114,333.33
161,059.00 Rp.
614,133.33 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

775,192.33
77,519.23
852,711.57

Rp.

886,900.00

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00

Rp.

Rp.
457,600.00
Rp.
73,100.00
Rp.
114,555.56
161,059.00 Rp.
645,255.56 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

806,314.56
80,631.46
886,946.01

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

912,400.00

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00

Rp.

Rp.
482,300.00
Rp.
69,800.00
Rp.
116,333.33
161,059.00 Rp.
668,433.33 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

829,492.33
82,949.23
912,441.57

Rp.

929,300.00

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00

Rp.

Rp.
499,200.00
Rp.
69,200.00
Rp.
115,444.44
161,059.00 Rp.
683,844.44 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

844,903.44
84,490.34
929,393.79

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00

619,471.11
61,947.11
681,418.22

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00
Rp.

527,800.00

Rp.

958,300.00

Page 145

H. SATUAN
Rp.
Rp.

UPAH

100.00
111.11

BAHAN

Rp.

Rp.
68,400.00
Rp.
114,000.00
161,059.00 Rp.
710,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.

967,400.00

Rp.
Rp.
Rp.
Rp.

8,300.00
2,884.00
26,125.00
123,750.00

Rp.

Rp.
536,900.00
Rp.
68,100.00
Rp.
113,444.44
161,059.00 Rp.
718,444.44 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

879,503.44
87,950.34
967,453.79

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
100.00
111.11

1,049,700.00

Rp.
Rp.
Rp.
Rp.

10,500.00
3,605.00
33,250.00
157,500.00

Rp.

Rp.
570,700.00
Rp.
67,000.00
Rp.
111,777.78
204,855.00 Rp.
749,477.78 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

954,332.78
95,433.28
1,049,766.06

Rp.

1,049,700.00

Rp.
Rp.
Rp.
Rp.

10,500.00
3,605.00
33,250.00
157,500.00

Rp.

Rp.
570,700.00
Rp.
67,000.00
Rp.
111,777.78
204,855.00 Rp.
749,477.78 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

954,332.78
95,433.28
1,049,766.06

Rp.
Rp.
Rp.
Rp.

10,500.00
3,605.00
33,250.00
157,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00
150,000.00
10,000.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
150,000.00

871,259.00
87,125.90
958,384.90

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

Rp.

1,016,400.00

Rp.
520,000.00
Rp.
67,200.00
Rp.
120,000.00
Rp.
12,000.00
204,855.00 Rp.
719,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

924,055.00
92,405.50
1,016,460.50

Dibulatkan

182,000.00

300.00
309.00
2,850.00
4,500.00
Rp.

157,500.00

Rp.

Page 146

H. SATUAN

UPAH
Rp.

BAHAN

7,959.00 Rp.
157,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
200,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
230,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

241,600.00

Rp.
210,000.00
9,687.00 Rp.
210,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

219,687.00
21,968.70
241,655.70

700.00
412.00
3,325.00
5,250.00

Rp.

277,300.00

Rp.
241,500.00
10,612.00 Rp.
241,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

252,112.00
25,211.20
277,323.20

400.00
412.00
3,800.00
6,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
9,000.00
15,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

12,000.00

Rp.
9,450.00
Rp.
225.00
1,302.10 Rp.
9,675.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

10,977.10
1,097.71
12,074.81

40.00
72.10
665.00
525.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,000.00
15,000.00

Rp.

12,700.00

Rp.
Rp.
Rp.
Rp.

30.00
51.50
475.00
375.00

Rp.

Rp.
10,500.00
Rp.
150.00
931.50 Rp.
10,650.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

11,581.50
1,158.15
12,739.65

Rp.

12,000.00

Rp.
Rp.
Rp.
Rp.

10.00
257.50
237.50
187.50

Rp.

Rp.
10,200.00
Rp.
75.00
692.50 Rp.
10,275.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

10,967.50
1,096.75
12,064.25

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,000.00
15,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00

165,459.00
16,545.90
182,004.90

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

2,600.00
2,678.00
24,700.00
39,000.00

Rp.

146,300.00

Page 147

H. SATUAN
Rp.
Rp.
Rp.

UPAH

BAHAN

PEKERJAAN

3,000,000.00
12,000.00
5,000.00

Rp.
120,000.00
Rp.
3,600.00
Rp.
500.00
Rp.
68,978.00 Rp.
124,100.00
Untuk kayu digunakan 2 X pakai
Rp.
64,100.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

133,078.00
13,307.80
146,385.80

Rp.

154,600.00

Rp.
135,000.00
Rp.
3,600.00
Rp.
500.00
Rp.
68,978.00 Rp.
139,100.00
Untuk kayu digunakan 2 X pakai
Rp.
71,600.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

140,578.00
14,057.80
154,635.80

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
12,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

2,600.00
2,678.00
24,700.00
39,000.00

Dibulatkan

Rp.

233,900.00

Rp.
120,000.00
Rp.
4,800.00
Rp.
1,000.00
Rp.
37,500.00
Rp.
41,125.00
Rp.
40,000.00
Rp.
87,549.00 Rp.
244,425.00
Untuk kayu digunakan 2 X pakai
Rp.
125,112.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

212,661.50
21,266.15
233,927.65

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
12,000.00
5,000.00
2,500,000.00
117,500.00
20,000.00

Rp.
Rp.
Rp.
Rp.

3,300.00
3,399.00
31,350.00
49,500.00

Dibulatkan

Rp.

238,000.00

Rp.
120,000.00
Rp.
4,800.00
Rp.
1,000.00
Rp.
45,000.00
Rp.
41,125.00
Rp.
40,000.00
Rp.
87,549.00 Rp.
211,925.00
Untuk kayu digunakan 2 X pakai
Rp.
128,862.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

216,411.50
21,641.15
238,052.65

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
12,000.00
5,000.00
2,500,000.00
117,500.00
20,000.00

Rp.
Rp.
Rp.
Rp.

3,300.00
3,399.00
31,350.00
49,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
12,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

3,300.00
3,399.00
31,350.00
49,500.00
Rp.
Rp.
Rp.

100,000.00
4,800.00
1,000.00

Rp.

431,100.00

Page 148

H. SATUAN
Rp.
Rp.
Rp.

UPAH

2,500,000.00
117,500.00
20,000.00
Rp.

BAHAN

Rp.
37,500.00
Rp.
41,125.00
Rp.
120,000.00
87,549.00 Rp.
304,425.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
12,000.00
5,000.00
2,500,000.00
117,500.00
20,000.00
500.00

Rp.
Rp.
Rp.
Rp.

237,500.00

Rp.

215,911.50

Overhead 10 % .. Rp.
Jumlah ..Rp.

21,591.15
237,502.65

3,300.00
3,399.00
31,350.00
49,500.00
90,000.00
4,800.00
1,000.00
50,000.00
41,125.00
60,000.00
2,000.00
248,925.00
128,362.50

Dibulatkan
100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
12,000.00
5,000.00
2,500,000.00
117,500.00
20,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

315,300.00

Rp.
75,000.00
Rp.
4,800.00
Rp.
750.00
Rp.
37,500.00
Rp.
41,125.00
Rp.
40,000.00
87,549.00 Rp.
199,175.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

286,724.00
28,672.40
315,396.40

3,300.00
3,399.00
31,350.00
49,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
12,000.00
20,000.00

Rp.

110,500.00

Rp.
Rp.
Rp.
Rp.

800.00
515.00
4,750.00
11,250.00

Rp.

Rp.
66,000.00
Rp.
7,200.00
Rp.
10,000.00
17,315.00 Rp.
83,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

100,515.00
10,051.50
110,566.50

Rp.
Rp.
Rp.
Rp.

3,000.00
2,060.00
19,000.00
45,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

391,974.00
39,197.40
431,171.40

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
87,549.00 Rp.
Untuk kayu digunakan 2 X pakai
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.

112,000.00
56,550.00
11,200.00

Rp.

273,600.00

Page 149

H. SATUAN

UPAH
Rp.

BAHAN

69,060.00 Rp.
179,750.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

260,200.00

Rp.
Rp.
Rp.
Rp.

3,000.00
2,060.00
19,000.00
45,000.00

Rp.

Rp.
112,000.00
Rp.
42,835.00
Rp.
12,740.00
69,060.00 Rp.
167,575.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

236,635.00
23,663.50
260,298.50

Rp.

251,400.00

Rp.
Rp.
Rp.
Rp.

3,000.00
2,060.00
19,000.00
45,000.00

Rp.

Rp.
112,000.00
Rp.
34,515.00
Rp.
13,020.00
69,060.00 Rp.
159,535.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

228,595.00
22,859.50
251,454.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

Rp.

246,600.00

Rp.
Rp.
Rp.
Rp.

3,000.00
2,060.00
19,000.00
45,000.00

Rp.

Rp.
112,000.00
Rp.
28,860.00
Rp.
14,280.00
69,060.00 Rp.
155,140.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

224,200.00
22,420.00
246,620.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

Rp.

244,400.00

Rp.
Rp.
Rp.
Rp.

3,000.00
2,060.00
19,000.00
45,000.00

Rp.

Rp.
112,000.00
Rp.
24,050.00
Rp.
17,080.00
69,060.00 Rp.
153,130.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

222,190.00
22,219.00
244,409.00

Rp.
Rp.
Rp.
Rp.

3,000.00
2,060.00
19,000.00
45,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00
281.25

248,810.00
24,881.00
273,691.00

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

112,000.00
13,104.00
12,950.00
7.73

Rp.

227,800.00

Page 150

H. SATUAN

UPAH
Rp.

BAHAN

69,060.00 Rp.
138,061.73 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

132,500.00

Rp.
Rp.
Rp.
Rp.

1,500.00
1,030.00
9,500.00
22,500.00

Rp.

Rp.
56,000.00
Rp.
24,635.00
Rp.
5,320.00
34,530.00 Rp.
85,955.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

120,485.00
12,048.50
132,533.50

Rp.

126,200.00

Rp.
Rp.
Rp.
Rp.

1,500.00
1,030.00
9,500.00
22,500.00

Rp.

Rp.
56,000.00
Rp.
18,681.00
Rp.
5,600.00
34,530.00 Rp.
80,281.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

114,811.00
11,481.10
126,292.10

Rp.

122,600.00

Rp.
Rp.
Rp.
Rp.

1,500.00
1,030.00
9,500.00
22,500.00

Rp.

Rp.
56,000.00
Rp.
14,950.00
Rp.
6,020.00
34,530.00 Rp.
76,970.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

111,500.00
11,150.00
122,650.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

Rp.

120,300.00

Rp.
Rp.
Rp.
Rp.

1,500.00
1,030.00
9,500.00
22,500.00

Rp.

Rp.
56,000.00
Rp.
12,584.00
Rp.
6,300.00
34,530.00 Rp.
74,884.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

109,414.00
10,941.40
120,355.40

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

207,121.73
20,712.17
227,833.91

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

1,500.00
1,030.00
9,500.00
22,500.00

Rp.

Rp.
Rp.
Rp.
34,530.00 Rp.

56,000.00
10,816.00
6,860.00
73,676.00

Rp.

119,000.00

Rp.

108,206.00

Page 151

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

116,500.00

Rp.
56,000.00
Rp.
8,450.00
Rp.
7,000.00
34,530.00 Rp.
71,450.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

105,980.00
10,598.00
116,578.00

1,500.00
1,030.00
9,500.00
22,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00
125,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

115,700.00

Rp.
56,000.00
Rp.
5,850.00
Rp.
7,000.00
Rp.
1,875.00
34,530.00 Rp.
70,725.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

105,255.00
10,525.50
115,780.50

1,500.00
1,030.00
9,500.00
22,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,200,000.00
140,000.00
125,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

128,500.00

Rp.
56,000.00
Rp.
21,600.00
Rp.
2,520.00
Rp.
2,250.00
34,530.00 Rp.
82,370.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

116,900.00
11,690.00
128,590.00

1,500.00
1,030.00
9,500.00
22,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00
125,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

105,800.00

Rp.
56,000.00
Rp.
18.20
Rp.
3,920.00
Rp.
1,750.00
34,530.00 Rp.
61,688.20 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

96,218.20
9,621.82
105,840.02

1,500.00
1,030.00
9,500.00
22,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,000.00
1,300.00

Rp.
Rp.
Rp.
Rp.

10,820.60
119,026.60

1,500.00
1,545.00
14,250.00
22,500.00
Rp.
Rp.

25,000.00
17,550.00

Rp.

205,400.00

Page 152

H. SATUAN
Rp.
Rp.

UPAH

140,000.00
9,000.00

BAHAN

Rp.

Rp.
101,920.00
Rp.
2,520.00
39,795.00 Rp.
146,990.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

Rp.
Rp.
Rp.
Rp.

1,500.00
1,545.00
14,250.00
22,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,000.00
1,300.00
140,000.00
9,000.00

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,700.00
1,300.00
140,000.00
9,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

227,900.00

Rp.
25,000.00
Rp.
31,850.00
Rp.
108,080.00
Rp.
2,520.00
39,795.00 Rp.
167,450.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

207,245.00
20,724.50
227,969.50

Rp.

188,900.00

Rp.
21,250.00
Rp.
29,562.00
Rp.
77,000.00
Rp.
2,520.00
41,436.00 Rp.
130,332.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

171,768.00
17,176.80
188,944.80

1,800.00
1,236.00
11,400.00
27,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,700.00
1,300.00
140,000.00
9,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

187,300.00

Rp.
21,250.00
Rp.
23,660.00
Rp.
81,480.00
Rp.
2,520.00
41,436.00 Rp.
128,910.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

170,346.00
17,034.60
187,380.60

1,800.00
1,236.00
11,400.00
27,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,500.00
1,300.00
140,000.00
9,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

139,100.00

Rp.
18,750.00
Rp.
19,708.00
Rp.
50,960.00
Rp.
2,520.00
34,530.00 Rp.
91,938.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

126,468.00
12,646.80
139,114.80

1,500.00
1,030.00
9,500.00
22,500.00

Dibulatkan
Rp.
Rp.

100,000.00
103,000.00

Rp.
Rp.

186,785.00
18,678.50
205,463.50

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

1,500.00
1,030.00

Rp.

137,200.00

Page 153

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

95,000.00
75,000.00
1,500.00
1,300.00
140,000.00
9,000.00

UPAH
Rp.
Rp.

Rp.

BAHAN

9,500.00
22,500.00
Rp.
18,750.00
Rp.
15,769.00
Rp.
53,200.00
Rp.
2,520.00
34,530.00 Rp.
90,239.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
50,000.00
1,300.00
140,000.00

100,000.00
103,000.00
95,000.00
75,000.00
50,000.00
1,300.00
140,000.00

2,041,600.00

Rp.
Rp.
Rp.
Rp.

1,500.00
1,030.00
9,500.00
22,500.00

Rp.

Rp.
1,800,000.00
Rp.
16,640.00
Rp.
4,900.00
34,530.00 Rp.
1,821,540.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,856,070.00
185,607.00
2,041,677.00

Rp.

1,709,100.00

Rp.
Rp.
Rp.
Rp.

1,500.00
1,030.00
9,500.00
22,500.00

Rp.

Rp.
1,500,000.00
Rp.
14,300.00
Rp.
4,900.00
34,530.00 Rp.
1,519,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,553,730.00
155,373.00
1,709,103.00

Rp.

211,100.00

Rp.
Rp.
Rp.
Rp.

1,500.00
1,545.00
14,250.00
22,500.00

Rp.

Rp.
129,500.00
Rp.
18,200.00
Rp.
4,480.00
39,795.00 Rp.
152,180.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

191,975.00
19,197.50
211,172.50

Rp.
Rp.

57,000.00
6,180.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,850.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

95,000.00
103,000.00
65,000.00
2,500,000.00
14,000.00

Rp.

Rp.

194,600.00

Rp.
26,202.63
Rp.
87,500.00
Rp.
70.00
63,180.00 Rp.
113,772.63 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

176,952.63
17,695.26
194,647.90

Dibulatkan
Rp.
Rp.
Rp.
Rp.

95,000.00
103,000.00
65,000.00
2,500,000.00

124,769.00
12,476.90
137,245.90

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.

171,000.00
18,540.00
Rp.
Rp.

52,405.27
87,500.00

Rp.

362,500.00

Page 154

H. SATUAN
Rp.

UPAH

14,000.00
Rp.

BAHAN

Rp.
140.00
189,540.00 Rp.
140,045.27 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.

95,000.00
103,000.00
26,388.89
2,500,000.00
14,000.00

95,000.00
103,000.00
26,388.89
2,500,000.00
14,000.00

Rp.

200,600.00

57,000.00
6,180.00

Rp.

Rp.
31,666.67
Rp.
87,500.00
Rp.
70.00
63,180.00 Rp.
119,236.67 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

182,416.67
18,241.67
200,658.33

Rp.

374,500.00

Rp.
Rp.

171,000.00
18,540.00

Rp.

Rp.
63,333.33
Rp.
87,500.00
Rp.
140.00
189,540.00 Rp.
150,973.33 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

340,513.33
34,051.33
374,564.67

Rp.
Rp.
Rp.
Rp.

4,000.00
20,600.00
190,000.00
60,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
4,400,000.00
14,500.00
15,000.00
51,562.50

Rp.

se Kayu Klas II
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

485,200.00

Rp.
110,000.00
Rp.
435.00
Rp.
4,500.00
Rp.
51,562.50
274,600.00 Rp.
166,497.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

441,097.50
44,109.75
485,207.25

Dibulatkan
100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
14,500.00
15,000.00
51,562.50
51,299.43

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

541,000.00

Rp.
75,000.00
Rp.
435.00
Rp.
12,000.00
Rp.
51,562.50
Rp.
25,649.71
327,250.00 Rp.
164,647.21 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

491,897.21
49,189.72
541,086.93

4,000.00
25,750.00
237,500.00
60,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
13,000.00

329,585.27
32,958.53
362,543.79

Rp.
Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

144,500.00

Rp.
70,000.00
Rp.
1,950.00
59,435.00 Rp.
71,950.00 Rp.
Overhead 10 % .. Rp.

131,385.00
13,138.50

800.00
4,635.00
42,750.00
11,250.00

Page 155

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
13,000.00
76,000.00

Rp.

224,300.00

Rp.
Rp.
Rp.
Rp.

8,000.00
4,635.00
42,750.00
11,250.00

Rp.

Rp.
70,000.00
Rp.
1,950.00
Rp.
65,360.00
66,635.00 Rp.
137,310.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

203,945.00
20,394.50
224,339.50

Rp.

232,400.00

Rp.
Rp.
Rp.
Rp.

1,000.00
6,180.00
57,000.00
15,000.00

Rp.

Rp.
70,000.00
Rp.
1,950.00
Rp.
60,200.00
79,180.00 Rp.
132,150.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

211,330.00
21,133.00
232,463.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
13,000.00
70,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
4,400,000.00
12,000.00
16,000.00

100,000.00
103,000.00
95,000.00
75,000.00
70,000.00
14,500.00

Rp.

299,100.00

Rp.
Rp.
Rp.
Rp.

3,000.00
18,540.00
171,000.00
45,000.00

Rp.

Rp.
30,800.00
Rp.
1,200.00
Rp.
2,400.00
237,540.00 Rp.
34,400.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

271,940.00
27,194.00
299,134.00

Dibulatkan

Rp.

42,400.00

Rp.
Rp.
Rp.
Rp.

130.00
772.50
7,125.00
1,875.00

Rp.

Rp.
28,000.00
Rp.
725.00
9,902.50 Rp.
28,725.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

38,627.50
3,862.75
42,490.25

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
8,000.00
1,600,000.00
13,000.00

144,523.50

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

52,500.00

Rp.
12,000.00
Rp.
22,400.00
Rp.
65.00
13,265.00 Rp.
34,465.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

47,730.00
4,773.00
52,503.00

500.00
515.00
4,750.00
7,500.00

Page 156

H. SATUAN

UPAH

BAHAN
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Rp.

59,600.00

Rp.
Rp.
Rp.
Rp.

1,000.00
1,545.00
14,250.00
15,000.00

Rp.

Rp.
20,155.20
Rp.
2,240.00
31,795.00 Rp.
22,395.20 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

54,190.20
5,419.02
59,609.22

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Rp.

52,600.00

Rp.
Rp.
Rp.
Rp.

1,000.00
1,545.00
14,250.00
15,000.00

Rp.

Rp.
13,291.20
Rp.
2,800.00
31,795.00 Rp.
16,091.20 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

47,886.20
4,788.62
52,674.82

Rp.

49,600.00

Rp.
Rp.
Rp.
Rp.

1,000.00
1,545.00
14,250.00
15,000.00

Rp.

Rp.
10,108.80
Rp.
3,220.00
31,795.00 Rp.
13,328.80 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

45,123.80
4,512.38
49,636.18

Rp.

47,500.00

Rp.
Rp.
Rp.
Rp.

1,000.00
1,545.00
14,250.00
15,000.00

Rp.

Rp.
8,112.00
Rp.
3,360.00
31,795.00 Rp.
11,472.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

43,267.00
4,326.70
47,593.70

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Rp.

46,300.00

Rp.
Rp.
Rp.
Rp.

1,000.00
1,545.00
14,250.00
15,000.00

Rp.

Rp.
6,739.20
Rp.
3,640.00
31,795.00 Rp.
10,379.20 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

42,174.20
4,217.42
46,391.62

Rp.
Rp.
Rp.
Rp.

1,000.00
1,545.00
14,250.00
15,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00

PEKERJAAN

Rp.

5,740.80

Rp.

45,400.00

Page 157

H. SATUAN
Rp.

UPAH

140,000.00
Rp.

BAHAN

Rp.
3,780.00
31,795.00 Rp.
9,520.80 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

44,900.00

Rp.
Rp.
Rp.
Rp.

1,000.00
1,545.00
14,250.00
15,000.00

Rp.

Rp.
5,116.80
Rp.
3,920.00
31,795.00 Rp.
9,036.80 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

40,831.80
4,083.18
44,914.98

Rp.

44,300.00

Rp.
Rp.
Rp.
Rp.

1,000.00
1,545.00
14,250.00
15,000.00

Rp.

Rp.
4,492.80
Rp.
4,060.00
31,795.00 Rp.
8,552.80 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

40,347.80
4,034.78
44,382.58

Rp.

43,900.00

Rp.
Rp.
Rp.
Rp.

1,100.00
1,236.00
11,400.00
16,500.00

Rp.

Rp.
7,488.00
Rp.
375.00
Rp.
1,820.00
30,236.00 Rp.
9,683.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

39,919.00
3,991.90
43,910.90

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
125,000.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
125,000.00
140,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

41,300.00

Rp.
3,900.00
Rp.
625.00
Rp.
2,800.00
30,236.00 Rp.
7,325.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

37,561.00
3,756.10
41,317.10

1,100.00
1,236.00
11,400.00
16,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
125,000.00
140,000.00

41,315.80
4,131.58
45,447.38

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

35,800.00

11.70
1,125.00
1,260.00
2,396.70 Rp.
10 % .. Rp.

32,632.70
3,263.27

1,100.00
1,236.00
11,400.00
16,500.00
Rp.
Rp.
Rp.
30,236.00 Rp.
Overhead

Page 158

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
125,000.00
140,000.00

Rp.

36,500.00

Rp.
Rp.
Rp.
Rp.

1,100.00
1,236.00
11,400.00
16,500.00

Rp.

Rp.
9.10
Rp.
875.00
Rp.
2,100.00
30,236.00 Rp.
2,984.10 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

33,220.10
3,322.01
36,542.11

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Rp.

69,600.00

Rp.
Rp.
Rp.
Rp.

1,300.00
2,060.00
19,000.00
19,500.00

Rp.

Rp.
17,721.60
Rp.
3,780.00
41,860.00 Rp.
21,501.60 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

63,361.60
6,336.16
69,697.76

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Rp.

65,600.00

Rp.
Rp.
Rp.
Rp.

1,300.00
2,060.00
19,000.00
19,500.00

Rp.

Rp.
13,478.40
Rp.
4,340.00
41,860.00 Rp.
17,818.40 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

59,678.40
5,967.84
65,646.24

Rp.

62,800.00

Rp.
Rp.
Rp.
Rp.

1,300.00
2,060.00
19,000.00
19,500.00

Rp.

Rp.
10,816.00
Rp.
4,480.00
41,860.00 Rp.
15,296.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

57,156.00
5,715.60
62,871.60

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Rp.

61,300.00

Rp.
Rp.
Rp.
Rp.

1,300.00
2,060.00
19,000.00
19,500.00

Rp.

Rp.
8,985.60
Rp.
4,900.00
41,860.00 Rp.
13,885.60 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

55,745.60
5,574.56
61,320.16

Rp.
Rp.
Rp.

1,300.00
2,060.00
19,000.00

Dibulatkan
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00

35,895.97

Rp.

60,000.00

Page 159

H. SATUAN
Rp.
Rp.
Rp.

75,000.00
1,300.00
140,000.00

UPAH

BAHAN

Rp.

19,500.00

Rp.

Rp.
7,654.40
Rp.
5,040.00
41,860.00 Rp.
12,694.40 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.

66,500.00

Rp.
Rp.
Rp.
Rp.

1,400.00
2,266.00
20,900.00
21,450.00

Rp.

Rp.
10,800.00
Rp.
1,125.00
Rp.
2,520.00
46,016.00 Rp.
14,445.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

60,461.00
6,046.10
66,507.10

Rp.

32,700.00

Rp.
Rp.
Rp.
Rp.

800.00
721.00
6,650.00
11,250.00

Rp.

Rp.
6,739.20
Rp.
3,640.00
19,421.00 Rp.
10,379.20 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

29,800.20
2,980.02
32,780.22

Rp.

51,700.00

Rp.
Rp.
Rp.
Rp.

300.00
3,914.00
36,100.00
4,275.00

Rp.

Rp.
650.00
Rp.
1,820.00
44,589.00 Rp.
2,470.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

47,059.00
4,705.90
51,764.90

Rp.

104,000.00

Rp.
Rp.
Rp.
Rp.

2,500.00
206.00
1,900.00
15,000.00

Rp.

Rp.
22,500.00
Rp.
52,500.00
19,606.00 Rp.
75,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

94,606.00
9,460.60
104,066.60

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,200,000.00
125,000.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,250.00
3,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,250.00
3,500.00

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

Rp.

54,554.40
5,455.44
60,009.84

Rp.

145,500.00

Rp.
22,500.00
Rp.
52,500.00
57,310.00 Rp.
75,000.00 Rp.
Overhead 10 % .. Rp.

132,310.00
13,231.00

2,500.00
2,060.00
19,000.00
33,750.00

Page 160

H. SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

UPAH

BAHAN

Jumlah ..Rp.

145,541.00

Dibulatkan

Rp.

40,700.00

Rp.
Rp.
Rp.
Rp.

1,300.00
1,030.00
9,500.00
18,750.00

Rp.

Rp.
5,616.00
Rp.
840.00
30,580.00 Rp.
6,456.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

37,036.00
3,703.60
40,739.60

Rp.

28,100.00

Rp.
Rp.
Rp.
Rp.

800.00
721.00
6,650.00
11,250.00

Rp.

Rp.
4,040.40
Rp.
2,100.00
19,421.00 Rp.
6,140.40 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

25,561.40
2,556.14
28,117.54

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

13,000.00

Rp.
2,080.00
9,762.00 Rp.
2,080.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

11,842.00
1,184.20
13,026.20

400.00
412.00
3,325.00
5,625.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00
140,000.00

Rp.

53,500.00

Rp.
Rp.
Rp.
Rp.

1,500.00
1,442.00
13,300.00
22,500.00

Rp.

Rp.
8,242.00
Rp.
1,680.00
38,742.00 Rp.
9,922.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

48,664.00
4,866.40
53,530.40

Rp.
Rp.
Rp.
Rp.

800.00
1,030.00
9,500.00
11,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,300.00

Rp.

Rp.

29,400.00

Rp.
4,225.00
22,580.00 Rp.
4,225.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

26,805.00
2,680.50
29,485.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

30,000.00
206,000.00
1,900,000.00
450,000.00

Rp.

8,205,000.00

Page 161

H. SATUAN
Rp.
Rp.
Rp.

UPAH

4,400,000.00
14,500.00
15,000.00

BAHAN

Rp.

Rp.
4,840,000.00
Rp.
18,125.00
Rp.
15,000.00
2,586,000.00 Rp.
4,873,125.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.

5,972,000.00

Rp.
Rp.
Rp.
Rp.

30,000.00
206,000.00
1,710,000.00
450,000.00

Rp.

Rp.
3,000,000.00
Rp.
18,125.00
Rp.
15,000.00
2,396,000.00 Rp.
3,033,125.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

5,429,125.00
542,912.50
5,972,037.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
14,500.00
15,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
13,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
13,000.00

Rp.

285,100.00

Rp.
120,000.00
Rp.
650.00
138,615.00 Rp.
120,650.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

259,265.00
25,926.50
285,191.50

Rp.

263,100.00

Rp.

Rp.
100,000.00
Rp.
650.00
138,615.00 Rp.
100,650.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

239,265.00
23,926.50
263,191.50

Rp.

526,000.00

Rp.
Rp.
Rp.
Rp.

5,000.00
25,750.00
237,500.00
75,000.00

Rp.

Rp.
120,000.00
Rp.
15,000.00
343,250.00 Rp.
135,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

478,250.00
47,825.00
526,075.00

Rp.
Rp.
Rp.
Rp.

1,800.00
10,815.00
99,750.00
26,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
15,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
15,000.00

7,459,125.00
745,912.50
8,205,037.50

1,800.00
10,815.00
99,750.00
26,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

386,200.00

Rp.
72,000.00
Rp.
4,500.00
274,600.00 Rp.
76,500.00 Rp.
Overhead 10 % .. Rp.

351,100.00
35,110.00

4,000.00
20,600.00
190,000.00
60,000.00

Page 162

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
15,000.00

Klas II (lebar < 90 cm)


Rp.
100,000.00
Rp.
103,000.00
Rp.
95,000.00
Rp.
75,000.00
Rp.
3,000,000.00
Rp.
14,500.00
Rp.
15,000.00
Rp.
37,882.65

Rp.

654,900.00

Rp.
Rp.
Rp.
Rp.

5,000.00
30,900.00
285,000.00
75,000.00

Rp.

Rp.
192,000.00
Rp.
7,500.00
395,900.00 Rp.
199,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

595,400.00
59,540.00
654,940.00

Rp.
Rp.
Rp.
Rp.

3,000.00
20,600.00
190,000.00
45,000.00

Dibulatkan

Rp.

Rp.

399,500.00

Rp.
58,800.00
Rp.
435.00
Rp.
7,500.00
Rp.
37,882.65
258,600.00 Rp.
104,617.65 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

363,217.65
36,321.77
399,539.42

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
14,500.00
15,000.00
37,882.65

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

436,900.00

Rp.
76,800.00
Rp.
435.00
Rp.
7,500.00
Rp.
37,882.65
274,600.00 Rp.
122,617.65 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

397,217.65
39,721.77
436,939.42

4,000.00
20,600.00
190,000.00
60,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

gka Baja Siku


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
14,500.00

Rp.

344,000.00

Rp.
Rp.
Rp.
Rp.

2,500.00
20,600.00
190,000.00
37,500.00

Rp.

Rp.
60,000.00
Rp.
2,175.00
250,600.00 Rp.
62,175.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

312,775.00
31,277.50
344,052.50

Dibulatkan
100,000.00
103,000.00
95,000.00
75,000.00
8,000.00
11,400.00
26,500.00

386,210.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

758,700.00

Rp.
120,000.00
Rp.
373,920.00
Rp.
1,325.00
194,515.00 Rp.
495,245.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

689,760.00
68,976.00
758,736.00

5,200.00
10,815.00
99,750.00
78,750.00

Page 163

H. SATUAN

UPAH

BAHAN
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,000.00
5,000.00
2,545.45

Rp.

265,600.00

Rp.

Rp.
47,600.00
Rp.
22,610.00
Rp.
50,909.09
120,395.00 Rp.
121,119.09 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

241,514.09
24,151.41
265,665.50

Rp.
Rp.
Rp.
Rp.

600.00
12,360.00
114,000.00
90,000.00

Rp.
Rp.
Rp.
Rp.

3,200.00
6,695.00
61,750.00
48,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800,000.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
450,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

1,118,600.00

Rp.
800,000.00
216,960.00 Rp.
800,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,016,960.00
101,696.00
1,118,656.00

Dibulatkan

Rp.

584,600.00

Rp.
450,000.00
81,532.00 Rp.
450,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

531,532.00
53,153.20
584,685.20

2,200.00
4,532.00
41,800.00
33,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
85,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

177,300.00

Rp.
85,000.00
76,240.00 Rp.
85,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

161,240.00
16,124.00
177,364.00

400.00
8,240.00
7,600.00
60,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
200,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

423,800.00

Rp.
200,000.00
185,300.00 Rp.
200,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

385,300.00
38,530.00
423,830.00

5,000.00
10,300.00
95,000.00
75,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00
25,000.00
10,000.00

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

210.00
442.90
4,085.00
3,225.00

Rp.

Rp.
Rp.
Rp.
7,962.90 Rp.

55,000.00
25,000.00
10,000.00
90,000.00

Rp.

107,700.00

Rp.

97,962.90

Page 164

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00
25,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

685,000.00

Rp.
242,000.00
Rp.
365,000.00
15,745.50 Rp.
607,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

622,745.50
62,274.55
685,020.05

420.00
875.50
8,075.00
6,375.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00
5,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

311,100.00

Rp.
242,000.00
Rp.
22,500.00
Rp.
2,700.00
15,674.00 Rp.
267,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

282,874.00
28,287.40
311,161.40

400.00
824.00
8,075.00
6,375.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
85,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

163,100.00

Rp.
85,000.00
63,280.00 Rp.
85,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

148,280.00
14,828.00
163,108.00

175.00
3,605.00
33,250.00
26,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
85,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

163,100.00

Rp.
85,000.00
63,280.00 Rp.
85,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

148,280.00
14,828.00
163,108.00

175.00
3,605.00
33,250.00
26,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
17,500.00
2,545.45

100,000.00
103,000.00
95,000.00
75,000.00

9,796.29
107,759.19

Rp.

535,000.00

Rp.
Rp.
Rp.
Rp.

8,300.00
17,201.00
158,650.00
125,250.00

Rp.

Rp.
108,097.50
Rp.
68,930.91
309,401.00 Rp.
177,028.41 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

486,429.41
48,642.94
535,072.35

Dibulatkan

47,100.00

Rp.
Rp.
Rp.
Rp.

50.00
1,030.00
9,500.00
7,500.00

Rp.

Page 165

H. SATUAN
Rp.
Rp.
Rp.

UPAH

22,500.00
2,545.45
8,000.00

BAHAN

Rp.

Rp.
24,750.00
Rp.
50.91
Rp.
14.40
18,080.00 Rp.
24,815.31 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.

266,300.00

Rp.
Rp.
Rp.
Rp.

100.00
2,060.00
19,000.00
15,000.00

Rp.

Rp.
82,500.00
Rp.
1,000.00
Rp.
122,500.00
36,160.00 Rp.
206,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

242,160.00
24,216.00
266,376.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
75,000.00
100.00
17,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
150,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

239,700.00

Rp.
150,000.00
67,980.00 Rp.
150,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

217,980.00
21,798.00
239,778.00

300.00
6,180.00
57,000.00
4,500.00

Rp.

114,500.00

Rp.
55,000.00
49,105.00 Rp.
55,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

104,105.00
10,410.50
114,515.50

500.00
1,030.00
47,500.00
75.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

108,500.00

Rp.
50,000.00
48,640.00 Rp.
50,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

98,640.00
9,864.00
108,504.00

250.00
515.00
47,500.00
375.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
80,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

42,895.31
4,289.53
47,184.84

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

141,500.00

Rp.
80,000.00
48,640.00 Rp.
80,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

128,640.00
12,864.00
141,504.00

250.00
515.00
47,500.00
375.00

Dibulatkan

Rp.

45,000.00

Page 166

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
24,000.00

UPAH
Rp.
Rp.
Rp.
Rp.
Rp.

BAHAN

75.00
1,545.00
14,250.00
1,125.00
Rp.
24,000.00
16,995.00 Rp.
24,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
15,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

23,400.00

Rp.
10,000.00
11,330.00 Rp.
10,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

21,330.00
2,133.00
23,463.00

50.00
1,030.00
9,500.00
750.00

Rp.

42,400.00

Rp.
15,000.00
23,560.00 Rp.
15,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

38,560.00
3,856.00
42,416.00

1,000.00
2,060.00
19,000.00
1,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
60,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

84,600.00

Rp.
60,000.00
16,995.00 Rp.
60,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

76,995.00
7,699.50
84,694.50

75.00
1,545.00
14,250.00
1,125.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

29,600.00

Rp.
10,000.00
16,995.00 Rp.
10,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

26,995.00
2,699.50
29,694.50

75.00
1,545.00
14,250.00
1,125.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

73,300.00

Rp.
10,000.00
56,650.00 Rp.
10,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

66,650.00
6,665.00
73,315.00

250.00
5,150.00
47,500.00
3,750.00

Dibulatkan
Rp.
Rp.

100,000.00
103,000.00

Rp.
Rp.

40,995.00
4,099.50
45,094.50

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

100.00
2,060.00

Rp.

41,400.00

Page 167

H. SATUAN
Rp.
Rp.
Rp.

95,000.00
75,000.00
15,000.00

UPAH
Rp.
Rp.
Rp.

BAHAN

19,000.00
1,500.00
Rp.
15,000.00
22,660.00 Rp.
15,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

73,300.00

Rp.
10,000.00
56,650.00 Rp.
10,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

66,650.00
6,665.00
73,315.00

Rp.

17,900.00

Rp.
5,000.00
11,330.00 Rp.
5,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

16,330.00
1,633.00
17,963.00

50.00
1,030.00
9,500.00
750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
100,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

184,700.00

Rp.
100,000.00
67,980.00 Rp.
100,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

167,980.00
16,798.00
184,778.00

300.00
6,180.00
57,000.00
4,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
12,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

44,300.00

Rp.
12,000.00
28,325.00 Rp.
12,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

40,325.00
4,032.50
44,357.50

125.00
2,575.00
23,750.00
1,875.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

79,100.00

Rp.
55,000.00
16,995.00 Rp.
55,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

71,995.00
7,199.50
79,194.50

75.00
1,545.00
14,250.00
1,125.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00

Rp.
Rp.
Rp.
Rp.

37,660.00
3,766.00
41,426.00

250.00
5,150.00
47,500.00
3,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

75.00
1,545.00
14,250.00
1,125.00

Rp.

115,400.00

Page 168

H. SATUAN
Rp.

UPAH

80,000.00
Rp.

BAHAN

Rp.
88,000.00
16,995.00 Rp.
88,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
100,000.00
10,000.00

100,000.00
103,000.00
95,000.00
75,000.00
125,000.00

152,700.00

Rp.
Rp.
Rp.
Rp.

125.00
2,575.00
23,750.00
1,875.00

Rp.

Rp.
110,000.00
Rp.
500.00
28,325.00 Rp.
110,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

138,825.00
13,882.50
152,707.50

Rp.
Rp.
Rp.
Rp.

75.00
1,545.00
14,250.00
1,125.00

Rp.

Rp.

169,900.00

Rp.
137,500.00
16,995.00 Rp.
137,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

154,495.00
15,449.50
169,944.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
70,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

103,300.00

Rp.
77,000.00
16,995.00 Rp.
77,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

93,995.00
9,399.50
103,394.50

75.00
1,545.00
14,250.00
1,125.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
85,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

123,400.00

Rp.
93,500.00
18,687.00 Rp.
93,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

112,187.00
11,218.70
123,405.70

75.00
1,699.50
15,675.00
1,237.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
60,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

93,100.00

Rp.
66,000.00
18,687.00 Rp.
66,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

84,687.00
8,468.70
93,155.70

75.00
1,699.50
15,675.00
1,237.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00

104,995.00
10,499.50
115,494.50

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

75.00
1,699.50
15,675.00
1,237.50
Rp.

60,500.00

Rp.

87,100.00

Page 169

H. SATUAN

UPAH
Rp.

BAHAN

18,687.00 Rp.
60,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
9,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
15,000.00
14,500.00

Rp.

17,600.00

Rp.
10,350.00
5,718.00 Rp.
10,350.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

16,068.00
1,606.80
17,674.80

Rp.

5,103,700.00

Rp.
Rp.
Rp.
Rp.

20,000.00
123,600.00
1,140,000.00
300,000.00

Rp.

Rp.
2,750,000.00
Rp.
225,000.00
Rp.
81,200.00
1,583,600.00 Rp.
3,056,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

4,639,800.00
463,980.00
5,103,780.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
4,400,000.00
15,000.00
14,500.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

7,460,400.00

Rp.
4,840,000.00
Rp.
225,000.00
Rp.
81,200.00
1,636,000.00 Rp.
5,146,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

6,782,200.00
678,220.00
7,460,420.00

30,000.00
206,000.00
950,000.00
450,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
15,000.00
14,500.00

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
2,500,000.00
12,000.00

79,187.00
7,918.70
87,105.70

30.00
618.00
570.00
4,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

4,365,500.00

Rp.
Rp.
Rp.
Rp.

12,000.00
74,160.00
684,000.00
180,000.00

Rp.

Rp.
2,750,000.00
Rp.
225,000.00
Rp.
43,500.00
950,160.00 Rp.
3,018,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

3,968,660.00
396,866.00
4,365,526.00

Dibulatkan

Rp.

161,100.00

Rp.

146,530.00

Rp.
Rp.
Rp.
Rp.

Rp.

500.00
1,030.00
9,500.00
7,500.00
Rp.
Rp.
Rp.
18,530.00 Rp.

35,000.00
90,000.00
3,000.00
128,000.00

Page 170

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
2,500,000.00
12,000.00

Rp.

218,900.00

Rp.

Rp.
35,000.00
Rp.
142,500.00
Rp.
3,000.00
18,530.00 Rp.
180,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

199,030.00
19,903.00
218,933.00

Rp.

480,800.00

Rp.
Rp.
Rp.
Rp.

600.00
1,236.00
11,400.00
9,000.00

Rp.

Rp.
412,500.00
Rp.
2,400.00
22,236.00 Rp.
414,900.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

437,136.00
43,713.60
480,849.60

Rp.
Rp.
Rp.
Rp.

500.00
1,030.00
9,500.00
7,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
12,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
95,000.00
103,000.00
2,500,000.00
14,500.00

Rp.

31,600.00

Rp.
Rp.
Rp.
Rp.

11,250.00
750.00
9,500.00
1,030.00

Rp.

Rp.
4,750.00
Rp.
1,450.00
22,530.00 Rp.
6,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

28,730.00
2,873.00
31,603.00

Rp.
Rp.
Rp.
Rp.

800.00
824.00
7,125.00
11,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
50,750.00

Rp.

Rp.

1,417,600.00

Rp.
1,268,750.00
19,999.00 Rp.
1,268,750.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,288,749.00
128,874.90
1,417,623.90

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
50,750.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

1,417,600.00

Rp.
1,268,750.00
19,999.00 Rp.
1,268,750.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,288,749.00
128,874.90
1,417,623.90

800.00
824.00
7,125.00
11,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00

14,653.00
161,183.00

Rp.
Rp.
Rp.
Rp.

800.00
824.00
7,125.00
11,250.00

Rp.

691,800.00

Page 171

H. SATUAN
Rp.

UPAH

50,750.00
Rp.

BAHAN

Rp.
609,000.00
19,999.00 Rp.
609,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
1,300.00
140,000.00

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
1,300.00
140,000.00

197,200.00

Rp.
Rp.
Rp.
Rp.

200.00
206.00
19,000.00
30,000.00

Rp.

Rp.
115,000.00
Rp.
10,400.00
Rp.
4,480.00
49,406.00 Rp.
129,880.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

179,286.00
17,928.60
197,214.60

Rp.

197,200.00

Rp.
Rp.
Rp.
Rp.

200.00
206.00
19,000.00
30,000.00

Rp.

Rp.
115,000.00
Rp.
10,400.00
Rp.
4,480.00
49,406.00 Rp.
129,880.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

179,286.00
17,928.60
197,214.60

Rp.

171,900.00

Rp.
Rp.
Rp.
Rp.

200.00
206.00
19,000.00
30,000.00

Rp.

Rp.
92,000.00
Rp.
10,400.00
Rp.
4,480.00
49,406.00 Rp.
106,880.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

156,286.00
15,628.60
171,914.60

Rp.

66,000.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
5,700.00
10,500.00

Rp.

Rp.
42,375.00
Rp.
72.50
17,621.00 Rp.
42,447.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

60,068.50
6,006.85
66,075.35

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
70,625.00
14,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
36,666.67
16,000.00

628,999.00
62,899.90
691,898.90

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

43,400.00

Rp.
18,333.33
Rp.
1,920.00
19,249.00 Rp.
20,253.33 Rp.
Overhead 10 % .. Rp.

39,502.33
3,950.23

800.00
824.00
7,125.00
10,500.00

Page 172

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
32,083.33
16,000.00

Rp.

44,400.00

Rp.
Rp.
Rp.
Rp.

800.00
824.00
7,125.00
10,500.00

Rp.

Rp.
19,250.00
Rp.
1,920.00
19,249.00 Rp.
21,170.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

40,419.00
4,041.90
44,460.90

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,650.00
10,500.00

Rp.

Rp.
Rp.
18,571.00 Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
24,000.00
16,000.00

Rp.

38,300.00

Rp.

34,891.00

Overhead 10 % .. Rp.
Jumlah ..Rp.

3,489.10
38,380.10

14,400.00
1,920.00
16,320.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
24,500.00
16,000.00

Rp.

42,700.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,650.00
10,500.00

Rp.

Rp.
18,375.00
Rp.
1,920.00
18,571.00 Rp.
20,295.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

38,866.00
3,886.60
42,752.60

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
64,000.00
16,000.00

Rp.

47,100.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,650.00
10,500.00

Rp.

Rp.
22,400.00
Rp.
1,920.00
18,571.00 Rp.
24,320.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

42,891.00
4,289.10
47,180.10

Rp.

41,500.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,650.00
10,500.00

Rp.

Rp.
17,325.00
Rp.
1,920.00
18,571.00 Rp.
19,245.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

37,816.00
3,781.60
41,597.60

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,365.00
10,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
41,250.00
16,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00

43,452.57

Rp.

40,000.00

Page 173

H. SATUAN
Rp.
Rp.

UPAH

36,750.00
16,000.00

BAHAN

Rp.

Rp.
16,170.00
Rp.
1,920.00
18,286.00 Rp.
18,090.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.

40,500.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,365.00
10,500.00

Rp.

Rp.
16,702.50
Rp.
1,920.00
18,286.00 Rp.
18,622.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

36,908.50
3,690.85
40,599.35

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
32,750.00
16,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
24,500.00
16,000.00

100,000.00
103,000.00
95,000.00
75,000.00
45,833.33
16,000.00

43,700.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,365.00
10,500.00

Rp.

Rp.
19,600.00
Rp.
1,920.00
18,286.00 Rp.
21,520.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

39,806.00
3,980.60
43,786.60

Rp.

40,800.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,365.00
10,500.00

Rp.

Rp.
16,958.33
Rp.
1,920.00
18,286.00 Rp.
18,878.33 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

37,164.33
3,716.43
40,880.77

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
41,250.00
16,000.00

Rp.

39,400.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,365.00
10,500.00

Rp.

Rp.
15,675.00
Rp.
1,920.00
18,286.00 Rp.
17,595.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

35,881.00
3,588.10
39,469.10

Rp.

40,000.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,365.00
10,500.00

Rp.

Rp.
16,866.67
Rp.
1,920.00
17,586.00 Rp.
18,786.67 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

36,372.67
3,637.27
40,009.93

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
36,666.67
16,000.00

36,376.00
3,637.60
40,013.60

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Dibulatkan

Rp.

39,500.00

Page 174

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
32,083.33
16,000.00

UPAH

BAHAN

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,365.00
10,500.00

Rp.

Rp.
15,720.83
Rp.
1,920.00
18,286.00 Rp.
17,640.83 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.

37,200.00

Rp.
Rp.
Rp.
Rp.

700.00
721.00
6,365.00
10,500.00

Rp.

Rp.
13,680.00
Rp.
1,920.00
18,286.00 Rp.
15,600.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

33,886.00
3,388.60
37,274.60

Rp.

87,200.00

Rp.
Rp.
Rp.
Rp.

400.00
1,339.00
11,875.00
6,300.00

Rp.

Rp.
58,800.00
Rp.
600.00
19,914.00 Rp.
59,400.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

79,314.00
7,931.40
87,245.40

Rp.

75,600.00

Rp.
Rp.
Rp.
Rp.

400.00
1,339.00
11,875.00
6,300.00

Rp.

Rp.
48,300.00
Rp.
600.00
19,914.00 Rp.
48,900.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

68,814.00
6,881.40
75,695.40

Rp.

74,400.00

Rp.
Rp.
Rp.
Rp.

400.00
1,339.00
11,875.00
6,300.00

Rp.

Rp.
47,150.00
Rp.
600.00
19,914.00 Rp.
47,750.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

67,664.00
6,766.40
74,430.40

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
24,000.00
16,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
24,500.00
100.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
100.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
100.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
100.00

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

400.00
1,339.00
11,875.00
6,300.00
Rp.
Rp.

27,600.00
600.00

Rp.

35,926.83
3,592.68
39,519.52

52,900.00

Page 175

H. SATUAN

UPAH
Rp.

BAHAN

19,914.00 Rp.
28,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
100.00

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
100.00

52,900.00

Rp.
Rp.
Rp.
Rp.

400.00
1,339.00
11,875.00
6,300.00

Rp.

Rp.
27,600.00
Rp.
600.00
19,914.00 Rp.
28,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

48,114.00
4,811.40
52,925.40

Rp.

52,900.00

Rp.
Rp.
Rp.
Rp.

400.00
1,339.00
11,875.00
6,300.00

Rp.

Rp.
27,600.00
Rp.
600.00
19,914.00 Rp.
28,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

48,114.00
4,811.40
52,925.40

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
100.00

Rp.

54,300.00

Rp.
Rp.
Rp.
Rp.

400.00
1,339.00
14,250.00
7,500.00

Rp.

Rp.
25,300.00
Rp.
600.00
23,489.00 Rp.
25,900.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

49,389.00
4,938.90
54,327.90

Rp.

50,300.00

Rp.
Rp.
Rp.
Rp.

400.00
1,339.00
11,875.00
6,300.00

Rp.

Rp.
25,300.00
Rp.
600.00
19,914.00 Rp.
25,900.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

45,814.00
4,581.40
50,395.40

Rp.

643,600.00

Rp.
Rp.
Rp.
Rp.

1,000.00
1,030.00
9,500.00
15,000.00

Rp.

Rp.
558,250.00
Rp.
390.00
26,530.00 Rp.
558,640.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

585,170.00
58,517.00
643,687.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
100.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
50,750.00
13,000.00

Dibulatkan
Rp.
Rp.

100,000.00
103,000.00

48,114.00
4,811.40
52,925.40

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.

1,000.00
1,030.00

Rp.

748,200.00

Page 176

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

95,000.00
75,000.00
90,000.00
85,000.00
14,500.00
5,000.00

UPAH
Rp.
Rp.

Rp.

BAHAN

9,500.00
15,000.00
Rp.
621,000.00
Rp.
29,750.00
Rp.
435.00
Rp.
2,500.00
26,530.00 Rp.
653,685.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
80,000.00
13,000.00

100,000.00
103,000.00
95,000.00
75,000.00
50,750.00
14,500.00

Rp.

121,800.00

1,000.00
1,030.00
9,500.00
15,000.00

Rp.

Rp.
81,600.00
Rp.
2,600.00
26,530.00 Rp.
84,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

110,730.00
11,073.00
121,803.00

Rp.

3,396,200.00

Rp.
Rp.
Rp.
Rp.

800.00
2,575.00
23,750.00
12,450.00

Rp.

Rp.
3,045,000.00
Rp.
2,900.00
39,575.00 Rp.
3,047,900.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

3,087,475.00
308,747.50
3,396,222.50

Rp.
Rp.
Rp.
Rp.

2,000.00
2,060.00
19,000.00
30,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
25,000.00
13,000.00
1,300.00
140,000.00
5,000.00

Rp.

Rp.

181,200.00

Rp.
87,500.00
Rp.
650.00
Rp.
14,040.00
Rp.
4,480.00
Rp.
5,000.00
53,060.00 Rp.
111,670.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

164,730.00
16,473.00
181,203.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
90,000.00
14,500.00
4,400,000.00

Rp.

255,600.00

Rp.
Rp.
Rp.
Rp.

600.00
2,575.00
23,750.00
9,375.00

Rp.

Rp.
180,000.00
Rp.
725.00
Rp.
15,400.00
36,300.00 Rp.
196,125.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

232,425.00
23,242.50
255,667.50

Dibulatkan
Rp.
Rp.

100,000.00
103,000.00

680,215.00
68,021.50
748,236.50

Rp.
Rp.
Rp.
Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.

1,300.00
1,545.00

Rp.

101,600.00

Page 177

H. SATUAN
Rp.
Rp.
Rp.
Rp.

95,000.00
75,000.00
50,750.00
14,500.00

UPAH

BAHAN

Rp.
Rp.

14,250.00
18,750.00

Rp.

Rp.
55,825.00
Rp.
725.00
35,845.00 Rp.
56,550.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

Rp.
Rp.
Rp.
Rp.

600.00
2,575.00
23,750.00
9,375.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
68,000.00
14,500.00
13,000.00
4,400,000.00

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00
14,500.00

Rp.
Rp.
Rp.
Rp.

Rp.

90,800.00

Rp.
27,200.00
Rp.
870.00
Rp.
650.00
Rp.
17,600.00
36,300.00 Rp.
46,320.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

82,620.00
8,262.00
90,882.00

Rp.

60,100.00

Rp.
38,500.00
Rp.
290.00
15,918.00 Rp.
38,790.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

54,708.00
5,470.80
60,178.80

600.00
618.00
5,700.00
9,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
68,000.00
14,500.00

Rp.

44,000.00

Rp.
Rp.
Rp.
Rp.

600.00
824.00
6,650.00
11,250.00

Rp.

Rp.
20,400.00
Rp.
290.00
19,324.00 Rp.
20,690.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

40,014.00
4,001.40
44,015.40

Rp.

156,100.00

Rp.
Rp.
Rp.
Rp.

600.00
824.00
71,250.00
11,250.00

Rp.

Rp.
57,750.00
Rp.
320.00
83,924.00 Rp.
58,070.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

141,994.00
14,199.40
156,193.40

Rp.
Rp.
Rp.
Rp.

1,000.00
1,030.00
95,000.00
7,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00
16,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,000.00
16,000.00

92,395.00
9,239.50
101,634.50

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.

27,600.00
640.00

Rp.

146,000.00

Page 178

H. SATUAN

UPAH
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

BAHAN

104,530.00 Rp.
28,240.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

132,770.00
13,277.00
146,047.00

Dibulatkan

Rp.

82,500.00

Rp.
57,750.00
17,315.00 Rp.
57,750.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

75,065.00
7,506.50
82,571.50

800.00
515.00
4,750.00
11,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
13,000.00

Rp.

69,600.00

Rp.
Rp.
Rp.
Rp.

500.00
2,575.00
19,000.00
7,500.00

Rp.

Rp.
32,400.00
Rp.
1,300.00
29,575.00 Rp.
33,700.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

63,275.00
6,327.50
69,602.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
13,000.00

Rp.

68,900.00

Rp.
Rp.
Rp.
Rp.

500.00
2,060.00
19,000.00
7,500.00

Rp.

Rp.
33,000.00
Rp.
650.00
29,060.00 Rp.
33,650.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

62,710.00
6,271.00
68,981.00

Rp.

203,700.00

Rp.
Rp.
Rp.
Rp.

1,000.00
2,575.00
38,000.00
15,000.00

Rp.

Rp.
71,400.00
Rp.
217.50
Rp.
57,000.00
56,575.00 Rp.
128,617.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

185,192.50
18,519.25
203,711.75

Rp.

130,900.00

Rp.
Rp.
Rp.
Rp.

700.00
3,090.00
28,500.00
11,250.00

Rp.

Rp.
71,400.00
Rp.
145.00
Rp.
4,000.00
43,540.00 Rp.
75,545.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

119,085.00
11,908.50
130,993.50

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
68,000.00
14,500.00
3,000,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
68,000.00
14,500.00
8,000.00

Dibulatkan
Rp.

100,000.00

PEKERJAAN

Rp.

125.00

Rp.

153,300.00

Page 179

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

103,000.00
95,000.00
75,000.00
68,000.00
14,500.00
3,000,000.00
15,000.00

UPAH
Rp.
Rp.
Rp.

Rp.

BAHAN

2,575.00
38,000.00
3,000.00
Rp.
34,000.00
Rp.
217.50
Rp.
57,000.00
Rp.
4,500.00
43,700.00 Rp.
95,717.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
12,000.00

100,000.00
103,000.00
95,000.00
75,000.00
2,500,000.00
12,000.00

Rp.

94,500.00

7,500.00
2,575.00
23,750.00
11,250.00

Rp.

Rp.
38,500.00
Rp.
2,400.00
45,075.00 Rp.
40,900.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

85,975.00
8,597.50
94,572.50

Rp.

100,400.00

Rp.
Rp.
Rp.
Rp.

1,000.00
3,090.00
28,500.00
15,000.00

Rp.

Rp.
40,750.00
Rp.
3,000.00
47,590.00 Rp.
43,750.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

91,340.00
9,134.00
100,474.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
35,000.00
14,000.00

Rp.

53,300.00

Rp.
Rp.
Rp.
Rp.

200.00
721.00
6,650.00
2,250.00

Rp.

Rp.
38,500.00
Rp.
140.00
9,821.00 Rp.
38,640.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

48,461.00
4,846.10
53,307.10

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
32,500.00
14,000.00

Rp.

50,200.00

Rp.
Rp.
Rp.
Rp.

200.00
721.00
6,650.00
2,250.00

Rp.

Rp.
35,750.00
Rp.
140.00
9,821.00 Rp.
35,890.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

45,711.00
4,571.10
50,282.10

Rp.
Rp.
Rp.
Rp.

200.00
721.00
6,650.00
2,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00

139,417.50
13,941.75
153,359.25

Rp.
Rp.
Rp.
Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

53,300.00

Page 180

H. SATUAN
Rp.
Rp.

UPAH

35,000.00
14,000.00
Rp.

BAHAN

Rp.
38,500.00
Rp.
140.00
9,821.00 Rp.
38,640.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
15,000.00
14,000.00

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00
14,000.00

Rp.

217,900.00

300.00
1,236.00
11,400.00
4,500.00

Rp.

Rp.
180,000.00
Rp.
700.00
17,436.00 Rp.
180,700.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

198,136.00
19,813.60
217,949.60

Rp.

135,800.00

Rp.
Rp.
Rp.
Rp.

300.00
1,030.00
950.00
4,500.00

Rp.

Rp.
116,000.00
Rp.
700.00
6,780.00 Rp.
116,700.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

123,480.00
12,348.00
135,828.00

Rp.

140,200.00

Rp.
Rp.
Rp.
Rp.

300.00
1,030.00
950.00
4,500.00

Rp.

Rp.
120,000.00
Rp.
700.00
6,780.00 Rp.
120,700.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

127,480.00
12,748.00
140,228.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
80,000.00
14,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
70,000.00
14,000.00

Rp.

47,100.00

Rp.

Rp.
26,250.00
Rp.
420.00
16,180.00 Rp.
26,670.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

42,850.00
4,285.00
47,135.00

Rp.
Rp.
Rp.
Rp.

300.00
8,240.00
76,000.00
45,000.00

Rp.
Rp.
Rp.
Rp.

400.00
1,030.00
9,500.00
5,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
14,000.00

48,461.00
4,846.10
53,307.10

Rp.
Rp.
Rp.
Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

Rp.

192,100.00

Rp.
45,000.00
Rp.
140.00
129,540.00 Rp.
45,140.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

174,680.00
17,468.00
192,148.00

Dibulatkan

66,500.00

Rp.

Page 181

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
125,000.00
16,000.00

UPAH
Rp.
Rp.
Rp.
Rp.

BAHAN

500.00
515.00
4,750.00
7,500.00

Rp.

Rp.
45,500.00
Rp.
1,760.00
13,265.00 Rp.
47,260.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

Rp.
Rp.
Rp.
Rp.

800.00
5,150.00
47,500.00
11,250.00

Rp.

Rp.
Rp.
Rp.
Rp.
64,700.00 Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
55,000.00
15,000.00
15,000.00
80,000.00

100,000.00
103,000.00
95,000.00
75,000.00
3,750.00
14,000.00

100,000.00
103,000.00
95,000.00
75,000.00
475,000.00
475,000.00

463,000.00

Rp.

420,950.00

Overhead 10 % .. Rp.
Jumlah ..Rp.

42,095.00
463,045.00

Dibulatkan

Rp.

15,200.00

Rp.
Rp.
Rp.
Rp.

300.00
1,030.00
4,750.00
3,750.00

Rp.

Rp.
3,937.50
Rp.
140.00
9,830.00 Rp.
4,077.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

13,907.50
1,390.75
15,298.25

198,000.00
22,500.00
15,750.00
120,000.00
356,250.00

Rp.

958,700.00

Rp.
Rp.
Rp.
Rp.

16,000.00
103.00
104,500.00
247,500.00

Rp.

Rp.
475,000.00
Rp.
28,500.00
368,103.00 Rp.
503,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

871,603.00
87,160.30
958,763.30

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,650,000.00
1,650,000.00

100,000.00
103,000.00
95,000.00

60,525.00
6,052.50
66,577.50

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

2,328,800.00

Rp.
Rp.
Rp.
Rp.

16,000.00
103.00
104,500.00
247,500.00

Rp.

Rp.
1,650,000.00
Rp.
99,000.00
368,103.00 Rp.
1,749,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

2,117,103.00
211,710.30
2,328,813.30

Dibulatkan

640,400.00

Rp.
Rp.
Rp.

16,000.00
154,500.00
142,500.00

Rp.

Page 182

H. SATUAN
Rp.
Rp.
Rp.
Rp.

75,000.00
185,000.00
1,300.00
140,000.00

UPAH
Rp.

BAHAN

75,000.00

Rp.

Rp.
185,000.00
Rp.
7,800.00
Rp.
1,400.00
388,000.00 Rp.
194,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

Rp.
Rp.
Rp.
Rp.

11,000.00
30,900.00
142,500.00
75,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
185,000.00
800.00
1,300.00
140,000.00

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
650,000.00
650,000.00
1,300.00
140,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

505,100.00

Rp.
185,000.00
Rp.
5,600.00
Rp.
7,800.00
Rp.
1,400.00
259,400.00 Rp.
199,800.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

459,200.00
45,920.00
505,120.00

Rp.

1,148,900.00

Rp.
650,000.00
Rp.
195,000.00
Rp.
7,800.00
Rp.
1,400.00
190,300.00 Rp.
854,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,044,500.00
104,450.00
1,148,950.00

10,000.00
10,300.00
95,000.00
75,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
675,000.00
675,000.00
1,300.00
140,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
210,000.00
1,300.00
140,000.00

Rp.

1,120,200.00

Rp.
675,000.00
Rp.
81,000.00
Rp.
7,800.00
Rp.
1,400.00
253,200.00 Rp.
765,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,018,400.00
101,840.00
1,120,240.00

Dibulatkan

10,000.00
15,450.00
137,750.00
90,000.00

Rp.

512,700.00

Rp.
Rp.
Rp.
Rp.

11,000.00
7,210.00
71,250.00
157,500.00

Rp.

Rp.
210,000.00
Rp.
7,800.00
Rp.
1,400.00
246,960.00 Rp.
219,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

466,160.00
46,616.00
512,776.00

Dibulatkan
Rp.

100,000.00

582,200.00
58,220.00
640,420.00

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

11,000.00

Rp.

938,700.00

Page 183

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.

103,000.00
95,000.00
75,000.00
335,000.00
335,000.00

UPAH

BAHAN

Rp.
Rp.
Rp.

55,620.00
256,500.00
135,000.00

Rp.

Rp.
335,000.00
Rp.
60,300.00
458,120.00 Rp.
395,300.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
574,919.15
1,300.00
140,000.00
435.60
5,000.00

100,000.00
103,000.00
95,000.00
2,500.00
250.00

1,551,700.00

Rp.
229,967.66
Rp.
156,000.00
Rp.
42,000.00
Rp.
156,816.00
Rp.
30,000.00
795,900.00 Rp.
614,783.66 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,410,683.66
141,068.37
1,551,752.03

Dibulatkan

Rp.

123,100.00

Rp.

Rp.
2,500.00
Rp.
50.00
109,375.00 Rp.
2,550.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

111,925.00
11,192.50
123,117.50

Rp.

1,291,600.00

Rp.
Rp.
Rp.
Rp.

90,000.00
92,700.00
427,500.00
225,000.00

Rp.

Rp.
335,000.00
Rp.
4,020.00
835,200.00 Rp.
339,020.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

1,174,220.00
117,422.00
1,291,642.00

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

30,000.00
30,900.00
285,000.00
450,000.00

25,000.00
77,250.00
7,125.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

iameter 15 cm
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

iameter 20 cm
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
335,000.00
33,500.00

Dibulatkan
100,000.00
103,000.00
95,000.00
75,000.00
40,000.00
1,300.00
140,000.00
65,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

82,800.00

Rp.
64,000.00
Rp.
884.00
Rp.
1,820.00
Rp.
715.00
7,909.00 Rp.
67,419.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

75,328.00
7,532.80
82,860.80

250.00
309.00
2,850.00
4,500.00

Dibulatkan
100,000.00
103,000.00
95,000.00

853,420.00
85,342.00
938,762.00

Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.

700.00
412.00
3,800.00

Rp.

104,400.00

Page 184

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00
50,000.00
1,300.00
140,000.00
65,000.00

UPAH
Rp.

Rp.

BAHAN

6,000.00
Rp.
80,000.00
Rp.
1,131.00
Rp.
1,960.00
Rp.
910.00
10,912.00 Rp.
84,001.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
40,000.00
574,919.15
1,300.00
140,000.00
65,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
150,000.00
574,919.15
1,300.00
140,000.00
65,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

101,800.00

Rp.
44,000.00
Rp.
15,522.82
Rp.
5,096.00
Rp.
7,840.00
Rp.
1,560.00
18,571.00 Rp.
74,018.82 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

92,589.82
9,258.98
101,848.80

700.00
721.00
6,650.00
10,500.00

Rp.

613,800.00

Rp.
165,000.00
Rp.
316,205.53
Rp.
13,390.00
Rp.
8,540.00
Rp.
4,485.00
50,407.00 Rp.
507,620.53 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

558,027.53
55,802.75
613,830.29

1,900.00
1,957.00
18,050.00
28,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
574,919.15
1,300.00
140,000.00
140,000.00
9,000.00
140,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

573,200.00

Rp.
83,363.28
Rp.
57,200.00
Rp.
9,800.00
Rp.
9,800.00
Rp.
14,400.00
Rp.
8,400.00
338,179.50 Rp.
182,963.28 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

521,142.78
52,114.28
573,257.05

1,600.00
154.50
96,425.00
240,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
574,919.15
1,300.00
140,000.00
140,000.00

Rp.
Rp.
Rp.
Rp.

94,913.00
9,491.30
104,404.30

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

7,100.00
4,841.00
44,935.00
106,500.00
Rp.
Rp.
Rp.
Rp.

143,729.79
100,100.00
18,200.00
2,800.00

Rp.

510,600.00

Page 185

H. SATUAN
Rp.
Rp.

UPAH

9,000.00
140,000.00

BAHAN

Rp.

Rp.
23,400.00
Rp.
12,600.00
163,376.00 Rp.
300,829.79 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

10,800.00
7,416.00
68,400.00
9,500.00
162,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
95,000.00
75,000.00
574,919.15
1,300.00
140,000.00
100,000.00
9,000.00
140,000.00

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,833.33
13,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
13,750.00
16,500.00

Rp.
Rp.
Rp.
Rp.

Rp.

780,000.00

Rp.
213,295.01
Rp.
148,200.00
Rp.
25,760.00
Rp.
3,300.00
Rp.
43,650.00
Rp.
16,800.00
258,116.00 Rp.
451,005.01 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

709,121.01
70,912.10
780,033.11

Dibulatkan

Rp.

37,100.00

Rp.
13,000.00
Rp.
4,550.00
16,227.00 Rp.
17,550.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

33,777.00
3,377.70
37,154.70

2,700.00
927.00
8,550.00
4,050.00

Rp.

42,300.00

Rp.
16,500.00
Rp.
5,775.00
16,227.00 Rp.
22,275.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

38,502.00
3,850.20
42,352.20

2,700.00
927.00
8,550.00
4,050.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
18,000.00
21,600.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

49,900.00

Rp.
21,600.00
Rp.
7,560.00
16,227.00 Rp.
29,160.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

45,387.00
4,538.70
49,925.70

2,700.00
927.00
8,550.00
4,050.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
26,000.00

Rp.
Rp.
Rp.
Rp.

464,205.79
46,420.58
510,626.37

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

540.00
1,854.00
17,100.00
8,100.00
Rp.

31,200.00

Rp.

76,600.00

Page 186

H. SATUAN
Rp.

UPAH

31,200.00
Rp.

BAHAN

Rp.
10,920.00
27,594.00 Rp.
42,120.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
46,500.00
55,800.00

100,000.00
103,000.00
95,000.00
75,000.00
65,000.00
78,000.00

113,200.00

Rp.
Rp.
Rp.
Rp.

540.00
1,854.00
17,100.00
8,100.00

Rp.

Rp.
55,800.00
Rp.
19,530.00
27,594.00 Rp.
75,330.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

102,924.00
10,292.40
113,216.40

Rp.

153,700.00

Rp.
Rp.
Rp.
Rp.

680.00
2,317.50
21,375.00
10,125.00

Rp.

Rp.
78,000.00
Rp.
27,300.00
34,497.50 Rp.
105,300.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

139,797.50
13,979.75
153,777.25

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
4,250.00
5,100.00

Rp.

17,600.00

Rp.
Rp.
Rp.
Rp.

180.00
618.00
5,700.00
2,700.00

Rp.

Rp.
5,100.00
Rp.
1,785.00
9,198.00 Rp.
6,885.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

16,083.00
1,608.30
17,691.30

Rp.

19,000.00

Rp.
Rp.
Rp.
Rp.

180.00
618.00
5,700.00
2,700.00

Rp.

Rp.
6,000.00
Rp.
2,100.00
9,198.00 Rp.
8,100.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

17,298.00
1,729.80
19,027.80

Rp.

20,800.00

Rp.
Rp.
Rp.
Rp.

180.00
618.00
5,700.00
2,700.00

Rp.

Rp.
7,200.00
Rp.
2,520.00
9,198.00 Rp.
9,720.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

18,918.00
1,891.80
20,809.80

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
5,000.00
6,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
6,000.00
7,200.00

Dibulatkan
Rp.

100,000.00

69,714.00
6,971.40
76,685.40

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

180.00

Rp.

23,400.00

Page 187

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.

103,000.00
95,000.00
75,000.00
7,500.00
9,000.00

UPAH

BAHAN

Rp.
Rp.
Rp.

618.00
5,700.00
2,700.00

Rp.

Rp.
9,000.00
Rp.
3,150.00
9,198.00 Rp.
12,150.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
9,500.00
11,400.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
12,500.00
15,000.00

32,100.00

Rp.
11,400.00
Rp.
3,990.00
13,797.00 Rp.
15,390.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

29,187.00
2,918.70
32,105.70

270.00
927.00
8,550.00
4,050.00

Rp.

32,300.00

Rp.
Rp.
Rp.
Rp.

180.00
618.00
5,700.00
2,700.00

Rp.

Rp.
15,000.00
Rp.
5,250.00
9,198.00 Rp.
20,250.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

29,448.00
2,944.80
32,392.80

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
16,375.00
19,650.00

Rp.

51,900.00

Rp.
Rp.
Rp.
Rp.

410.00
1,390.50
12,825.00
6,075.00

Rp.

Rp.
19,650.00
Rp.
6,877.50
20,700.50 Rp.
26,527.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

47,228.00
4,722.80
51,950.80

Rp.

63,900.00

Rp.
Rp.
Rp.
Rp.

410.00
1,390.50
12,825.00
6,075.00

Rp.

Rp.
27,750.00
Rp.
9,712.50
20,700.50 Rp.
37,462.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

58,163.00
5,816.30
63,979.30

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
23,125.00
27,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
170,000.00
35,000.00

21,348.00
2,134.80
23,482.80

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

150.00
3,090.00
28,500.00
2,250.00

Rp.

Rp.
Rp.
33,990.00 Rp.

170,000.00
35,000.00
205,000.00

Rp.

262,800.00

Rp.

238,990.00

Page 188

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
210,000.00
35,000.00
1,300.00
140,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

368,100.00

Rp.
210,000.00
Rp.
35,000.00
Rp.
26,000.00
Rp.
7,000.00
56,650.00 Rp.
278,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

334,650.00
33,465.00
368,115.00

250.00
5,150.00
47,500.00
3,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
25,000.00
2,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

40,500.00

Rp.
25,000.00
Rp.
50.00
11,780.00 Rp.
25,050.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

36,830.00
3,683.00
40,513.00

500.00
1,030.00
9,500.00
750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
47,500.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

65,200.00

Rp.
47,500.00
11,780.00 Rp.
47,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

59,280.00
5,928.00
65,208.00

500.00
1,030.00
9,500.00
750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

95,000.00
103,000.00
75,000.00
100,000.00
702,636.36
65,000.00
120,454.55
829,454.55
10,909.09
391,909.09
47,818.18
9,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,000.00
16,272.73
680,000.00
120,454.55
47,818.18
829,454.55

23,899.00
262,889.00

Rp.

844,900.00

Rp.
70,263.64
Rp.
6,500.00
Rp.
100,378.79
Rp.
41,472.73
Rp.
54,545.45
Rp.
195,954.55
Rp.
143,454.55
Rp.
3,996.00
151,590.00 Rp.
616,565.70 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

768,155.70
76,815.57
844,971.27

28,500.00
3,090.00
75,000.00
45,000.00

Dibulatkan
Rp.
1,065,600.00
Rp.
58,581.82
Rp.
340,000.00
Rp.
2,509,469.70
Rp.
990,792.73
Rp.
414,727.27

Rp.

9,699,000.00

Page 189

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

UPAH

10,909.09
391,909.09
125,000.00
95,000.00
23,125.00
5,000.00
15,000.00
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,000.00
16,272.73
680,000.00
120,454.55
47,818.18
829,454.55
10,909.09
391,909.09
125,000.00
95,000.00
23,125.00
5,000.00
15,000.00
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,000.00
16,272.73
680,000.00
120,454.55
47,818.18
829,454.55
10,909.09
391,909.09
125,000.00
95,000.00
23,125.00
5,000.00
15,000.00
Rp.

BAHAN

Rp.
545,454.55
Rp.
1,959,545.45
Rp.
312,500.00
Rp.
190,000.00
Rp.
115,625.00
Rp.
15,000.00
Rp.
300,000.00
- Rp.
8,817,296.52 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

100,000.00
103,000.00
95,000.00
75,000.00
9,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

6,573,400.00

Dibulatkan
Rp.
Rp.
208,800.00
Rp.
13,018.18
Rp.
95,200.00
Rp.
1,033,901.52
Rp.
107,590.91
Rp.
116,123.64
Rp.
152,727.27
Rp.
548,672.73
Rp.
250,000.00
Rp.
190,000.00
Rp.
115,625.00
Rp.
15,000.00
Rp.
150,000.00
- Rp.
2,996,659.24 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

3,296,300.00

100,000.00

Rp.

5,975,886.21
597,588.62
6,573,474.83

2,996,659.24
299,665.92
3,296,325.17

Rp.

17,600.00

Rp.
10,350.00
5,718.00 Rp.
10,350.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

16,068.00
1,606.80
17,674.80

30.00
618.00
570.00
4,500.00

Dibulatkan
Rp.

8,817,296.52
881,729.65
9,699,026.17

Dibulatkan
Rp.
Rp.
455,040.00
Rp.
26,036.36
Rp.
136,000.00
Rp.
1,947,348.48
Rp.
789,000.00
Rp.
248,836.36
Rp.
327,272.73
Rp.
1,175,727.27
Rp.
250,000.00
Rp.
190,000.00
Rp.
115,625.00
Rp.
15,000.00
Rp.
300,000.00
- Rp.
5,975,886.21 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

500.00

Rp.

72,900.00

Page 190

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

103,000.00
95,000.00
75,000.00
7,600.00
20,000.00
40,000.00

UPAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

BAHAN

103.00
9,500.00
7,500.00
760.00
2,000.00
Rp.
46,000.00
20,363.00 Rp.
46,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
26,500.00
7,600.00
20,000.00
40,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
18,000.00
14,500.00
2,500,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

2,800.00

Rp.
1,060.00
Rp.
228.00
Rp.
80.00
Rp.
680.00
530.60 Rp.
2,048.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

2,578.60
257.86
2,836.46

20.00
20.60
190.00
300.00

Rp.

46,900.00

Rp.
19,800.00
Rp.
290.00
Rp.
4,500.00
18,080.00 Rp.
24,590.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

42,670.00
4,267.00
46,937.00

50.00
1,030.00
9,500.00
7,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
18,000.00
14,500.00
2,500,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

46,900.00

Rp.
19,800.00
Rp.
290.00
Rp.
4,500.00
18,080.00 Rp.
24,590.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

42,670.00
4,267.00
46,937.00

50.00
1,030.00
9,500.00
7,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
15,000.00
14,500.00
2,500,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

66,363.00
6,636.30
72,999.30

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

43,300.00

Rp.
16,500.00
Rp.
290.00
Rp.
4,500.00
18,080.00 Rp.
21,290.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

39,370.00
3,937.00
43,307.00

50.00
1,030.00
9,500.00
7,500.00

Dibulatkan

Rp.

105,100.00

Page 191

H. SATUAN
Rp.
Rp.
Rp.
Rp.

75,000.00
95,000.00
2,000.00
140,000.00

UPAH

BAHAN

Rp.
Rp.

15,000.00
5,700.00

Rp.

Rp.
70,000.00
Rp.
4,900.00
20,700.00 Rp.
74,900.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
22,400.00
1,300.00
140,000.00

100,000.00
103,000.00
95,000.00
75,000.00
6,000.00
1,300.00
140,000.00

220,200.00

Rp.
Rp.
Rp.
Rp.

1,300.00
1,236.00
11,400.00
18,750.00

Rp.

Rp.
148,512.00
Rp.
12,740.00
Rp.
6,300.00
32,686.00 Rp.
167,552.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

200,238.00
20,023.80
220,261.80

Rp.

136,900.00

Rp.
Rp.
Rp.
Rp.

1,300.00
1,339.00
11,875.00
19,500.00

Rp.

Rp.
71,220.00
Rp.
13,000.00
Rp.
6,300.00
34,014.00 Rp.
90,520.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

124,534.00
12,453.40
136,987.40

Rp.

99,500.00

Rp.
Rp.
Rp.
Rp.

1,400.00
1,339.00
12,350.00
20,250.00

Rp.

Rp.
39,750.00
Rp.
13,520.00
Rp.
1,890.00
35,339.00 Rp.
55,160.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

90,499.00
9,049.90
99,548.90

Rp.
Rp.
Rp.
Rp.

1,300.00
1,236.00
11,400.00
18,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,500.00
1,300.00
140,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
22,400.00
1,300.00
140,000.00
5,000.00

Rp.

Rp.

227,400.00

Rp.
148,512.00
Rp.
12,740.00
Rp.
6,300.00
Rp.
6,500.00
32,686.00 Rp.
174,052.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

206,738.00
20,673.80
227,411.80

Dibulatkan
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00

95,600.00
9,560.00
105,160.00

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.

1,300.00
1,339.00
11,875.00

Rp.

145,200.00

Page 192

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00
6,000.00
1,300.00
140,000.00
5,000.00

UPAH
Rp.

Rp.

BAHAN

19,500.00
Rp.
71,220.00
Rp.
13,000.00
Rp.
6,300.00
Rp.
7,500.00
34,014.00 Rp.
98,020.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
22,400.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
6,000.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

227,400.00

Rp.
148,512.00
Rp.
12,740.00
Rp.
6,300.00
Rp.
6,500.00
32,686.00 Rp.
174,052.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

206,738.00
20,673.80
227,411.80

1,300.00
1,236.00
11,400.00
18,750.00

Rp.

145,200.00

Rp.
71,220.00
Rp.
13,000.00
Rp.
6,300.00
Rp.
7,500.00
34,014.00 Rp.
98,020.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

132,034.00
13,203.40
145,237.40

1,300.00
1,339.00
11,875.00
19,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
22,400.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

227,400.00

Rp.
148,512.00
Rp.
12,740.00
Rp.
6,300.00
Rp.
6,500.00
32,686.00 Rp.
174,052.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

206,738.00
20,673.80
227,411.80

1,300.00
1,236.00
11,400.00
18,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
8,750.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

132,034.00
13,203.40
145,237.40

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

181,100.00

Rp.
103,862.50
Rp.
13,000.00
Rp.
6,300.00
Rp.
7,500.00
34,014.00 Rp.
130,662.50 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

164,676.50
16,467.65
181,144.15

1,300.00
1,339.00
11,875.00
19,500.00

Dibulatkan

Rp.

227,500.00

Page 193

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
22,400.00
1,300.00
140,000.00
5,000.00

UPAH
Rp.
Rp.
Rp.
Rp.

Rp.

BAHAN

1,300.00
1,339.00
11,400.00
18,750.00
Rp.
148,512.00
Rp.
12,740.00
Rp.
6,300.00
Rp.
6,500.00
32,789.00 Rp.
174,052.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
6,000.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
58,333.33
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

145,200.00

Rp.
71,220.00
Rp.
13,000.00
Rp.
6,300.00
Rp.
7,500.00
34,014.00 Rp.
98,020.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

132,034.00
13,203.40
145,237.40

1,300.00
1,339.00
11,875.00
19,500.00

Rp.

263,700.00

Rp.
180,833.33
Rp.
12,480.00
Rp.
6,300.00
Rp.
7,500.00
32,686.00 Rp.
207,113.33 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

239,799.33
23,979.93
263,779.27

1,300.00
1,236.00
11,400.00
18,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
22,400.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

227,400.00

Rp.
148,512.00
Rp.
12,740.00
Rp.
6,300.00
Rp.
6,500.00
32,686.00 Rp.
174,052.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

206,738.00
20,673.80
227,411.80

1,300.00
1,236.00
11,400.00
18,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
6,000.00
1,300.00
140,000.00
5,000.00

206,841.00
20,684.10
227,525.10

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

1,300.00
1,339.00
11,875.00
19,500.00

Rp.

Rp.
Rp.
Rp.
Rp.
34,014.00 Rp.

71,220.00
13,000.00
6,300.00
7,500.00
98,020.00

Rp.

145,200.00

Rp.

132,034.00

Page 194

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
450.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

183,700.00

Rp.
47,700.00
Rp.
10,647.00
Rp.
6,300.00
Rp.
16,000.00
86,355.00 Rp.
80,647.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

167,002.00
16,700.20
183,702.20

3,000.00
3,605.00
33,250.00
46,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
6,000.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

188,500.00

Rp.
60,000.00
Rp.
10,647.00
Rp.
6,300.00
Rp.
8,100.00
86,355.00 Rp.
85,047.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

171,402.00
17,140.20
188,542.20

3,000.00
3,605.00
33,250.00
46,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
5,272.73
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

193,300.00

Rp.
62,587.27
Rp.
13,000.00
Rp.
6,300.00
Rp.
7,500.00
86,355.00 Rp.
89,387.27 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

175,742.27
17,574.23
193,316.50

3,000.00
3,605.00
33,250.00
46,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
10,500.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

200,200.00

Rp.
68,906.25
Rp.
13,000.00
Rp.
6,300.00
Rp.
7,500.00
86,355.00 Rp.
95,706.25 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

182,061.25
18,206.13
200,267.38

3,000.00
3,605.00
33,250.00
46,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,000.00

Rp.
Rp.
Rp.
Rp.

13,203.40
145,237.40

3,000.00
3,605.00
33,250.00
46,500.00
Rp.

53,000.00

Rp.

184,000.00

Page 195

H. SATUAN
Rp.
Rp.
Rp.

UPAH

1,300.00
140,000.00
5,000.00

BAHAN

Rp.

Rp.
13,520.00
Rp.
6,300.00
Rp.
8,100.00
86,355.00 Rp.
80,920.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

Rp.
Rp.
Rp.
Rp.

3,000.00
3,605.00
33,250.00
46,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
4,000.00
1,300.00
140,000.00
5,000.00

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
900.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

184,400.00

Rp.
47,480.00
Rp.
18,395.00
Rp.
5,460.00
Rp.
10,000.00
86,355.00 Rp.
81,335.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

167,690.00
16,769.00
184,459.00

Rp.

25,800.00

Rp.
4,770.00
Rp.
1,482.00
Rp.
420.00
Rp.
125.00
16,727.00 Rp.
6,797.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

23,524.00
2,352.40
25,876.40

500.00
927.00
8,550.00
6,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

30,000.00

Rp.
8,480.00
Rp.
1,482.00
Rp.
420.00
Rp.
250.00
16,727.00 Rp.
10,632.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

27,359.00
2,735.90
30,094.90

500.00
927.00
8,550.00
6,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
450.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

22,100.00

Rp.
2,385.00
Rp.
741.00
Rp.
210.00
Rp.
65.00
16,727.00 Rp.
3,401.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

20,128.00
2,012.80
22,140.80

500.00
927.00
8,550.00
6,750.00

Dibulatkan
Rp.

100,000.00

Rp.

167,275.00
16,727.50
184,002.50

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

3,800.00

Rp.

138,300.00

Page 196

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

103,000.00
95,000.00
75,000.00
3,000.00
1,300.00
140,000.00
5,000.00

UPAH
Rp.
Rp.
Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
15,000.00
15,000.00

BAHAN

4,635.00
42,750.00
56,250.00
Rp.
15,900.00
Rp.
1,482.00
Rp.
420.00
Rp.
500.00
107,435.00 Rp.
18,302.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

125,737.00
12,573.70
138,310.70

Dibulatkan

Rp.

57,800.00

Rp.
Rp.
Rp.
Rp.

900.00
1,751.00
16,150.00
12,750.00

Rp.

Rp.
15,750.00
Rp.
5,250.00
31,551.00 Rp.
21,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

52,551.00
5,255.10
57,806.10

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
67,500.00
15,000.00

Rp.

108,100.00

Rp.
Rp.
Rp.
Rp.

600.00
1,236.00
11,400.00
9,000.00

Rp.

Rp.
70,875.00
Rp.
5,250.00
22,236.00 Rp.
76,125.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

98,361.00
9,836.10
108,197.10

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
35,000.00
15,000.00

Rp.

148,100.00

Rp.
Rp.
Rp.
Rp.

3,300.00
3,605.00
33,250.00
48,750.00

Rp.

Rp.
36,750.00
Rp.
9,000.00
88,905.00 Rp.
45,750.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

134,655.00
13,465.50
148,120.50

Rp.

149,300.00

Rp.
Rp.
Rp.
Rp.

3,300.00
3,605.00
33,250.00
49,875.00

Rp.

Rp.
36,750.00
Rp.
9,000.00
90,030.00 Rp.
45,750.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

135,780.00
13,578.00
149,358.00

Rp.
Rp.
Rp.
Rp.

3,000.00
5,150.00
47,500.00
46,500.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
35,000.00
15,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
435.60

PEKERJAAN

Rp.

37,461.60

Rp.

177,800.00

Page 197

H. SATUAN
Rp.
Rp.
Rp.

UPAH

1,300.00
140,000.00
5,000.00
Rp.

BAHAN

Rp.
12,090.00
Rp.
2,520.00
Rp.
7,500.00
102,150.00 Rp.
59,571.60 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
850.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,800.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

185,600.00

Rp.
45,050.00
Rp.
12,090.00
Rp.
2,520.00
Rp.
13,750.00
95,385.00 Rp.
73,410.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

168,795.00
16,879.50
185,674.50

Rp.

184,100.00

Rp.
47,700.00
Rp.
12,090.00
Rp.
2,520.00
Rp.
9,700.00
95,385.00 Rp.
72,010.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

167,395.00
16,739.50
184,134.50

3,000.00
4,635.00
42,750.00
45,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
900.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

188,500.00

Rp.
47,700.00
Rp.
12,090.00
Rp.
2,520.00
Rp.
13,750.00
95,385.00 Rp.
76,060.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

171,445.00
17,144.50
188,589.50

3,000.00
4,635.00
42,750.00
45,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
450.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

189,400.00

Rp.
47,700.00
Rp.
12,090.00
Rp.
2,520.00
Rp.
14,500.00
95,385.00 Rp.
76,810.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

172,195.00
17,219.50
189,414.50

3,000.00
4,635.00
42,750.00
45,000.00

Dibulatkan
Rp.

100,000.00

Rp.

161,721.60
16,172.16
177,893.76

3,000.00
4,635.00
42,750.00
45,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

3,000.00

Rp.

188,500.00

Page 198

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

103,000.00
95,000.00
75,000.00
900.00
1,300.00
140,000.00
5,000.00

UPAH
Rp.
Rp.
Rp.

Rp.

BAHAN

4,635.00
42,750.00
45,000.00
Rp.
47,700.00
Rp.
12,090.00
Rp.
2,520.00
Rp.
13,750.00
95,385.00 Rp.
76,060.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
2,000.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
800.00
1,300.00
140,000.00
5,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

189,900.00

Rp.
53,000.00
Rp.
12,090.00
Rp.
2,520.00
Rp.
9,700.00
95,385.00 Rp.
77,310.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

172,695.00
17,269.50
189,964.50

Rp.

207,000.00

Rp.
50,400.00
Rp.
16,172.00
Rp.
3,500.00
Rp.
13,750.00
104,400.00 Rp.
83,822.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

188,222.00
18,822.20
207,044.20

3,000.00
5,150.00
47,500.00
48,750.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
700.00
1,300.00
140,000.00

Rp.

118,000.00

Rp.
Rp.
Rp.
Rp.

3,000.00
3,605.00
33,250.00
46,500.00

Rp.

Rp.
770.00
Rp.
15,275.00
Rp.
4,900.00
86,355.00 Rp.
20,945.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

107,300.00
10,730.00
118,030.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
700.00
1,300.00
140,000.00

171,445.00
17,144.50
188,589.50

3,000.00
4,635.00
42,750.00
45,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.

118,000.00

Rp.
Rp.
Rp.
Rp.

3,000.00
3,605.00
33,250.00
46,500.00

Rp.

Rp.
770.00
Rp.
15,275.00
Rp.
4,900.00
86,355.00 Rp.
20,945.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

107,300.00
10,730.00
118,030.00

Dibulatkan

Rp.

75,500.00

Page 199

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000.00
15,000.00

UPAH

BAHAN

Rp.
Rp.
Rp.
Rp.

800.00
1,545.00
14,250.00
11,250.00

Rp.

Rp.
35,610.00
Rp.
5,250.00
27,845.00 Rp.
40,860.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Rp.

137,600.00

Rp.
Rp.
Rp.
Rp.

4,000.00
17,510.00
16,150.00
56,250.00

Rp.

Rp.
27,500.00
Rp.
3,750.00
93,910.00 Rp.
31,250.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

125,160.00
12,516.00
137,676.00

Rp.
Rp.
Rp.
Rp.

600.00
1,236.00
11,400.00
9,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
12,500.00
15,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
15,000.00

Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000.00
15,000.00

106,900.00

Rp.
75,000.00
22,236.00 Rp.
75,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

97,236.00
9,723.60
106,959.60

Rp.

23,400.00

Rp.

Rp.
5,280.00
Rp.
1,200.00
14,824.00 Rp.
6,480.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

21,304.00
2,130.40
23,434.40

Rp.

34,300.00

Rp.
Rp.
Rp.
Rp.

600.00
1,236.00
11,400.00
9,000.00

Rp.

Rp.
9,000.00
Rp.
5.00
22,236.00 Rp.
9,005.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

31,241.00
3,124.10
34,365.10

Rp.
Rp.
Rp.
Rp.

750.00
1,545.00
14,250.00
11,250.00

Rp.

Rp.
Rp.
27,795.00 Rp.

Rp.
Rp.
Rp.
Rp.

400.00
824.00
7,600.00
6,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000,000.00
100.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
3,000.00
15,000.00

68,705.00
6,870.50
75,575.50

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

33,150.00
5,250.00
38,400.00

Rp.

72,800.00

Rp.

66,195.00

Page 200

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.

100,000.00
75,000.00
50,000.00

Rp.
Rp.
Rp.

Rp.

15,400.00

Rp.
2,500.00
11,500.00 Rp.
2,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

14,000.00
1,400.00
15,400.00

250.00
11,250.00

Dibulatkan
Rp.
Rp.
Rp.

100,000.00
75,000.00
10,000.00

Rp.
Rp.
Rp.

Rp.

13,200.00

Rp.
500.00
11,500.00 Rp.
500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

12,000.00
1,200.00
13,200.00

250.00
11,250.00

Dibulatkan
Rp.
Rp.
Rp.

100,000.00
75,000.00
10,000.00

Rp.
Rp.
Rp.

Rp.

13,200.00

Rp.
500.00
11,500.00 Rp.
500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

12,000.00
1,200.00
13,200.00

250.00
11,250.00

Dibulatkan
Rp.
Rp.
Rp.

100,000.00
75,000.00
10,000.00

Rp.
Rp.
Rp.

Rp.

13,200.00

Rp.
500.00
11,500.00 Rp.
500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

12,000.00
1,200.00
13,200.00

250.00
11,250.00

Pancar Pasir (Sanblasting) Dengan ingkat KebersihaDibulatkan


Rp.
Rp.
100,000.00 Rp.
50,000.00
Rp.
103,000.00 Rp.
82,400.00
Rp.
95,000.00 Rp.
95,000.00
Rp.
75,000.00 Rp.
120,000.00
Rp.
93.33
Rp.
3,733.33
Rp.
7,600.00
Rp.
76,000.00
Rp.
100,000.00
Rp.
20,000.00
Rp.
347,400.00 Rp.
99,733.33 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
15,000.00
15,000.00
1,000.00

100,000.00

491,800.00

447,133.33
44,713.33
491,846.67

Rp.

9,800.00

Rp.
Rp.
Rp.
Rp.

250.00
412.00
3,800.00
3,000.00

Rp.

Rp.
1,200.00
Rp.
300.00
Rp.
10.00
7,462.00 Rp.
1,510.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

8,972.00
897.20
9,869.20

Dibulatkan
Rp.

6,619.50
72,814.50

Rp.

250.00

Rp.

28,900.00

Page 201

H. SATUAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

103,000.00
95,000.00
75,000.00
15,000.00
18,000.00
45,000.00

UPAH
Rp.
Rp.
Rp.

Rp.

Cat Dasar, 2 Lapis Cat Penutup


Rp.
100,000.00
Rp.
103,000.00
Rp.
95,000.00
Rp.
75,000.00
Rp.
19,000.00
Rp.
15,000.00
Rp.
18,000.00
Rp.
45,000.00

Rp.
Rp.
Rp.
Rp.

Rp.
2,250.00
Rp.
3,060.00
Rp.
7,650.00
13,397.50 Rp.
12,960.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

Rp.

37,600.00

Rp.
3,800.00
Rp.
2,250.00
Rp.
3,060.00
Rp.
11,700.00
13,397.50 Rp.
20,810.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

34,207.50
3,420.75
37,628.25

250.00
772.50
7,125.00
5,250.00

Rp.

44,800.00

Rp.
3,800.00
Rp.
2,250.00
Rp.
3,060.00
Rp.
15,750.00
15,887.00 Rp.
24,860.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

40,747.00
4,074.70
44,821.70

250.00
412.00
9,975.00
5,250.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

25,200.00

Rp.
7,200.00
15,724.00 Rp.
7,200.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

22,924.00
2,292.40
25,216.40

250.00
6,489.00
5,985.00
3,000.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
15,000.00
45,000.00
4,000.00

Rp.

38,000.00

Rp.
Rp.
Rp.

250.00
1,648.00
5,700.00

Rp.

Rp.
2,250.00
Rp.
16,740.00
Rp.
8,000.00
7,598.00 Rp.
26,990.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

34,588.00
3,458.80
38,046.80

Dibulatkan
Rp.
Rp.
Rp.

100,000.00
75,000.00
10,000.00

26,357.50
2,635.75
28,993.25

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

772.50
7,125.00
5,250.00

Dibulatkan

Rp.

Cat Dasar, 3 Lapis Cat Penutup


Rp.
100,000.00
Rp.
103,000.00
Rp.
95,000.00
Rp.
75,000.00
Rp.
19,000.00
Rp.
15,000.00
Rp.
18,000.00
Rp.
45,000.00

BAHAN

Rp.
Rp.

600.00
7,500.00
Rp.

3,500.00

Rp.

12,700.00

Page 202

H. SATUAN

UPAH
Rp.

BAHAN

8,100.00 Rp.
3,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
17,500.00
15,000.00
4,000.00
15,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

sar, 2 Lapis Cat Penutup)


Rp.
100,000.00
Rp.
103,000.00
Rp.
95,000.00
Rp.
75,000.00
Rp.
15,000.00
Rp.
18,000.00
Rp.
21,600.00

100,000.00
103,000.00
95,000.00
75,000.00
18,000.00
21,600.00

36,300.00

Rp.
2,625.00
Rp.
750.00
Rp.
400.00
Rp.
150.00
29,098.00 Rp.
3,925.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

33,023.00
3,302.30
36,325.30

250.00
1,648.00
15,200.00
12,000.00

Dibulatkan

Rp.

19,000.00

Rp.
Rp.
Rp.
Rp.

250.00
648.90
5,985.00
1,500.00

Rp.

Rp.
1,500.00
Rp.
1,800.00
Rp.
5,616.00
8,383.90 Rp.
8,916.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

17,299.90
1,729.99
19,029.89

Rp.

14,100.00

Rp.
Rp.
Rp.
Rp.

250.00
432.60
3,990.00
2,100.00

Rp.

Rp.
2,160.00
Rp.
3,888.00
6,772.60 Rp.
6,048.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

12,820.60
1,282.06
14,102.66

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
20,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

9,600.00

Rp.
2,000.00
6,772.60 Rp.
2,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

8,772.60
877.26
9,649.86

250.00
432.60
3,990.00
2,100.00

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
4,000.00
2,500.00
1,800,000.00
150,000.00

11,600.00
1,160.00
12,760.00

Rp.

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN

Rp.
Rp.
Rp.
Rp.

Rp.

Rp.

42,600.00

Rp.
400.00
Rp.
625.00
Rp.
3,600.00
Rp.
22,500.00
11,605.30 Rp.
27,125.00 Rp.
Overhead 10 % .. Rp.

38,730.30
3,873.03

250.00
10.30
95.00
11,250.00

Page 203

H. SATUAN

UPAH

BAHAN

PEKERJAAN

Jumlah ..Rp.
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
1,800,000.00
150,000.00

Rp.

57,600.00

Rp.
Rp.
Rp.
Rp.

250.00
51.50
475.00
3,000.00

Rp.

Rp.
3,600.00
Rp.
45,000.00
3,776.50 Rp.
48,600.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

52,376.50
5,237.65
57,614.15

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
12,500.00
10,000.00

Rp.

41,700.00

Rp.
Rp.
Rp.
Rp.

250.00
206.00
19,000.00
1,500.00

Rp.

Rp.
15,000.00
Rp.
2,000.00
20,956.00 Rp.
17,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

37,956.00
3,795.60
41,751.60

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
22,500.00
15,000.00

Rp.

28,500.00

Rp.
Rp.
Rp.
Rp.

1,000.00
2,060.00
19,000.00
1,500.00

Rp.

Rp.
2,250.00
Rp.
150.00
23,560.00 Rp.
2,400.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

25,960.00
2,596.00
28,556.00

Rp.

54,100.00

Rp.
Rp.
Rp.
Rp.

750.00
2,317.50
21,375.00
18,750.00

Rp.

Rp.
2,250.00
Rp.
150.00
Rp.
3,600.00
43,192.50 Rp.
6,000.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

49,192.50
4,919.25
54,111.75

Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
103,000.00
95,000.00
75,000.00
22,500.00
15,000.00
1,800,000.00

42,603.33

a Manual Sistem 4 Lapis Cat Konvensional Dengan


Rp.
100,000.00 Rp.
750.00
Rp.
103,000.00 Rp.
2,317.50
Rp.
95,000.00 Rp.
570.00
Rp.
75,000.00 Rp.
450.00
Rp.
17,500.00
Rp.
20,000.00
Rp.
35,000.00
Rp.
35,000.00
Rp.
12,000.00
Rp.
1,800,000.00
Rp.
4,087.50

Dibulatkan

Rp.

15,700.00

Rp.
1,750.00
Rp.
2,000.00
Rp.
1,400.00
Rp.
1,400.00
Rp.
120.00
Rp.
3,600.00
Rp.
10,270.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

14,357.50
1,435.75
15,793.25

Page 204

H. SATUAN

UPAH

BAHAN

PEKERJAAN

a Manual Sistem 1 Lapis Cat Mutakhir Dengan Teba Dibulatkan


Rp.
Rp.
100,000.00 Rp.
600.00
Rp.
103,000.00 Rp.
1,236.00
Rp.
95,000.00 Rp.
5,700.00
Rp.
75,000.00 Rp.
450.00
Rp.
45,000.00
Rp.
13,500.00
Rp.
7,986.00 Rp.
13,500.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

a Manual Sistem 3 Lapis Cat Konvensional Dengan


Rp.
100,000.00 Rp.
50,000.00
Rp.
103,000.00 Rp.
82,400.00
Rp.
95,000.00 Rp.
28,500.00
Rp.
75,000.00 Rp.
15,000.00
Rp.
18,000.00
Rp.
42,000.00
Rp.
45,000.00
Rp.
175,900.00

100,000.00
103,000.00
95,000.00
75,000.00
18,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

21,486.00
2,148.60
23,634.60

Rp.

207,400.00

Rp.
1,980.00
Rp.
7,140.00
Rp.
3,600.00
Rp.
12,720.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

188,620.00
18,862.00
207,482.00

Rp.

156,700.00

Rp.
5,400.00
137,100.00 Rp.
5,400.00 Rp.
Overhead 10 % .. Rp.
Jumlah ..Rp.

142,500.00
14,250.00
156,750.00

prot (Airless Spray) Dengan Sistem 1 Lapis Cat Mutakhir

Rp.
Rp.
Rp.
Rp.
Rp.

Dibulatkan

23,600.00

Dibulatkan

20,000.00
20,600.00
66,500.00
30,000.00

MODEL PERHITUNGAN HARGA SATUAN

BANGUNAN GEDUNG NEGARA


PENJELASAN UMUM

KONVERSI HSBGN

ISI DATA HARGA BAHAN


& UPAH KERJA

PERHITUNGAN BGN

HSBGN

PERHITUNGAN
PAGAR
KOMPONEN BIAYA BGN KLASIFIKASI
SEDERHANA
KOMPONEN BIAYA BGN KLASIFIKASI
TIDAK SEDERHANA
KOMPONEN BIAYA BGN KLASIFIKASI
KHUSUS

DITJEN PERUMAHAN DAN


PERMUKIMAN
DEP. PERMUKIMAN DAN PRASARANA WILAYAH

PERHITUNGAN HARGA SATUAN TERTINGG


KABUPATEN/KOTA

KOTA PADANG PANJANG

PROVINSI

SUMATERA BARAT

BULAN / TRIWULAN

JANUARI / TRIWULAN I (SA

TAHUN ANGGARAN

2015
GEDUNG PER-M2

GEDUNG BERTINGKAT
KLAS SEDERHANA

GEDUNG TIDAK BERTINGKAT

KLAS TIDAK SEDERHANA

3,614,000

5,060,000

KLAS SEDERHANA

KLAS TIDAK SEDERHANA

2,677,000

3,748,000

PAGAR PER-M1
GEDUNG
KLAS SEDERHANA

KLAS TIDAK SEDERHANA

DEPAN

1,307,000

1,437,700

SAMPING

1,239,000

1,362,900

Diketahui
Kepala Dinas Pekerjaan Umum
Kota Padang Panjang

Disetujui
Kabid. Perencanaan dan Pengawasan
Dinas Pekerjaan Umum Kota Padang Panjang

DEFRIAL, ST
NIP. 19561206 198103 1 009

HENDRA PUTRA, SST, MT


NIP. 19700107 199003 1 003

AN HARGA SATUAN TERTINGGI BGN


KOTA PADANG PANJANG
SUMATERA BARAT
JANUARI / TRIWULAN I (SATU)
(DALAM RUPIAH)

GEDUNG PER-M2
RUMAH NEGARA
TIPE C

TIPE B

2,575,000

TIPE A

3,090,000

3,090,000

PAGAR PER-M1

Kabid. Perencanaan dan Pengawasan


nas Pekerjaan Umum Kota Padang Panjang

RUMAH NEGARA
TIPE C

TIPE B

TIPE A

826,200

908,820

908,820

1,015,000

1,116,500

1,116,500

Padang Panjang, 01 January 2014

Dibuat oleh
Kasi Perencanaan Bid. Keciptakaryaan
Bidang Perencanaan dan Pengawasan
Dinas Pekerjaan Umum Kota Padang Panjang

HENDRI YANI, ST, MT, MSc


NIP. 19780708 200212 2 005

KONVERSI SISTEM PERHITUNGAN HSBGN BARU KE SISTEM PERHITUNG


STANDAR HARGA SATUAN BANGUNAN GEDUNG NEGARA PER-M2 TERTI
BERTINGKAT
BARU
332/2002

LAMA
295/1997

TIDAK BERTINGKAT

SEDERHANA

TIDAK SEDERHANA

SEDERHANA

TIDAK SEDERHANA

3,614,000

5,060,000

2,677,000

3,748,000

100%

140%

100%

140%

3,975,400

5,287,282

5,923,346

2,944,700

3,916,451

4,387,603

100%

133%

149%

100%

133%

149%

STEM PERHITUNGAN HSBGN LAMA


ARA PER-M2 TERTINGGI
(DALAM RUPIAH)

RUMAH DINAS

KETERANGAN

SEDERHANA

TIDAK SEDERHANA

2,575,000

3,090,000

100%

120%

HARGA KONSTRUKSI FISIK

2,832,500

3,144,075

3,512,300

100%

111%

124%

HARGA KESELURUHAN BANGUNAN

MENU UTAMA

DATA HARGA BAHAN BANGUNAN DAN UPAH K


DATA HARGA BAHAN BANGUNAN
NO
A.
1
2
3
4
5
6
B.
7
C.
8
D.
9
10
11
12
E.
13
14
F.
15
16
17
18
19
20
G.
21
22
23
24
25
26
27
H.
28
29
30
31
32
33
I.
34

NAMA BAHAN

SATUAN

BAHAN PASANGAN
PASIR BETON
PASIR PASANG
PASIR URUG
SEMEN PC (50 Kg)
KERIKIL BETON UK. 3 cm s/d 4 cm
KERIKIL KORAL

m3
m3
m3
zak
m3
m3

BAHAN PONDASI
BATU KALI / BATU BELAH / BATU GUNUNG

m3

BAHAN LANTAI
KERAMIK 30 X 30

m2

BAHAN DINDING
BATAKO UK. 20 X 40 X 10
BATU BATA UK. 5.5 X 11 X 23
BATU TELA UK. 20 X 30 X 10
BETON ROSTER / KERAWANG

bh
bh
bh
bh

BAHAN PENUTUP LANGIT-LANGIT


ETERNIT, UK. 100 X 100
KAYU LAPIS 4 MM UK 120 X 240

lbr
lbr

BAHAN PENUTUP ATAP


BUBUNGAN GENTENG PLENTONG "S"
GENTENG PLENTONG "S"
SENG DATAR BJLS 0.3
SENG GELOMBANG KECIL
BUBUNGAN ASBES GELOMBANG
ASBES GELOMBANG KECIL

bh
bh
m
lbr
m
lbr

BAHAN KAYU
KAYU
KAYU
KAYU
KAYU
KAYU
KAYU
KAYU

BALOK KLAS I
BALOK KLAS II
PAPAN KLAS II
PAPAN KLAS III
PAPAN KLAS IV
LAPIS 4 mm UK. 8" X 4"
LAPIS 12 mm UK. 8" X 4"

m3
m3
m3
m3
m3
lbr
lbr

BAHAN BESI
BESI BETON POLOS DIA. 10 mm
BESI BETON ULIR DIA. 13 mm
KAWAT BENDRAT / BETON
PAKU UK. 3 CM - 7 CM
PAGAR BRC JADI (T 1M)
BESI PROFIL C a PIPA BESI DIA. 2"

Kg
Kg
Kg
Kg
m
m

BAHAN SANITAIR / SALURAN AIR


BAK MANDI FIBRE GLASS 70 X 70 X 66

bh

35
36
37
38
39
40
41
42
43
44
44
45
46
47
J
48
49
50
K.
51
52
53

BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr


BUIS BETON 1/2 DIA. 20 CM
PIPA GIP DIA. 1"
PIPA GIP DIA. 1 1/2"
PIPA GIP DIA. 2"
PIPA PVC DIA. 1/2"
PIPA PVC DIA. 3/4"
PIPA PVC DIA. 2"
PIPA PVC DIA. 3"
PIPA PVC DIA. 4"
KLOSET DUDUK KERAMIK
KLOSET JONGKOK KERAMIK STANDAR
URINOAR KERAMIK STANDAR
WASTAFEL GANTUNG KERAMIK

bh
bh
m
m
m
m
m
m
m
m
bh
bh
bh
bh

BAHAN FINISHING
CAT BESI
CAT DINDING
CAT KAYU

Kg
Kg
Kg

BAHAN LAIN - LAIN


KACA BENING 5 MM
POMPA TANGAN
INSTALASI LISTRIK

m2
bh
titik

DATA UPAH KERJA


NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TENAGA KERJA
MANDOR
KEPALA TUKANG
TUKANG BATU
LADEN TUKANG BATU
TUKANG BESI
LADEN TUKANG BESI
TUKANG KAYU
LADEN TUKANG KAYU
TUKANG CAT
LADEN TUKANG CAT
TUKANG BONGKAR
PEKERJA GALIAN & URUG
TUKANG LISTRIK
TUKANG PIPA

SATUAN
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG

AN BANGUNAN DAN UPAH KERJA

HARGA SURVAI
(Rp)

KETERANGAN

140,000
140,000
65,000
65,000
150,000
150,000
157,500
58,000
0 PILIH SALAH SATU SESUAI DENGAN
800 BAHAN YANG TERSEDIA
0
50,000
0 PILIH SALAH SATU SESUAI BAHAN
66,000 YANG TERSEDIA
PILIH SALAH SATU SESUAI DENGAN
BAHAN YANG TERSEDIA

0
55,000
0
0
4,400,000
2,500,000
2,500,000
2,500,000
1,800,000
66,000
85,000
9,000
9,000
15,000
13,000
80,000 x
30,000
335,000

1,200,000
40,000
18,000
26,000
30,000
4,250
5,000
9,500
16,375
23,125
1,650,000
185,000
650,000
675,000
45,000
20,000
45,000
80,000
125,000
150,000

HARGA SURVAI
(Rp)
100,000
103,000
95,000
75,000
95,000
75,000
95,000
75,000
95,000
75,000
75,000
75,000
95,000
95,000

PERHITUNGAN HARGA SATUAN TERTINGGI BANGUNAN GEDUNG NEGARA PE


KAB/KOTA
TANGGAL

NO
1

A.
1
2
3
4
5
6
B.
7
C.
8
D.
9
10
11
12
E.
13
14
F.
15
16
17
18
19
20
G.
21
22
23
24
25
26
27
H.
28
29
30
31
I.
32
33
34
35
36
37
38

:
:

KOTA PADANG PANJANG


01 Januari 2014

KEBUTUHAN
2
KEBUTUHAN BAHAN DAN UPAH
BAHAN
BAHAN PASANGAN
PASIR BETON
PASIR PASANG
PASIR URUG
SEMEN PC (50 Kg)
KERIKIL BETON UK. 3 cm s/d 4 cm
KERIKIL KORAL
BAHAN PASANGAN
BATU KALI / BATU BELAH / BATU GUNUNG
BAHAN LANTAI
KERAMIK 30 X 30
BAHAN DINDING
BATAKO UK. 20 X 40 X 10
BATU BATA UK. 5.5 X 11 X 23
BATU TELA UK. 20 X 30 X 10
BETON ROSTER / KERAWANG
BAHAN PENUTUP LANGIT-LANGIT
ETERNIT, UK. 100 X 100
KAYU LAPIS 4 MM 120 X 240
BAHAN PENUTUP ATAP
BUBUNGAN GENTENG PLENTONG "S"
GENTENG PLENTONG "S"
SENG DATAR BJLS 0.3
SENG GELOMBANG KECIL
BUBUNGAN ASBES GELOMBANG
ASBES GELOMBANG KECIL
BAHAN KAYU
KAYU BALOK KLAS I
KAYU BALOK KLAS II
KAYU PAPAN KLAS II
KAYU PAPAN KLAS III
KAYU PAPAN KLAS IV
KAYU LAPIS 4 mm UK. 8" X 4"
KAYU LAPIS 12 mm UK. 8" X 4"
BAHAN BESI
BESI BETON POLOS DIA. 10 mm
BESI BETON ULIR DIA. 13 mm
KAWAT BENDRAT / BETON
PAKU UK. 3 CM - 7 CM
BAHAN SANITAIR / SALURAN AIR
BAK MANDI FIBRE GLASS 70 X 70 X 66
BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr
BUIS BETON 1/2 DIA. 20 CM
PIPA GIP DIA. 1"
PIPA GIP DIA. 1 1/2"
PIPA GIP DIA. 2"
PIPA PVC DIA. 1/2"

MENU UTAMA
SATUAN
3

m3
m3
m3
zak
m3
m3
m3
m2
bh
bh
bh
bh
lbr
bh
bh
bh
m
lbr
m
lbr
m3
m3
m3
m3
m3
lbr
lbr
Kg
Kg
Kg
Kg
bh
bh
bh
m
m
m
m

NO
1
39
40
41
42

SATUAN

KEBUTUHAN
2
PIPA
PIPA
PIPA
PIPA

PVC
PVC
PVC
PVC

DIA.
DIA.
DIA.
DIA.

3/4"
2"
3"
4"

3
m
m
m
m

NO
1
43
44
45
46
J.
47
48
49
K.
50
51
52
52

SATUAN

KEBUTUHAN
2
KLOSET DUDUK KERAMIK
KLOSET JONGKOK KERAMIK STANDAR
URINOAR KERAMIK STANDAR
WASTAFEL GANTUNG KERAMIK
BAHAN FINISHING
CAT BESI
CAT DINDING
CAT KAYU
BAHAN LAIN - LAIN
KACA BENING 5 MM
POMPA TANGAN
INSTALASI LISTRIK
BAHAN LAIN - LAIN (5% dari total Bahan)

3
bh
bh
bh
bh
Kg
Kg
Kg
m2
bh
titik

Sub Total Biaya Bahan Bangunan

1
2
3
4
5
6
7
8
9
10
11
12
13
14

UPAH
MANDOR
KEPALA TUKANG
TUKANG BATU
LADEN TUKANG BATU
TUKANG BESI
LADEN TUKANG BESI
TUKANG KAYU
LADEN TUKANG KAYU
TUKANG CAT
LADEN TUKANG CAT
TUKANG BONGKAR
TUKANG GALI & URUG
TUKANG LISTRIK
TUKANG PIPA

ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG

Sub Total Biaya Upah Kerja


II

BIAYA KONSTRUKSI (K)


Sub Total Biaya Bahan Bangunan
Sub Total Biaya Upah Kerja
Sub Biaya Peralatan Kerja
A. BIAYA NYATA BANGUNAN
B. JASA KONTRAKTOR + OVERHEAD
C. PAJAK - PAJAK
a. PPh Pasal 21 & 23
b. PPn
D. SUB TOTAL (A) + (B) + (C)
E. ASURANSI
a. All Risk
b. Tenaga Kerja (ASTEK)
c. Pihak ke III
F. PERIZINAN
a. Izin Mendirikan Bangunan (IMB)
b. Sertifikat Laik Fungsi
G. TINGKAT INFLASI
H. KESELAMATAN DAN KESEHATAN KERJA

(A)
10% (A)
2% (A)
10% (A)

3% (A)
0,5% (A)
0,3% (A)
1% (A)
0.5% (A)
5% Bahan
1% (D)

NO

KEBUTUHAN

1
I.

2
SUB TOTAL BIAYA KONSTRUKSI FISIK

IV

BIAYA KONSTRUKSI FISIK BANGUNAN SEDERHANA PER M2

BIAYA KONSTRUKSI FISIK BANGUNAN TIDAK SEDERHANA PER M2

SATUAN
3

DUNG NEGARA PER M2


MENU UTAMA
HARGA
4

140,000.00
140,000.00
65,000.00
65,000.00
150,000.00
150,000.00
157,500.00
58,000.00
800.00
50,000.00
66,000.00
55,000.00
4,400,000.00
2,500,000.00
2,500,000.00
2,500,000.00
1,800,000.00
66,000.00
85,000.00
9,000.00
9,000.00
15,000.00
13,000.00
335,000.00
1,200,000.00
40,000.00
18,000.00
26,000.00
30,000.00
4,250.00

RUMAH DINAS TIPE-70


VOLUME
5

0.0952
0.8450
0.1358
2.3285
0.0853
0.2476
1.0395
21.3553
115.7625
28.4738
0.9450
0.4784
0.7784
29.5191
0.0696
0.8581
0.0696
0.8581
0.1332
0.0318
0.0079
0.5196
12.2475
0.1224
0.0799
0.0118
0.0059
0.0591
0.0142
0.0709
-

GEDUNG TIDAK BERTINGKAT

JUMLAH
6

VOLUME
9

13,328.00
118,300.00
8,827.00
151,352.50
12,795.00
38,996.36
60,291.00
92,610.00
31,574.40
47,195.50
333,000.00
79,500.00
19,750.00
34,293.60
110,227.50
1,836.00
1,038.70
3,953.00
7,080.00
2,362.50
369.20
2,127.00
-

0.1278
0.2781
0.1121
2.3285
0.2028
0.0050
###
0.2150
1.0395
10.4768
99.3850
13.9691
0.2131
0.9450
0.8803
0.8803
30.0390
0.0185
0.9038
0.0185
0.9038
0.1557
0.0013
0.0495
0.0014
0.1349
11.4648
13.4580
1.2712
0.2476
0.0036
0.1132
0.0143

JUMLAH
10

17,892.00
38,934.00
7,286.50
151,352.50
30,420.00
750.00
33,862.50
60,291.00
79,508.00
10,655.00
58,099.80
49,709.00
389,250.00
3,250.00
123,750.00
2,520.00
8,903.40
103,183.20
121,122.00
19,068.00
3,218.80
4,320.00
4,528.13
60.78

HARGA
4
5,000.00
9,500.00
16,375.00
23,125.00

RUMAH DINAS TIPE-70


VOLUME
5
0.0921

GEDUNG TIDAK BERTINGKAT

JUMLAH
6
2,129.81

VOLUME
9
0.0286
0.0430
0.0358

JUMLAH
10
143.00
408.50
827.88

HARGA
4
1,650,000.00
185,000.00
650,000.00
675,000.00
45,000.00
20,000.00
45,000.00
80,000.00
125,000.00
150,000.00

100,000.00
103,000.00
95,000.00
75,000.00
95,000.00
75,000.00
95,000.00
75,000.00
95,000.00
75,000.00
75,000.00
75,000.00
95,000.00
95,000.00

RUMAH DINAS TIPE-70


VOLUME
5
0.0059
0.0059
1.2921
0.3169
0.0823
0.0059
0.0059
0.2867
0.1077
0.8190
0.7371
0.3667
0.2465
1.8675
0.4047
0.4986
0.4301
0.0096
0.8033
0.1815
0.0241

GEDUNG TIDAK BERTINGKAT

JUMLAH
6
9,735.00
1,091.50
25,842.00
14,260.50
6,584.00
737.50
885.00
67,715.32
1,299,787.88

28,670.00
11,093.10
77,805.00
55,282.50
34,836.50
18,487.50
177,412.50
30,352.50
47,367.00
32,257.50
720.00
60,247.50
17,242.50
2,289.50

VOLUME
9
0.0012
0.0072
0.0072
0.0012
0.5346
0.3680
0.0376
0.0018
0.0018
###
###
###
0.2976
0.2015
0.5053
0.4043
0.4763
0.3402
1.5298
0.3718
0.4118
0.2314
0.1270
1.1271
0.1080
0.0225

594,063.60

30.41%
(10% Upah Kerja)

1,299,787.88
594,063.60
59,406.36
1,953,257.84
195,325.78
234,390.94
39,065.16
195,325.78
2,382,974.57
74,223.80
58,597.74
9,766.29
5,859.77
29,298.87
19,532.58
9,766.29
64,989.39
23,829.75

JUMLAH
10
1,980.00
1,332.00
4,680.00
810.00
10,692.00
16,560.00
3,008.00
225.00
270.00
74,943.05
1,437,814.03

29,760.00
20,754.50
48,003.50
30,322.50
45,248.50
25,515.00
145,331.00
27,885.00
39,121.00
17,355.00
9,525.00
84,532.50
10,260.00
2,137.50
535,751.00

26.43%
(10% Upah Kerja)

1,437,814.03
535,751.00
53,575.10
2,027,140.13
202,714.01
243,256.82
40,542.80
202,714.01
2,473,110.96
77,031.32
60,814.20
10,135.70
6,081.42
30,407.10
20,271.40
10,135.70
71,890.70
24,731.11

HARGA
4

RUMAH DINAS TIPE-70


VOLUME
5

JUMLAH
6
2,575,316.38

GEDUNG TIDAK BERTINGKAT


VOLUME
9

JUMLAH
10
2,677,171.19

2,575,000.00

2,677,000.00

3,090,000.00

3,748,000.00

VOLUME
13

GEDUNG
BERTINGKAT
JUMLAH
14

0.1767
0.1520
0.1620
2.9988
1.3524
1.3524
0.0938
0.9702
8.0898
86.9734
10.7864
0.8820
0.0915
0.0915
14.0182
0.0006
0.0006
0.0017
0.1660
0.0012
0.1001
0.0022
0.1728
0.0025
10.0361
19.8851
2.7362
0.2576
0.0013
0.0615
0.1257
0.0014
0.3098
-

24,738.00
21,280.00
10,530.00
194,922.00
202,860.00
202,860.00
14,773.50
56,271.60
69,578.72
6,039.00
7,480.00
415,000.00
3,000.00
250,250.00
3,960.00
11,404.80
212.50
90,324.90
178,965.90
41,043.00
3,348.80
1,560.00
2,460.00
2,262.60
36.40
9,294.00
-

VOLUME
13

GEDUNG
BERTINGKAT
JUMLAH
14

0.0041
0.0082

38.95
189.63

GEDUNG
BERTINGKAT
VOLUME
JUMLAH
13
14
0.0011
1,815.00
0.0021
388.50
0.0068
4,420.00
0.0012
810.00
0.0122
549.00
0.4456
8,912.00
0.2005
9,022.50
0.0525
4,200.00
0.0013
162.50
0.0013
195.00
102,023.01
1,957,181.80
0.2697
26,970.00
0.2617
26,955.10
0.3662
34,789.00
0.2946
22,095.00
1.0618
100,871.00
0.9910
74,325.00
1.8299
173,840.50
0.3183
23,872.50
0.3319
31,530.50
0.1041
7,807.50
0.9629
72,217.50
1.3715
102,862.50
0.0918
8,721.00
0.0086
817.00
707,674.10

25.87%
(20% Upah Kerja)

1,957,181.80
707,674.10
70,767.41
2,735,623.31
273,562.33
328,274.80
54,712.47
273,562.33
3,337,460.44
103,953.69
82,068.70
13,678.12
8,206.87
41,034.35
27,356.23
13,678.12
97,859.09
33,374.60

VOLUME
13

GEDUNG
BERTINGKAT
JUMLAH
14
3,613,682.17
3,614,000.00
5,060,000.00

PERHITUNGAN HARGA SATUAN TERTINGGI PAGAR PER-M1 BGN


KAB/KODYA
TANGGAL

NO
1

A.
1
2
3
4
5
6
B.
7
C.
9
10
11
12
D.
21
22
23
24
25
26
27
E.
28
29
30
31
32
33
F.
34
35
36

:
:

KOTA PADANG PANJANG


01 Januari 2014

KEBUTUHAN
2
KEBUTUHAN BAHAN DAN UPAH
BAHAN
BAHAN PASANGAN
PASIR BETON
PASIR PASANG
PASIR URUG
SEMEN PC (50 Kg)
KERIKIL BETON UK. 3 cm s/d 4 cm
KERIKIL KORAL
BAHAN PASANGAN
BATU KALI / BATU BELAH / BATU GUNUNG
BAHAN DINDING
BATAKO UK. 20 X 40 X 10
BATU BATA UK. 5.5 X 11 X 23
BATU TELA UK. 20 X 30 X 10
BETON ROSTER / KERAWANG
BAHAN KAYU
KAYU BALOK KLAS I
KAYU BALOK KLAS II
KAYU PAPAN KLAS II
KAYU PAPAN KLAS III
KAYU PAPAN KLAS IV
KAYU LAPIS 4 mm UK. 8" X 4"
KAYU LAPIS 12 mm UK. 8" X 4"
BAHAN BESI
BESI BETON POLOS DIA. 10 mm
BESI BETON ULIR DIA. 13 mm
KAWAT BENDRAT / BETON
PAKU UK. 3 CM - 7 CM
PAGAR BRC JADI (T 1M)
PAGAR PROFIL C a PIPA BESI DIA.. 2"
BAHAN FINISHING
CAT BESI
CAT DINDING
CAT KAYU

Sub Total Biaya Bahan Bangunan

MENU UTAMA

SATUAN

HARGA

m3
m3
m3
zak
m3
m3

140,000
140,000
65,000
65,000
150,000
150,000

m3

157,500

bh
bh
bh
bh

0
800
0
50,000

m3
m3
m3
m3
m3
lbr
lbr

4,400,000
2,500,000
2,500,000
2,500,000
1,800,000
66,000
85,000

Kg
Kg
Kg
Kg
m
m

9,000
9,000
15,000
13,000
80,000
30,000

Kg
Kg
Kg

45,000
20,000
45,000

1
2
3
4
5
6
7
8
9
10
11
12

UPAH
MANDOR
KEPALA TUKANG
TUKANG BATU
LADEN TUKANG BATU
TUKANG BESI
LADEN TUKANG BESI
TUKANG KAYU
LADEN TUKANG KAYU
TUKANG CAT
LADEN TUKANG CAT
TUKANG BONGKAR
TUKANG GALI & URUG

ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG

Sub Total Biaya Upah Kerja


II

BIAYA KONSTRUKSI (K)


Sub Total Biaya Bahan Bangunan
Sub Total Biaya Upah Kerja
Sub Biaya Peralatan Kerja
A. BIAYA NYATA BANGUNAN
B. JASA KONTRAKTOR + OVERHEAD
C. PAJAK - PAJAK
a. PPh Pasal 21 & 23
b. PPn
D. SUB TOTAL (A) + (B) + (C)
E. ASURANSI
a. All Risk
b. Tenaga Kerja (ASTEK)
c. Pihak ke III
F. PERIZINAN
a. Izin Mendirikan Bangunan (IMB)
b. Izin Penggunaan Bangunan (IPB)
G. TINGKAT INFLASI
H. KESELAMATAN & KESEHATAN KERJA
I. SUB TOTAL BIAYA KONSTRUKSI FISIK

IV

BIAYA KONSTRUKSI FISIK BANGUNAN SEDERHANA PER M2

BIAYA KONSTRUKSI FISIK BANGUNAN TIDAK SEDERHANA PER M2

(A)
10% (A)
2% (A)
10% (A)

3% (A)
0,5% (A)
0,3% (A)
1% (A)
0.5% (A)
5% Bahan
1% (D)

100,000
103,000
95,000
75,000
95,000
75,000
95,000
75,000
95,000
75,000
75,000
75,000

RUMAH DINAS
PAGAR DEPAN
VOLUME
JUMLAH
5
6

0.0125
0.3938
0.0614
1.0162
0.0000
0.0391
0.0000
0.3000
0.0000
0.0000
21.3333
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0053
0.0000
0.0000
0.0000
6.2465
0.0000
0.0527
0.0499
1.0000
0.0000
0.0000
0.2906
0.2066
0.0000

1,750.00
55,132.00
3,991.00
66,053.00
5,865.00
47,250.00
17,066.67
9,600.00
56,218.64
790.50
648.70
80,000.00
13,077.00
4,132.00
-

361,574.50

GEDUNG

PAGAR SAMPING
VOLUME
JUMLAH
7
8

0.0481
0.4760
0.0714
2.4012
0.0000
0.0890
0.0000
0.3750
0.0000
0.0000
102.8571
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0107
0.0000
0.0000
0.0000
12.8260
0.0000
0.2310
0.2570
0.0000
0.0000
0.0000
0.0000
0.8250
0.0000

6,734.00
66,640.00
4,641.00
156,078.00
13,350.00
59,062.50
82,285.71
19,200.00
115,434.00
3,465.00
3,341.00
16,500.00
-

546,731.21

PAGAR DEPAN
VOLUME
JUMLAH
9
10

0.0176
0.4796
0.0915
1.2162
0.0000
0.0724
0.0000
0.3750
0.0000
0.0000
32.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0053
0.0000
0.0000
0.0000
17.4813
0.0000
0.2669
0.2669
0.0000
8.0000
0.0000
0.4861
0.0000
0.0000

2,464.00
67,144.00
5,947.50
79,053.00
10,860.00
59,062.50

25,600.00

9,600.00

157,331.70
4,003.50
3,469.70
240,000.00
21,874.50

686,410.40

0.0553
0.0664
0.2350
0.1795
0.7873
0.2712
0.0856
0.0428
0.5484
0.4731
0.0105
0.1532

5,528.90
6,840.85
22,326.95
13,465.91
74,795.61
20,339.71
8,131.37
3,209.75
52,099.13
35,484.99
788.84
11,489.16

0.0553
0.0664
0.4550
0.2895
0.1575
0.0586
0.1127
0.0563
0.5484
0.4731
0.0105
0.1532

254,501.15

5,528.90
6,840.85
43,226.95
21,715.91
14,959.12
4,394.85
10,704.61
4,225.50
52,099.13
35,484.99
788.84
11,489.16

0.0642
0.0664
0.2350
0.1795
1.1448
0.2712
0.0856
0.0428
0.5484
0.4731
0.0105
0.1532

6,422.65
6,840.85
22,326.95
13,465.91
108,758.11
20,339.71
8,131.37
3,209.75
52,099.13
35,484.99
788.84
11,489.16

211,458.80

289,357.40

546,731.21
211,458.80
10,572.94
768,762.96
76,876.30
92,251.55
15,375.26
76,876.30
937,890.81
29,212.99
23,062.89
3,843.81
2,306.29
11,531.44
7,687.63
3,843.81
27,336.56
9,378.91
1,015,350.71

686,410.40
289,357.40
14,467.87
990,235.67
99,023.57
118,828.28
19,804.71
99,023.57
1,208,087.52
37,628.96
29,707.07
4,951.18
2,970.71
14,853.54
9,902.36
4,951.18
34,320.52
12,080.88
1,306,971.41

826,200.00

1,015,000.00

1,307,000.00

908,800.00

1,117,000.00

1,438,000.00

361,574.50
254,501.15
12,725.06
628,800.71
62,880.07
75,456.09
12,576.01
62,880.07
767,136.87
23,894.43
18,864.02
3,144.00
1,886.40
9,432.01
6,288.01
3,144.00
18,078.73
7,671.37
826,213.40

27.51%
(5% Upah Kerja)

10.0000
2.0000
10.0000

3.0000
0.5000
0.3000
1.0000
0.5000
5.0000
1.0000

GEDUNG
PAGAR SAMPING
VOLUME
JUMLAH
11
12

0.0608
0.6021
0.0835
3.0376
0.0000
0.1126
0.0000
0.3750
0.0000
0.0000
114.2857
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0107
0.0000
0.0000
0.0000
16.2249
0.0000
0.2922
0.3251
0.0000
0.0000
0.0000
0.0000
1.0436
0.0000

8,512.00
84,294.00
5,427.50
197,444.00
16,890.00
59,062.50
91,428.57
19,200.00
146,024.10
4,383.00
4,226.30
20,872.00
-

657,763.97

0.0699
0.0840
0.5756
0.3663
0.1992
0.0741
0.1425
0.0713
0.6937
0.5985
0.0133
0.1938

6,994.06
8,653.67
54,682.09
27,470.62
18,924.00
5,559.49
13,541.33
5,345.26
65,905.39
44,888.51
997.88
14,533.78
267,496.09

28.50%
(5% Upah Kerja)

657,763.97
267,496.09
13,374.80
938,634.87
93,863.49
112,636.18
18,772.70
93,863.49
1,145,134.54
35,668.13
28,159.05
4,693.17
2,815.90
14,079.52
9,386.35
4,693.17
32,888.20
11,451.35
1,239,221.73
1,239,000.00
1,363,000.00

P
R
O
S
E
N
T
A
S
E
PROSENTASE
BIAYA
PERENCANAAN

PROSENTASE BIAYA PENGAWASAN

TABEL E1
DAFTAR BIAYA KOMPONEN KEGIATAN
PEMBANGUNAN BANGUNAN GEDUNG NEGARA
Klasifikasi :

B
I
A
Y
A

R
O
S
E
N
T
A
S
E

PROSENTASE BIAYA PENGELOLAAN

B
I
A
Y
A
P
E
N
G
E
L
O
L
A
A
N

M
A
N
A
J
E
M
E
N

MENU UTAMA

SEDERHANA
(dalam ribuan rupiah)

BIAYA
KONSTRUKSI FISIK

BIAYA
PERENCANAAN
KONSTRUKSI

BIAYA
MANAJEMEN
KONSTRUKSI

BIAYA
PENGAWASAN
KONSTRUKSI

BIAYA
PENGELOLAAN
PROYEK

TOTAL BIAYA
PEMBANGUNAN

#NAME?

#NAME?

#NAME?

20,000,000.00

#NAME?

CATATAN:
1. MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.
BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN
TOTAL LUASNYA.
2. SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.
UNTUK BANGUNAN KLASIFIKASI SEDERHANA TIDAK ADA BIAYA MANAJEMEN KONSTRUKSI.
3. BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) YAITU TOTAL BIAYA PEMBANGUNAN.

P
R
O
S
E
N
T
A
S
E
PROSENTASE
BIAYA
PERENCANAAN

PROSENTASE BIAYA PENGAWASAN

TABEL E2
DAFTAR BIAYA KOMPONEN KEGIATAN
PEMBANGUNAN BANGUNAN GEDUNG NEGARA

BIAYA
KONSTRUKSI FISIK

BIAYA
PERENCANAAN
KONSTRUKSI

#NAME?

20,000,000.00

BIAYA
MANAJEMEN
KONSTRUKSI

B
I
A
Y
A

PROSENTASE BIAYA PENGELOLAAN

M
A
N
A
J
E
M
E
N

Klasifikasi :

BIAYA
PENGAWASAN
KONSTRUKSI

BIAYA
PENGELOLAAN
PROYEK

#NAME?

#NAME?

#NAME?

CATATAN:
1. MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.

BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA

2. SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.
3. UNTUK KLASIFIKASI TIDAK SEDERHANA, DIMUNGKINKAN PILIHAN MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI ATAU KONSULTAN PENGAWAS,
TERGANTUNG PADA KRITERIA LUASAN, JUMLAH LANTAI, ATAU JUMLAH PENYEDIA JASA.

4. BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) UNTUK YANG MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI, ATAU KOLOM (7)
KONSULTAN PENGAWAS.

R
O
S
E
N
T
A
S
E
B
I
A
Y
A
P
E
N
G
E
L
O
L
A
A
N

MENU UTAMA

TIDAK SEDERHANA
(dalam ribuan rupiah)
TOTAL BIAYA PEMBANGUNAN
DENGAN MANAJEMEN
DENGAN PENGAWASAN
KONSTRUKSI
6

#NAME?

#NAME?

E BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA.

KONSULTAN PENGAWAS,

KONSULTAN MANAJEMEN KONSTRUKSI, ATAU KOLOM (7) YANG MENGGUNAKAN

Diketahui
Kepala Dinas Pekerjaan Umum
Kota Padang Panjang

Disetujui
Kabid. Perencanaan dan Pengawasan
Dinas Pekerjaan Umum Kota Padang Panjang

H. MAISUL, ST. MM
NIP. 19590402 198103 1 009

D E F R I A L, ST
NIP. 19561206 198103 1 009

Padang Panjang,

January/2014

Dibuat oleh
Kasi Perencanaan Bid. Keciptakaryaan
Bidang Perencanaan dan Pengawasan
Dinas Pekerjaan Umum Kota Padang Panjang

HENDRA PUTRA, SST. MT


NIP. 19700107 199003 1 003