Project

Building Factory
Company PT
Location Kawasan Industri kabil
Type of Building 25 x 80 m x 2 lots
S/N

Description

Unit

Qty

Rat
A

Building Size 25 x 80 m x 2 lots


Preparatory for permite work
Permite and design building
1 Design of factory planning by building consultants
Including profesional engginer ( PE )Calculation structure
( Main building 50 x 80 m ,Roof shelter 6 x 99 m and
Guard house 5 x 5 m including main gate
2 Building permit ( IMB ) and the completeness of the
document prepared by Owner
only for ( Fatwa Planologi , IMB , others permits)
and if there are other provisions will be considered as additional work

Temporary Site office and store


Preparation Safety and K3
Employment insurance
Electricity and water to work
Setting location

lot
lot
lot
lot
lot

Building factory
Earthworks
1 Excavation for the footing foundation , and the ground beam
Dimension foundation 2,2 m x 2,2m x 1,5 m
2 Excavation for ground beam 40cmx 20 cm
3 Backfiled and compacted at building area
4 hoarding under slab stone hardener with dusstone 20 cm thick
with compacted for loading 150 tons

ls

Preparation of construction work


1
2
3
4
5

ls

m3
m3
m2
m3

Sub Structure
Footing and stump and Concrete Slab
1 10 cm the sand piled under foundations including compacting
2 Lean concrete under footing ( foundation ) 5 cm thick
Concrete G.10
3 Formwork with celcon block 30 cm high
4 Concrete footing G,35 thick 30 cm P1 and P2
5 Reinfocment @16-200 mm
6 Concrete stump G.35

m3
m3
m2
m3
ton
m3

7
8
9
10
1
2
3
4
5
1
2
3
3
4
6
7
1

Reinfocment @16-200 mm
Formwork with plywood 12 mm
Anchor bolt 8020 HTB A325 - 800 mm / Column 8 nos
Base plate 15 mm
Ground beam
10 cm thick the sand piled under ground beam
lean concrete 50 mm thick concrete G.10
Formwork with celcon block 50 cm high
Concrete G,35
Reifocment @16-200 mm
Concrete Slab for 150 tons and linterl beam
Lean concrete 10 mm thick
Plastick sehet under slab
Reifocment for concrete salb @10-200 mm ( 2 layer )
Concrete thick 300 mm G.35
Delatasi for slab expansion joint ( Spasi for concreting )
Trowel for smooth the concrete surfac
RC,Lintel beam 130 x 400 mm
Apron Area
10 cm thick RC concrete for apron area with BRC A-7

m3
m3
m2
m3
tons
m3
m2
ton
m3
m'
m2
m3
m3

Uper Structure ( Steel Sturcture )


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

- Bolt and base plate


- Steel column WF450 x 200 x 9 x 14 x 76 kg / m
- Stee l rafter WF450 x 200 x 9 x 14 x 76 kg / m
- Tee beam WF450 x 200 x 9 x 14 x 76 kg / m
- Wind Braching with angel bar 75 x 75 x 6 mm- 6.6 kg / m
- Tee beam WF175 x 90 x 5 x 8 - 18.08 kb / m'
- Purlin C 200 x 75 x 20 x 3.2 x 9.27 kg / m'
- Sagrod with round bar @ 12 mm
- Bolts and other connective tool
- Other stifner with plate see on the drawing
- Metal roof thiknes 0.42 mm
- insulation glas wall and almunium foil double side thick 75 mm
and wire mash
- Ridge capping
-Roof gutter
- RWDP ( Rain water down pipe ) PVC 6 " including braket
- Facia ( Matrial similar with cutting roof )
- h 70 cm including with angel 75x75 x 3 mm
- Vertical Braching matrial with angel bar 75 x 75 x 6 mm
- Painting all steel trust

19 - Equipment for erection Cran and other tools

ton
m2
kg
ton

kg
tons
tons
tons
tons
tons
tons
tons
tons
tons
m2
m2
m'
m'
m'
m2
tons
ls
la

Proposed Roof Shelter ( Dimension 6 x 99 m )


1 Baseplat 10 mm and anchor bolet 16 mm ( 6 nos / column )
2 Steel column WF 150 x 75 x 5 x 7

nos
tons

3
4
6
7
8
9
10
11
12
13
14

Steel roof beam WF 150 x 75 x 5 x 7


Tee beam 125 x 6 x 8 mm
Purlin 125 x 50 x 20 x 3.5 mm
Metal roof 0.42 mm
Cofering with matrial roofing including holow 2 x 3" x 3,2 mm
Including steel holow frame
Fascia width of 600 mm using a matrial with the roof cutting
Ridge capping and flasing plate
Repair damage to the concrete floor with Sika grouting
Ram with steel plate for aanti slip
Repair damage to the concrete floor with Sika grouting
Painting roof trust

tons
tons
m2
m2
m'
m'
m2
m'
m2
ls

Proposed Guard house 5 x 5 m


1 Seting on site and bow plank
2 Excavation for the footing foundation , and the ground beam
Footing 1,5 x 1,5 m and ground beam 25 x 40 cm
3 Filed sand under slab 10 cm
Under construction
1 Concrete footing Grade 30. ( 1,5 x 1,5 x 0.25 m )
2 Form work with Celcon block
3 Reinfocment @16-180 mm
4 Concrete ground beam 25 x 40 cm
5 Form work with Celcon block
6 Concrete floor 10 cm thick
Column
1 Concrete column 25 x 40 cm h.3.2
2 Form work with playwood 9 mm
3 Steel bar for column 16 @ 10
Concrete roof slab
1 Concrete roof slab 10 cm thick including baem and fascia concrete
2 Form work with playwood 12 mm thick
3 Reinfocment @10-150 mm ( One layer )
Architek
1 Celcon block including plaster and cement selury
2 Almunium glass window
3 Timber door including others necseseries
4 Ceramic floor
5 Painting for external
6 Painting internal
7 Toilet ( Closet,Floor drain ,Tap ,Wall ceramic ,floor ceramic )
8 Instalation water supply
9 Septick tank 2 x 2 x 1,5 m
10 Concrete apron 10 cm thick

tons

External work

ls
m3
m3
m3
m2
kg
m3
m2
m3
m3
m2
kg
m3
m2
tons
m2
nos
nos
m2
m2
m2
ls
ls
ls
m2

1 Main Gate
a Metal Sliding main gate width 10 m
Including footing foundation
2 Fance at front area
a Construction foundation for BRC Fance in front area
( 70 cm base 100 cm high )
c RC. Ground beam 25 x 25 cm
d BRC Fance high 2,5 m
3 Fance at side Area
a Construction foundation for BRC Fance inside area
( 70 cm base 200 cm high )
b RC. Ground beam 25 x 25 cm
c BRC Fance high 2,5 m
4
a
b
c

Dreinage
Proposed concrete U drain 30 cm around building 50 x 80 m'
Proposed Gutter at shelter area 99 m
Drainage join for exiting drain

m'

m3
m3
m'

m3
m3
m'

m'
m'
m'

Unite
Rate ( S$ )

Unite
Price ( S$ )