1.

- DATOS PARA EL DISEO


- Sobrecarga S/C 1 Techo

150 Kg/m =

- Resitencia a la Compresin del Concreto


f'c =
qad =
- Capacidad Admisible del Terreno

175 Kg/cm =

0.18 Ton/cm

2.00 Kg/cm =

20.00 Ton/m

2.- PLANTA GENERAL

2.60 0.40
2.15

0
.
4
0
0
.
8
0

0
.8
0

2
.
1
5

2
.1
5

0
.4
0

2.90 0.40
2.15

0.90 0.40
2.15

0.90 0.40
2.15

DISTRIBUCIN 1ra PLANTA

3.- METRADO DE CARGAS PARA PREDIMENSIONAMIENTO


1 TECHO
CARGA MUERTA :
- Peso losa aligerada

: 2247 Kg/m

- Peso de Acabados

100

"

- Peso de Tabiqueria

100

"

- Peso de Columnas

480

"

- Peso de Vigas

: 435.6

Diseo: Vito Len Aguilar

"

0.15 Ton/m

WD = 3363 Kg/m

Diseo: Vito Len Aguilar

CARGA VIVA :
- Sobrecarga S/C

WL = 250

Kg/m

CARGA TOTAL :
w1 = 3,613 Kg/m
w1 =
3.61 Ton/m
4.- PREDIMENSIONAMIENTO DE ELEMENTOS ESTRUCTURALES
4.1.- PREDIMENSIONAMIENTO DE COLUMNAS (tipos C-1)
Segn el criterio japones (zonas muy sismicas) se analizara la columna C-1, ubicada entre los ejes
B y 2, considerada la ms crtica.
AREA

PISO
N

AREA

TRIBUTARIA TRIBUTARIA

(m2)

Pu

Ps=K.Pu

(Ton/m2)

(Ton)

(Ton)

ACUMULADA

1.25

(m2)

10.50

10.50

f'c

bD

(Ton/cm2)

(cm2)

(cm)

(cm)

3.61 37.94 47.42 0.25 0.175 1084

15

15

4.2.- PREDIMENSIONAMIENTO DE VIGAS


Porticos
h

L
20
B
20

3.13
20
3.13
20

0.16

0.20 mts.

0.16

0.20 mts.

Entonces = 0.20 x 0.20

Diseo: Vito Len Aguilar

(mnimo)

4.3 PREDIMENSIONAMIENTO DE ZAPATA DE Z1 (Columna C1)


Para disear la zapata calculamos con los predimensionamientos de los elementos estrructurales calculados

PISO CONSTRUIDO N=0, S=1


AREA TRIBUTARIA

PRIMERO

PRIMER PISO

MUROS (1 )

Largo
(m)

Area
(m2)

2.27

2.75

6.23

Ancho Peralte, h Densidad Longitud


(m)

TECHO (1 )
VIGAS (1)

Ancho
(m)

0.20

2.77

(Tn)
1.87
0.33

0.25
0.00

0.15
0.00

2.40
0.00

2.75
0.00

0.25
0.00

0.20
0.10

2.27
2.54

0.10
0.10

3.55
5.80

0.81
1.47

0.20

0.00

0.10
0.10

0.00

0.00
0.62

2.28 Tn
0.62 Tn

0.20
0.00

0.25
0.00

2.80
0.00

3.00
0.00

0.42
0.00

0.42 Tn

ACABADOS (1 )
COLUMNAS (2 )
SOBRECARGA (1 )

Diseo: Vito Len Aguilar

0.30

(m)

Peso

(m)n/m3,m2)
0.30
0.25
2.40

1.87 Tn

0.58 Tn

1.87

PD =

5.77 Tn

Peso Propio

PL =

1.87 Tn

Peso de Servicio

1.87 Tn

DATOS
PD =

5.77 Tn

Peso Propio

PL =

1.87 Tn

Peso de Servicio

t =

2.00 Kg/cm2

Resistencia del suelo

Df =

0.70 m

Profundidad de cimentacin

NPT =

0.10 m

hf =

0.80 m

fc z =

175 Kg/cm2

Fy =

4,200 Kg/cm2

m =

1.80 Tn/m3

S/C =

150 Kg/m2

Calidad de concreto en la zapata


Limite de fluencia
Peso Especifico del suelo
Sobrecarga del piso

Dimensionar la columna por :


n=

0.25

P = PD + PL
Ps = 1.25*P
fc c=

b D=

175 Kg/cm2

P=

7.64 Tn

Ps =

9.55 Tn

Calidad del concreto de la columna

Ps
n f c

bD =

0.02 m2 (DISEO)

bD =

0.02 m2

b=
D=
Ag =

n= t m h f S /C

n =

Az = P/n

Az =

Usar :

0.20 m
0.25 m
500.00 cm2 (ARQUITECTURA )
18.41 Tn/m2
0.41 m2

Lado =

0.64 m

T=

0.80 m

S=

0.80 m

Usar :

Az =

Comprobando :

Lv1 =

0.30 m

Lv2 =

0.28 m

Pu =

11.26 Tn

Coirregir

0.64 m2

REACCION NETA DEL TERRENO


Pu = 1.4*PD + 1.7*PL
WNU =

Pu / Az =

Diseo: Vito Len Aguilar

WNU =

17.59 Tn/m2

DIMENSIONAMIENTO DE LA ALTURA hz DE LA ZAPATA


Por Punzamiento

CONDICION DE DISEO : Vu / =Vc

0.53

Vu 1
= ( P W u ( D+ d )( b+d ) ) (1)
u
c = Dmayor / Dmenor

c =

1.25 < 2.00

v c =1 . 06 f c

Vc=1. 06

f c b o d ( 2)
(1) = (2)

Donde :
bo = 2(D+d)+2(b+d)
bo = 2(b + D + 2d)
d=

0.2397

0.0000

Vu

Vc

0.2397

7.4686

33.1132

0.2397

7.4687

33.1111

0.2397

7.4689

33.1090

0.2397

7.4691

33.1069

0.2397

7.4692

33.1048

0.2397

7.4694

33.1028

0.2396

7.4696

33.1007

0.2396

7.4697

33.0986

0.2396

7.4699

33.0965

0.2396

7.4700

33.0944

0.2396

7.4702

33.0923

d=
r=
Diametro Acero =

Diseo: Vito Len Aguilar

Vu > Vc

0.24 m ...( I )
0.075 m
1/2

0.0127 m

El perlate de la zapata debe ser capaz de permitir el desarrollo de refuerzo en comprensin del
refuerzo de la columna.(ACI-12.3.2)

l dc =0 . 08 d b

Fy

f 'c

l dc 0 . 004 d b Fy

ldc =

0.32 m ...( I I )

ldc =

0.21 m ......( I I I )

Escogemos el maximos valor entre los valores de (I), (II) y (III)


Tenemos :

d=

0.32 m

h = d+r

h=

0.40 m

Usar :

h=

0.40 m

Usar :

d=

0.32 m

VERIFICACION POR CORTE


Vdu = (Wu*S)(Lv-d)
Vn = Vdu /

Vc=0 .53 f c bd

Vdu =

-0.26 Tn

Vn =

-0.31 Tn

Vc =

17.87 Tn

Vn < Vc ? CONFORME
DISEO POR FLEXION

1
Mu= (W u S ) L2v
2
As=

Mu =

Mu
a
F y ( d )
2

a=

0.63 Tn-m

0.90

a (cm)

As (cm)

a(cm)

6.37

0.5840

0.2061

0.5273

0.1861

0.5272

0.1861

0.5272

0.1861

0.5272

0.1861

0.5272

0.1861

0.5272

0.1861

As F y
. 85 f c S

As =

0.53 cm2

As min =

4.59 cm2

As =

4.59 cm2

VERIFICACION DE As_minimo

A s min = tem bd

Usar ;

D (Pgda)

cm

cm2

Usar acero de :

3/8

0.95

0.71

Diametro =

1/2

1.27

1.27

Area =

1.27 cm2

5/8

1.59

1.98

3/4

1.91

2.85

n=

3.60 Und.

2.54

5.07

s=

s=

S 2r
n1

Diseo: Vito Len Aguilar

1/2 "
1.27 cm

24.51 cm

S 2r
n1

Usar :

4 Acero1/2@ 0.25

4 Acero1/2@

0.2451153846

s=

0.25

0.80

0.20
Malla de Acero1/2@ 0.25

0.40

0.80

5.4.- VERIFICACION DIMENSIONAMIENTO DE CIMIENTOS CORRIDOS


El predimensionamiento de este elemento se realiza usando las cargas totales (muerta + viva) de
servicio y la presin admisible del terreno. El anlisis es por metro lineal de cimiento (B = 1.00 mt.)
Las cargas actuantes se muestran en el siguiente cuadro:
PISO ANCHO TRIBUT

WD

WL

PD

PL

P
(Ton)

(m2)

(Ton/m2)

(Ton/m2)

(Ton)

(Ton)

2.00

3.36

0.25

6.73

0.50

6.73

0.50

Totales

7.23

Tenemos :

B=

P
qn

Usar:

Diseo: Vito Len Aguilar

P=
qn =

7.23 Ton
20.00 Ton/m2

B=

0.36 m

B=

0.40 m (Minimo)

B=

0.40 m