Professional Documents
Culture Documents
INTRODUCTION
PHILOSOPHY OF TREATMENT
SPECIFICATION OF WORK
SCOPE OF WORK
DELIVERABLES & EXCLUSIONS
FINANCIAL OFFER
We trust you will find our offer in line with your requirement and hope to receive your
valued order in due course. In the meanwhile, should there be further information /
clarification required please feel free to write to us.
Thanking You,
SAMIR AHMED
(Director)
1.0
1.1
1.2
INTRODUCTION
DESIGN FLOW = 100 Cu. mt / Day
DESIGN CHARACTERISTIC
Sr. No
Parameter
Inlet Parameters
Outlet Parameters
(mg/l)
1.3
1.0
pH
2.0
3.0
4.0
5.0
TSS
BOD
COD
O&G
6.5-8.5
6.5-8.5
1000
300
500
50
<100
<30
<100
<10
PHILOSOPHY OF TREATMENT
Physical Treatment:
Sewage shall be collected in an underground collection sump. From underground
collection sump, sewage will be pumped through a submersible pump to
Equalization tank after sieving floatable materials in Bar Screen and removing oil
and grease in O&G trap.
Biological Treatment:
From the Equalization tank, the Sewage shall pump to Aeration Tank. Nutrient
and oxygen shall be supplied to facilitate biomass generation. The biomass
generated in the activated sludge process will digest and reduce the organic
load. The bioflocs so formed in the process will be settled in the Secondary
Clarifier.
Polishing Treatment:
The overflow from secondary clarifier will be stored in an clarified water tank
from where it will pass through Dual Media Filter to remove residual SS.
Online chlorination will be provided for disinfection
Treated sewage will be stored in treated water tank
Solids Treatment:
Solids from secondary clarifier will be dried using Sludge Drying Beds.
Air line will be provided in Equalization tank to maintain aerobic condition and
prevent septic condition that leads to foul odour.
2.00
SPECIFICATION OF WORK
2.1
SPECIFICATION IN DETAILS OF PROPOSED CIVIL UNITS: (NOT IN OUR
SCOPE)
SR.NO NAME OF UNIT
DIMENSION (Meter)
NOS
MOC
1.
Collection Sump
RCC M20
2.
Approach Channel
RCC M20
3.
Screen Chamber
RCC M20
4.
RCC M20
5.
Equalization Tank
RCC M20
6.
7.
1
1
RCC M20
MSEP
8.
Aeration Tank
Lamella
clarifier/Tube settler
Clarified Water
RCC M20
9.
Sump
Treated Water
RCC M20
10.
11.
Sump
DMF Foundation
Sludge Drying Beds
3.00 x 1.50
As per requirement
1
3
RCC M20
Brick.Mas
12.
As per requirement
RCCM20 &
Brick.Mas
ITEM
CAPACITY
NOS
MOC
MAKE
Coarse Screens
10 mm Opening
MSEP
EEEPL/EQUI
13 m /hr, 15 m
head
1+1
CI
JOHNSON/EQUI
1+1
CI
USHA/KAY/
EQUI
30
PVC
SSI/EQUI
23
EPDM
OTT/SSI/EQUI
MSEP
VOLTAS/EQUI
1+1
CI
JOHNSON/EQUI
13 m3/hr
MSEP
EEEPL/EQUI
13 m3/hr, 35 m
head
1+1
CI
0-30 LPH
PP
63 mm OD x 800
mm Long
65 mm OD x
2250 mm Long
5.0 m x (2.5 m
SWD + 0.5 FB +
0.3 HB)
10 m3/hr, 15 m
head
KIRLOSKAR/
JOHNSON/EQUI
MILTON ROY/
SEIKO
(ITALY/EQUI)
b.
Of required Nos
of required section
For use in 415 V system shall be
Aluminum conductor, PVC sheathed
armored as per IS 1554
of required section
Copper conductor PVC insulate PVC
sheathed
flexible with an overall
PVC sheathed
as per IS 1554 (Part- I)
MCC Panel
It shall be fabricated from 14-16 SWG CRCA sheet steel for both load and nonload bearing members. It will be painted by light gray paint as per shade 631 of
15.5 after applying seven Tanks process for derusting, degreasing and
phosphate.
1 No. Suitable Incomer switch fuse unit with electronic energy meter, voltmeter,
ammeter, selector switches, C.T. & R,Y,B phase indication bulb shall be provided.
It Shall be suitable for bottom cable entry and 2.5 mm thick detachable Bottom
plate should be provided for the same.
MCC should be provided with Danger nameplate in accordance with IS 25511963 and IS 8923-1978.
All components used in MCC shall be of approved make like L & T/ Siemens
/Telemechanique/Equivalent.
3.00
SCOPE OF WORK
Supply of all the mechanical equipment and instrumentation items as per the
specification covered in section 2.2 of this document
4.0
All civil and construction work including fabrication work attached to civil work
like ladders, CI rungs, Railings, Structural supports, insert plates etc is not
considered in our offer.
This proposal is valid for acceptance by client for a period of 3 months from the
date of this offer.
It is assumed that water and electricity shall be supplied free of cost within
battery limits of the ETP. (Battery limits of the ETP = 3m from the boundary of
ETP units)
The client shall supply chemicals and other material required for the
commissioning.
Any other items not specifically mentioned in our specifications are not part of
our offer.
Works contract taxes, ESI and service tax & VAT, Other duties applicable have
not been considered in the cost indicated. Same will be charged extra as
applicable.
Client shall make provision for transport of Sewage from treated storage tank.
The client shall provide proper Storage room with Lock & Key for storage of all
Equipments supplied by Envision.
Battery Limits
Sewage Line
Sewage Outlet
Electrical Cables
Chemicals Line
Sludge line
5.0
FINANCIAL OFFER :-
We shall charge Rs.29,48,200.00 (Rs. Twenty Nine Lakh forty eight Thousand Two
Hundred only) for the scope of work mentioned in 3.0
SR.NO
1.
2.
4.
5.
6.
WORK
MECHANICAL
ELECTRICAL
PIPING
ERECTION & COMMISSIONING
DESIGN & CONSULTING
COST (RS.)
17,78,200.00
4,12,500.00
5,37,500.00
1,30,000.00
90,000.00
29,48,200.00
5.1
5.2
Basis of Offer
i)
Freight
Extra at Actual
ii)
Included
iii)
Excise
Not Applicable
iv)
Octroi
Not Applicable
v)
VAT
Extra as Applicable
vi)
Service Tax
Extra as Applicable
TERMS OF PAYMENT
MECHANICAL WORK
50%
40%
Upon erection
5%
Upon commissioning
5%
PIPING WORK
1
40%
40%
Upon erection
15%
Upon commissioning
5%
ELECTRICAL WORK
1
40%
40%
Upon erection
15%
Upon commissioning
5%
40%
30%
Upon commissioning
30%
(With R. A. bills)
On commissioning
20%
25%
30%
25%