PROJECT COORDINATION / PROJECT MANAGMENT


Red Seal Alberta Journeyman Steamfitter-Pipefitter with 6 plus years assisting and overseeing completion
of major oil sand projects throughout Alberta. Safety and Quality driven individual with a passion for
innovation and building team environments with a win-win approach. Goal orientated using measureable
gains to provide an on schedule project, within or under budget.

Key Skills
— New Construction Projects — Site Safety/OSHA Compliance — Budgeting & Cost Controls
— Fabrication Shop / Modular Yard — QA/QC — Bidding/Estimating/Proposals
— Lean Management — Drafting(Spoolgen/Acorn) — Mentoring/Team Building

Employer Summary
JV DRIVER FABRICATORS INC. (Nisku, AB) — Sr. Project Coordinator, 01/06 to 01/10
Working as a Sr. Project Coordinator, oversaw and help develop multiple tools for the company’s use including
the access database responsible for all project tracking. Assisted and worked with project management team to
ensure project was on schedule and was heavily involved in multiple facets of the company during my tenure.
FLINT ENGERY PIPELINE (Anzac, AB) — Pipefitter, 7/05 to 8/05
Working as a pipefitter was involved in the construction and installation of the pipe racks for the Opti-Nexen Joint
Venture Long Lake Project, also managed and responsible for the coordination of the material lay down.

JV DRIVER PROJECTS (Fort McMurray, AB) — Pipefitter- QA/QC Coordinator, 12/04 to 7/05, 07/09 to 12/09
Worked as a pipefitter during the installation and turnover of the MVU expansion at Suncor, as well as the CNRL
Hydrogen Plant. Also worked as a QA/QC coordinator developing and assisting to oversee completion of the hydro
test program at the Shell Albian Expansion.

Project Highlights
Shell ASE Ex 1 (2007 to 2009)  Project: $550M
Worked as Construction Safety Officer/ Project Coordinator/ QA/QC Coordinator over the course of the entire
duration of the project.
Canadian Natural Resources Limited Extraction Plant Phase 1 (2006 to 2007)  Project: $16M
Served as lead draftsman / Project Coordinator working as liaison to ensure completion of project on time.
Devon Jackfish SAGD Processing Facility (2005 to 2006)  Project: $15M
Worked as lead draftsman for the fabrication facility of primary contractor, liaison with client.
Opti-Nexen Long Lake Project (2005 to 2005)  Project: $425M
Installation of pipe racking and modules for SAGD process, in addition oversaw material lay down.
Suncor MVU Expansion (2004 to 2005)  Project: $425M
Completed installation and turnover of the Millennium Vacuum Unit Expansion located at Suncor near Fort McMurray
Alberta.

Education & Certifications


ALBERTA CONSTRUCTION SAFETY ASSOSCIATION (Edmonton, AB) — NCSO DESGINATION,
NORTHERN ALBERTA INSITUTE OF TECHNOLOGY (Edmonton, AB) — Journeyman Steamfitter/Pipefitter,
Also Certified in various safety courses (LSE,OSSA Fall Protection ect), 2 of 12 modules completed towards PMC via
Nait and First Aid/CPR

You might also like