PUB Corenet Form Changes

Table of Contents
Summary of Corenet Form Changes ................................................................................................ 1 5
Forms with Changes ............................................................................................................................ 1
Forms with No Changes ...................................................................................................................... 5
Corenet Forms with Changes ......................................................................................................... 7 37
1 Development Control (DC) Clearance Forms ................................................................................... 7
1.1 Guide for Development Control (DC) Clearance Forms ....................................................... 7
1.2 Select Fields DC Clearance Forms ................................................................................... 11
2 Detailed Plan (DP) Form ................................................................................................................. 22
2.1 Guide for Detailed Plan (DP) Form..................................................................................... 22
2.2 Select Fields DP Form ...................................................................................................... 24
3 Completion of Work Form ............................................................................................................. 27
3.1 Guide for Completion of Work Form ................................................................................. 27
3.2 Select Fields Completion of Work Form.......................................................................... 29
4 Temporary Occupation Permit (TOP) Forms .................................................................................. 30
4.1 Guide for Temporary Occupation Permit (TOP) Forms ..................................................... 30
4.2 Select Fields TOP Forms .................................................................................................. 32
5 Certificate of Statutory Completion (CSC) Forms .......................................................................... 33
5.1 Guide for Certificate of Statutory Completion (CSC) Forms .............................................. 33
5.2 Select Fields CSC Forms ................................................................................................... 34
6 Water Submission Forms ............................................................................................................... 35
6.1 Guide for Water Submission Forms ................................................................................... 35
6.2 Select Fields Water Submission Forms ........................................................................... 36
Appendix ............................................................................................................................... 38 149

Summary of Corenet Form Changes


Forms with Changes
File Number
ENV-CBPU-DCCLR-NEW SUBMISSION

Form Name
Application for Development Control
(DC) Clearance - New Submission

ENV-CBPU-DCCLRApplication for Development Control


RESUBMISSION/AMENDMENT/REVISION (DC) Clearance
Resubmission/Amendment/Revision

Changes
Includes fields to classify minor and major projects;
For minor projects, fields will be included to allow DC and DP to be submitted at
the same time.
PUB (C&W) Checklist will be a section of the DC form
(No need for separate checklist to be submitted)

PUB-DD-CHECKLIST
PUB-BPU-CLRDP01

Checklist for Drainage DC Plans


Application for Clearance Certificate
for Detailed Plan on Drainage and
Sewerage (Sanitary/Sewer) Works
[Under Section 33(1) of the
Sewerage and Drainage Act (SDA),
Chapter 294]

PUB-BPU-COMPOFWORK

Certificate of Completion and


All completion of work forms for Sewerage, Sanitary, M&E and Drainage to
Inspection of Sanitary, Sewerage and merge into one form. Previously known as Form C, Form C1, Annex A, Annex C
Drainage Works
and Annex D.
[Under Section 35(1)(e) and (f) of
For Form C, please fill the COMPOFWORK form
the Sewerage and Drainage Act
For Annex A, Annex C and Form C1, please fill in Section A2: Sanitary
(Chapter 294)]
Work
For Annex D, please fill in Section A1: Sewerage Work

Drainage DP, Sewerage DP, Sewerage Form A, Sewerage Form D and Sewerage
RC Trench combined into 1 form. Previously known as PUB-DD-CLRDPDRA01 &
PUB-SEW-CLRDPSEW01.
For Form A & Form D, please fill Section A1: Sanitary Work
For RC Trench, please fill Section A2: Sewerage Work, RC Trench

File Number
PUB-BPU-COMPOFWORK

Form Name
Certificate of Completion and
Inspection of Sanitary, Sewerage and
Drainage Works
[Under Section 35(1)(e) and (f) of
the Sewerage and Drainage Act
(Chapter 294)]

Changes
It is known that these different forms are submitted by different QPs at different
stages of the development of the project. Hence built into the form is the
feature which allows one particular section of the form to be submitted. (For
example, if only the civil PE is ready to make his submissions, he can proceed to
do so using the form). If more than one QP/PE is ready to make theirs, more
sections of the form may be submitted at the same time by selecting the
relevant sections.

ENV-CBPU-CLRTOP01-NEW SUBMISSION

Application for Clearance of


Temporary Occupation Permit (TOP)
- New Submission

ENV-CBPU-CLRTOP01-RESUBMISSION

Application for Clearance of


Temporary Occupation Permit (TOP)
- Resubmission

New declarations added for developer/owner to endorse with regards to:


maximum allowable peak surface runoff stipulated in the COP and
constructed according to approved plans
SOP of the maintenance, operation and monitoring of the detention
tank system
Inspection of crest levels being constructed to approved plans
annually/every 3 years upon obtaining the TOP
Submission of the following documents as required annually upon
obtaining the TOP
New attachments added:
As built drawings for detention tank systems
SOP for pumped drainage system
SOP for flood barrier

ENV-CBPU-CLRCSC01-NEW SUBMISSION

Application for Compliance


Certificate - New Submission
[Under Section 33(7) of the
Environmental Protection and
Management Act (Chapter 94A) and
Compliance Certificate under
Section 33(8) of the Sewerage and
Drainage Act (Chapter 294)]

Attachments section modified to comply with revised Code of Practice on


Surface Water Drainage.

File Number
ENV-CBPU-CLRCSC01-RESUBMISSION

Form Name
Application for Compliance
Certificate Resubmission
[Under Section 33(7) of the
Environmental Protection and
Management Act (Chapter 94A) and
Compliance Certificate under
Section 33(8) of the Sewerage and
Drainage Act (Chapter 294)]

Changes
Attachments section modified to comply with revised Code of Practice on
Surface Water Drainage.

PUBWTR-0-PPC01

Pre-Planning Consultation

Modified fields to indicate water demand for Potable and NEWater.

PUBWTR-0-WLP01

Notification of Water Service Work


by Licensed Water Service Plumber

Modified fields to indicate water demand for Potable and NEWater.

PUBWTR-0-WSW01

Notification of Water Service Work


by Professional Engineer

Modified fields to indicate water demand for Potable and NEWater.

PUBWTR-0-CSC01

Certificate of Satisfactory
Completion of Water Service Work
by Professional Engineer

Added new section - Particulars of the Licensed Water Service Plumber

PUBWTR-0-MCG01

Form for Manufacturing Category

Include fields to indicate water demand for Potable and NEWater.

PUBWTR-0-NMC01

Form for Non-Manufacturing


Category

PUBWTR-0-RCG01

Form for Residential Category

PUBWTR-0-TSP01

Form for Temporary Category

PUB-SEW-FORM_A

Notice to Commencement of
Sanitary/Sewerage Works

Not in Use from 28 Feb 2014

File Number
PUB-SEW-FORM_C1

Form Name
Certificate of Completion and
Inspection for the Mechanical and
Electrical Works for Sewerage
Installation

Changes
Not in Use from 28 Feb 2014

PUB-SEW-FORM_D

Supplementary Information to the


Application for Clearance Certificate
for Detailed Plan on Sewerage
(M&E) Works

Not in Use from 28 Feb 2014

PUB-SEW-FORM_D1

Details of Standby Generator &


Automatic Transfer Switch

Not in Use from 28 Feb 2014

PUB-SEW-FORM_D2

Omission of Standby Generator/


Alternate Power Supply Owner's
Undertaking Form

Not in Use from 28 Feb 2014

PUB-SEW-FORM_DP

Application for Clearance Certificate


for Detailed Plans on Sewerage
(M&E Works)

Not in Use from 28 Feb 2014

PUB-SEW-ANNEX_A

Declaration By Qualified Person on


Chargeable Sanitary Appliances
Installed

Not in Use from 28 Feb 2014

PUB-SEW-ANNEX_C

Plumbers/Contractor's Confirmation
of Completion of Sanitary/Sewerage
Works
Hydrostatic (Water) Tests for
Sanitary Drainlines & Sewers
(<600mm DIA) and CCTV Inspection
Survey (>600mm DIA Sewers)
[Annex D to Form C/QP]

Not in Use from 28 Feb 2014

PUB-SEW-ANNEX_D

Not in Use from 28 Feb 2014

PUB-SEW-RC TRENCH

Certificate of Completion for RC


Trench

Not in Use from 28 Feb 2014

PUBWTR-0-WSP01

Application for License As a Water


Service Plumber

Not in Use from 28 Feb 2014

PUBWTR-0-WSR01

Application for Renewal of Water


Service Plumber Licence

Not in Use from 28 Feb 2014

PUBWTR-0-PWS01

Application for Potable Water


Supply

Not in Use from 28 Feb 2014

Forms with No Changes


File Number
PUB-SEW-CLR-OVER-SEW

Form Name
Application for Approval of Works Affecting Public Sewerage System

PUB-SEW-FORM DLP

End of Defects Liability Period Inspection for Public Sewers

PUB-SEW-FORM_B

Application for Work in Public Sewerage System

PUB-SEW-FORM_B1

Notice for Carrying out Sewer Connection Work

PUBWTR-0-WSW02

Certification of Satisfactory Completion of Water Service Work by Licensed Water Service Plumber

PUB-DD-CSIDRA

Certificate of Inspection for Drainage Works

PUB-DD-PCWVDRA

Pre-consultation /Waiver Application Form on Drainage Matters

PUB-SEW-PCWVSEW

Pre-consultation /Waiver Application Form on Sewerage Matters

Corenet Forms with Changes

1.1

Guide for Development Control (DC) Clearance Forms


ENV-CBPU-DCCLR-NEW SUBMISSION
Application for Development Control (DC) Clearance New Submission

a)

The DC clearance form is updated to support the work flow process. As part of an effort to
improve our service to the industry, PUB has introduced the classification of projects into
major and minor. This allows processing through separate tracks so that minor projects can be
processed more quickly.

b)

A development is considered a minor project if it meets all of the following criteria:


The development area is less than 0.2 Ha
The development is 3 storeys or less
No linkage to MRT
No Basements (no pumping system)
No Drainage Reserve affected
Single Residential, shophouse or simple infrastructure projects that does not generate
used water or Change of Use (e.g. conversion of void deck to Child Care Centre)
Has used water discharge flow rate of less than 2 litres per second

c)

All other projects are classified as major projects.

d)

For minor projects, QPs may submit both the DC plan and Detailed Plan (DP) at the same time,
allowing for shorter processing time. Previously, QPs need to obtain DC clearance before DP
can be submitted.

e)

On the second page of the forms, there is a section called Development Details. This section
must be filled to allow the sorting of the project into major or minor to take place.
Accurate information is necessary to facilitate processing of the submissions.

Please refer to Section 1.2 for more information on the Select fields and how they can affect
your submissions.
7

f)

For projects sorted as minor, QP will be directed to the next section SUBMISSION FOR
DEVELOPMENTAL CONTROL (DC) CLEARANCE WITH DETAIL PLAN.

Please select name of owner or QP

g)

For projects sorted as major, QP will be directed to the next section SUBMISSION FOR
DEVELOPMENTAL CONTROL (DC) PLAN.

Please select name of owner or QP

h)

There are sections in the form that must be selected and filled only when the project involves
the respective sections. For example, if the project involves:
(i)
sanitary/sewerage work, Section A needs to be selected and filled by QP
(ii)
sanitary/sewerage AND drainage work, Section A and Section B need to be selected and
filled by QP

Please select name of QP/PE


submitting

i)

The selection of the section can be done by marking the checkbox.

j)

If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill
that particular section.

k)

Compulsory fields within these sections must be duly filled only when the section is selected
for submission. The sections are listed as follows:
Submission for Development Control (DC) Clearance Plan (for MAJOR projects only)
Section A Sanitary/ Sewerage Work
Section B Drainage Work
Submission for Development Control (DC) Clearance with Detail Plan (for MINOR projects only)
Section A1 Sanitary, M&E Work (Used Water)
Section A2 Sewerage Work, RC Trench
Section B Drainage Work
Section C Infrastructure or other works affecting Sewer & Drainage (e.g. covered link way,
bus stop)

l)

To make attachments and declarations, QPs can similarly mark the provided checkboxes.

m)

The Catchment & Waterways departments Checklist for DC plans is now part of the DC
clearance forms. Please fill up the fields in the checklist if the project involves drainage works.
QPs need not submit a separate signed copy of the checklist for DC submission.
(i)

Development site with area less than 0.2 hectares will be directed to the checklist
below.

(ii)

n)

Development site with area greater than or equal to 0.2 hectares will be directed to the
checklist below.

There are a number of Select fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.

Please refer to Section 1.2 for more information on the Select fields and how they can affect
your submissions.
o)

Compulsory fields are highlighted in yellow, as shown in Appendix 1. These must be filled to
enable successful submission of the forms in Corenet.

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Application
for
Development
Control
(DC)
Resubmission/Amendment/Revision
p)

Clearance

Please refer to Appendix 2 for the ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION


form.

10

1.2

Select Fields DC Clearance Forms

Field

Detail
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments

This field can be found on Page 41


Please select one of the three options:
New Erection
Reconstruction
A&A (Addition and Alteration)

This field can be found on Page 42


Please select the most appropriate type of development for
your project.

This field can be found on Page 42


11

Field

This field can be found on Page 42

Detail
Please choose the catchment where your project is located.
For projects that take place in more than one catchment, please
select one catchment.
Used Water Catchment No.
The used water catchments in Singapore are divided into 6 regions:
1) Bedok
2) Jurong
3) Kim Chuan
4) Kranji
5) Seletar
6) Ulu Pandan
Drainage Catchment No.
The drainage catchments in Singapore are divided into 10 regions:
1)
2)
3)
4)
5)

This field can be found on Page 42

Jurong
Kranji
Pandan
Woodlands
Kallang

6) Bukit Timah
7) (A) Singapore River
(B) Stamford Marina
8) Geylang
9) Punggol
10) Changi

The used water and drainage catchment maps are available at the link
below.
http://www.pub.gov.sg/customer/QPPortal/Pages/CatchmentMaps.as
px

12

Field

Detail

Items have to be clearly indicated on plan.


Select YES from the corresponding fields in the checklist in order
to proceed with the DC submission.

This field can be found on Page 52

Select YES if items are provided.


Select NOT APPLICABLE if items are not relevant to the project.
This field can be found on Page 52
13

Field

Detail

Select YES if items are provided.


Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 52 53

14

Field

Detail

Select YES if items are provided.


Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 53 54

15

Field

Detail

Select YES if items are provided.


Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 54

16

Field

Detail

Select YES if items are provided.


Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 54 55

This field can be found on Page 55

With direct / indirect linkage


Developments with linkages (direct or indirect) to special
underground facilities such as MRT stations shall comply with
the minimum platform level and crest level (Clause 2.1.1c and
Clause 2.2) as stated in the latest addendum or edition to the
Code of Practice on Surface Water Drainage.
Quoting the example of Orchard MRT station, developments with
direct linkage are Ion Orchard and Wisma Atria which are directly
connected to Orchard MRT station. Developments with indirect
linkages are Ngee Ann City and Lucky Plaza which are indirectly
connected to MRT Station through another building with direct
or indirect connection to Orchard MRT Station.
17

Field

Detail

Select YES if items are provided.


Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 55 56


18

Field

Detail

Select YES if items are provided.


Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 56 57


19

Field

Detail

Select YES if items are provided.


Select NOT APPLICABLE if items are not relevant to the project.

This field can be found on Page 58


20

Field

Detail

Select YES if items are provided.


This field can be found on Page 58

Select NOT APPLICABLE if items are not relevant to the project.

Pumping Installation
A minimum of two pumps duty and standby pumps shall be
provided.
Ejector
The pit for the sewage ejector or solids divertor installation shall
be adequately sized (min. 3m x 3m) and shall include a working
space for maintenance.
Sump
A screen chamber shall be provided before the pump sump.
When the depth of pump sump or screen chamber exceeds 6m,
intermediate platforms shall be provided.
Access opening shall be provided directly above the pumps for
ease of maintenance.

This field can be found on Page 45

Carpark
A screen chamber is NOT needed for carpark pump sump.
Swimming Pool
Backwash from swimming pool filter.
21

2.1

Guide for Detailed Plan (DP) Form


PUB-BPU-CLRDP01
Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage
(Sanitary / Sewer) Works
[Under Section 33(1) of the Sewerage and Drainage Act (SDA), Chapter 294]

a)

Projects classified as major, as described in Chapter 1, will undergo a separate DP submission


process. This can be done with the PUB-BPU-CLRDP01 form.

b)

Previously, there were two forms for DP submissions, one for sewerage works (PUB-SEWCLRDPSEW01) and one for drainage works (PUB-DD-CLRDPDRA01). These two forms are now
combined into one single PUB-BPU-CLRDP01 form.
OLD DP Forms
NEW DP Form
PUB-SEW-CLRDPSEW01
PUB-DD-CLRDPDRA01

PUB-BPU-CLRDP01

c)

There are sections in the form that must be selected and filled only when the project involves
the respective sections. For example, if the project involves:
(i)
sanitary work, Section A1 needs to be selected and filled by QP
(ii)
sanitary AND drainage work, Section A1 and Section B need to be selected and filled by
QP

d)

The selection of the section can be done by marking the checkbox.

e)

If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill
that particular section.

f)

Compulsory fields within these sections must be duly filled only when the section is selected
for submission. The sections are listed as follows:
Section A1 Sanitary Work
Section A2 M&E Works (Used Water)
Section A3 Sewerage Work, RC Trench
Section B Drainage Work

22

g)

To make attachments and declarations, QPs can similarly mark the provided checkboxes.

h)

There are a number of Select fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.

Please refer to Section 2.2 for more information on the Select fields and how they can affect
your submissions.
i)

Compulsory fields are highlighted in yellow, as shown in Appendix 3. These must be filled to
enable successful submission of the forms in Corenet.

23

2.2

Select Fields DP Form

Field

Detail
Sanitary
Includes works on any sanitary plumbing or drainage system and
the fixing, alteration and repair of a sanitary appliance

This field can be found on Page 92

Sewer
Includes engineering works for the construction, alteration and
maintenance of any sewerage system
Sewage Treatment Plant
Refers to sewage treatment works, septic tank, imhoff tank,
percolating filter, sludge digestion tank, or any tank designed for
the pre-treatment, treatment or the stabilisation of sewage
Drainage
If the project involves drainage works only, this field can be left
unfilled. QP can proceed to fill up Section B: Drainage Work of
the PUB-BPU-CLRDP01 form to submit for DP clearance.

24

Field

Detail
New Submission
First DP submission for the particular project

This field can be found on Page 92

Resubmission
Subsequent DP submission(s) of the same project
- Revised Plan Submission
- Amendment Plan Submission

Industrial
Factories, warehouses, power plants, industrial parks
This field can be found on Page 92

Non Industrial
Residential, commercial and institutional developments

25

Field

Detail
Pumping Installation
A minimum of two pumps duty and standby pumps shall be
provided.
Ejector
The pit for the sewage ejector or solids divertor installation shall
be adequately sized (min. 3m x 3m) and shall include a working
space for maintenance.

This field can be found on Page 94

Sump
A screen chamber shall be provided before the pump sump.
When the depth of pump sump or screen chamber exceeds 6m,
intermediate platforms shall be provided.
Access opening shall be provided directly above the pumps for
ease of maintenance.
Carpark
A screen chamber is NOT needed for carpark pump sump.
Swimming Pool
Backwash from swimming pool filter.

26

3.1

Guide for Completion of Work Form


PUB-BPU-COMPOFWORK
Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works
[Under Section 35(1)(e) and (f) of the Sewerage and Drainage Act (Chapter 294)]

a)

The PUB-BPU-COMPOFWORK form puts together all the Completion of Work forms for
Sewerage, Sanitary, M&E and Drainage. These forms were previously known as Form C, Form
C1, Annex A, Annex C and Annex D. This is to give the Lead QP an overview of the various
Completion of Work forms that has to be submitted to PUB over the course of the project.

b)

It is known that these different forms are submitted by different QPs at different stages of the
development of the project. Hence, built into the form is a feature which allows one particular
section of the form to be submitted even if other required sections are not ready for
submission. (For example, if only the Civil PE is ready to make his submissions, he can proceed
to do so using the form even if the M&E PE is not ready to submit theirs). If more than one
QP/PE are ready to make their submissions, more sections of the form may be submitted at
the same time by selecting the relevant sections.

c)

The table below shows the options and the respective sections that will be made available.
Selection Options
Sections Available for Submission
Completion of Sewerage
Section A1 Sewerage Work
Work only
Application for PUB
Clearance for Temporary
Occupation Permit (TOP)

Section A2 Sanitary Work


Section A3 RC Trench Completion
Section B Drainage Work
Section C Infrastructure Works Affecting Sewer & Drainage

Application for PUB


Clearance for
Certificate of Statutory
Completion (CSC)

Section D Application for PUB Clearance for CSC

Application for PUB


Clearance for both
Temporary Occupation
Permit (TOP) &
Certificate of Statutory
Completion (CSC)

Section A2 Sanitary Work


Section A3 RC Trench Completion
Section B Drainage Work
Section C Infrastructure Works Affecting Sewer & Drainage
Section D Application for PUB Clearance for CSC

27

d)

The options are available on the first page of the PUB-BPU-COMPOFWORK form.

e)

For Application for PUB Clearance for Certificate of Statutory Completion (CSC), please be
reminded to submit the Certificate of Inspection for Drainage Works (PUB-DD-CSIDRA)
together with the PUB-BPU-COMPOFWORK form.

f)

There are a number of Select fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.

Please refer to Section 3.2 for more information on the Select fields and how they can affect
your submissions.
g)

Compulsory fields are highlighted in yellow, as shown in Appendix 4. These must be filled to
enable successful submission of the forms in Corenet. Compulsory fields under the sections
A1, A2, A3, B, C and D must be duly filled only when the section is selected for submission.

28

3.2

Select Fields Completion of Work Form

Field

Detail
Please select the appropriate options:
a change
no change

This field can be found on Page 101 & 106

Please select one of the three options:


New Erection
Reconstruction
A&A (Addition and Alteration)

This field can be found on Page 101 & 106

29

4.1

Guide for Temporary Occupation Permit (TOP) Forms

ENV-CBPU-CLRTOP01-NEW SUBMISSION
ENV-CBPU-CLRTOP01-RESUBMISSION
Application for Clearance of Temporary Occupation Permit (TOP) New Submission
Application for Clearance of Temporary Occupation Permit (TOP) Resubmission
a)

The following new declarations are added:


The crest levels, platform levels, flood protection levels are in compliance with Code
of Practice on Surface Water Drainage and constructed according to approved plans.
The maximum stormwater discharge from the development is in compliance with the
maximum allowable peak runoff stipulated in the COP and constructed according to
approved plans.
As the QP, you will need to declare the following I have liaised with the Developer/
Owner to ensure that a Maintenance/Managing Agent has been established to
undertake the SOP of the maintenance, operation and monitoring of the detention
tank system.

b)

The following new attachments are added to allow the submission of the following documents
(in line with the current edition of Code of Practice on Surface Water Drainage):
As built survey plans indicating crest levels, platform levels, flood protection levels
based on approved flood protection measures
As built drawings for detention tank systems and final design calculations, and
factory test report for its pumping system
Standard Operating Procedure for pumped drainage system(basement / detention
tank)
Standard Operating Procedure for flood barrier
Developer/Owner declaration on the following - I shall inspect and declare that the
crest levels are constructed to approved plans annually / every 3 years upon obtaining
the TOP
Developer/Owner declaration on the following:
- I shall submit the following documents as required annually upon obtaining
the TOP
- Certificate of inspection on flood barriers on site, including leak test
certificate
- Amendments to SOP for flood barrier
- Certificate of inspection on pumped drainage system (basement/detention
tank)
- Certificate of inspection on ABC Waters design features

30

c)

To make attachments and declarations, QPs can mark the checkboxes provided.

d)

Compulsory fields are highlighted in yellow, as shown in Appendix 5 & Appendix 6. These must
be filled to enable successful submission of the forms in Corenet.

31

4.2

Select Fields TOP Forms

Field

Detail
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments

This field can be found on Page 110 & 114

32

5.1

Guide for Certificate of Statutory Completion (CSC) Forms

ENV-CBPU-CLRCSC01-NEW SUBMISSION
ENV-CBPU-CLRCSC01-RESUBMISSION
Application for Compliance Certificate New Submission
Application for Compliance Certificate Resubmission
[Under Section 33(7) of the Environmental Protection and Management Act (Chapter 94A) and
Compliance Certificate under Section 33(8) of the Sewerage and Drainage Act (Chapter 294)]
a)

To indicate attachments and declarations, QPs can mark the checkboxes provided.

b)

Compulsory fields are highlighted in yellow, as shown in Appendix 7 and Appendix 8. These
must be filled to enable successful submission of the forms in Corenet.

33

5.2

Select Fields CSC Forms

Field

Detail
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments

This field can be found on Page 119 & 124

34

6.1

Guide to Water Submission Forms


PUBWTR-0-MCG01
PUBWTR-0-NMC01
PUBWTR-0-RCG01
PUBWTR-0-TSP01
PUBWTR-0-PPC01
PUBWTR-0-WLP01
PUBWTR-0-WSW01
PUBWTR-0-CSC01
Form for Manufacturing Category
Form for Non-Manufacturing Category
Form for Residential Category
Form for Temporary Category
Pre-Planning Consultation
Notification of Water Service Work by Licensed Water Service Plumber
Notification of Water Service Work by Professional Engineer
Certificate of Satisfactory Completion of Water Service Work by Professional Engineer

a)

New fields are included to indicate water demand for PUB Water (Potable Water) and
NEWater in the following forms:
File Name
Form Name
PUBWTR-0-PPC01
Pre-Planning Consultation
PUBWTR-0-WLP01 Notification of Water Service Work by Licensed
Water Service Plumber
PUBWTR-0-WSW01 Notification of Water Service Work by
Professional Engineer
PUBWTR-0-MCG01 Form for Manufacturing Category
PUBWTR-0-NMC01 Form for Non-Manufacturing Category
PUBWTR-0-RCG01
Form for Residential Category
PUBWTR-0-TSP01
Form for Temporary Category

b)

New section is added to indicate the particulars of Licensed Water Service Plumber in the
following form:
File Name
Form Name
PUBWTR-0-CSC01
Certificate of Satisfactory Completion of Water Service Work by
Professional Engineer

c)

Compulsory fields are highlighted in yellow, as shown in Appendix 9 16. These must be filled
to enable successful submission of the forms in Corenet.

35

6.2

Select Fields Water Submission Forms

Field

Detail
Please select the most appropriate type of development for
your project.

This field can be found on Page 137, 143 and 147

Please select the most appropriate work nature of your project.

This field can be found on Page 143 and 147

36

Field

Detail
Please select the most appropriate work nature of your project.

This field can be found on Page 140

37

Appendix

38

List of Appendix
Appendix 1 ENV-CBPU-DCCLR-NEW SUBMISSION .................................................................. 41 64
Application for Development Control (DC) Clearance New Submission
Appendix 2 ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION ............................. 65 90
Application for Development Control (DC) Clearance Resubmission/Amendment/Revision
Appendix 3 PUB-BPU-CLRDP01 ................................................................................................ 91 96
Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage (Sanitary/Sewer)
Works
Appendix 4 PUB-BPU-COMPOFWORK ................................................................................... 97 109
Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works
Appendix 5 ENV-CBPU-CLRTOP01-NEW SUBMISSION ........................................................ 110 113
Application for Clearance of Temporary Occupation Permit (TOP) New Submission
Appendix 6 ENV-CBPU-CLRTOP01-RESUBMISSION/AMENDMENT/REVISION ................... 114 118
Application for Clearance of Temporary Occupation Permit (TOP)
Resubmission/Amendment/Revision
Appendix 7 ENV-CBPU-CLRCSC01-NEW SUBMISSION ......................................................... 119 123
Application for Compliance Certificate New Submission
Appendix 8 ENV-CBPU-CLRCSC01-RESUBMISSION/AMENDMENT/REVISION ................... 124 128
Application for Compliance Certificate Resubmission/Amendment/Revision
Appendix 9 PUBWTR-0-MCG01 ............................................................................................ 129 130
Form for Manufacturing Category
Appendix 10 PUBWTR-0-NMC01 ......................................................................................... 131 132
Form for Non-Manufacturing Category
Appendix 11 PUBWTR-0-RCG01 ..................................................................................................... 133
Form for Residential Category
Appendix 12 PUBWTR-0-TSP01 ............................................................................................ 134 136
Form for Temporary Category
Appendix 13 PUBWTR-0-PPC01 ........................................................................................... 137 139
Pre-Planning Consultation
Appendix 14 PUBWTR-0-WLP01 .......................................................................................... 140 142
Notification of Water Service Work by Licensed Water Service Plumber
Appendix 15 PUBWTR-0-WSW01 ......................................................................................... 143 146
Notification of Water Service Work by Professional Engineer
Appendix 16 PUBWTR-0-CSC01 ............................................................................................ 147 148
Certificate of Statutory Completion of Water Service Work by Professional Engineer
39

Appendix 17 Contact List ................................................................................................................ 149

40

Appendix 1

ENV-CBPU-DCCLR-NEW SUBMISSION

APPLICATION FOR DEVELOPMENT CONTROL (DC)


CLEARANCE - NEW SUBMISSION
This form may take you 10 minutes to fill in. You will need the
following information to fill in the form:- Particulars of Project
- Particulars of Qualified Person
Date: 19/03/2014
Central Building Plan Unit

To:

National Environment Agency


40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
works.
2. This form is to be accompanied by the relevant attachments.
3. Please read the DC checklist before filling the form.

Particulars of Project
Project Reference Number
Project Title

Location Description
[Include Lot/Plot, MK/TS,
Building Address, House
No and Road information]

Particulars of Application
Development Proposal
Application

Select

File Ref No/


Case ID

Dated

SIP/DIP from CBPU


(if applicable)

41

ENV-CBPU-DCCLR-NEW SUBMISSION

Particulars of Qualified Person


Name

Select

Role In Project
Registration No
Firm Name
UEN
Firm Address

Telephone No.
Extension No
Fax No.
Email Address

Development Details
Type of Submission

Select

Type of Development

Select

Is there basement?

Yes

No

Is there sewer connection


to neighbour house?

Yes

No

Is there public sewer in


the development lot?

Yes

No

No.of storeys in
development

Storeys

Total used water discharge

L/s

Area of development

ha

DR in the development?

Yes

No

Proposed MIN PLATFORM


LEVEL

mRL

Max Adjacent Road

mRL

Any linkage to MRT

Yes

Used Water Catchment No.

Select

Drainage Catchment No.

Select

No

Please refer to www.pub.gov.sg for


catchment maps of used water and drainage.

42

ENV-CBPU-DCCLR-NEW SUBMISSION

Confirmation
Roof gutters (including rain water down pipes and outlets, and roof scupper
drains) are banned as an anti-mosquito breeding measure for all new
developments. Waiver in writing must be obtained from National Environment
Agency to erect roof gutters at the DC stage prior to BP submission
I confirm that :
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Dated:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A & A and reconstruction
building projects.

Attachments
Development Control Plan
Others, please specify
Add

Delete

43

SUBMISSION FOR DEVELOPMENT CONTROL (DC)


CLEARANCE WITH DETAIL PLAN
Instruction:
1. This page of the form is applicable for minor projects.
2. First storey plan/site plan for section A1 and B can be submitted as one plan
with clear layer and identification
3. Please check all the relevant infromations have been indicated and provided
before submitting
Particulars of Owner(s)
Name

Select

Address
Contact No
Email
(Tick if applicable)

SECTION A1: SANITARY, M&E WORK (Used Water)

Attachments
1. Site plan and first storey plan
(indicate the sewer setback, propose and existing sewer
connection, top/invert level of manhole(s), and platform levels,
propose and existing sanitary drainline.
2. Detailed sanitary plan (to show sanitary line)
3. Is there pumping system(s) for used water?
Declaration:

Name

Yes
Role

By QP/PE:
I have carried out a
thorough investigation
of the existing
sewerage system within
and adjacent to the site
and will take every
practical measure to
ensure that the
proposed development
will not disrupt or affect
any existing
sewer/drain-line that
serves other properties/
premises.

Select

by QP/PE:
I hereby certify that
these plans and the
works shown therein
comply with the
provisions of the
Sewerage and

Select

No

Phone Email Firm Arch/PE


Reg No

44

Drainage
Act (Chapter 294),
the Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and Sanitary
Works
by PE(M/E) if there is
pumping system(s)
I, being a Professional
Engineer hereby certify
that the propose
mechanical and
electrical(M&E) works
of the above
mentioned project are
design in accordance
with the current Code
of Practice on
Sewerage
and Sanitary Works,
Sewerage and
Drainage
Act (Chapter 294) and
other sewerage
requirements as
stipulated by Water
Reclamation (Network)
Department.

Select

Attachments:
1. Detail plan drawings of used water pumping system(s)
2. Attached Form D2/QP if an alternate power source is not available
3. Design calculations
4. Pump and system curves
5. Relevant equipment catalogues
Please state if any deviation from
the COP
Pump Design
Condition
Pump Application

Brand

Model

Estimated
Inflow
(l/s)

Pump
operating
capacity (l/s)

Pump
operating
head (m)

Solids
free
passage
Size (mm)

Motor
Rating (kw)

Select
Add

Delete

45

Particulars of Plumber/Contractor
Name

Select

Firm Details
Contact No
Email
please indicate your
membership/license

PUB LP
SPS registered
N.A.

Expected Date of Commencement


Expected Date of Completion
Tick if Applicable

SECTION A2: SEWERAGE WORK, RC Trench

Attachments:
1. Detail sewerage plan
To show: propose sewer alignment with diameter, material,
top/invert level, existing sewer alignment to be abandoned (if any)
2. Design & calculation of RC trench (if applicable)
Declaration
by PE (Civil):
I hereby certify that
the sewerage plans
and the works shown
therein comply with
the provisions of the
Sewerage and
Drainage
Act (Chapter 294), the
Sewerage and
Drainage
(Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.

Name

Role

Phone Email

Firm Arch/PE
Reg No

Select

Particulars of Plumber/Contractor
Tick if same as in Sanitary Work
Name

Select

NRIC/Passport No.
Firm Details
Contact No
46

Email
please indicate your
membership/license

PUB LP
SPS registered
N.A.

Expected Date of Commencement


Expected Date of Completion
Tick if applicable

SECTION B: DRAINAGE WORK

Attachment:
1. Site Plan and First Sty Plan
2. Basement Plans
3. Detail of Drainage Work
4. DC Checklist
5. Proposed plan showing crest levels, platform levels with and
without flood barriers at various entrance and exit points, and
flood barrier installed at all points of entry and exit for building
premises or for entire development
Name

Declaration

I certify that the drainage


work are designed in full
compliance with PUB
requirements including
Sewerage and Drainage
Act (Chapter 294) and
current edition of COP on
Surface Water Drainage

Role

Phone

Email

Firm Arch/PE
Reg No

Select

Please state if any deviation from


the COP
Tick if applicable

SECTION C: Infrastructure or other works affecting Sewer &


Drainage (eg. Covered link way, bus stop)

Attachment:
1. First storey plan, showing sewer setback, sewer alignment, diameter,
manhole & sewer ID.
2. Cross sectional plan
3. Sewer and drainage plan
4. Proposed plan showing crest levels, platform levels with and without
flood barriers at various entrance and exit points, and flood barrier
installed at all pints of entry and exit for building premises or for entire
development.
47

Declaration
I hereby certify that these
plans and the works shown
therein comply with the
provisions of the Sewerage
and Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on
Sewerage and Sanitary
Works.

Name

Role

Phone Email

Firm

Arch/PE
Reg No

Select

48

DC SUBMISSION

SUBMISSION FOR DEVELOPMENT CONTROL (DC) PLAN


1. This page of the form is applicable for major projects
2. First Storey Plan/Site Plan for Section A and B can be submitted as one plan
with clear layer and identification
3. Please check all the relevant information have been indicated and provided
before submitting
4. Detailed Plan for sanitary, sewer, and drainage works shall be submitted after the
DC clearance is obtained.

Particulars of Owner(s)
Name

Select

Address
Contact No
Email
(Tick if applicable)

SECTION A: SANITARY / SEWERAGE WORK

Attachments:
1. Site plan and first storey plan
to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and
platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and
sewer identification number

2. Is there any sewerage pump system required?


Declaration

Name

I hereby certify that


these plans and the
works shown therein
comply with the
provisions of the
Sewerage and
Drainage Act
(Chapter 294), the
Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and
Sanitary Works.

Select

I have carried out a


thorough investigation
of the existing
sewerage system
within the site
and will take every
practical measure to
ensure that the
proposed
development
will not disrupt or
affect any existing
sewer / drain-line that
serves other
properties / premises.

Select

Role

Contact

Yes

No
Email

Firm

Arch/PE
Reg No

Please state if any

49

COP

50

DC SUBMISSION

SECTION B: DRAINAGE WORK

(Tick if applicable)

Attachments:
1. Site Plan and First Sty Plan
2. Basement Plans
3. DC Checklist
4. Proposed plan showing crest levels, platform levels
with and without flood barriers at various entrance
and exit points, and flood barrier installed at all points
of entry and exit for building premises or for entire
development
Declaration

Name

I certify that the


drainage work
are designed in
full compliance
with PUB
requirements
including
Sewerage and
Drainage Act
(Chapter 294)
and current
edition of COP
on Surface Water
Drainage

Select

Role

Contact

Email

Firm

Arch/PE
Reg No

Please state if any


deviation from the
COP

51

PUB-DD-CHECKLIST

PUBLIC UTILITIES BOARD (PUB)


CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
*Please use this form if development site is equal to or
greater than 0.2 Ha*
(A) General
1. Date of Drainage Interpretation
Plan (DIP) issuance

(Please indicate the date of DIP)

2. Site boundary lines are clearly


indicated on plan

Select

3. Existing drains alignment, drain size,


drain type, summit point, flow direction
and discharge points of internal surface
drain system are clearly indicated on plan

Select

4. All addition and alteration works


are highlighted

Select

5. For JTC, HDB, URA developments,


the drainage masterplan of the
development site is attached together
with the submission.

Select

6. There is provision of peak runoff control


measures within the development site.

Select

Size of development site

Ha

(a) Post-development Runoff Coefficient


(Please indicate value between 0 to 1)

(b) Type of measures to reduce


peak runoff
(i) Detention tanks: Volume
*For developments with detention tank systems, please also
fill out section 6 (c) in the form*

(Please indicate size


< width (m) x length (m) x
effective depth (m) >)

(ii) Retention/ sedimentation ponds

Select

(iii) Green roofs

Select

(iv) Planter boxes

Select

(v) Porous pavements

Select

(vi) ABC Waters Design Features


(to be endorsed by an ABC Waters
Professional - please fill out
Section 7 in the form)
Constructed Wetlands

Select
52

Bioretention Swales/Basins

Select

Rain Gardens

Select

(vii) Others
(Please indicate if any)

(c) For developments with detention


tank systems
(i) Detention tank incorporates rainwater
harvesting feature

Select

Detention volume
Detention volume to meet the requirement as stated in Clause 7.1.5
of the latest edition of Code of Practice on Surface Water Drainage
(Detention V)

Volume set aside for rainwater harvesting


storage (Rainwater Harvesting V)
Total volume of tank (Total V)

(Please indicate volume


in cubic metre)

(Please indicate volume


in cubic metre)

Total V = Detention V + Rainwater Harvesting V

(ii) Proposed drainage plan indicating


catchment and sub-catchment
boundaries, and the specific subcatchment
of each tank including the outlet discharge
point of the internal drainage system to the
public drain is attached with the submission.

Select

(iii) Proposed site plan with runoff


coefficients and area of development
with varying characteristics of catchment/
sub-catchment clearly indicated.

Select

(iv) Proposed site plan with features, and


catchment/sub-catchment of each feature,
to attenuate stormwater runoff to comply
with COP requirements clearly indicated.

Select

(v) PE (Civil) -endorsed design calculations


or modelling results as per the design
calculations templates or equivalent, are
included in the submission. If there is any
pumped drainage system involved, the civil
and structural components shall be
endorsed by a PE (Civil) while the
mechanical and electrical components shall
be endorsed by a PE (Mechanical/Electrical).

Select

(vi) Proposed site layout plans indicating


the location and footprint of the detention
tank(s), pumping facilities (if applicable),
the effective depth of the detention tank(s)
and the connection point to the internal
drainage system are attached in the
submission.

Select

53

7. ABC Waters design features are incorporated


within the development.
(a) Names & Registration No. of ABC
Waters Professional

*If yes, please also respond


to 7(a), 7(b)*

(Please indicate name & registration


no. of ABC professional)

(b) Concept design and design calculations


(e.g. catchment area, treatment area and
detainment volume etc for the ABC Waters
design feature), endorsed by the ABC
Waters Professional are submitted to PUB.
(c ) Hydraulic calculation for the overflow
system, endorsed by ABC Waters
Professional (PE) are submitted to PUB.
8. If the proposed development site area
exceeds 0.4 ha, hydraulic calculations
for the proposed internal drainage facilities,
including sub-catchment plans for the
proposed development site endorsed by a
Professional Engineer (Civil) to be submitted
for PUB record.
9. There is upstream drainage connection
from the neighbouring lots into the
development site.

(B) DRAINAGE RESERVE


10. Drainage Reserve lines and lot boundaries
are indicated, dimensioned and highlighted.
11. All embankments and structures are set
outside the Drainage Reserve
12. Drainage Reserve are free from encumbrances
13. Design of embankment and structures
near a drain or Drainage Reserve (within 2m)
must not take into consideration the passive
resistance offered by the existing or
proposed drainage structures.
(Note clause 5.3 of the latest edition of
Code of Practice on Surface Water
Drainage). The structural and stability
calculations for an embankment or a structure
within 2 m from the edge of Drainage Reserve
shall be endorsed by a Professional Engineer
and submitted to the Board for record at
Detailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)


14. MPL of development

mRL

15. All proposed/existing platform levels


are clearly indicated on plan
54

16. The proposed platform levels and


road/ground levels adjacent to the
internal drain outlet discharge point are
clearly indicated
17. For addition and alteration works
submission, the existing platform levels
are indicate
18. Linkages (direct/indirect) to special
underground facilities and basements,
if any, are indicated and complied with
the latest Code of Practice on Surface
Water Drainage
19. Flood barrier (as stipulated in Section 2.4 of
the latest Code of Practice on Surface
Water Drainage), if any, is incorporated into
the development site.

Select

*If Yes, please also respond


to 19(a)*

(a) Proposed plans indicating the crest


levels and/or platform levels with and
without flood barrier at various entrance
and exit points are attached together
with the submission

For developments where flood barriers are automated and/or with more than 2
points of entry/exit, the following document shall be submitted at Detailed Planning
stage.
-- Details on the Standard Operating Procedure (SOP) including the operation and
maintenance of the flood barrier to be endorsed by Mechanical and/ or Electrical
QP or PE, and the developer/ building owner.
-- Details on the size, type and design of the flood barrier.

55

(D) PROPOSED DRAINAGE WORKS


20. Proposed/ existing drains and drains to be
deleted are clearly indicated using
different colour

Select

21. Alignment, summit point, flow direction, type


& size and outlet discharge points of the
proposed internal surface drains are clearly
indicated.

Select

22. Connection point to existing drain is indicated

Select

23. Proposed internal surface drains are able to


discharge into roadside/ outlet drain as
shown on plan.

Select

24. Sump size is indicated

Select

25. Vertical grating at internal drain outlet


discharge point is provided

Select

26. External drainage works (including culvert


details) to be submitted separately during
Detailed Planning stage. This shall be clearly
annotated on plan

Select

(E) OPENING LEADING TO BASEMENT LEVEL


27. Crest level of access ways and openings
leading into the basement is indicated and
complied with the latest Code of Practice
on Surface Water Drainage

Select

28. Proposed sizes and flow direction of cut off


drains are indicated

Select

(F) COMMON DRAIN


29. Alignment, size and flow of existing
common drain within the development
lot are indicated.

Select

30. If there is common drain within the


development site, the following shall be
endorsed on the plan:

Select

"Surface runoff from the site and all


neighbouring lots shall continue to be
allowed to discharge through the common
drain within the site."

31. There is no permanent structure erected


above and over the common drain

Select

32. If the proposal involves the reconstruction


of common drain, the proposed common
drain shall be at least 450mm wide as
stipulated in Section 4.5 of Code of
Practice on Surface Water Drainage or

Select

56

any other sizes as directed by PUB


33. Details of the proposed common drain to
be submitted by Professional Engineer
(Civil) separately to PUB for approval
during Detailed Planning/ Building Plan
stage. This is to be annotated on the plan

Select

34. The position of the existing/proposed


boundary wall/fence is clearly indicated

Select

57

(G) PUMPED DRAINAGE SYSTEM


35. Pumped drainage system complies with the
latest Code of Practice on Surface Water
Drainage. Details of pumped drainage
system and design computations duly
endorsed by PE shall be submitted
separately to PUB for record during Detailed
Planning stage

Select

36. Source catchment area with surface runoff


leading into the pumped drainage system is
clearly indicated

Select

37. The location, size, inlet and outlet


connections of the rainwater pump sump
for the proposed pumped drainage system
are clearly indicated

Select

(H) RETAINING WALL


38. If a retaining wall is erected to raise the
ground level of the development site above
adjacent premises, adequate internal
drainage system provided to effectively
intercept and drain away runoff including the
sub-soil flow from the development site

Select

39. If a retaining wall is erected to lower the


ground level of the development site,
adequate internal drainage system provided
to effectively intercept and drain away
existing sub-soil and overland flows
discharging through the development site
from the adjacent premises

Select

(I) DRAINAGE AFFECTING OTHER PREMISES


40. Minimum 600mm high solid boundary wall
around development site is erected to
prevent surface runoff from overflowing into
adjacent premises on lower ground

Select

I hereby confirm that the above items have been complied with and endorsed on
the plans.
I hereby certify that the standard endorsement below will also be certified on the
plans:(a) The planning, design, construction activities and procedures for plan
submission shall comply fully with the requirements as stipulated in the
latest edition of the Code of Practice on Surface Water Drainage and the
Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge
all runoff from the development site.
(c) The runoff within, upstream of and adjacent to the development lot can be
effectively drained away without causing flooding within the lot or in areas
outside the lot.
(d) There is no direct connection from the internal drains within the basement or
58

sub-basement to the external roadside drains.


* Public Utilities Board (PUB) reserves the right to report any false declaration of
information to the relevant professional bodies for action in accordance to the
Act/ethnics governing all the Qualified Professional.*

59

PUB-DD-CHECKLIST

PUBLIC UTILITIES BOARD (PUB)


CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
*Please use this form if development site is less than 0.2 Ha*
(A) General
1. Date of Drainage Interpretation Plan (DIP) issuance
2. Site boundary lines are clearly indicated on plan

Select

3. Existing drains alignment, drain size, drain type,


summit point, flow direction and discharge
points of internal surface drain system are
clearly indicated on plan

Select

4. All addition and alteration works are highlighted

Select

5. For JTC, HDB, URA developments, the drainage


masterplan of the development site is attached
together with the submission.

Select

6. ABC Waters design features are incorporated within


the development.

Select

(a) Names & Registration No. of ABC Waters


Professional
(b) Concept design and design calculations,
endorsed by the ABC Waters Professional
are submitted to PUB.

Select

(c ) Hydraulic calculation for the overflow


system, endorsed by ABC Waters
Professional (PE) are submitted to PUB.

Select

7. If the proposed development site area exceeds


0.4 ha, hydraulic calculations for the proposed
internal drainage facilities, including
sub-catchment plans for the proposed development
site endorsed by a Professional Engineer (Civil) to
be submitted for PUB record.

Select

8. There is upstream drainage connection from the


neighbouring lots into the development site.

Select

60

PUB-DD-CHECKLIST

(B) DRAINAGE RESERVE


9. Drainage Reserve lines and lot boundaries
are indicated, dimensioned and highlighted.

Select

10. All embankments and structures are set outside


the Drainage Reserve
11. Drainage Reserve are free from encumbrances
12. Design of embankment and structures near a drain
or Drainage Reserve (within 2m) must not take into
consideration the passive resistance offered by the
existing or proposed drainage structures. (Note
clause 5.3 of the latest edition of Code of Practice
on Surface Water Drainage). The structural and
stability calculations for an embankment or a
structure within 2 m from the edge of Drainage
Reserve shall be endorsed by a Professional
Engineer and submitted to the Board for record at
Detailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)


mRL

13. MPL of development


14. All proposed/existing platform levels are clearly
indicated on plan

Select

15. The proposed platform levels and road/ground


levels adjacent to the internal drain outlet
discharge point are clearly indicated

Select

16. For addition and alteration works submission, the


existing platform levels are indicated

Select

17. Linkages (direct/indirect) to special underground


facilities and basements, if any, are indicated and
complied with the latest Code of Practice on
Surface Water Drainage

Select

18. Flood barrier (as stipulated in Section 2.4 of the


latest Code of Practice on Surface Water
Drainage), if any, is incorporated into the
development site.

Select

(a) Proposed plans indicating the crest levels


and/or platform levels with and without
flood barrier at various entrance and exit
points are attached together with the
submission

Select

For developments where flood barriers are automated and/or with more than 2 points of
entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.
-- Details on the standard operating procedure (SOP) including the proposed maintenance
plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person,
and the developer/owner.
-- Details on the size, type and design of the flood barrier.

(D) PROPOSED DRAINAGE WORKS


61

19. Proposed/ existing drains and drains to be deleted


are clearly indicated using different colour

Select

20. Alignment, summit point, flow direction, type & size


and outlet discharge points of the proposed
internal surface drains are clearly indicated

Select

21. Connection point to existing drain is indicated

Select

22. Proposed internal surface drains are able to


discharge into roadside/ outlet drain as
shown on plan

Select

23. Sump size is indicated

Select

24. Vertical grating at internal drain outlet discharge


point is provided

Select

25. External drainage works to be submitted separately


during Detailed Planning/ Building Plan stage. This
shall be clearly annotated on plan

Select

(E) OPENING LEADING TO BASEMENT LEVEL


26. Crest level of access ways and openings leading
into the basement is indicated and complied with
the latest Code of Practice on Surface Water
Drainage

Select

27. Proposed sizes and flow direction of cut off drains


are indicated

Select

62

PUB-DD-CHECKLIST

(F) COMMON DRAIN


28. Alignment, size and flow of existing common drain
within the development lot are indicated

Select

29. If there is common drain within the development


site, the following shall be endorsed on the plan:

Select

Surface runoff from the site and all


neighbouring lots shall continue to be
allowed to discharge through the
common drain within the site.
30. There is no permanent structure erected above
and over the common drain

Select

31. If the proposal involves the reconstruction of


common drain, the proposed common drain
shall be at least 450mm wide as stipulated in
Section 4.5 of Code of Practice on Surface Water
Drainage or any other sizes as directed by PUB

Select

32. Details of the proposed common drain to be


submitted by Professional Engineer (Civil)
separately to PUB for approval during Detailed
Planning/ Building Plan stage. This is to be
annotated on the plan

Select

33. The position of the existing/proposed boundary


wall / fence is clearly indicated

Select

(G) PUMPED DRAINAGE SYSTEM


34. Pumped drainage system complies with the latest
Code of Practice on Surface Water Drainage.
Details of pumped drainage system and design
computations duly endorsed by PE shall be
submitted separately to PUB for record during
Detailed Planning / Building Plan stage

Select

35. Source catchment area with surface runoff leading


into the pumped drainage system is clearly
indicated

Select

36. The location, size, inlet and outlet connections of


the rainwater pump sump for the proposed
pumped drainage system are clearly indicated

Select

(H) RETAINING WALL


37. If a retaining wall is erected to raise the ground
level of the development site above adjacent
premises, adequate internal drainage system
provided to effectively intercept and drain away
runoff including the sub-soil flow from the
development site

Select

38. If a retaining wall is erected to lower the ground


level of the development site, adequate internal
drainage system provided to effectively intercept
and drain away existing sub-soil and overland flows
discharging through the development site from the
adjacent premises

Select

(I) DRAINAGE AFFECTING OTHER PREMISES


39. Minimum 600mm high solid boundary wall around
development site is erected to prevent surface
runoff from overflowing into adjacent premises on
lower ground

Select

I hereby confirm that the above items have been complied with and endorsed on the plans.

63

(a) The planning, design, construction activities and procedures for plan submission shall comply fully
with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water
Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the
development site.
(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained
away without causing flooding within the lot or in areas outside the lot.
(d) There is no direct connection from the internal drains within the basement or sub-basement to the
external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professional
bodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *

64

Appendix 2

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

APPLICATION FOR DEVELOPMENT CONTROL (DC)


CLEARANCE - RESUBMISSION/AMENDMENT/REVISION
This form may take you 10 minutes to fill in. You will need the following information
to fill in the form:- Particulars of Project
- Particulars of Qualified Person
Date: 19/03/2014
Central Building Plan Unit

To:

National Environment Agency


40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
works.
2. This form is to be accompanied by the relevant attachments.
3. Please read the DC checklist before filling the form.

Information
1. For enquiries on application of status, please call 67319681 / 67319513

Particulars of Project
Project Reference Number

New Project Title


(if original project title is
revised)
Location Description for

revised project title


above
[Include Lot/Plot, MK/TS,
Building Address, House
No and Road information]

Particulars of Application
Submission Type

Select

File Ref No/


Case ID

Dated

Previous DC Advice from


CBPU (for resubmission
case)
Previous DC Clearance
from CBPU (for
amendment/revision)
65

CBPU Processing Officer


given in DC advice/
clearance
Remarks

Particulars of Qualified Person


Name

Please Select

Role In Project
Registration No

66

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

Particulars of Qualified Person (Continue)


Firm Name
UEN
Firm Address

Telephone No.
Extension No
Fax No.
Email Address

Development Details
Type of Submission

Select

Type of Development

Select

Is there basement?

Yes

No

Is there sewer connection


to neighbour house?

Yes

No

Is there public sewer in


the development lot?

Yes

No

No.of storeys in
development

Storeys

Total used water discharge

L/s

Area of development

ha

DR in the development?

Yes

No

Proposed MIN PLATFORM


LEVEL

mRL

Max Adjacent Road

mRL

Any linkage to MRT

Yes

Used Water Catchment No.

Select

Drainage Catchment No.

Select

No

Please refer to www.pub.gov.sg for


catchment maps of used water and drainage.

67

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

Confirmation (Applicable for amendment/revised DC submission only)


Roof gutters (including rain water down pipes and outlets, and roof scupper
drains) are banned as an anti-mosquito breeding measure for all new
developments. Waiver in writing must be obtained from National Environment
Agency to erect roof gutters at the DC stage prior to BP submission
I confirm that :
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Dated:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A & A and reconstruction
building projects.

Attachments
Development Control Plan

Any change to previous PUB (C&W) checklist under same project


reference number? (If yes, please tick and enclose updated checklist)
Others, please specify

Add

Delete

68

SUBMISSION FOR DEVELOPMENT CONTROL (DC)


CLEARANCE WITH DETAIL PLAN
Instruction:
1. This page of the form is applicable for minor projects.
2. First storey plan/site plan for section A1 and B can be submitted as one plan
with clear layer and identification
3. Please check all the relevant infromations have been indicated and provided
before submitting
Particulars of Owner(s)
Name

Select

Address
Contact No
Email
(Tick if applicable)

SECTION A1: SANITARY, M&E WORK (Used Water)

Attachments:
1. Site plan and first storey plan
(indicate the sewer setback, propose and existing sewer
connection, top/invert level of manhole(s), and platform levels,
propose and existing sanitary drainline.
2. Detailed sanitary plan (to show sanitary line)
3. Is there pumping system(s) for used water?
Declaration:

Name

Yes
Role

By QP/PE:
I have carried out a
thorough investigation
of the existing
sewerage system within
and adjacent to the site
and will take every
practical measure to
ensure that the
proposed development
will not disrupt or affect
any existing
sewer/drain-line that
serves other properties/
premises.

Select

by QP/PE:
I hereby certify that
these plans and the
works shown therein
comply with the
provisions of the
Sewerage and

Select

No

Phone Email Firm Arch/PE


Reg No

69

Drainage
Act (Chapter 294),
the Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and Sanitary
Works
by PE(M/E) if there is
pumping system(s)
I, being a Professional
Engineer hereby certify
that the propose
mechanical and
electrical(M&E) works
of the above
mentioned project are
design in accordance
with the current Code
of Practice on
Sewerage
and Sanitary Works,
Sewerage and
Drainage
Act (Chapter 294) and
other sewerage
requirements as
stipulated by Water
Reclamation (Network)
Department.

Select

Attachments:
1. Detail plan drawings of used water pumping system(s)
2. Attached Form D2/QP if an alternate power source is not available
3. Design calculations
4. Pump and system curves
5. Relevant equipment catalogues
Please state if any
deviation from the
COP
Pump Design
Condition
Pump Application

Brand

Model

Estimated
Inflow
(l/s)

Pump
operating
capacity (l/s)

Pump
operating
head (m)

Solids
free
passage
Size (mm)

Motor
Rating (kw)

Select
Add

Delete

70

Particulars of Plumber/Contractor
Name

Select

Firm Details
Contact No
Email
please indicate your
membership/license

PUB LP
SPS registered
N.A.

Expected Date of Commencement


Expected Date of Completion
Tick if applicable

SECTION A2: SEWERAGE WORK, RC Trench

Attachment:
1. Detail sewerage plan
To show: propose sewer alignment with diameter, material,
top/invert level, existing sewer alignment to be abandoned (if any)
2. Design & calculation of RC trench (if applicable)
Declaration
by PE (Civil):
I hereby certify that
the sewerage plans
and the works shown
therein comply with
the provisions of the
Sewerage and
Drainage
Act (Chapter 294), the
Sewerage and
Drainage
(Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.

Name

Role

Phone Email

Firm Arch/PE
Reg No

Select

Particulars of Plumber/Contractor
Tick if same as in Sanitary Work
Name

Select

NRIC/Passport No.
Firm Details
Contact No
71

Email
please indicate your
membership/license

PUB LP
SPS registered
N.A.

Expected Date of Commencement


Expected Date of Completion
Tick if applicable

SECTION B: DRAINAGE WORK

Attachment:
1. Site Plan and First Sty Plan
2. Basement Plans
3. Detail of Drainage Work
4. DC Checklist
5. Proposed plan showing crest levels, platform levels with and
without flood barriers at various entrance and exit points, and
flood barrier installed at all points of entry and exit for building
premises or for entire development
Name

Declaration

I certify that the drainage


work are designed in full
compliance with PUB
requirements including
Sewerage and Drainage
Act (Chapter 294) and
current edition of COP on
Surface Water Drainage

Role

Phone

Email

Firm Arch/PE
Reg No

Select

Please state if any deviation from


the COP
Tick if applicable

SECTION C: Infrastructure or other works affecting Sewer &


Drainage (eg. Covered link way, bus stop)

Attachment:
1. First storey plan, showing sewer setback, sewer alignment, diameter,
manhole & sewer ID.
2. Cross sectional plan
3. Sewer and drainage plan
4. Proposed plan showing crest levels, platform levels with and without
flood barriers at various entrance and exit points, and flood barrier
installed at all pints of entry and exit for building premises or for entire
development.
72

Declaration
I hereby certify that these
plans and the works shown
therein comply with the
provisions of the Sewerage
and Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on
Sewerage and Sanitary
Works.

Name

Role

Phone Email

Firm

Arch/PE
Reg No

Select

73

DC SUBMISSION

SUBMISSION FOR DEVELOPMENT CONTROL (DC) PLAN


1. This page of the form is applicable for major projects
2. First Storey Plan/Site Plan for Section A and B can be submitted as one plan
with clear layer and identification
3. Please check all the relevant information have been indicated and provided
before submitting
4. Detailed Plan for sanitary, sewer, and drainage works shall be submitted after the
DC clearance is obtained.

Particulars of Owner(s)
Name

Select

Address
Contact No
Email
(Tick if applicable)

SECTION A: SANITARY / SEWERAGE WORK

Attachments:
1. Site plan and first storey plan
to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and
platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and
sewer identification number

2. Is there any sewerage pump system required?


Declaration

Name

I hereby certify that


these plans and the
works shown therein
comply with the
provisions of the
Sewerage and
Drainage Act
(Chapter 294), the
Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and
Sanitary Works.

Select

I have carried out a


thorough investigation
of the existing
sewerage system
within the site
and will take every
practical measure to
ensure that the
proposed
development
will not disrupt or
affect any existing
sewer / drain-line that
serves other
properties / premises.

Select

Role

Contact

Yes
Email

No
Firm

Arch/PE
Reg No

Please state if any

75

COP

76

DC SUBMISSION

SECTION B: DRAINAGE WORK

(Tick if applicable)

Attachments:
1. Site Plan and First Sty Plan
2. Basement Plans
3. DC Checklist
4. Proposed plan showing crest levels, platform levels
with and without flood barriers at various entrance
and exit points, and flood barrier installed at all points
of entry and exit for building premises or for entire
development
Declaration

Name

I certify that the


drainage work
are designed in
full compliance
with PUB
requirements
including
Sewerage and
Drainage Act
(Chapter 294)
and current
edition of COP
on Surface Water
Drainage

Select

Role

Contact

Email

Firm

Arch/PE
Reg No

Please state if any


deviation from the
COP

77

PUB-DD-CHECKLIST

PUBLIC UTILITIES BOARD (PUB)


CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
*Please use this form if development site is equal to or
greater than 0.2 Ha*
(A) General
1. Date of Drainage Interpretation
Plan (DIP) issuance

(Please indicate the date of DIP)

2. Site boundary lines are clearly


indicated on plan

Select

3. Existing drains alignment, drain size,


drain type, summit point, flow direction
and discharge points of internal surface
drain system are clearly indicated on plan

Select

4. All addition and alteration works


are highlighted

Select

5. For JTC, HDB, URA developments,


the drainage masterplan of the
development site is attached together
with the submission.

Select

6. There is provision of peak runoff control


measures within the development site.

Select

Size of development site

Ha

(a) Post-development Runoff Coefficient


(Please indicate value between 0 to 1)

(b) Type of measures to reduce


peak runoff
(i) Detention tanks: Volume
*For developments with detention tank systems, please also
fill out section 6 (c) in the form*

(Please indicate size


< width (m) x length (m) x
effective depth (m) >)

(ii) Retention/ sedimentation ponds

Select

(iii) Green roofs

Select

(iv) Planter boxes

Select

(v) Porous pavements

Select

(vi) ABC Waters Design Features


(to be endorsed by an ABC Waters
Professional - please fill out
Section 7 in the form)
Constructed Wetlands

Select
78

Bioretention Swales/Basins

Select

Rain Gardens

Select

(vii) Others
(Please indicate if any)

(c) For developments with detention


tank systems
(i) Detention tank incorporates rainwater
harvesting feature

Select

Detention volume
Detention volume to meet the requirement as stated in Clause 7.1.5
of the latest edition of Code of Practice on Surface Water Drainage
(Detention V)

Volume set aside for rainwater harvesting


storage (Rainwater Harvesting V)
Total volume of tank (Total V)

(Please indicate volume


in cubic metre)

(Please indicate volume


in cubic metre)

Total V = Detention V + Rainwater Harvesting V

(ii) Proposed drainage plan indicating


catchment and sub-catchment
boundaries, and the specific subcatchment
of each tank including the outlet discharge
point of the internal drainage system to the
public drain is attached with the submission.

Select

(iii) Proposed site plan with runoff


coefficients and area of development
with varying characteristics of catchment/
sub-catchment clearly indicated.

Select

(iv) Proposed site plan with features, and


catchment/sub-catchment of each feature,
to attenuate stormwater runoff to comply
with COP requirements clearly indicated.

Select

(v) PE (Civil) -endorsed design calculations


or modelling results as per the design
calculations templates or equivalent, are
included in the submission. If there is any
pumped drainage system involved, the civil
and structural components shall be
endorsed by a PE (Civil) while the
mechanical and electrical components shall
be endorsed by a PE (Mechanical/Electrical).

Select

(vi) Proposed site layout plans indicating


the location and footprint of the detention
tank(s), pumping facilities (if applicable),
the effective depth of the detention tank(s)
and the connection point to the internal
drainage system are attached in the
submission.

Select

79

7. ABC Waters design features are incorporated


within the development.
(a) Names & Registration No. of ABC
Waters Professional

Select
*If yes, please also respond
to 7(a), 7(b)*

(Please indicate name & registration


no. of ABC professional)

(b) Concept design and design calculations


(e.g. catchment area, treatment area and
detainment volume etc for the ABC Waters
design feature), endorsed by the ABC
Waters Professional are submitted to PUB.
(c ) Hydraulic calculation for the overflow
system, endorsed by ABC Waters
Professional (PE) are submitted to PUB.
8. If the proposed development site area
exceeds 0.4 ha, hydraulic calculations
for the proposed internal drainage facilities,
including sub-catchment plans for the
proposed development site endorsed by a
Professional Engineer (Civil) to be submitted
for PUB record.
9. There is upstream drainage connection
from the neighbouring lots into the
development site.

(B) DRAINAGE RESERVE


10. Drainage Reserve lines and lot boundaries
are indicated, dimensioned and highlighted.
11. All embankments and structures are set
outside the Drainage Reserve
12. Drainage Reserve are free from encumbrances
13. Design of embankment and structures
near a drain or Drainage Reserve (within 2m)
must not take into consideration the passive
resistance offered by the existing or
proposed drainage structures.
(Note clause 5.3 of the latest edition of
Code of Practice on Surface Water
Drainage). The structural and stability
calculations for an embankment or a structure
within 2 m from the edge of Drainage Reserve
shall be endorsed by a Professional Engineer
and submitted to the Board for record at
Detailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)


14. MPL of development
15. All proposed/existing platform levels
are clearly indicated on plan

mRL
Select

80

16. The proposed platform levels and


road/ground levels adjacent to the
internal drain outlet discharge point are
clearly indicated
17. For addition and alteration works
submission, the existing platform levels
are indicate
18. Linkages (direct/indirect) to special
underground facilities and basements,
if any, are indicated and complied with
the latest Code of Practice on Surface
Water Drainage

Select

19. Flood barrier (as stipulated in Section 2.4 of


the latest Code of Practice on Surface
Water Drainage), if any, is incorporated into
the development site.

Select

(a) Proposed plans indicating the crest


levels and/or platform levels with and
without flood barrier at various entrance
and exit points are attached together
with the submission

*If Yes, please also respond


to 19(a)*

Select

For developments where flood barriers are automated and/or with more than 2
points of entry/exit, the following document shall be submitted at Detailed Planning
stage.
-- Details on the Standard Operating Procedure (SOP) including the operation and
maintenance of the flood barrier to be endorsed by Mechanical and/ or Electrical
QP or PE, and the developer/ building owner.
-- Details on the size, type and design of the flood barrier.

81

(D) PROPOSED DRAINAGE WORKS


20. Proposed/ existing drains and drains to be
deleted are clearly indicated using
different colour

Select

21. Alignment, summit point, flow direction, type


& size and outlet discharge points of the
proposed internal surface drains are clearly
indicated.

Select

22. Connection point to existing drain is indicated

Select

23. Proposed internal surface drains are able to


discharge into roadside/ outlet drain as
shown on plan.
24. Sump size is indicated

Select

25. Vertical grating at internal drain outlet


discharge point is provided

Select

26. External drainage works (including culvert


details) to be submitted separately during
Detailed Planning stage. This shall be clearly
annotated on plan

Select

(E) OPENING LEADING TO BASEMENT LEVEL


27. Crest level of access ways and openings
leading into the basement is indicated and
complied with the latest Code of Practice
on Surface Water Drainage

Select

28. Proposed sizes and flow direction of cut off


drains are indicated

Select

(F) COMMON DRAIN


29. Alignment, size and flow of existing
common drain within the development
lot are indicated.

Select

30. If there is common drain within the


development site, the following shall be
endorsed on the plan:

Select

"Surface runoff from the site and all


neighbouring lots shall continue to be
allowed to discharge through the common
drain within the site."

31. There is no permanent structure erected


above and over the common drain

Select

32. If the proposal involves the reconstruction


of common drain, the proposed common
drain shall be at least 450mm wide as
stipulated in Section 4.5 of Code of
Practice on Surface Water Drainage or

Select

82

any other sizes as directed by PUB


33. Details of the proposed common drain to
be submitted by Professional Engineer
(Civil) separately to PUB for approval
during Detailed Planning/ Building Plan
stage. This is to be annotated on the plan

Select

34. The position of the existing/proposed


boundary wall/fence is clearly indicated

Select

83

(G) PUMPED DRAINAGE SYSTEM


35. Pumped drainage system complies with the
latest Code of Practice on Surface Water
Drainage. Details of pumped drainage
system and design computations duly
endorsed by PE shall be submitted
separately to PUB for record during Detailed
Planning stage

Select

36. Source catchment area with surface runoff


leading into the pumped drainage system is
clearly indicated

Select

37. The location, size, inlet and outlet


connections of the rainwater pump sump
for the proposed pumped drainage system
are clearly indicated

Select

(H) RETAINING WALL


38. If a retaining wall is erected to raise the
ground level of the development site above
adjacent premises, adequate internal
drainage system provided to effectively
intercept and drain away runoff including the
sub-soil flow from the development site

Select

39. If a retaining wall is erected to lower the


ground level of the development site,
adequate internal drainage system provided
to effectively intercept and drain away
existing sub-soil and overland flows
discharging through the development site
from the adjacent premises

Select

(I) DRAINAGE AFFECTING OTHER PREMISES


40. Minimum 600mm high solid boundary wall
around development site is erected to
prevent surface runoff from overflowing into
adjacent premises on lower ground

Select

I hereby confirm that the above items have been complied with and endorsed on
the plans.
I hereby certify that the standard endorsement below will also be certified on the
plans:(a) The planning, design, construction activities and procedures for plan
submission shall comply fully with the requirements as stipulated in the
latest edition of the Code of Practice on Surface Water Drainage and the
Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge
all runoff from the development site.
(c) The runoff within, upstream of and adjacent to the development lot can be
effectively drained away without causing flooding within the lot or in areas
outside the lot.
(d) There is no direct connection from the internal drains within the basement or
84

sub-basement to the external roadside drains.


* Public Utilities Board (PUB) reserves the right to report any false declaration of
information to the relevant professional bodies for action in accordance to the
Act/ethnics governing all the Qualified Professional.*

85

PUB-DD-CHECKLIST

PUBLIC UTILITIES BOARD (PUB)


CATCHMENT & WATERWAYS DEPARTMENT
CHECKLIST FOR DC PLANS
*Please use this form if development site is less than 0.2 Ha*
(A) General
1. Date of Drainage Interpretation Plan (DIP) issuance
2. Site boundary lines are clearly indicated on plan

Select

3. Existing drains alignment, drain size, drain type,


summit point, flow direction and discharge
points of internal surface drain system are
clearly indicated on plan

Select

4. All addition and alteration works are highlighted

Select

5. For JTC, HDB, URA developments, the drainage


masterplan of the development site is attached
together with the submission.

Select

6. ABC Waters design features are incorporated within


the development.

Select

(a) Names & Registration No. of ABC Waters


Professional
(b) Concept design and design calculations,
endorsed by the ABC Waters Professional
are submitted to PUB.

Select

(c ) Hydraulic calculation for the overflow


system, endorsed by ABC Waters
Professional (PE) are submitted to PUB.

Select

7. If the proposed development site area exceeds


0.4 ha, hydraulic calculations for the proposed
internal drainage facilities, including
sub-catchment plans for the proposed development
site endorsed by a Professional Engineer (Civil) to
be submitted for PUB record.

Select

8. There is upstream drainage connection from the


neighbouring lots into the development site.

Select

86

PUB-DD-CHECKLIST

(B) DRAINAGE RESERVE


9. Drainage Reserve lines and lot boundaries
are indicated, dimensioned and highlighted.

Select

10. All embankments and structures are set outside


the Drainage Reserve

Select

11. Drainage Reserve are free from encumbrances

Select

12. Design of embankment and structures near a drain


or Drainage Reserve (within 2m) must not take into
consideration the passive resistance offered by the
existing or proposed drainage structures. (Note
clause 5.3 of the latest edition of Code of Practice
on Surface Water Drainage). The structural and
stability calculations for an embankment or a
structure within 2 m from the edge of Drainage
Reserve shall be endorsed by a Professional
Engineer and submitted to the Board for record at
Detailed Planning stage.

Select

(C)MINIMUM PLATFORM LEVEL (MPL)


mRL

13. MPL of development


14. All proposed/existing platform levels are clearly
indicated on plan

Select

15. The proposed platform levels and road/ground


levels adjacent to the internal drain outlet
discharge point are clearly indicated

Select

16. For addition and alteration works submission, the


existing platform levels are indicated

Select

17. Linkages (direct/indirect) to special underground


facilities and basements, if any, are indicated and
complied with the latest Code of Practice on
Surface Water Drainage

Select

18. Flood barrier (as stipulated in Section 2.4 of the


latest Code of Practice on Surface Water
Drainage), if any, is incorporated into the
development site.

Select

(a) Proposed plans indicating the crest levels


and/or platform levels with and without
flood barrier at various entrance and exit
points are attached together with the
submission

Select

For developments where flood barriers are automated and/or with more than 2 points of
entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.
-- Details on the standard operating procedure (SOP) including the proposed maintenance
plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person,
and the developer/owner.
-- Details on the size, type and design of the flood barrier.

(D) PROPOSED DRAINAGE WORKS


87

19. Proposed/ existing drains and drains to be deleted


are clearly indicated using different colour

Select

20. Alignment, summit point, flow direction, type & size


and outlet discharge points of the proposed
internal surface drains are clearly indicated

Select

21. Connection point to existing drain is indicated

Select

22. Proposed internal surface drains are able to


discharge into roadside/ outlet drain as
shown on plan

Select

23. Sump size is indicated

Select

24. Vertical grating at internal drain outlet discharge


point is provided

Select

25. External drainage works to be submitted separately


during Detailed Planning/ Building Plan stage. This
shall be clearly annotated on plan

Select

(E) OPENING LEADING TO BASEMENT LEVEL


26. Crest level of access ways and openings leading
into the basement is indicated and complied with
the latest Code of Practice on Surface Water
Drainage

Select

27. Proposed sizes and flow direction of cut off drains


are indicated

Select

88

PUB-DD-CHECKLIST

(F) COMMON DRAIN


28. Alignment, size and flow of existing common drain
within the development lot are indicated

Select

29. If there is common drain within the development


site, the following shall be endorsed on the plan:

Select

Surface runoff from the site and all


neighbouring lots shall continue to be
allowed to discharge through the
common drain within the site.
30. There is no permanent structure erected above
and over the common drain

Select

31. If the proposal involves the reconstruction of


common drain, the proposed common drain
shall be at least 450mm wide as stipulated in
Section 4.5 of Code of Practice on Surface Water
Drainage or any other sizes as directed by PUB

Select

32. Details of the proposed common drain to be


submitted by Professional Engineer (Civil)
separately to PUB for approval during Detailed
Planning/ Building Plan stage. This is to be
annotated on the plan

Select

33. The position of the existing/proposed boundary


wall / fence is clearly indicated

Select

(G) PUMPED DRAINAGE SYSTEM


34. Pumped drainage system complies with the latest
Code of Practice on Surface Water Drainage.
Details of pumped drainage system and design
computations duly endorsed by PE shall be
submitted separately to PUB for record during
Detailed Planning / Building Plan stage

Select

35. Source catchment area with surface runoff leading


into the pumped drainage system is clearly
indicated

Select

36. The location, size, inlet and outlet connections of


the rainwater pump sump for the proposed
pumped drainage system are clearly indicated

Select

(H) RETAINING WALL


37. If a retaining wall is erected to raise the ground
level of the development site above adjacent
premises, adequate internal drainage system
provided to effectively intercept and drain away
runoff including the sub-soil flow from the
development site

Select

38. If a retaining wall is erected to lower the ground


level of the development site, adequate internal
drainage system provided to effectively intercept
and drain away existing sub-soil and overland flows
discharging through the development site from the
adjacent premises

Select

(I) DRAINAGE AFFECTING OTHER PREMISES


39. Minimum 600mm high solid boundary wall around
development site is erected to prevent surface
runoff from overflowing into adjacent premises on
lower ground

Select

I hereby confirm that the above items have been complied with and endorsed on the plans.

I hereby certify that the standard endorsement below will also be certified on the plans:89

(a) The planning, design, construction activities and procedures for plan submission shall comply fully
with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water
Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the
development site.
(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained
away without causing flooding within the lot or in areas outside the lot.
(d) There is no direct connection from the internal drains within the basement or sub-basement to the
external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professional
bodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *

90

Appendix 3

PUB-BPU-CLRDP01

APPLICATION FOR CLEARANCE CERTIFICATE FOR


DETAILED PLAN ON DRAINAGE AND SEWERAGE
(SANITARY/SEWER) WORKS
[UNDER SECTION 33(1) OF THE SEWERAGE AND DRAINAGE
ACT (SDA), CHAPTER 294]
This form may take you 10 minutes to fill in. You will need the
following information to fill in the form:- Particulars of Project
- Particulars of Qualified Person
Date: 19/03/2014
Central Building Plan Unit

To:

National Environment Agency


40, Scotts Road, #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
works.
2. This form is to be accompanied by the relevant attachments.

Information
1. For enquiries on application of status for :
a) Industrial development,please call 67319637
b) Non-industrial development,please call 67319628 / 67319653

Particulars of Project
Project Reference Number
Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Project Address

Plan Type

Please Select

001
91

Particulars of Application
Application for
Clearance Certificate
for Detailed Plan on
Sewerage

Please Select

Submission Type

Please Select

Development Proposal
Application

Please Select

NA

File Ref. No. /


Case ID

Dated

SIP Reference Number


from CBPU (if applicable)
DC Clearance Reference
Number from CBPU
(if applicable)
Department File Reference
No (if applicable)

92

PUB-BPU-CLRDP01
(Tick if applicable)

SECTION A1: SANITARY WORK

Attachments:
1. Detail Sanitary Plan
2. Detail of Holding Tank/STP/Retention tank (if applicable)
Declaration

Name

I hereby certify that these


plans and the works shown
therein comply with the
provisions of the Sewerage
and Drainage Act
(Chapter 294), the Sewerage
and Drainage (Sanitary
Works) Regulations and the
current Code of Practice
on the Sewerage
and Sanitary Works.

Select

Role

Phone

Email

Firm

Arch / PE
Reg. No

Firm

Arch / PE
Reg. No

Please state if any deviance


from the COP

Particulars of Plumber/Contractor
Name

Please select

Firm Details
Contact No
Email
Please indicate your
Registration / License
Number

SPS registered
PUB LP
N.A

Date of Commencement

Date of Completion

3. Details of M&E Works (Used Water)


Declaration

Name

I, being a Professional
Engineer hereby certify
that the proposed
mechanical and electrical
(M&E) works of the above
mentioned project are in
accordance with the current
Code of Practice on
Sewerage and Sanitary
Works, Sewerage and
Drainage Act (Chapter 294)
and other sewerage
requirements as stipulated
by Water Reclamation
(Network) Department and
have been fully and
accurately reflected in the
submitted detail plan
drawings.

Select

Yes
Role

No
Phone

Email

Attachments
93

1. Detail plan drawings of used water pumping system(s)


2. Attached Form D2/QP if an alternate power source is not available
3. Design calculations
4. Pump and system curves
5. Relevant equipment catalogues
Please state if any
deviation from the
COP
Pump Design
Condition
Pump Application

Brand

Model

Estimated
Inflow
(l/s)

Pump
operating
capacity (l/s)

Pump
operating
head (m)

Solids
free
passage
Size (mm)

Motor
Rating (kw)

Select
Add

Delete

94

PUB-BPU-CLRDP01
(Tick if applicable)

SECTION A2: SEWERAGE WORK, RC Trench

Attachments:
1. Detail Sewerage Plan (to indicate: diameter, pipe material, gradient, manhole detail, and
longitudinal section)
2. Design & Calculation of RC Trench (if structure is proposed over sewer). PE to endorse in drawing

Declaration

Name

by PE (Civil):
I hereby certify that the
sewerage plans and the
works shown therein
comply with the provisions
of the Sewerage and
Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.

Select

Role

Contact

Email

Firm

Arch / PE
Reg. No

I also declare that I have


carried out a thorough
investigation of the
existing sewerage system
within the site and will
take every practical
measure to ensure that
the proposed development
will not disrupt or affect any
existing sewer/drain-line
that serves other
properties/premises.
Please state if any
deviation from the COP

Date of Commencement

Date of Completion

Particulars of Plumber/Contractor
Name

Please select

Firm Details
Contact No
Email
Please indicate your
Registration / License
Number

SPS registered
PUB LP
N.A

95

PUB-BPU-CLRDP01
(Tick if applicable)

SECTION B: DRAINAGE WORK

Please tick if this submission pertains to:


Internal drainage works
External drainage works (entrance culvert/ roadside drain)

Attachments:
1. Detail Plan on Drainage Works as required under Section 33(3) and 33(4) of the SDA, Chapter 294
2. As built drawings for drainage works and piling records
3. Leak Test Certificates on installed flood barriers
4. As built survey plans for detention tank system

Declaration

Name

I hereby certify that the


drainage work shown
on the detailed plans
have been designed in
accordance with the
provisions of the SDA,
Chapter 294, Sewerage
and Drainage (Surface
Water Drainage)
Regulations, current Code
of Practice on Surface
Water Drainage and the
drainage requirements
stipulated during planning
stage (if applicable) except
for those provisions where
waivers have been obtained
from the Public Utilities
Board in writing.

Select

Role

Contact

Email

Firm

Arch / PE
Reg. No

Please state if any


deviation from the COP

96

Appendix 4

PUB-BPU-COMPOFWORK

CERTIFICATE OF COMPLETION AND INSPECTION OF


SANITARY, SEWERAGE AND DRAINAGE WORKS
[UNDER SECTION 35(1)(e) AND (f) OF THE SEWERAGE AND
DRAINAGE ACT (CHAPTER 294)]
Date: 28/08/2012
PUB

To:
Building Plan Unit
PUB
40 Scotts Road #15-01
Environment Building
Singapore 228231

Instructions
1. The form shall be digitally signed by the appropriate QP/PE
2. The form is to be submitted by the QP/PE appointed under
section 8,9 & 11 of Building Control Act.

Particulars of Project
Project Ref No
Project Title

MK-LOT( ie, MK03-12345)


Project Address

Please Select Your


Application:

Completion of Sewerage Work only


Application for PUB Clearance for Temporary
Occupation Permit (TOP)
Application for PUB Clearance for
Certificate of Statutory Completion (CSC)
Application for PUB Clearance for both
Temporary Occupation Permit (TOP) &
Certificate of Statutory Completion (CSC)
(this option is applicable if
the QP could confirm that there is no
outstanding matters related to PUB (sewerage
and drainage)

97

SECTION A1: SEWERAGE WORK


Attachments
1. Site plan and first storey plan
2. As built sewerage plan
To Show:
2.1 Length, diameter, gradient, material of the sewer pipe, top & invert level
of the manhole
2.2 Position of manholes shall follow SVY21 coordinate cadastral base
established by SLA

3. CCTV for the newly constructed sewer (applicable for sewer with
diameter 600mm or larger) to be sent to: 82 Toh Guan Road East
#C2-14, Singapore 608575
4 As built pumping installation plan (if applicable)
5 Others (Eg: Sewage Treatment Plant (STP), holding tank)
Declaration (PE Civil)
PE Name

Select

PE Reg no
Role
Ph No
Email
Firm
Declaration (PE Mech.)
PE Name

Select

PE Reg no
Role
Ph No
Email
Firm
Declaration (PE Elec. )
PE Name

Select

PE Reg no
Role
Ph No
Email
Firm
98

I/We, the above name, hereby certify that to the best of my knowledge and
belief, the works were carried out in accordance with the above building
plans and detailed plans, the current Code of Practice on Sewerage and
Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the
Sewerage and Drainage (Sanitary Works) Regulations and any other
conditions under which the plans and amendments thereto were approved
by PUB.
I

certify that the hydrostatic test has been conducted for

sewers and manholes and the test results have met the requirements
stipulated in Code of Practice on Sewerage and Sanitary Works.
I

confirm that I have received the below plumber/ contractor

has executed the sewerage works in accordance with the plans as


supplied by the QP/PE and in accordance with the current Code
of Practice on Sewerage and Sanitary Works.
Plumber's/Contractor's name

Select

NRIC No. or Passport No.


Firm Name
Email address
Registration/license type

SPS registered
PUB LP
NA

99

Tick if applicable

Application for PUB Clearance for TOP


SECTION A2: SANITARY WORK

Attachments:
1. As built sanitary plan (to be endorsed by QP)
2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,
Singapore 228231, PUB Water Reclamation (Network) Department
3. As built plans for used-water pumping system(s)
Declaration

Name

Role

I hereby certify that to the best


of my knowledge and belief,
the works were carried out in
accordance with the above
building plans and detailed
plans, the current Code of
Practice on Sewerage and
Sanitary Works, Sewerage
and Drainage Act (Chapter
294) and the Sewerage and
Drainage (Sanitary Works)
Regulations and any other
conditions under which the
plans and amendments
thereto were approved.

Select

I have checked and certified


that there is no change in the
condition of the existing
sewer(s) and manhole(s)
between the pre and post
constrcution CCTV inspection
report.

Select

I confirm that I have received


the plumber's confirmation
that the below plumber/
contractor has executed the
sanitary plumbing works in
accordance with the plans
as supplied by the QP and in
accordance with the current
Code of Practice on
Sewerage and Sanitary
Works

Select

I, being a Professional
Engineer (M/E) hereby certify
that to the best of my
knowledge and belief,
the completed mechanical
and electrical (M&E) works
of the above mentioned
project are in accordance

Select

Phone

Email

Firm

Arch/PE
Reg No

100

with the current Code of


Practice on Sewerage and
Sanitary Works, Sewerage
and Drainage Act (Chapter
294) and other sewerage
requirements as stipulated
by Water Reclamation
(Network) Department and
have been fully and
accurately reflected in the
submitted "As built" plans.
I also confirm that the installed
M&E equipment are safe for
operation
Plumber's/Contractor's name

Select

NRIC No. or Passport No.


Firm Name
Email address
Registration/license type

SPS registered
PUB LP
NA

3. Declaration of Chargeable Sanitary Appliances Installed.


There is

Select

to the original number of chargeable sanitary appliances in the premises

4. Details of Chargeable Sanitary Appliances


4a. Type of Submission

Select

For "New Erections", the existing buildings are unaffected.

Attachments:
4b. The allotment of address from the comptroller of property tax
4c. Floor layout plan showing the location of the appliances
4d. SP Services' Ltd Utilities Bill

The number of chargeable sanitary appliances in the premises upon completion of this project are
as follows:
House No. or Unit
No. (Eg. #01-01)

Previous quantites of chargeable


sanitary appliances at the affected
area before commencement of project
WC

Add

Urinal

Bidet

Slop Sink

Quantities of chargeable sanitary


appliances after completion of
project
WC

Urinal

Bidet Slop Sink

Delete (Add or Delete row for house no. or unit no.)

#Common Area

Previous quantites of chargeable


sanitary appliances before
commencement of project
WC

Urinal

Bidet

Slop Sink

Quantities of chargeable sanitary


appliances after commencement of
project
WC

Urinal

Bidet Slop Sink


101

If Applicable

SECTION A3: RC TRENCH COMPLETION


(RC TRENCH shall not be backfilled before inspection)

Declaration

I herby certify that the


RC trench has been
constructed is ready
for PUB (WRN)'s audit
inspection before
backfilling and
covering up the
trench.

Name

Role

Phone

Email

Firm

Arch/PE
Reg No

Select

I herby certify that the


RC trench has been
constructed is ready
for PUB (WRN)'s audit
inspection before
backfilling and
covering up the trench.
I or my authorised
representative (with
letter of authorisation to
be provided) will be
present during PUB
(WRN)'s inspection.
After the inspection I will
submit the photographs
of the RC trench.
[Note: The photographs
taken in sequence
showing the process of
constructing, backfilling
and covering up the RC
trench shall show clearly,
among other things, the
width, depth, base of the
trench, the fill materials
and the condition of the
sewer pipe. Adequate
number of photographs
taken to capture all
details above and
pasted on A4 papers
and clearly labelled.]

Attachment:
As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench
and position of the existing sewer.
If Applicable
102

SECTION B: DRAINAGE WORK


External drainage work has not yet completed
Site Area:

ha

Attachment:
1. As constructed drainage plan
(to show as built platform level, crest level and flood
protection levels)
2. Internal drainage Hydraulic calculations submissions
(for developments more than 0.4 Ha)
Declaration

Name

I certify that the drainage


work are designed in full
compliance with PUB
requirement including
Sewerage and Drainage
(Chapter 294) Act
and COP on Surface Water
Drainage
Tick if applicable

Role

Phone

Email

Firm

Arch/PE
Reg No

Select

SECTION C: Infrastructure works affecting Sewer & Drainage


(eg. Covered link way, bus stop)

Declaration by PE(Civil)
Name

Select

PE Reg No
Role
Ph No
Email
Firm
Declaration
I hereby certify that the work has been completed in compliance with the approved drawing,
Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.
Attachment:
1. Post Construction CCTV to the public sewer (when required in DC Clearance).
Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,
PUB Water Reclamation (Network) Department
2. As constructed drawing showing the sewer setback
3. As built topographical survey plan

103

Section D: Application for PUB Clearance for CSC


Attachments:
1. As constructed drainage plan (to show as built platform level, crest level
and flood protection levels)
2. Post rectification CCTV to the public sewer or drainline
(when required). To be sent to: 40 Scotts Rd #15-01, Singapore
228231, PUB Water Reclamation (Network) Department
3. As built topographical survey plan

Declaration
by PE (Civil):
I certify that the drainage work
are designed in full compliance
with PUB requirement including
Sewerage and Drainage Act
(Chapter 294) and COP on
Surface Water Drainage.
I am requesting for PUB
Clearance for CSC and
confirms there is no further
outstanding work.

Name

Role

Phone

Email

Firm

Arch/PE
Reg No

Select

Select

104

Tick if applicable

Application for PUB Clearance for TOP


SECTION A2: SANITARY WORK

Attachments:
1. As built sanitary plan (to be endorsed by QP)
2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,
Singapore 228231, PUB Water Reclamation (Network) Department
3. As built plans for used-water pumping system(s)
Declaration

Name

Role

I hereby certify that to the best


of my knowledge and belief,
the works were carried out in
accordance with the above
building plans and detailed
plans, the current Code of
Practice on Sewerage and
Sanitary Works, Sewerage
and Drainage Act (Chapter
294) and the Sewerage and
Drainage (Sanitary Works)
Regulations and any other
conditions under which the
plans and amendments
thereto were approved.

Select

I have checked and certified


that there is no change in the
condition of the existing
sewer(s) and manhole(s)
between the pre and post
constrcution CCTV inspection
report.

Select

I confirm that I have received


the plumber's confirmation
that the below plumber/
contractor has executed the
sanitary plumbing works in
accordance with the plans
as supplied by the QP and in
accordance with the current
Code of Practice on
Sewerage and Sanitary
Works

Select

by PE (M/E)
I, being a Professional
Engineer hereby certify
that to the best of my
knowledge and belief,
the completed mechanical
and electrical (M&E) works
of the above mentioned

Select

Phone

Email

Firm

Arch/PE
Reg No

105

project are in accordance


with the current Code of
Practice on Sewerage and
Sanitary Works, Sewerage
and Drainage Act (Chapter
294) and other sewerage
requirements as stipulated
by Water Reclamation
(Network) Department and
have been fully and
accurately reflected in the
submitted "As built" plans.
I also confirm that the installed
M&E equipment are safe for
operation
Plumber's/Contractor's name

Select

NRIC No. or Passport No.


Firm Name
Email address
Registration/license type

SPS registered
PUB LP
NA

3. Declaration of Chargeable Sanitary Appliances Installed.


There is

Select

to the original number of chargeable sanitary appliances in the premises

4. Details of Chargeable Sanitary Appliances


4a. Type of Submission

Select

For "New Erections", the existing buildings are unaffected

Attachments:
4b. The allotment of address from the comptroller of property tax
4c. Floor layout plan showing the location of the appliances
4d. SP Services' Ltd Utilities Bill

The number of chargeable sanitary appliances in the premises upon completion of this project are
as follows:
House No. or Unit
No. (Eg. #01-01)

Previous quantites of chargeable


sanitary appliances at the affected
area before commencement of project
WC

Add

Urinal

Bidet

Slop Sink

Quantities of chargeable sanitary


appliances after completion of
project
WC

Urinal

Bidet Slop Sink

Delete (Add or Delete row for house no. or unit no.)

#Common Area

Previous quantites of chargeable


sanitary appliances before
commencement of project

Quantities of chargeable sanitary


appliances after commencement of
project
106

WC

If Applicable

Urinal

Bidet

Slop Sink

WC

Urinal

Bidet Slop Sink

SECTION A3: RC TRENCH COMPLETION


(RC TRENCH shall not be backfilled before inspection)

Declaration

I herby certify that the


RC trench has been
constructed is ready
for PUB (WRN)'s audit
inspection before
backfilling and
covering up the
trench.

Name

Role

Phone

Email

Firm

Arch/PE
Reg No

Select

I herby certify that the


RC trench has been
constructed is ready
for PUB (WRN)'s audit
inspection before
backfilling and
covering up the trench.
I or my authorised
representative (with
letter of authorisation to
be provided) will be
present during PUB
(WRN)'s inspection.
After the inspection I will
submit the photographs
of the RC trench.
[Note: The photographs
taken in sequence
showing the process of
constructing, backfilling
and covering up the RC
trench shall show clearly,
among other things, the
width, depth, base of the
trench, the fill materials
and the condition of the
sewer pipe. Adequate
number of photographs
taken to capture all
details above and
pasted on A4 papers
and clearly labelled.]

Attachment:
As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench
and position of the existing sewer.
107

If Applicable

SECTION B: DRAINAGE WORK


External drainage work has not yet completed
Site Area:

ha

Attachment:
1. As constructed drainage plan
(to show as built platform level, crest level and flood
protection levels)
2. Internal drainage Hydraulic calculations submissions
(for developments more than 0.4 Ha)
Declaration

Name

I certify that the drainage


work are designed in full
compliance with PUB
requirement including
Sewerage and Drainage
(Chapter 294) Act
and COP on Surface Water
Drainage
Tick if applicable

Role

Phone

Email

Firm

Arch/PE
Reg No

Select

SECTION C: Infrastructure works affecting Sewer & Drainage


(eg. Covered link way, bus stop)

Declaration by PE(Civil)
Name

Select

PE Reg No
Role
Ph No
Email
Firm
Declaration
I hereby certify that the work has been completed in compliance with the approved drawing,
Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.
Attachment:
1. Post Construction CCTV to the public sewer (when required in DC Clearance).
Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,
PUB Water Reclamation (Network) Department
2. As constructed drawing showing the sewer setback
3. As built topographical survey plan

108

Section D: Application for PUB Clearance for CSC


Attachments:
1. As constructed drainage plan (to show as built platform level, crest level
and flood protection levels)
2. Post rectification CCTV to the public sewer or drainline
(when required). To be sent to: 40 Scotts Rd #15-01, Singapore
228231, PUB Water Reclamation (Network) Department
3. As built topographical survey plan

Declaration
by PE (Civil):
I certify that the drainage work
are designed in full compliance
with PUB requirement including
Sewerage and Drainage Act
(Chapter 294) and COP on
Surface Water Drainage.
I am requesting for PUB
Clearance for CSC and
confirms there is no further
outstanding work.

Name

Role

Phone

Email

Firm

Arch/PE
Reg No

Select

Select

109

Appendix 5

ENV-CBPU-CLRTOP01-NEW SUBMISSION

APPLICATION FOR CLEARANCE OF TEMPORARY


OCCUPATION PERMIT (TOP) - NEW SUBMISSION
This form may take you 15 minutes to fill in. You will need the
following information to fill in the form:- Particulars of Project
- Particulars of Qualified Person
- Supporting completion and inspection certificates.
Date: 19/03/2014
To:

Central Building Plan Unit


National Environment Agency
40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).
2. This form is to be accompanied by the relevant attachments.

Information
1. Service Standard :
Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project
Project Reference Number
Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Plan Type
Add

Please Select

001

Delete

Particulars of Application
Development Proposal
Application

Please Select

110

Date of CBPU
DC Clearance
Application for Temporary
Occupation Permit

19/03/2014
Pollution Control Works
Sewerage Works
Drainage Works (for crest levels , platform
levels, flood protection levels based on
approved flood protection measures)
Environmental Health (Sanitary Facilities)

Remarks:
Application for
Partial TOP (if applicable)

NA

File Ref. No. /


Case ID

Dated

Clearance Certificate for


Building Plan on Pollution
Control; for Industrial
Plant Works (if applicable)
Clearance Certificate for
Building Plan on
Environmental Health
(if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (Sanitary Works)
(if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (Sewer
Works)(if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (M&E Works)
(if applicable)
Clearance Certificate for
Detailed Plan on
Drainage Works
Plan Submission for the
location of Mechanical
Equipment and its noise
abatement measures to
be incorporated at the
development premises

111

Particulars of Qualified Person


Name

Please Select

Role In Project
Registration No
Firm Name
UEN
Firm Address

Telephone No.
Extension No
Fax No.
Email Address

Declaration by Qualified Person


I confirm that:
I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the
Building Control Act (Cap. 29) in respect of the works described which
include Pollution Control, Environmental Health (Sanitary Facilities)
Sewerage Works and Drainage Works (platform and crest protection levels
only); and my qualification is appropriate to the nature of these works;
The particulars of Project, Application and Submission Checklists given in
this form are correct;
The works have been carried out and completed.
The crest levels, platform levels, flood protection levels are in compliance
with COP on Surface Water Drainage and constructed according to
approved plans.
The maximum stormwater discharge from the development is in
compliance with the maximum allowable peak runoff stipulated in the
COP and constructed according to approved plans.
I have liaised with the Developer/ Owner to ensure that a
Maintenance/Managing Agent has been established to undertake the SOP
of the maintenance, operation and monitoring of the detention tank system.
If there are deviations from any of the above, please indicate in detail,
attachments and PUB approval if applicable

Development with Public Toilet

I have inspected the public toilets in this development and that they have
112

been completed in accordance with the provision of sanitary facilities


stipulated in the Code of Practice on Environmental Health, except for
those provisions where waivers have been obtainted from the National
Environment Agency
Development has no public toilet

Attachments
Dated
Certificate of Completion and Inspection for Sanitary Works
(PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for Sewerage
Works (PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for the
Mechanical and Electrical Works for
Sewerage Installation
(PUB-BPU-COMPOFWORK)
Certificate of Inspection for Drainage Works
As built survey plans indicating crest levels, platform
levels, flood protection levels based on approved
flood protection measures
As built drawings for detention tank systems and final
design calculations, and factory test report for its
pumping system.
Standard Operating Procedure for pumped drainage
system(basement/ detention tank)
Standard Operating Procedure for flood barrier
Developer/Owner declaration on the following I shall inspect and declare that the crest levels are
constructed to approved plans annually/every 3
years upon obtaining the TOP
Developer/Owner declaration on the following I shall submit the following documents as required annually
upon obtaining the TOP.
- Certificate of inspection on flood barriers on site, including
leak test certificate.
- Amendments to SOP for flood barrier.
- Certificate of inspection on pumped drainage system
(basement/detention tank).
- Certificate of inspection on ABC Waters design features.

113

Appendix 6

ENV-CBPU-CLRTOP01-RESUBMISSION

APPLICATION FOR CLEARANCE OF TEMPORARY


OCCUPATION PERMIT (TOP) - RESUBMISSION
This form may take you 15 minutes to fill in. You will need the
following information to fill in the form:- Particulars of Project
- Particulars of Qualified Person
- Supporting completion and inspection certificates.
Date: 19/03/2014
To:

Central Building Plan Unit


National Environment Agency
40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).
2. This form is to be accompanied by the relevant attachments.

Information
1. Service Standard :
Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project
Project Reference Number
Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Plan Type
Add

Please Select

001

Delete

Particulars of Application
Development Proposal
Application

Please Select

114

Date of CBPU
DC Clearance
Application for Temporary
Occupation Permit

19/03/2014
Pollution Control Works
Sewerage Works
Drainage Works (for crest levels ,
platform levels, flood protection levels
based on approved flood protection
measures)
Environmental Health (Sanitary Facilities)

Remarks:
Application for
Partial TOP (if applicable)
Previous TOP Advice from
CBPU (if applicable)
CBPU Processing Officer

NA

File Ref. No. /


Case ID

Dated

Clearance Certificate for


Building Plan on Pollution
Control; for Industrial
Plant Works (if applicable)
Clearance Certificate for
Building Plan on
Environmental Health
(if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (Sanitary Works)
(if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (Sewer
Works)(if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (M&E Works)
(if applicable)
Clearance Certificate for
Detailed Plan on
Drainage Works (if
applicable)
Plan Submission for the
location of Mechanical
Equipment and its noise
abatement measures to
be incorporated at the
115

development premises

116

Particulars of Qualified Person


Name

Please Select

Role In Project
Registration No
Firm Name
UEN
Firm Address

Telephone No.
Extension No
Fax No.
Email Address

Declaration by Qualified Person


I confirm that:
I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the
Building Control Act (Cap. 29) in respect of the works described which
include Pollution Control, Environmental Health (Sanitary Facilities)
Sewerage Works and Drainage Works (platform and crest protection levels
only); and my qualification is appropriate to the nature of these works;
The particulars of Project, Application and Submission Checklists given in
this form are correct;
The works have been carried out and completed.
The crest levels, platform levels, flood protection levels are in compliance
with COP on Surface Water Drainage and constructed according to
approved plans.
The maximum stormwater discharge from the development is in compliance
with the maximum allowable peak runoff stipulated in the COP and
constructed according to approved plans.
I have liaised with the Developer/ Owner to ensure that a
Maintenance/Managing Agent has been established to undertake
the SOP of the maintenance, operation and monitoring of the
detention tank system.
If there are deviations from any of the above, please
indicate in detail, attachments and PUB approval if
applicable.

117

Development with Public Toilet


I have inspected the public toilets in this development and that they have
been completed in accordance with the provision of sanitary facilities
stipulated in the Code of Practice on Environmental Health, except for
those provisions where waivers have been obtainted from the National
Environment Agency
Development has no public toilet

Attachments
Dated
Certificate of Completion and Inspection for Sanitary Works
(PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for Sewerage
Works (PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for the
Mechanical and Electrical Works for
Sewerage Installation (PUB-BPU-COMPOFWORK)
Certificate of Inspection for Drainage Works
As built survey plans indicating crest levels, platform levels,
flood protection levels based on approved flood protection
measures
As built drawings for detention tank systems and final
design calculations, and factory test report for its
pumping system.
Standard Operating Procedure for pumped drainage
system (basement/ detention tank)
Standard Operating Procedure for flood barrier
Developer/Owner declaration on the following - I shall
inspect and declare that the crest levels are constructed
to approved plans annually/every 3 years upon obtaining
the TOP
Developer/Owner declaration on the following I shall submit the following documents as required annually
upon obtaining the TOP.
- Certificate of inspection on flood barriers on site, including
leak test certificate.
- Amendments to SOP for flood barrier.
- Certificate of inspection on pumped drainage system
(basement/detention tank).
- Certificate of inspection on ABC Waters design features.

118

Appendix 7

ENV-CBPU-CLRCSC01-NEW SUBMISSION

APPLICATION FOR COMPLIANCE CERTIFICATE NEW SUBMISSION


[UNDER SECTION 33(7) OF THE ENVIRONMENTAL
PROTECTION AND MANAGEMENT ACT (CHAPTER 94A)
AND COMPLIANCE CERTIFICATE UNDER SECTION 33(8)
OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)]
This form may take you 15 minutes to fill in. You will need the
following information to fill in the form:- Particulars of Project
- Particulars of Qualified Person
- Supporting completion and inspection certificates.
Date: 19/03/2014
Central Building Plan Unit

To:

National Environment Agency


40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).
2. This form is to be accompanied by the relevant attachments.

Information
1. Service Standard : Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project
Project Reference Number
Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Plan Type
Add

Please Select

001

Delete

Particulars of Application
Development Proposal

Please Select
119

Application
Date of CBPU
DC Clearance
Application for Compliance
Certificate and Clearance
for Certificate of Statutory
Completion

Environmental Health Works


Pollution Control Works
Sewerage Works
Drainage Works

NA

File Ref. No. /


Case ID

Dated

Clearance Certificate for


Building Plan on Pollution
Control for Industrial Plant
Works (if applicable)
Clearance Certificate for
Building Plan on
Environmental Health
(if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (Sanitary
Works) (if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (if applicable)

120

Particulars of Application (Continue)


NA

File Ref. No. /

Dated

Clearance Certificate for


Detailed Plan on
Sewerage (M&E Works)
(if applicable)
Clearance Certificate for
Detailed Plan on
Drainage Works
(if applicable)

Particulars of Qualified Person


Name

Please Select

Role In Project
Registration No
Firm Name
UEN
Firm Address

Telephone No.
Extension No
Fax No.
Email Address

Declaration by Qualified Person


I confirm that:
I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the
Building Control Act (Cap. 29) in respect of the works described which
include
Environmental Health Works,
Pollution Control Works,
Sewerage Works,
Drainage Works; and my
qualification is appropriate to the nature of these works;
The particulars of Project, Application and Submission Checklists given in
this form are correct;
The works have been carried out and completed. For industrial plant works,
all related pollution control equipment and facilities have been installed/
completed according to the approved plans as listed in Particulars of Project
and Application
121

Confirmation
1) I confirm that:
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Date:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A&A and reconstruction
building projects.

Attachments
Dated
1. Certificate of Completion and Inspection for Building
Plan for Environmental Health
2. Certificate of Completion and Inspection for Sanitary
Works (PUB-BPU-COMPOFWORK)
3. Certificate of Completion and Inspection for Sewerage
Works (PUB-BPU-COMPOFWORK)
4. Certificate of Completion and Inspection for the
Mechanical and Electrical Works
for Sewerage Installation (PUB-BPU-COMPOFWORK)
5. Certificate of Inspection for Drainage Works

122

Attachments (Continue)
6. As Constructed drainage drawings in accordance to COP for
Surface Water Drainage Appendix 5
7. As-built survey plans indicating crest levels, platform levels
and flood protection levels in accordance to COP for
Surface Water Drainage Appendix 2

123

Appendix 8

ENV-CBPU-CLRCSC01-RESUBMISSION

APPLICATION FOR COMPLIANCE CERTIFICATE RESUBMISSION


[UNDER SECTION 33(7) OF THE ENVIRONMENTAL
PROTECTION AND MANAGEMENT ACT (CHAPTER 94A)
AND COMPLIANCE CERTIFICATE UNDER SECTION 33(8)
OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)]
This form may take you 15 minutes to fill in. You will need the
following information to fill in the form:- Particulars of Project
- Particulars of Qualified Person
- Supporting completion and inspection certificates.
Date: 19/03/2014
Central Building Plan Unit

To:

National Environment Agency


40, Scotts Road #13-00
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).
2. This form is to be accompanied by the relevant attachments.

Information
1. Service Standard : Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project
Project Reference Number
Project Title

Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Plan Type
Add

Please Select

001

Delete

Particulars of Application
Development Proposal

Please Select
124

Application
Date of CBPU
DC Clearance
Application for Compliance
Certificate and Clearance
for Certificate of Statutory
Completion

Environmental Health Works


Pollution Control Works
Sewerage Works
Drainage Works

Previous CSC Advice from


CBPU (if applicable)
CBPU Processing Officer

NA

File Ref. No. /


Case ID

Dated

Clearance Certificate for


Building Plan on Pollution
Control for Industrial Plant
Works (if applicable)
Clearance Certificate for
Building Plan on
Environmental Health
(if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (Sanitary
Works) (if applicable)
Clearance Certificate for
Detailed Plan on
Sewerage (if applicable)

125

Particulars of Application (Continue)


NA

File Ref. No. /

Dated

Clearance Certificate for


Detailed Plan on
Sewerage (M&E Works)
(if applicable)
Clearance Certificate for
Detailed Plan on
Drainage Works
(if applicable)

Particulars of Qualified Person


Name

Please Select

Role In Project
Registration No
Firm Name
UEN
Firm Address

Telephone No.
Extension No
Fax No.
Email Address

Declaration by Qualified Person


I confirm that:
I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the
Building Control Act (Cap. 29) in respect of the works described which
include
Environmental Health Works,
Pollution Control Works,
Sewerage Works,
Drainage Works; and my
qualification is appropriate to the nature of these works;
The particulars of Project, Application and Submission Checklists given in
this form are correct;
The works have been carried out and completed. For industrial plant works,
all related pollution control equipment and facilities have been installed/
completed according to the approved plans as listed in Particulars of Project
and Application
126

Confirmation
1) I confirm that:
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Date:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A&A and reconstruction
building projects.

Attachments
Dated
1. Certificate of Completion and Inspection for Building
Plan for Environmental Health
2. Certificate of Completion and Inspection for Sanitary
Works (PUB-BPU-COMPOFWORK)
3. Certificate of Completion and Inspection for Sewerage
Works (PUB-BPU-COMPOFWORK)
4. Certificate of Completion and Inspection for the
Mechanical and Electrical Works
for Sewerage Installation (PUB-BPU-COMPOFWORK)
5. Certificate of Inspection for Drainage Works

127

Attachments (Continue)
6. As- Constructed drainage drawings in accordance to COP for
Surface Water Drainage Appendix 5
7. As-built survey plans indicating crest levels, platform levels
and flood protection levels in accordance to COP for
Surface Water Drainage Appendix 2

128

Appendix 9

PUBWTR-0-MCG01

FORM FOR MANUFACTURING CATEGORY


Date:

24/02/2014

Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/
Professional Engineer.

Details of PUB Water / NEWater requirement


Nature of
manufacturing products
BAI (Business Activity
Indicator)

The measure of business activity that takes into account the core business
operations specific to the site. (e.g. No of wafers for wafer fab plant, no of
occupants in an office building, metric tonnes of wash load for a laundry etc)

Production rate

BAI/mth

PUB Water
Manufacturing use

NEWater
m/mth

m/mth

Please submit a copy of the water balance chart indicating the quantity of water
required at each manufacturing process. See Annex A.
Any water recycling

Yes
No

If Yes, please complete the following.


Percentage of water
recycling (See Annex B)

If No, please complete the following.


Reasons for not
recycling water
No of occupants
Any Canteen?

Yes
No

Domestic use

m/mth

Toilet Flushing

m/mth

m/mth

No of staff that
take shower
Showering

m/mth

Cooling Usage
PUB Water

NEWater

No of cooling tower
129

Refrigerating capacity
and operating hours
of individual cooling
towers:

Add

Tons

hr/mth

m/mth

m/mth

Delete

Total make-up water


required for cooling
towers
Reasons for not using
air-cooled/refrigerantcooled air con system

Other Usage
PUB Water

NEWater

No of toilets
Toilets washing

m/mth

m/mth

m/mth

m/mth

Other usage (Please


specify) E.g. General
washing, etc

Add

Delete
Total

Total water
requirements

m/mth

m/mth

m/mth

m/mth

Other sources of water


Water usage areas

Type of water

Water required
m/mth

Add

Delete

Please indicate water


usage areas to be
installed with private
meters or submeters:

130

Appendix 10

PUBWTR-0-NMC01

FORM FOR NON-MANUFACTURING CATEGORY


Date:

24/02/2014

Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/
Professional Engineer.

Details of PUB Water / NEWater requirement


PUB Water

NEWater

Project Description
BAI (Business Activity
Indicator)

The measure of business activity that takes into


account the core business operations specific to
the site. (e.g. No of wafers for wafer fab plant, no
of occupants in an office building, metric tonnes
of wash load for a laundry etc)

No of occupants
Any Canteen?

Yes
No

Domestic use

(m3/mth)

Toilet Flushing

(m3/mth)

(m3/mth)

No of occupants
that take shower
Showering

(m3/mth)

Cooling usage
PUB Water

NEWater

No of cooling towers
Refrigerating capacity
and operating hours of
individual cooling towers:

Add

Tons

hr/mth

(m3/mth)

(m3/mth)

Delete

Total make-up water


required for cooling
towers
Reasons for not using
air-cooled / refrigerant
cooled air con system

Other usage
PUB Water

NEWater
131

No of toilets
Toilets washing

(m3/mth)

(m3/mth)

(m3/mth)

(m3/mth)

Other areas (Please


specify, eg: F&B, Shops,
Laundry, Fountain,
Swimming Pool, General
/Car park Washing,
Irrigation etc

Add

Delete
Total

Total water requirements

(m3/mth)

(m3/mth)

(m3/mth)

(m3/mth)

For Retails (if applicable)


No of shoppers

For Hotels (if applicable)


No of Hotel rooms
Other sources of water
Please indicate water
usage areas

Type of water

Water required
(m3/mth)

Add

Delete

Please indicate water


usage areas to be
installed with private
meters or submeters

132

Appendix 11

PUBWTR-0-RCG01

FORM FOR RESIDENTIAL CATEGORY


Date:

24/02/2014

Instructions
1. This form is to be digitally signed by the Licensed Water Service
Plumber/Professional Engineer.

Details of PUB Water / NEWater requirement


PUB Water

NEWater

No of Units
Household usage

m/mth

Swimming Pool
(make-up water)

m/mth

Common Amenities
m/mth

m/mth

General Washing

m/mth

m/mth

Gardening

m/mth

m/mth

m/mth

m/mth

Add

Delete

Other usage
(Please specify)

Add

Delete

Total water requirements

m/mth

m/mth

Other sources of water


Please indicate water
usage areas

Type of water

Water required

m/mth
Add

Delete

133

Appendix 12

PUBWTR-0-TSP01

FORM FOR TEMPORARY CATEGORY


Date:

24/02/2014

Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/
Professional Engineer.

Details of PUB Water / NEWater requirement


Construction Site (Staff / Workers use)
PUB Water

NEWater

No of staff & construction workers


Domestic use

(m3/mth)

Toilet Flushing

(m3/mth)

(m3/mth)

No of staff & construction workers


that take shower
Showering

(m3/mth)

Any Canteen?

Yes
No

Washing use
PUB Water

NEWater

Washing vehicle

(m3/mth)

(m3/mth)

Washing Frameworks/Steel
bars/Moulds

(m3/mth)

(m3/mth)

(m3/mth)

(m3/mth)

Other washing (pl specify)

Add

Delete
Total

(m3/mth)

Concreting use
Recycling of wash water

(m3/mth)

(m3/mth)
(m3/mth)

Yes
No

If Yes,please complete the following


Percentage of water recycling

If No,please complete the following


Reasons for not recycling water
Other usage (Please specify)E .g.
Architectural works, Canteen Use

134

(m3/mth)
Add

(m3/mth)

Delete
Total

(m3/mth)

(m3/mth)

135

(Continue)
Workers dormitory
PUB Water
Any workers dormitory?

NEWater

Yes
No

If Yes, please specify the no. of


workers
Workers dormitory consumption
Total water requirements

(m3/mth)
0

(m3/mth)

(m3/mth)

Other sources of water


Please indicate
water usage areas

Type of water

Water required

(m3/mth)
Add

Delete

Type of Project
Construction Site Location
Total Built-Up Floor Area

M2

Started from

136

Appendix 13

PUBWTR-0-PPC01

PRE-PLANNING CONSULTATION
Date:

24/02/2014

To:

PUB Water
Water Supply (Network) Department
Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Qualified Person.
2. Design of water service installation including the mode of supply shall comply
with the Public Utilities (Water Supply) Regulations and the Singapore
Standard CP 48 - Code of Practice for Water Services.
3. Water meter shall be located above ground near to the main entrance of the
above development and shall be easily accessible for maintenance and
reading.
4. There shall be no risk of contamination to PUB potable water supply system
through backflow.
5. Potable water storage cisterms should not be located below sanitary pipes
and other non-potable water pipes.
6. This form is to be accompanied by the relevant documents (refer to
Submission Checklists).

Particulars of Project
Project Reference Number
Development Type

Please Select

Location Description

[Include Lot/lot, MK/TS,


Address/Road and
Building Name if any]
Project Description

Estimated PUB Water


Requirement (m/mth)
Estimated NEWater
Requirement (m/mth)
137

Platform Level of
Development (mRL)
Reduced Level of Highest
Direct Supply
Water Fitting (mRL)
Issue For Discussion

138

Particulars of the Qualified Person


Name

Please Select

Name of Company
UEN

Submission Checklists
1

Site Plan

139

Appendix 14

PUBWTR-0-WLP01

NOTIFICATION OF WATER SERVICE WORK BY LICENSED


WATER SERVICE PLUMBER
Date:

24/02/2014

To:

PUB Water
Water Supply (Network) Department
Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber.
2. This form is to be accompanied by the relevant documents
(refer to Submission Checklists).

Particulars of Project
Notification Number
Project Description

Location Description

[Include Lot/lot, MK/TS,


Address/Road
and Building Name if any]
Nature of Work

Please Select

Estimated Water Requirements


PUB Water (m3/mth)
NEWater (m3/mth)
Commencement Date
Expected Completion Date
Platform Level of
Development (mRL)
Reduced Level of Highest
Direct Supply
Water Fitting (mRL)

Particulars of Customer
Name

Please Select

Name of Company
140

UEN
Address

Telephone No.
Extension No.
Fax No.

Particulars of the Licensed Water Service Plumber


Name

Please Select

Residential Address

141

Particulars of Licensed Water Service Plumber (Continue)


Mailing Address
(if different from above)

Telephone No. (O)


Telephone No. (H)
Extension No.
Fax No.
Pager No.
Handphone No.
Licence No.
I/C No.

Declaration by Licensed Water Service Plumber


1

I,
, the undersigned, hereby certify
that the water service installation at the premises is designed in
full compliance with the Public Utilities Board's requirements
including the Public Utilities (Water Supply) Regulations,
Singapore Standard CP 48 - Code of Practice for Water
Services, Authorities' requirements and other statutory
requirements. I also confirm that potable water storage cisterns
shall not be located below sanitary pipes and other non-potable
water pipes. All the water fittings installed in the water service
installation are of types that comply with standards prescribed/
stipulated by PUB and all water conservation measures will
be adopted.

The site plan, the water schematic drawing/s and the breakdown
of water requirements, if any, of the above developments are
attached herewith.

Submission Checklists
1

Site Plan

Water Reticulation Schematic Drawing

142

Appendix 15

PUBWTR-0-WSW01

NOTIFICATION OF WATER SERVICE WORK BY


PROFESSIONAL ENGINEER
Date:

24/02/2014
PUB Water

To:

Water Supply (Network) Department


Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Professional Engineer.
2. This form is to be accompanied by the relevant documents
(refer to Submission Checklists).
3. Please note that for "Particulars of Licensed Water Service Plumber", the
member role of "Licensed Water Service Plumber" is required when updating
the member's details.

Particulars of Project
Pre-Planning Consultation

Yes
No

Date of Pre-Planning
Consultation with PUB
Type of Submission

New Submission
Resubmission

PUB Ref

WSN 92433 /

Project Reference Number


Development Type

Please Select

Location Description

[Include Lot/lot, MK/TS,


Address/Road
and Building Name if any]
Project Description

Nature of Work

Please Select
143

Estimated Water Requirement


PUB Water (m3/mth)
NEWater (m3/mth)
Commencement Date
Expected Completion Date

Particulars of the Professional Engineer


Name

Please Select

Name of Company
UEN
Address

144

Particulars of the Professional Engineer (Continue)


Telephone No.
Extension No.
Fax No.

Particulars of the Owner/Developer


Name

Please Select

Name of Company
UEN
Address

Telephone No.
Extension No.
Fax No.

Particulars of the Licensed Water Service Plumber


Name

Please Select

Address

Telephone No.
Extension No.
Fax No.

Declaration by Professional Engineer


1

I,
, the Professional Engineer-in-charge
hereby certify that the water service installation is designed in full
compliance with the Public Utilities Board's requirements including
the Public Utilities (Water Supply) Regulations, Singapore Standard
CP 48 - Code of Practice for Water Services, Authorities'
requirements and other statutory requirements. I also confirm that
potable water storage cisterns shall not be located below sanitary
pipes and other non-potable water pipes. All the water fittings
installed in the water service installation are of types that comply
with standards prescribed/stipulated by PUB and all water
conservation measures will be adopted.

The site plan, the water schematic drawing/s and the breakdown of
water requirements, if any, of the above developments are attached
herewith.

Submission Checklists
1

Site Plan
145

Water Reticulation Schematic Drawing

146

Appendix 16

PUBWTR-0-CSC01

CERTIFICATE OF SATISFACTORY COMPLETION OF WATER


SERVICE WORK BY PROFESSIONAL ENGINEER
Date: 19/03/2014
PUB Water

To:

Water Supply (Network) Department


Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231

Instructions
1. This form is to be digitally signed by the Professional Engineer.

Particulars of Project
Project Reference Number
Development Type

Please Select

Project Description

Development Address
Nature of Work

Please Select

Water Utility Account


Number
Commencement Date
Expected Completion Date

Particulars of the Professional Engineer


Name

Please Select

Name of Company
UEN

Particulars of the Licensed Water Service Plumber


Name

Please Select

Telephone No.
Extension No.
Fax No.
147

FORM-PE-CSC

Mar 19 2014 at 13:12:53 PM

Page 2

Declaration by Professional Engineer


1

I,

the Professional Engineer-in-charge

hereby certify that I have supervised the construction of the water


service installation of the above development and inspected the
completed water service installation. I confirm that to the best of my
knowledge and belief, the water service installation was carried out in
accordance with the Public Utilities Board's requirements including the
Public Utilities (Water Supply) regulations, Singapore Standard CP
48-Code of Practice for Water Services, Authorities' requirements and
other statutory requirements. I also confirm that potable water storage
cisterns have not been located below sanitary pipes and other
non-potable water pipes. All the water fittings installed in the water
service installation are of the types that comply with standards
prescribed / stipulated by PUB and all water conservation measures
have been adopted. I further certify that the said water service
installation and the associated electrical devices and equipment have
been tested and are safe and acceptable for operation.

148

Appendix 17 Contact List


PUB Building Plan Unit (BPU)
Address
Building Plan Unit
PUB
40 Scotts Road #15-01
Environment Building
Singapore 228231
For further enquiries on Corenet form changes, please contact PUB BPU at:

Hotline: 67313512
Email: PUB_BPU@pub.gov.sg