Professional Documents
Culture Documents
Table of Contents
Summary of Corenet Form Changes ................................................................................................ 1 5
Forms with Changes ............................................................................................................................ 1
Forms with No Changes ...................................................................................................................... 5
Corenet Forms with Changes ......................................................................................................... 7 37
1 Development Control (DC) Clearance Forms ................................................................................... 7
1.1 Guide for Development Control (DC) Clearance Forms ....................................................... 7
1.2 Select Fields DC Clearance Forms ................................................................................... 11
2 Detailed Plan (DP) Form ................................................................................................................. 22
2.1 Guide for Detailed Plan (DP) Form..................................................................................... 22
2.2 Select Fields DP Form ...................................................................................................... 24
3 Completion of Work Form ............................................................................................................. 27
3.1 Guide for Completion of Work Form ................................................................................. 27
3.2 Select Fields Completion of Work Form.......................................................................... 29
4 Temporary Occupation Permit (TOP) Forms .................................................................................. 30
4.1 Guide for Temporary Occupation Permit (TOP) Forms ..................................................... 30
4.2 Select Fields TOP Forms .................................................................................................. 32
5 Certificate of Statutory Completion (CSC) Forms .......................................................................... 33
5.1 Guide for Certificate of Statutory Completion (CSC) Forms .............................................. 33
5.2 Select Fields CSC Forms ................................................................................................... 34
6 Water Submission Forms ............................................................................................................... 35
6.1 Guide for Water Submission Forms ................................................................................... 35
6.2 Select Fields Water Submission Forms ........................................................................... 36
Appendix ............................................................................................................................... 38 149
Form Name
Application for Development Control
(DC) Clearance - New Submission
Changes
Includes fields to classify minor and major projects;
For minor projects, fields will be included to allow DC and DP to be submitted at
the same time.
PUB (C&W) Checklist will be a section of the DC form
(No need for separate checklist to be submitted)
PUB-DD-CHECKLIST
PUB-BPU-CLRDP01
PUB-BPU-COMPOFWORK
Drainage DP, Sewerage DP, Sewerage Form A, Sewerage Form D and Sewerage
RC Trench combined into 1 form. Previously known as PUB-DD-CLRDPDRA01 &
PUB-SEW-CLRDPSEW01.
For Form A & Form D, please fill Section A1: Sanitary Work
For RC Trench, please fill Section A2: Sewerage Work, RC Trench
File Number
PUB-BPU-COMPOFWORK
Form Name
Certificate of Completion and
Inspection of Sanitary, Sewerage and
Drainage Works
[Under Section 35(1)(e) and (f) of
the Sewerage and Drainage Act
(Chapter 294)]
Changes
It is known that these different forms are submitted by different QPs at different
stages of the development of the project. Hence built into the form is the
feature which allows one particular section of the form to be submitted. (For
example, if only the civil PE is ready to make his submissions, he can proceed to
do so using the form). If more than one QP/PE is ready to make theirs, more
sections of the form may be submitted at the same time by selecting the
relevant sections.
ENV-CBPU-CLRTOP01-NEW SUBMISSION
ENV-CBPU-CLRTOP01-RESUBMISSION
ENV-CBPU-CLRCSC01-NEW SUBMISSION
File Number
ENV-CBPU-CLRCSC01-RESUBMISSION
Form Name
Application for Compliance
Certificate Resubmission
[Under Section 33(7) of the
Environmental Protection and
Management Act (Chapter 94A) and
Compliance Certificate under
Section 33(8) of the Sewerage and
Drainage Act (Chapter 294)]
Changes
Attachments section modified to comply with revised Code of Practice on
Surface Water Drainage.
PUBWTR-0-PPC01
Pre-Planning Consultation
PUBWTR-0-WLP01
PUBWTR-0-WSW01
PUBWTR-0-CSC01
Certificate of Satisfactory
Completion of Water Service Work
by Professional Engineer
PUBWTR-0-MCG01
PUBWTR-0-NMC01
PUBWTR-0-RCG01
PUBWTR-0-TSP01
PUB-SEW-FORM_A
Notice to Commencement of
Sanitary/Sewerage Works
File Number
PUB-SEW-FORM_C1
Form Name
Certificate of Completion and
Inspection for the Mechanical and
Electrical Works for Sewerage
Installation
Changes
Not in Use from 28 Feb 2014
PUB-SEW-FORM_D
PUB-SEW-FORM_D1
PUB-SEW-FORM_D2
PUB-SEW-FORM_DP
PUB-SEW-ANNEX_A
PUB-SEW-ANNEX_C
Plumbers/Contractor's Confirmation
of Completion of Sanitary/Sewerage
Works
Hydrostatic (Water) Tests for
Sanitary Drainlines & Sewers
(<600mm DIA) and CCTV Inspection
Survey (>600mm DIA Sewers)
[Annex D to Form C/QP]
PUB-SEW-ANNEX_D
PUB-SEW-RC TRENCH
PUBWTR-0-WSP01
PUBWTR-0-WSR01
PUBWTR-0-PWS01
Form Name
Application for Approval of Works Affecting Public Sewerage System
PUB-SEW-FORM DLP
PUB-SEW-FORM_B
PUB-SEW-FORM_B1
PUBWTR-0-WSW02
Certification of Satisfactory Completion of Water Service Work by Licensed Water Service Plumber
PUB-DD-CSIDRA
PUB-DD-PCWVDRA
PUB-SEW-PCWVSEW
1.1
a)
The DC clearance form is updated to support the work flow process. As part of an effort to
improve our service to the industry, PUB has introduced the classification of projects into
major and minor. This allows processing through separate tracks so that minor projects can be
processed more quickly.
b)
c)
d)
For minor projects, QPs may submit both the DC plan and Detailed Plan (DP) at the same time,
allowing for shorter processing time. Previously, QPs need to obtain DC clearance before DP
can be submitted.
e)
On the second page of the forms, there is a section called Development Details. This section
must be filled to allow the sorting of the project into major or minor to take place.
Accurate information is necessary to facilitate processing of the submissions.
Please refer to Section 1.2 for more information on the Select fields and how they can affect
your submissions.
7
f)
For projects sorted as minor, QP will be directed to the next section SUBMISSION FOR
DEVELOPMENTAL CONTROL (DC) CLEARANCE WITH DETAIL PLAN.
g)
For projects sorted as major, QP will be directed to the next section SUBMISSION FOR
DEVELOPMENTAL CONTROL (DC) PLAN.
h)
There are sections in the form that must be selected and filled only when the project involves
the respective sections. For example, if the project involves:
(i)
sanitary/sewerage work, Section A needs to be selected and filled by QP
(ii)
sanitary/sewerage AND drainage work, Section A and Section B need to be selected and
filled by QP
i)
j)
If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill
that particular section.
k)
Compulsory fields within these sections must be duly filled only when the section is selected
for submission. The sections are listed as follows:
Submission for Development Control (DC) Clearance Plan (for MAJOR projects only)
Section A Sanitary/ Sewerage Work
Section B Drainage Work
Submission for Development Control (DC) Clearance with Detail Plan (for MINOR projects only)
Section A1 Sanitary, M&E Work (Used Water)
Section A2 Sewerage Work, RC Trench
Section B Drainage Work
Section C Infrastructure or other works affecting Sewer & Drainage (e.g. covered link way,
bus stop)
l)
To make attachments and declarations, QPs can similarly mark the provided checkboxes.
m)
The Catchment & Waterways departments Checklist for DC plans is now part of the DC
clearance forms. Please fill up the fields in the checklist if the project involves drainage works.
QPs need not submit a separate signed copy of the checklist for DC submission.
(i)
Development site with area less than 0.2 hectares will be directed to the checklist
below.
(ii)
n)
Development site with area greater than or equal to 0.2 hectares will be directed to the
checklist below.
There are a number of Select fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.
Please refer to Section 1.2 for more information on the Select fields and how they can affect
your submissions.
o)
Compulsory fields are highlighted in yellow, as shown in Appendix 1. These must be filled to
enable successful submission of the forms in Corenet.
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Application
for
Development
Control
(DC)
Resubmission/Amendment/Revision
p)
Clearance
10
1.2
Field
Detail
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments
Field
Detail
Please choose the catchment where your project is located.
For projects that take place in more than one catchment, please
select one catchment.
Used Water Catchment No.
The used water catchments in Singapore are divided into 6 regions:
1) Bedok
2) Jurong
3) Kim Chuan
4) Kranji
5) Seletar
6) Ulu Pandan
Drainage Catchment No.
The drainage catchments in Singapore are divided into 10 regions:
1)
2)
3)
4)
5)
Jurong
Kranji
Pandan
Woodlands
Kallang
6) Bukit Timah
7) (A) Singapore River
(B) Stamford Marina
8) Geylang
9) Punggol
10) Changi
The used water and drainage catchment maps are available at the link
below.
http://www.pub.gov.sg/customer/QPPortal/Pages/CatchmentMaps.as
px
12
Field
Detail
Field
Detail
14
Field
Detail
15
Field
Detail
16
Field
Detail
Field
Detail
Field
Detail
Field
Detail
Field
Detail
Pumping Installation
A minimum of two pumps duty and standby pumps shall be
provided.
Ejector
The pit for the sewage ejector or solids divertor installation shall
be adequately sized (min. 3m x 3m) and shall include a working
space for maintenance.
Sump
A screen chamber shall be provided before the pump sump.
When the depth of pump sump or screen chamber exceeds 6m,
intermediate platforms shall be provided.
Access opening shall be provided directly above the pumps for
ease of maintenance.
Carpark
A screen chamber is NOT needed for carpark pump sump.
Swimming Pool
Backwash from swimming pool filter.
21
2.1
a)
b)
Previously, there were two forms for DP submissions, one for sewerage works (PUB-SEWCLRDPSEW01) and one for drainage works (PUB-DD-CLRDPDRA01). These two forms are now
combined into one single PUB-BPU-CLRDP01 form.
OLD DP Forms
NEW DP Form
PUB-SEW-CLRDPSEW01
PUB-DD-CLRDPDRA01
PUB-BPU-CLRDP01
c)
There are sections in the form that must be selected and filled only when the project involves
the respective sections. For example, if the project involves:
(i)
sanitary work, Section A1 needs to be selected and filled by QP
(ii)
sanitary AND drainage work, Section A1 and Section B need to be selected and filled by
QP
d)
e)
If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill
that particular section.
f)
Compulsory fields within these sections must be duly filled only when the section is selected
for submission. The sections are listed as follows:
Section A1 Sanitary Work
Section A2 M&E Works (Used Water)
Section A3 Sewerage Work, RC Trench
Section B Drainage Work
22
g)
To make attachments and declarations, QPs can similarly mark the provided checkboxes.
h)
There are a number of Select fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.
Please refer to Section 2.2 for more information on the Select fields and how they can affect
your submissions.
i)
Compulsory fields are highlighted in yellow, as shown in Appendix 3. These must be filled to
enable successful submission of the forms in Corenet.
23
2.2
Field
Detail
Sanitary
Includes works on any sanitary plumbing or drainage system and
the fixing, alteration and repair of a sanitary appliance
Sewer
Includes engineering works for the construction, alteration and
maintenance of any sewerage system
Sewage Treatment Plant
Refers to sewage treatment works, septic tank, imhoff tank,
percolating filter, sludge digestion tank, or any tank designed for
the pre-treatment, treatment or the stabilisation of sewage
Drainage
If the project involves drainage works only, this field can be left
unfilled. QP can proceed to fill up Section B: Drainage Work of
the PUB-BPU-CLRDP01 form to submit for DP clearance.
24
Field
Detail
New Submission
First DP submission for the particular project
Resubmission
Subsequent DP submission(s) of the same project
- Revised Plan Submission
- Amendment Plan Submission
Industrial
Factories, warehouses, power plants, industrial parks
This field can be found on Page 92
Non Industrial
Residential, commercial and institutional developments
25
Field
Detail
Pumping Installation
A minimum of two pumps duty and standby pumps shall be
provided.
Ejector
The pit for the sewage ejector or solids divertor installation shall
be adequately sized (min. 3m x 3m) and shall include a working
space for maintenance.
Sump
A screen chamber shall be provided before the pump sump.
When the depth of pump sump or screen chamber exceeds 6m,
intermediate platforms shall be provided.
Access opening shall be provided directly above the pumps for
ease of maintenance.
Carpark
A screen chamber is NOT needed for carpark pump sump.
Swimming Pool
Backwash from swimming pool filter.
26
3.1
a)
The PUB-BPU-COMPOFWORK form puts together all the Completion of Work forms for
Sewerage, Sanitary, M&E and Drainage. These forms were previously known as Form C, Form
C1, Annex A, Annex C and Annex D. This is to give the Lead QP an overview of the various
Completion of Work forms that has to be submitted to PUB over the course of the project.
b)
It is known that these different forms are submitted by different QPs at different stages of the
development of the project. Hence, built into the form is a feature which allows one particular
section of the form to be submitted even if other required sections are not ready for
submission. (For example, if only the Civil PE is ready to make his submissions, he can proceed
to do so using the form even if the M&E PE is not ready to submit theirs). If more than one
QP/PE are ready to make their submissions, more sections of the form may be submitted at
the same time by selecting the relevant sections.
c)
The table below shows the options and the respective sections that will be made available.
Selection Options
Sections Available for Submission
Completion of Sewerage
Section A1 Sewerage Work
Work only
Application for PUB
Clearance for Temporary
Occupation Permit (TOP)
27
d)
The options are available on the first page of the PUB-BPU-COMPOFWORK form.
e)
For Application for PUB Clearance for Certificate of Statutory Completion (CSC), please be
reminded to submit the Certificate of Inspection for Drainage Works (PUB-DD-CSIDRA)
together with the PUB-BPU-COMPOFWORK form.
f)
There are a number of Select fields that can be found throughout the forms. These fields,
when clicked, will show a drop-down menu with options for the QP to choose accordingly.
Please refer to Section 3.2 for more information on the Select fields and how they can affect
your submissions.
g)
Compulsory fields are highlighted in yellow, as shown in Appendix 4. These must be filled to
enable successful submission of the forms in Corenet. Compulsory fields under the sections
A1, A2, A3, B, C and D must be duly filled only when the section is selected for submission.
28
3.2
Field
Detail
Please select the appropriate options:
a change
no change
29
4.1
ENV-CBPU-CLRTOP01-NEW SUBMISSION
ENV-CBPU-CLRTOP01-RESUBMISSION
Application for Clearance of Temporary Occupation Permit (TOP) New Submission
Application for Clearance of Temporary Occupation Permit (TOP) Resubmission
a)
b)
The following new attachments are added to allow the submission of the following documents
(in line with the current edition of Code of Practice on Surface Water Drainage):
As built survey plans indicating crest levels, platform levels, flood protection levels
based on approved flood protection measures
As built drawings for detention tank systems and final design calculations, and
factory test report for its pumping system
Standard Operating Procedure for pumped drainage system(basement / detention
tank)
Standard Operating Procedure for flood barrier
Developer/Owner declaration on the following - I shall inspect and declare that the
crest levels are constructed to approved plans annually / every 3 years upon obtaining
the TOP
Developer/Owner declaration on the following:
- I shall submit the following documents as required annually upon obtaining
the TOP
- Certificate of inspection on flood barriers on site, including leak test
certificate
- Amendments to SOP for flood barrier
- Certificate of inspection on pumped drainage system (basement/detention
tank)
- Certificate of inspection on ABC Waters design features
30
c)
To make attachments and declarations, QPs can mark the checkboxes provided.
d)
Compulsory fields are highlighted in yellow, as shown in Appendix 5 & Appendix 6. These must
be filled to enable successful submission of the forms in Corenet.
31
4.2
Field
Detail
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments
32
5.1
ENV-CBPU-CLRCSC01-NEW SUBMISSION
ENV-CBPU-CLRCSC01-RESUBMISSION
Application for Compliance Certificate New Submission
Application for Compliance Certificate Resubmission
[Under Section 33(7) of the Environmental Protection and Management Act (Chapter 94A) and
Compliance Certificate under Section 33(8) of the Sewerage and Drainage Act (Chapter 294)]
a)
To indicate attachments and declarations, QPs can mark the checkboxes provided.
b)
Compulsory fields are highlighted in yellow, as shown in Appendix 7 and Appendix 8. These
must be filled to enable successful submission of the forms in Corenet.
33
5.2
Field
Detail
Industrial
Factories, warehouses, power plants, industrial parks
Non Industrial
Residential, commercial and institutional developments
34
6.1
a)
New fields are included to indicate water demand for PUB Water (Potable Water) and
NEWater in the following forms:
File Name
Form Name
PUBWTR-0-PPC01
Pre-Planning Consultation
PUBWTR-0-WLP01 Notification of Water Service Work by Licensed
Water Service Plumber
PUBWTR-0-WSW01 Notification of Water Service Work by
Professional Engineer
PUBWTR-0-MCG01 Form for Manufacturing Category
PUBWTR-0-NMC01 Form for Non-Manufacturing Category
PUBWTR-0-RCG01
Form for Residential Category
PUBWTR-0-TSP01
Form for Temporary Category
b)
New section is added to indicate the particulars of Licensed Water Service Plumber in the
following form:
File Name
Form Name
PUBWTR-0-CSC01
Certificate of Satisfactory Completion of Water Service Work by
Professional Engineer
c)
Compulsory fields are highlighted in yellow, as shown in Appendix 9 16. These must be filled
to enable successful submission of the forms in Corenet.
35
6.2
Field
Detail
Please select the most appropriate type of development for
your project.
36
Field
Detail
Please select the most appropriate work nature of your project.
37
Appendix
38
List of Appendix
Appendix 1 ENV-CBPU-DCCLR-NEW SUBMISSION .................................................................. 41 64
Application for Development Control (DC) Clearance New Submission
Appendix 2 ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION ............................. 65 90
Application for Development Control (DC) Clearance Resubmission/Amendment/Revision
Appendix 3 PUB-BPU-CLRDP01 ................................................................................................ 91 96
Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage (Sanitary/Sewer)
Works
Appendix 4 PUB-BPU-COMPOFWORK ................................................................................... 97 109
Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works
Appendix 5 ENV-CBPU-CLRTOP01-NEW SUBMISSION ........................................................ 110 113
Application for Clearance of Temporary Occupation Permit (TOP) New Submission
Appendix 6 ENV-CBPU-CLRTOP01-RESUBMISSION/AMENDMENT/REVISION ................... 114 118
Application for Clearance of Temporary Occupation Permit (TOP)
Resubmission/Amendment/Revision
Appendix 7 ENV-CBPU-CLRCSC01-NEW SUBMISSION ......................................................... 119 123
Application for Compliance Certificate New Submission
Appendix 8 ENV-CBPU-CLRCSC01-RESUBMISSION/AMENDMENT/REVISION ................... 124 128
Application for Compliance Certificate Resubmission/Amendment/Revision
Appendix 9 PUBWTR-0-MCG01 ............................................................................................ 129 130
Form for Manufacturing Category
Appendix 10 PUBWTR-0-NMC01 ......................................................................................... 131 132
Form for Non-Manufacturing Category
Appendix 11 PUBWTR-0-RCG01 ..................................................................................................... 133
Form for Residential Category
Appendix 12 PUBWTR-0-TSP01 ............................................................................................ 134 136
Form for Temporary Category
Appendix 13 PUBWTR-0-PPC01 ........................................................................................... 137 139
Pre-Planning Consultation
Appendix 14 PUBWTR-0-WLP01 .......................................................................................... 140 142
Notification of Water Service Work by Licensed Water Service Plumber
Appendix 15 PUBWTR-0-WSW01 ......................................................................................... 143 146
Notification of Water Service Work by Professional Engineer
Appendix 16 PUBWTR-0-CSC01 ............................................................................................ 147 148
Certificate of Statutory Completion of Water Service Work by Professional Engineer
39
40
Appendix 1
ENV-CBPU-DCCLR-NEW SUBMISSION
To:
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
works.
2. This form is to be accompanied by the relevant attachments.
3. Please read the DC checklist before filling the form.
Particulars of Project
Project Reference Number
Project Title
Location Description
[Include Lot/Plot, MK/TS,
Building Address, House
No and Road information]
Particulars of Application
Development Proposal
Application
Select
Dated
41
ENV-CBPU-DCCLR-NEW SUBMISSION
Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Development Details
Type of Submission
Select
Type of Development
Select
Is there basement?
Yes
No
Yes
No
Yes
No
No.of storeys in
development
Storeys
L/s
Area of development
ha
DR in the development?
Yes
No
mRL
mRL
Yes
Select
Select
No
42
ENV-CBPU-DCCLR-NEW SUBMISSION
Confirmation
Roof gutters (including rain water down pipes and outlets, and roof scupper
drains) are banned as an anti-mosquito breeding measure for all new
developments. Waiver in writing must be obtained from National Environment
Agency to erect roof gutters at the DC stage prior to BP submission
I confirm that :
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Dated:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A & A and reconstruction
building projects.
Attachments
Development Control Plan
Others, please specify
Add
Delete
43
Select
Address
Contact No
Email
(Tick if applicable)
Attachments
1. Site plan and first storey plan
(indicate the sewer setback, propose and existing sewer
connection, top/invert level of manhole(s), and platform levels,
propose and existing sanitary drainline.
2. Detailed sanitary plan (to show sanitary line)
3. Is there pumping system(s) for used water?
Declaration:
Name
Yes
Role
By QP/PE:
I have carried out a
thorough investigation
of the existing
sewerage system within
and adjacent to the site
and will take every
practical measure to
ensure that the
proposed development
will not disrupt or affect
any existing
sewer/drain-line that
serves other properties/
premises.
Select
by QP/PE:
I hereby certify that
these plans and the
works shown therein
comply with the
provisions of the
Sewerage and
Select
No
44
Drainage
Act (Chapter 294),
the Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and Sanitary
Works
by PE(M/E) if there is
pumping system(s)
I, being a Professional
Engineer hereby certify
that the propose
mechanical and
electrical(M&E) works
of the above
mentioned project are
design in accordance
with the current Code
of Practice on
Sewerage
and Sanitary Works,
Sewerage and
Drainage
Act (Chapter 294) and
other sewerage
requirements as
stipulated by Water
Reclamation (Network)
Department.
Select
Attachments:
1. Detail plan drawings of used water pumping system(s)
2. Attached Form D2/QP if an alternate power source is not available
3. Design calculations
4. Pump and system curves
5. Relevant equipment catalogues
Please state if any deviation from
the COP
Pump Design
Condition
Pump Application
Brand
Model
Estimated
Inflow
(l/s)
Pump
operating
capacity (l/s)
Pump
operating
head (m)
Solids
free
passage
Size (mm)
Motor
Rating (kw)
Select
Add
Delete
45
Particulars of Plumber/Contractor
Name
Select
Firm Details
Contact No
Email
please indicate your
membership/license
PUB LP
SPS registered
N.A.
Attachments:
1. Detail sewerage plan
To show: propose sewer alignment with diameter, material,
top/invert level, existing sewer alignment to be abandoned (if any)
2. Design & calculation of RC trench (if applicable)
Declaration
by PE (Civil):
I hereby certify that
the sewerage plans
and the works shown
therein comply with
the provisions of the
Sewerage and
Drainage
Act (Chapter 294), the
Sewerage and
Drainage
(Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.
Name
Role
Phone Email
Firm Arch/PE
Reg No
Select
Particulars of Plumber/Contractor
Tick if same as in Sanitary Work
Name
Select
NRIC/Passport No.
Firm Details
Contact No
46
Email
please indicate your
membership/license
PUB LP
SPS registered
N.A.
Attachment:
1. Site Plan and First Sty Plan
2. Basement Plans
3. Detail of Drainage Work
4. DC Checklist
5. Proposed plan showing crest levels, platform levels with and
without flood barriers at various entrance and exit points, and
flood barrier installed at all points of entry and exit for building
premises or for entire development
Name
Declaration
Role
Phone
Firm Arch/PE
Reg No
Select
Attachment:
1. First storey plan, showing sewer setback, sewer alignment, diameter,
manhole & sewer ID.
2. Cross sectional plan
3. Sewer and drainage plan
4. Proposed plan showing crest levels, platform levels with and without
flood barriers at various entrance and exit points, and flood barrier
installed at all pints of entry and exit for building premises or for entire
development.
47
Declaration
I hereby certify that these
plans and the works shown
therein comply with the
provisions of the Sewerage
and Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on
Sewerage and Sanitary
Works.
Name
Role
Phone Email
Firm
Arch/PE
Reg No
Select
48
DC SUBMISSION
Particulars of Owner(s)
Name
Select
Address
Contact No
Email
(Tick if applicable)
Attachments:
1. Site plan and first storey plan
to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and
platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and
sewer identification number
Name
Select
Select
Role
Contact
Yes
No
Email
Firm
Arch/PE
Reg No
49
COP
50
DC SUBMISSION
(Tick if applicable)
Attachments:
1. Site Plan and First Sty Plan
2. Basement Plans
3. DC Checklist
4. Proposed plan showing crest levels, platform levels
with and without flood barriers at various entrance
and exit points, and flood barrier installed at all points
of entry and exit for building premises or for entire
development
Declaration
Name
Select
Role
Contact
Firm
Arch/PE
Reg No
51
PUB-DD-CHECKLIST
Select
Select
Select
Select
Select
Ha
Select
Select
Select
Select
Select
52
Bioretention Swales/Basins
Select
Rain Gardens
Select
(vii) Others
(Please indicate if any)
Select
Detention volume
Detention volume to meet the requirement as stated in Clause 7.1.5
of the latest edition of Code of Practice on Surface Water Drainage
(Detention V)
Select
Select
Select
Select
Select
53
mRL
Select
For developments where flood barriers are automated and/or with more than 2
points of entry/exit, the following document shall be submitted at Detailed Planning
stage.
-- Details on the Standard Operating Procedure (SOP) including the operation and
maintenance of the flood barrier to be endorsed by Mechanical and/ or Electrical
QP or PE, and the developer/ building owner.
-- Details on the size, type and design of the flood barrier.
55
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
56
Select
Select
57
Select
Select
Select
Select
Select
Select
I hereby confirm that the above items have been complied with and endorsed on
the plans.
I hereby certify that the standard endorsement below will also be certified on the
plans:(a) The planning, design, construction activities and procedures for plan
submission shall comply fully with the requirements as stipulated in the
latest edition of the Code of Practice on Surface Water Drainage and the
Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge
all runoff from the development site.
(c) The runoff within, upstream of and adjacent to the development lot can be
effectively drained away without causing flooding within the lot or in areas
outside the lot.
(d) There is no direct connection from the internal drains within the basement or
58
59
PUB-DD-CHECKLIST
Select
Select
Select
Select
Select
Select
Select
Select
Select
60
PUB-DD-CHECKLIST
Select
Select
Select
Select
Select
Select
Select
For developments where flood barriers are automated and/or with more than 2 points of
entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.
-- Details on the standard operating procedure (SOP) including the proposed maintenance
plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person,
and the developer/owner.
-- Details on the size, type and design of the flood barrier.
Select
Select
Select
Select
Select
Select
Select
Select
Select
62
PUB-DD-CHECKLIST
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
I hereby confirm that the above items have been complied with and endorsed on the plans.
63
(a) The planning, design, construction activities and procedures for plan submission shall comply fully
with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water
Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the
development site.
(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained
away without causing flooding within the lot or in areas outside the lot.
(d) There is no direct connection from the internal drains within the basement or sub-basement to the
external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professional
bodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *
64
Appendix 2
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
To:
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
works.
2. This form is to be accompanied by the relevant attachments.
3. Please read the DC checklist before filling the form.
Information
1. For enquiries on application of status, please call 67319681 / 67319513
Particulars of Project
Project Reference Number
Particulars of Application
Submission Type
Select
Dated
Please Select
Role In Project
Registration No
66
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Telephone No.
Extension No
Fax No.
Email Address
Development Details
Type of Submission
Select
Type of Development
Select
Is there basement?
Yes
No
Yes
No
Yes
No
No.of storeys in
development
Storeys
L/s
Area of development
ha
DR in the development?
Yes
No
mRL
mRL
Yes
Select
Select
No
67
ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION
Attachments
Development Control Plan
Add
Delete
68
Select
Address
Contact No
Email
(Tick if applicable)
Attachments:
1. Site plan and first storey plan
(indicate the sewer setback, propose and existing sewer
connection, top/invert level of manhole(s), and platform levels,
propose and existing sanitary drainline.
2. Detailed sanitary plan (to show sanitary line)
3. Is there pumping system(s) for used water?
Declaration:
Name
Yes
Role
By QP/PE:
I have carried out a
thorough investigation
of the existing
sewerage system within
and adjacent to the site
and will take every
practical measure to
ensure that the
proposed development
will not disrupt or affect
any existing
sewer/drain-line that
serves other properties/
premises.
Select
by QP/PE:
I hereby certify that
these plans and the
works shown therein
comply with the
provisions of the
Sewerage and
Select
No
69
Drainage
Act (Chapter 294),
the Sewerage and
Drainage (Sanitary
Works) Regulations
and the current Code
of Practice on the
Sewerage and Sanitary
Works
by PE(M/E) if there is
pumping system(s)
I, being a Professional
Engineer hereby certify
that the propose
mechanical and
electrical(M&E) works
of the above
mentioned project are
design in accordance
with the current Code
of Practice on
Sewerage
and Sanitary Works,
Sewerage and
Drainage
Act (Chapter 294) and
other sewerage
requirements as
stipulated by Water
Reclamation (Network)
Department.
Select
Attachments:
1. Detail plan drawings of used water pumping system(s)
2. Attached Form D2/QP if an alternate power source is not available
3. Design calculations
4. Pump and system curves
5. Relevant equipment catalogues
Please state if any
deviation from the
COP
Pump Design
Condition
Pump Application
Brand
Model
Estimated
Inflow
(l/s)
Pump
operating
capacity (l/s)
Pump
operating
head (m)
Solids
free
passage
Size (mm)
Motor
Rating (kw)
Select
Add
Delete
70
Particulars of Plumber/Contractor
Name
Select
Firm Details
Contact No
Email
please indicate your
membership/license
PUB LP
SPS registered
N.A.
Attachment:
1. Detail sewerage plan
To show: propose sewer alignment with diameter, material,
top/invert level, existing sewer alignment to be abandoned (if any)
2. Design & calculation of RC trench (if applicable)
Declaration
by PE (Civil):
I hereby certify that
the sewerage plans
and the works shown
therein comply with
the provisions of the
Sewerage and
Drainage
Act (Chapter 294), the
Sewerage and
Drainage
(Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.
Name
Role
Phone Email
Firm Arch/PE
Reg No
Select
Particulars of Plumber/Contractor
Tick if same as in Sanitary Work
Name
Select
NRIC/Passport No.
Firm Details
Contact No
71
Email
please indicate your
membership/license
PUB LP
SPS registered
N.A.
Attachment:
1. Site Plan and First Sty Plan
2. Basement Plans
3. Detail of Drainage Work
4. DC Checklist
5. Proposed plan showing crest levels, platform levels with and
without flood barriers at various entrance and exit points, and
flood barrier installed at all points of entry and exit for building
premises or for entire development
Name
Declaration
Role
Phone
Firm Arch/PE
Reg No
Select
Attachment:
1. First storey plan, showing sewer setback, sewer alignment, diameter,
manhole & sewer ID.
2. Cross sectional plan
3. Sewer and drainage plan
4. Proposed plan showing crest levels, platform levels with and without
flood barriers at various entrance and exit points, and flood barrier
installed at all pints of entry and exit for building premises or for entire
development.
72
Declaration
I hereby certify that these
plans and the works shown
therein comply with the
provisions of the Sewerage
and Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on
Sewerage and Sanitary
Works.
Name
Role
Phone Email
Firm
Arch/PE
Reg No
Select
73
DC SUBMISSION
Particulars of Owner(s)
Name
Select
Address
Contact No
Email
(Tick if applicable)
Attachments:
1. Site plan and first storey plan
to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and
platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and
sewer identification number
Name
Select
Select
Role
Contact
Yes
Email
No
Firm
Arch/PE
Reg No
75
COP
76
DC SUBMISSION
(Tick if applicable)
Attachments:
1. Site Plan and First Sty Plan
2. Basement Plans
3. DC Checklist
4. Proposed plan showing crest levels, platform levels
with and without flood barriers at various entrance
and exit points, and flood barrier installed at all points
of entry and exit for building premises or for entire
development
Declaration
Name
Select
Role
Contact
Firm
Arch/PE
Reg No
77
PUB-DD-CHECKLIST
Select
Select
Select
Select
Select
Ha
Select
Select
Select
Select
Select
78
Bioretention Swales/Basins
Select
Rain Gardens
Select
(vii) Others
(Please indicate if any)
Select
Detention volume
Detention volume to meet the requirement as stated in Clause 7.1.5
of the latest edition of Code of Practice on Surface Water Drainage
(Detention V)
Select
Select
Select
Select
Select
79
Select
*If yes, please also respond
to 7(a), 7(b)*
mRL
Select
80
Select
Select
Select
For developments where flood barriers are automated and/or with more than 2
points of entry/exit, the following document shall be submitted at Detailed Planning
stage.
-- Details on the Standard Operating Procedure (SOP) including the operation and
maintenance of the flood barrier to be endorsed by Mechanical and/ or Electrical
QP or PE, and the developer/ building owner.
-- Details on the size, type and design of the flood barrier.
81
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
82
Select
Select
83
Select
Select
Select
Select
Select
Select
I hereby confirm that the above items have been complied with and endorsed on
the plans.
I hereby certify that the standard endorsement below will also be certified on the
plans:(a) The planning, design, construction activities and procedures for plan
submission shall comply fully with the requirements as stipulated in the
latest edition of the Code of Practice on Surface Water Drainage and the
Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge
all runoff from the development site.
(c) The runoff within, upstream of and adjacent to the development lot can be
effectively drained away without causing flooding within the lot or in areas
outside the lot.
(d) There is no direct connection from the internal drains within the basement or
84
85
PUB-DD-CHECKLIST
Select
Select
Select
Select
Select
Select
Select
Select
Select
86
PUB-DD-CHECKLIST
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
For developments where flood barriers are automated and/or with more than 2 points of
entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.
-- Details on the standard operating procedure (SOP) including the proposed maintenance
plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person,
and the developer/owner.
-- Details on the size, type and design of the flood barrier.
Select
Select
Select
Select
Select
Select
Select
Select
Select
88
PUB-DD-CHECKLIST
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
Select
I hereby confirm that the above items have been complied with and endorsed on the plans.
I hereby certify that the standard endorsement below will also be certified on the plans:89
(a) The planning, design, construction activities and procedures for plan submission shall comply fully
with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water
Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007.
(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the
development site.
(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained
away without causing flooding within the lot or in areas outside the lot.
(d) There is no direct connection from the internal drains within the basement or sub-basement to the
external roadside drains.
* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professional
bodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *
90
Appendix 3
PUB-BPU-CLRDP01
To:
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
works.
2. This form is to be accompanied by the relevant attachments.
Information
1. For enquiries on application of status for :
a) Industrial development,please call 67319637
b) Non-industrial development,please call 67319628 / 67319653
Particulars of Project
Project Reference Number
Project Title
Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Project Address
Plan Type
Please Select
001
91
Particulars of Application
Application for
Clearance Certificate
for Detailed Plan on
Sewerage
Please Select
Submission Type
Please Select
Development Proposal
Application
Please Select
NA
Dated
92
PUB-BPU-CLRDP01
(Tick if applicable)
Attachments:
1. Detail Sanitary Plan
2. Detail of Holding Tank/STP/Retention tank (if applicable)
Declaration
Name
Select
Role
Phone
Firm
Arch / PE
Reg. No
Firm
Arch / PE
Reg. No
Particulars of Plumber/Contractor
Name
Please select
Firm Details
Contact No
Email
Please indicate your
Registration / License
Number
SPS registered
PUB LP
N.A
Date of Commencement
Date of Completion
Name
I, being a Professional
Engineer hereby certify
that the proposed
mechanical and electrical
(M&E) works of the above
mentioned project are in
accordance with the current
Code of Practice on
Sewerage and Sanitary
Works, Sewerage and
Drainage Act (Chapter 294)
and other sewerage
requirements as stipulated
by Water Reclamation
(Network) Department and
have been fully and
accurately reflected in the
submitted detail plan
drawings.
Select
Yes
Role
No
Phone
Attachments
93
Brand
Model
Estimated
Inflow
(l/s)
Pump
operating
capacity (l/s)
Pump
operating
head (m)
Solids
free
passage
Size (mm)
Motor
Rating (kw)
Select
Add
Delete
94
PUB-BPU-CLRDP01
(Tick if applicable)
Attachments:
1. Detail Sewerage Plan (to indicate: diameter, pipe material, gradient, manhole detail, and
longitudinal section)
2. Design & Calculation of RC Trench (if structure is proposed over sewer). PE to endorse in drawing
Declaration
Name
by PE (Civil):
I hereby certify that the
sewerage plans and the
works shown therein
comply with the provisions
of the Sewerage and
Drainage Act (Chapter
294), the Sewerage and
Drainage (Sanitary Works)
Regulations, the current
Code of Practice on the
Sewerage and Sanitary
Works.
Select
Role
Contact
Firm
Arch / PE
Reg. No
Date of Commencement
Date of Completion
Particulars of Plumber/Contractor
Name
Please select
Firm Details
Contact No
Email
Please indicate your
Registration / License
Number
SPS registered
PUB LP
N.A
95
PUB-BPU-CLRDP01
(Tick if applicable)
Attachments:
1. Detail Plan on Drainage Works as required under Section 33(3) and 33(4) of the SDA, Chapter 294
2. As built drawings for drainage works and piling records
3. Leak Test Certificates on installed flood barriers
4. As built survey plans for detention tank system
Declaration
Name
Select
Role
Contact
Firm
Arch / PE
Reg. No
96
Appendix 4
PUB-BPU-COMPOFWORK
To:
Building Plan Unit
PUB
40 Scotts Road #15-01
Environment Building
Singapore 228231
Instructions
1. The form shall be digitally signed by the appropriate QP/PE
2. The form is to be submitted by the QP/PE appointed under
section 8,9 & 11 of Building Control Act.
Particulars of Project
Project Ref No
Project Title
97
3. CCTV for the newly constructed sewer (applicable for sewer with
diameter 600mm or larger) to be sent to: 82 Toh Guan Road East
#C2-14, Singapore 608575
4 As built pumping installation plan (if applicable)
5 Others (Eg: Sewage Treatment Plant (STP), holding tank)
Declaration (PE Civil)
PE Name
Select
PE Reg no
Role
Ph No
Email
Firm
Declaration (PE Mech.)
PE Name
Select
PE Reg no
Role
Ph No
Email
Firm
Declaration (PE Elec. )
PE Name
Select
PE Reg no
Role
Ph No
Email
Firm
98
I/We, the above name, hereby certify that to the best of my knowledge and
belief, the works were carried out in accordance with the above building
plans and detailed plans, the current Code of Practice on Sewerage and
Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the
Sewerage and Drainage (Sanitary Works) Regulations and any other
conditions under which the plans and amendments thereto were approved
by PUB.
I
sewers and manholes and the test results have met the requirements
stipulated in Code of Practice on Sewerage and Sanitary Works.
I
Select
SPS registered
PUB LP
NA
99
Tick if applicable
Attachments:
1. As built sanitary plan (to be endorsed by QP)
2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,
Singapore 228231, PUB Water Reclamation (Network) Department
3. As built plans for used-water pumping system(s)
Declaration
Name
Role
Select
Select
Select
I, being a Professional
Engineer (M/E) hereby certify
that to the best of my
knowledge and belief,
the completed mechanical
and electrical (M&E) works
of the above mentioned
project are in accordance
Select
Phone
Firm
Arch/PE
Reg No
100
Select
SPS registered
PUB LP
NA
Select
Select
Attachments:
4b. The allotment of address from the comptroller of property tax
4c. Floor layout plan showing the location of the appliances
4d. SP Services' Ltd Utilities Bill
The number of chargeable sanitary appliances in the premises upon completion of this project are
as follows:
House No. or Unit
No. (Eg. #01-01)
Add
Urinal
Bidet
Slop Sink
Urinal
#Common Area
Urinal
Bidet
Slop Sink
Urinal
If Applicable
Declaration
Name
Role
Phone
Firm
Arch/PE
Reg No
Select
Attachment:
As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench
and position of the existing sewer.
If Applicable
102
ha
Attachment:
1. As constructed drainage plan
(to show as built platform level, crest level and flood
protection levels)
2. Internal drainage Hydraulic calculations submissions
(for developments more than 0.4 Ha)
Declaration
Name
Role
Phone
Firm
Arch/PE
Reg No
Select
Declaration by PE(Civil)
Name
Select
PE Reg No
Role
Ph No
Email
Firm
Declaration
I hereby certify that the work has been completed in compliance with the approved drawing,
Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.
Attachment:
1. Post Construction CCTV to the public sewer (when required in DC Clearance).
Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,
PUB Water Reclamation (Network) Department
2. As constructed drawing showing the sewer setback
3. As built topographical survey plan
103
Declaration
by PE (Civil):
I certify that the drainage work
are designed in full compliance
with PUB requirement including
Sewerage and Drainage Act
(Chapter 294) and COP on
Surface Water Drainage.
I am requesting for PUB
Clearance for CSC and
confirms there is no further
outstanding work.
Name
Role
Phone
Firm
Arch/PE
Reg No
Select
Select
104
Tick if applicable
Attachments:
1. As built sanitary plan (to be endorsed by QP)
2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,
Singapore 228231, PUB Water Reclamation (Network) Department
3. As built plans for used-water pumping system(s)
Declaration
Name
Role
Select
Select
Select
by PE (M/E)
I, being a Professional
Engineer hereby certify
that to the best of my
knowledge and belief,
the completed mechanical
and electrical (M&E) works
of the above mentioned
Select
Phone
Firm
Arch/PE
Reg No
105
Select
SPS registered
PUB LP
NA
Select
Select
Attachments:
4b. The allotment of address from the comptroller of property tax
4c. Floor layout plan showing the location of the appliances
4d. SP Services' Ltd Utilities Bill
The number of chargeable sanitary appliances in the premises upon completion of this project are
as follows:
House No. or Unit
No. (Eg. #01-01)
Add
Urinal
Bidet
Slop Sink
Urinal
#Common Area
WC
If Applicable
Urinal
Bidet
Slop Sink
WC
Urinal
Declaration
Name
Role
Phone
Firm
Arch/PE
Reg No
Select
Attachment:
As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench
and position of the existing sewer.
107
If Applicable
ha
Attachment:
1. As constructed drainage plan
(to show as built platform level, crest level and flood
protection levels)
2. Internal drainage Hydraulic calculations submissions
(for developments more than 0.4 Ha)
Declaration
Name
Role
Phone
Firm
Arch/PE
Reg No
Select
Declaration by PE(Civil)
Name
Select
PE Reg No
Role
Ph No
Email
Firm
Declaration
I hereby certify that the work has been completed in compliance with the approved drawing,
Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.
Attachment:
1. Post Construction CCTV to the public sewer (when required in DC Clearance).
Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,
PUB Water Reclamation (Network) Department
2. As constructed drawing showing the sewer setback
3. As built topographical survey plan
108
Declaration
by PE (Civil):
I certify that the drainage work
are designed in full compliance
with PUB requirement including
Sewerage and Drainage Act
(Chapter 294) and COP on
Surface Water Drainage.
I am requesting for PUB
Clearance for CSC and
confirms there is no further
outstanding work.
Name
Role
Phone
Firm
Arch/PE
Reg No
Select
Select
109
Appendix 5
ENV-CBPU-CLRTOP01-NEW SUBMISSION
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).
2. This form is to be accompanied by the relevant attachments.
Information
1. Service Standard :
Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number
Project Title
Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Plan Type
Add
Please Select
001
Delete
Particulars of Application
Development Proposal
Application
Please Select
110
Date of CBPU
DC Clearance
Application for Temporary
Occupation Permit
19/03/2014
Pollution Control Works
Sewerage Works
Drainage Works (for crest levels , platform
levels, flood protection levels based on
approved flood protection measures)
Environmental Health (Sanitary Facilities)
Remarks:
Application for
Partial TOP (if applicable)
NA
Dated
111
Please Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
I have inspected the public toilets in this development and that they have
112
Attachments
Dated
Certificate of Completion and Inspection for Sanitary Works
(PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for Sewerage
Works (PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for the
Mechanical and Electrical Works for
Sewerage Installation
(PUB-BPU-COMPOFWORK)
Certificate of Inspection for Drainage Works
As built survey plans indicating crest levels, platform
levels, flood protection levels based on approved
flood protection measures
As built drawings for detention tank systems and final
design calculations, and factory test report for its
pumping system.
Standard Operating Procedure for pumped drainage
system(basement/ detention tank)
Standard Operating Procedure for flood barrier
Developer/Owner declaration on the following I shall inspect and declare that the crest levels are
constructed to approved plans annually/every 3
years upon obtaining the TOP
Developer/Owner declaration on the following I shall submit the following documents as required annually
upon obtaining the TOP.
- Certificate of inspection on flood barriers on site, including
leak test certificate.
- Amendments to SOP for flood barrier.
- Certificate of inspection on pumped drainage system
(basement/detention tank).
- Certificate of inspection on ABC Waters design features.
113
Appendix 6
ENV-CBPU-CLRTOP01-RESUBMISSION
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).
2. This form is to be accompanied by the relevant attachments.
Information
1. Service Standard :
Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number
Project Title
Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Plan Type
Add
Please Select
001
Delete
Particulars of Application
Development Proposal
Application
Please Select
114
Date of CBPU
DC Clearance
Application for Temporary
Occupation Permit
19/03/2014
Pollution Control Works
Sewerage Works
Drainage Works (for crest levels ,
platform levels, flood protection levels
based on approved flood protection
measures)
Environmental Health (Sanitary Facilities)
Remarks:
Application for
Partial TOP (if applicable)
Previous TOP Advice from
CBPU (if applicable)
CBPU Processing Officer
NA
Dated
development premises
116
Please Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
117
Attachments
Dated
Certificate of Completion and Inspection for Sanitary Works
(PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for Sewerage
Works (PUB-BPU-COMPOFWORK)
Certificate of Completion and Inspection for the
Mechanical and Electrical Works for
Sewerage Installation (PUB-BPU-COMPOFWORK)
Certificate of Inspection for Drainage Works
As built survey plans indicating crest levels, platform levels,
flood protection levels based on approved flood protection
measures
As built drawings for detention tank systems and final
design calculations, and factory test report for its
pumping system.
Standard Operating Procedure for pumped drainage
system (basement/ detention tank)
Standard Operating Procedure for flood barrier
Developer/Owner declaration on the following - I shall
inspect and declare that the crest levels are constructed
to approved plans annually/every 3 years upon obtaining
the TOP
Developer/Owner declaration on the following I shall submit the following documents as required annually
upon obtaining the TOP.
- Certificate of inspection on flood barriers on site, including
leak test certificate.
- Amendments to SOP for flood barrier.
- Certificate of inspection on pumped drainage system
(basement/detention tank).
- Certificate of inspection on ABC Waters design features.
118
Appendix 7
ENV-CBPU-CLRCSC01-NEW SUBMISSION
To:
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).
2. This form is to be accompanied by the relevant attachments.
Information
1. Service Standard : Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number
Project Title
Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Plan Type
Add
Please Select
001
Delete
Particulars of Application
Development Proposal
Please Select
119
Application
Date of CBPU
DC Clearance
Application for Compliance
Certificate and Clearance
for Certificate of Statutory
Completion
NA
Dated
120
Dated
Please Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Confirmation
1) I confirm that:
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Date:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A&A and reconstruction
building projects.
Attachments
Dated
1. Certificate of Completion and Inspection for Building
Plan for Environmental Health
2. Certificate of Completion and Inspection for Sanitary
Works (PUB-BPU-COMPOFWORK)
3. Certificate of Completion and Inspection for Sewerage
Works (PUB-BPU-COMPOFWORK)
4. Certificate of Completion and Inspection for the
Mechanical and Electrical Works
for Sewerage Installation (PUB-BPU-COMPOFWORK)
5. Certificate of Inspection for Drainage Works
122
Attachments (Continue)
6. As Constructed drainage drawings in accordance to COP for
Surface Water Drainage Appendix 5
7. As-built survey plans indicating crest levels, platform levels
and flood protection levels in accordance to COP for
Surface Water Drainage Appendix 2
123
Appendix 8
ENV-CBPU-CLRCSC01-RESUBMISSION
To:
Instructions
1. This form is to be digitally signed by the Qualified Person responsible for the
project(s).
2. This form is to be accompanied by the relevant attachments.
Information
1. Service Standard : Within 7 working days.
2. For enquiries on application of status, please call 67319783 / 67319527
Particulars of Project
Project Reference Number
Project Title
Location Description
[Include Lot/Plot, MK/TS,
House No, Building
Address and Road
information]
Plan Type
Add
Please Select
001
Delete
Particulars of Application
Development Proposal
Please Select
124
Application
Date of CBPU
DC Clearance
Application for Compliance
Certificate and Clearance
for Certificate of Statutory
Completion
NA
Dated
125
Dated
Please Select
Role In Project
Registration No
Firm Name
UEN
Firm Address
Telephone No.
Extension No
Fax No.
Email Address
Confirmation
1) I confirm that:
a) there are no roof gutters (including rain water down pipes and
outlets, and roof supper drains) provided for in the development
proposal; or
b) waiver for roof gutter has been obtained from the National Environment
Agency in writing on : File Ref No:
Date:
c) There are roof gutters (including rain water down pipes and outlets,
and roof scupper drains) provided in the development proposal. Waiver
application from ENV-CBPU-WVRG is attached.
d) Confirmation for a), b) or c) not applicable, for A&A and reconstruction
building projects.
Attachments
Dated
1. Certificate of Completion and Inspection for Building
Plan for Environmental Health
2. Certificate of Completion and Inspection for Sanitary
Works (PUB-BPU-COMPOFWORK)
3. Certificate of Completion and Inspection for Sewerage
Works (PUB-BPU-COMPOFWORK)
4. Certificate of Completion and Inspection for the
Mechanical and Electrical Works
for Sewerage Installation (PUB-BPU-COMPOFWORK)
5. Certificate of Inspection for Drainage Works
127
Attachments (Continue)
6. As- Constructed drainage drawings in accordance to COP for
Surface Water Drainage Appendix 5
7. As-built survey plans indicating crest levels, platform levels
and flood protection levels in accordance to COP for
Surface Water Drainage Appendix 2
128
Appendix 9
PUBWTR-0-MCG01
24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/
Professional Engineer.
The measure of business activity that takes into account the core business
operations specific to the site. (e.g. No of wafers for wafer fab plant, no of
occupants in an office building, metric tonnes of wash load for a laundry etc)
Production rate
BAI/mth
PUB Water
Manufacturing use
NEWater
m/mth
m/mth
Please submit a copy of the water balance chart indicating the quantity of water
required at each manufacturing process. See Annex A.
Any water recycling
Yes
No
Yes
No
Domestic use
m/mth
Toilet Flushing
m/mth
m/mth
No of staff that
take shower
Showering
m/mth
Cooling Usage
PUB Water
NEWater
No of cooling tower
129
Refrigerating capacity
and operating hours
of individual cooling
towers:
Add
Tons
hr/mth
m/mth
m/mth
Delete
Other Usage
PUB Water
NEWater
No of toilets
Toilets washing
m/mth
m/mth
m/mth
m/mth
Add
Delete
Total
Total water
requirements
m/mth
m/mth
m/mth
m/mth
Type of water
Water required
m/mth
Add
Delete
130
Appendix 10
PUBWTR-0-NMC01
24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/
Professional Engineer.
NEWater
Project Description
BAI (Business Activity
Indicator)
No of occupants
Any Canteen?
Yes
No
Domestic use
(m3/mth)
Toilet Flushing
(m3/mth)
(m3/mth)
No of occupants
that take shower
Showering
(m3/mth)
Cooling usage
PUB Water
NEWater
No of cooling towers
Refrigerating capacity
and operating hours of
individual cooling towers:
Add
Tons
hr/mth
(m3/mth)
(m3/mth)
Delete
Other usage
PUB Water
NEWater
131
No of toilets
Toilets washing
(m3/mth)
(m3/mth)
(m3/mth)
(m3/mth)
Add
Delete
Total
(m3/mth)
(m3/mth)
(m3/mth)
(m3/mth)
Type of water
Water required
(m3/mth)
Add
Delete
132
Appendix 11
PUBWTR-0-RCG01
24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service
Plumber/Professional Engineer.
NEWater
No of Units
Household usage
m/mth
Swimming Pool
(make-up water)
m/mth
Common Amenities
m/mth
m/mth
General Washing
m/mth
m/mth
Gardening
m/mth
m/mth
m/mth
m/mth
Add
Delete
Other usage
(Please specify)
Add
Delete
m/mth
m/mth
Type of water
Water required
m/mth
Add
Delete
133
Appendix 12
PUBWTR-0-TSP01
24/02/2014
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber/
Professional Engineer.
NEWater
(m3/mth)
Toilet Flushing
(m3/mth)
(m3/mth)
(m3/mth)
Any Canteen?
Yes
No
Washing use
PUB Water
NEWater
Washing vehicle
(m3/mth)
(m3/mth)
Washing Frameworks/Steel
bars/Moulds
(m3/mth)
(m3/mth)
(m3/mth)
(m3/mth)
Add
Delete
Total
(m3/mth)
Concreting use
Recycling of wash water
(m3/mth)
(m3/mth)
(m3/mth)
Yes
No
134
(m3/mth)
Add
(m3/mth)
Delete
Total
(m3/mth)
(m3/mth)
135
(Continue)
Workers dormitory
PUB Water
Any workers dormitory?
NEWater
Yes
No
(m3/mth)
0
(m3/mth)
(m3/mth)
Type of water
Water required
(m3/mth)
Add
Delete
Type of Project
Construction Site Location
Total Built-Up Floor Area
M2
Started from
136
Appendix 13
PUBWTR-0-PPC01
PRE-PLANNING CONSULTATION
Date:
24/02/2014
To:
PUB Water
Water Supply (Network) Department
Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231
Instructions
1. This form is to be digitally signed by the Qualified Person.
2. Design of water service installation including the mode of supply shall comply
with the Public Utilities (Water Supply) Regulations and the Singapore
Standard CP 48 - Code of Practice for Water Services.
3. Water meter shall be located above ground near to the main entrance of the
above development and shall be easily accessible for maintenance and
reading.
4. There shall be no risk of contamination to PUB potable water supply system
through backflow.
5. Potable water storage cisterms should not be located below sanitary pipes
and other non-potable water pipes.
6. This form is to be accompanied by the relevant documents (refer to
Submission Checklists).
Particulars of Project
Project Reference Number
Development Type
Please Select
Location Description
Platform Level of
Development (mRL)
Reduced Level of Highest
Direct Supply
Water Fitting (mRL)
Issue For Discussion
138
Please Select
Name of Company
UEN
Submission Checklists
1
Site Plan
139
Appendix 14
PUBWTR-0-WLP01
24/02/2014
To:
PUB Water
Water Supply (Network) Department
Public Utilities Board
40 Scotts Road #22-01
Environment Building
Singapore 228231
Instructions
1. This form is to be digitally signed by the Licensed Water Service Plumber.
2. This form is to be accompanied by the relevant documents
(refer to Submission Checklists).
Particulars of Project
Notification Number
Project Description
Location Description
Please Select
Particulars of Customer
Name
Please Select
Name of Company
140
UEN
Address
Telephone No.
Extension No.
Fax No.
Please Select
Residential Address
141
I,
, the undersigned, hereby certify
that the water service installation at the premises is designed in
full compliance with the Public Utilities Board's requirements
including the Public Utilities (Water Supply) Regulations,
Singapore Standard CP 48 - Code of Practice for Water
Services, Authorities' requirements and other statutory
requirements. I also confirm that potable water storage cisterns
shall not be located below sanitary pipes and other non-potable
water pipes. All the water fittings installed in the water service
installation are of types that comply with standards prescribed/
stipulated by PUB and all water conservation measures will
be adopted.
The site plan, the water schematic drawing/s and the breakdown
of water requirements, if any, of the above developments are
attached herewith.
Submission Checklists
1
Site Plan
142
Appendix 15
PUBWTR-0-WSW01
24/02/2014
PUB Water
To:
Instructions
1. This form is to be digitally signed by the Professional Engineer.
2. This form is to be accompanied by the relevant documents
(refer to Submission Checklists).
3. Please note that for "Particulars of Licensed Water Service Plumber", the
member role of "Licensed Water Service Plumber" is required when updating
the member's details.
Particulars of Project
Pre-Planning Consultation
Yes
No
Date of Pre-Planning
Consultation with PUB
Type of Submission
New Submission
Resubmission
PUB Ref
WSN 92433 /
Please Select
Location Description
Nature of Work
Please Select
143
Please Select
Name of Company
UEN
Address
144
Please Select
Name of Company
UEN
Address
Telephone No.
Extension No.
Fax No.
Please Select
Address
Telephone No.
Extension No.
Fax No.
I,
, the Professional Engineer-in-charge
hereby certify that the water service installation is designed in full
compliance with the Public Utilities Board's requirements including
the Public Utilities (Water Supply) Regulations, Singapore Standard
CP 48 - Code of Practice for Water Services, Authorities'
requirements and other statutory requirements. I also confirm that
potable water storage cisterns shall not be located below sanitary
pipes and other non-potable water pipes. All the water fittings
installed in the water service installation are of types that comply
with standards prescribed/stipulated by PUB and all water
conservation measures will be adopted.
The site plan, the water schematic drawing/s and the breakdown of
water requirements, if any, of the above developments are attached
herewith.
Submission Checklists
1
Site Plan
145
146
Appendix 16
PUBWTR-0-CSC01
To:
Instructions
1. This form is to be digitally signed by the Professional Engineer.
Particulars of Project
Project Reference Number
Development Type
Please Select
Project Description
Development Address
Nature of Work
Please Select
Please Select
Name of Company
UEN
Please Select
Telephone No.
Extension No.
Fax No.
147
FORM-PE-CSC
Page 2
I,
148
Hotline: 67313512
Email: PUB_BPU@pub.gov.sg
149