You are on page 1of 8

Project:North Mine Majors

Layout:EHM-All Act WBS


TASK filter: 1-78-1-Jan 2013 (Revision 3191301S).
Activity ID

Data Date; 01-Feb-13


Print Date; 07-Feb-13 13:13

Extraction Hydrotransport Maintenance


(EHM)

Activity Name

Equipment

Resource

FM39 North Mine Majors


FM39.13 78-1 Outage Jan 2013 (Revision 3191301S)
FM39.13.14 Durations

Orig
Dur

Duration %
Complete

BDBG Start
WF Hrs

Finish

Total
Float

70h

0%

4043h

01-Feb-13 07:30 13-Feb-13 14:00

16442h

70h

0%

4043h

01-Feb-13 07:30 13-Feb-13 14:00

16442h

31h

0%

0h

07-Feb-13 20:00 13-Feb-13 14:00

16442h

IST.3260

FEED OFF DURATION 78-1 (Target )

138h

0%

0h

07-Feb-13 20:00 13-Feb-13 14:00

69058h

IST.3270

TOOLS ON DURATION DRY 78-1 (Target 72hrs )

94h

0%

0h

08-Feb-13 08:00 12-Feb-13 06:00

-46h

IST.3340

TOOLS ON WET DURATION 78-1 (Target 72 hrs )

96h

0%

0h

09-Feb-13 08:00 13-Feb-13 08:00

-72h

TF SS

70h

0%

0h

01-Feb-13 07:30 13-Feb-13 14:00

16442h

IST.3590

PRE WORK

0h

0%

0h

01-Feb-13
07:30*

PRE
110hWORK

IST.3280

FEED OFF (Target 05-Feb @ 20:00)

0h

0%

0h

07-Feb-13
20:00*

-72h

IST.3290

TOOLS ON DRY (Target 06-Feb @ 08:00)

0h

0%

0h

08-Feb-13 08:00

-47h

IST.3300

TOOLS ON WET (Target 07-Feb @ 08:00)

0h

0%

0h

09-Feb-13 08:00

-51h

IST.3310

TOOLS OFF DRY (Target 10-Feb @ 08:00)

0h

0%

0h

12-Feb-13
06:00*

-46h

IST.3320

TOOLS OFF WET (Target 10-Feb @ 08:00)

0h

0%

0h

13-Feb-13
08:00*

-72h

IST.3330

FEED ON (Target 10-Feb @ 13:30)

0h

0%

0h

13-Feb-13 14:00

8h

0%

0h

07-Feb-13 20:00 09-Feb-13 08:00

-16h

FM39.13.1 Milestones

FM39.13.12 Safe Out

February
T T FSS

TF SS

T FSS

TOOLS ON DURATION DRY 78-1 (Target 72hrs )


TOOLS ON WET DURATION 78-1 (Target 72 hrs )

FEED OFF (Target 05-Feb @ 20:00)

TOOLS ON DRY (Target 06-Feb @ 08:00)


TOOLS ON WET (Target 07-Feb @ 08:00)
TOOLS OFF DRY (Target 10-Feb @ 08:00)

TOOLS OFF WET (Target 10-Feb @ 08:00)

69058h

FEED ON (Target 10-Feb @ 13:30)

DE-ICING (Manbasket required)

36h

0%

0h

07-Feb-13 20:00 09-Feb-13 08:00

-51h

IST.3630

FLUSH

6h

0%

0h

08-Feb-13 14:00 08-Feb-13 20:00

-51h

IST.3350

SAFE OUT

12h

0%

0h

08-Feb-13 20:00 09-Feb-13 08:00

-51h

8h

0%

54h

07-Feb-13 20:00 08-Feb-13 16:00

-16h

DE-ICING (Manbasket required)

1h

0%

0h

07-Feb-13 20:00 07-Feb-13 21:00

-47h

Scaling the Hopper Walls

FLUSH
SAFE OUT

IST.3610

Scaling the Hopper Walls

SCP.20065269.0020

Airblast Hopper and Inlet Chute with Manbasket

75-6T-1

FM.LSA28

4h

0%

12h

07-Feb-13 21:00 08-Feb-13 01:00

-39h

Airblast Hopper and Inlet Chute with Manbasket

SCP.20065269.0010

Install Barricade Scaffold at Hopper

75-6T-1

FM.LSCF.NM

4h

0%

12h

07-Feb-13 21:00 08-Feb-13 01:00

-39h

Install Barricade Scaffold at Hopper

SCP.20065269.0029

Chip Grouser Bars As Required and Rotate

75-6T-1

FM.LSA28

2h

0%

6h

08-Feb-13 01:00 08-Feb-13 03:00

-39h

Chip Grouser Bars As Required and Rotate

SCP.20065269.0028

Sandblast for Tooth & Base Replacement

75-6T-1

FM.LSA28

8h

0%

24h

08-Feb-13 08:00 08-Feb-13 16:00

-47h

Sandblast for Tooth & Base Replacement

0h

0%

24h

09-Feb-13 08:00 09-Feb-13 20:00

0h

0h

0%

8h

09-Feb-13 16:00 09-Feb-13 20:00

0h

4h

0%

8h

09-Feb-13 16:00 09-Feb-13


20:00*

12h

09-Feb-13 08:00 09-Feb-13 16:00

0h

FM39.13.15 General
FM39.13.15.SCP.20001974 Replace Mcc B100B
B
Ground Fauld Card. - SCP.20001974
SCP.20001974.0010

Replace Mcc B100B Ground Fauld Card.

78-1PMCC0...

FM39.13.15.SCP.20002525 Replace Harmonic Resistor on 78-1. - SCP.20002525


Remaining Level of Effort

Milestone

FM.LEL22.NM

0h

0%

16h

FM39

Actual Level of Effort


Actual Work
Remaining Work
Critical Remaining Work

North Mine Majors - All Activities


Page 1 of 8

March
TF SS T

FEED OFF DURATION 78-1 (Target )

IST.3620

FM39.13.17 PREWORK

Replace Mcc B100B Ground Fauld Card.

T FSS

Project:North Mine Majors


Layout:EHM-All Act WBS
TASK filter: 1-78-1-Jan 2013 (Revision 3191301S).
Activity ID

Activity Name

SCP.20002525.0010

Equipment

Replace Harmonic Resistor on 78-1.

78-1PVFD5-5A

Resource

FM.LEL22.NM

FM39.13.2 Crusher DRC 6


FM39.13.2.SCP.20065271 Crusher Regulatory Safety Switches PM - SCP.20065271
SCP.20065271.0010

Crusher Regulatory Safety Switches PM

75-6B1000

FM.LEL22.NM

FM39.13.2.1 Hoppers DRC 6


FM39.13.2.1.SCP.20065270 Crusher Minor Inst. PM - SCP.20065270
SCP.20065270.0010

Data Date; 01-Feb-13


Print Date; 07-Feb-13 13:13

Extraction Hydrotransport Maintenance


(EHM)

Perform Instrumentation PM

75-6B-4001

FM.LIN.NM

FM39.13.2.2 Crusher Rolls DRC 6


FM39.13.2.2.SCP.20071957 flip belts on drc 6 fixed roll - SCP.20071957

Orig
Dur

Duration %
Complete

BDBG Start
WF Hrs

Finish

Total
Float

8h

0%

16h

09-Feb-13 08:00 09-Feb-13 16:00

12h

15h

0%

322h

08-Feb-13 08:00 12-Feb-13 06:00

-8h

6h

0%

12h

08-Feb-13 08:00 08-Feb-13 14:00

2h

6h

0%

12h

08-Feb-13 08:00 08-Feb-13 14:00

42h

7h

0%

48h

08-Feb-13 08:00 09-Feb-13 08:00

0h

7h

0%

48h

08-Feb-13 08:00 09-Feb-13 08:00

0h

24h

0%

48h

08-Feb-13 08:00 09-Feb-13 08:00

24h

8h

0%

250h

08-Feb-13 16:00 12-Feb-13 06:00

-8h

0h

0%

36h

08-Feb-13 16:00 09-Feb-13 04:00

-16h

TF SS

February
T T FSS

TF SS

T FSS

Replace Harmonic Resistor on 78-1.

Crusher Regulatory Safety Switches PM

Perform Instrumentation PM

SCP.20071957.0010

Sandblast crusher sheaves (Glass Bead)

75-6T-1

FM.LSA28

4h

0%

12h

08-Feb-13 16:00 08-Feb-13 20:00

-47h

Sandblast crusher sheaves (Glass Bead)

SCP.20071957.0020

Flip V-belts to correct position

75-6T-1

FM.LMW21.NM

8h

0%

24h

08-Feb-13 20:00 09-Feb-13 04:00

-39h

Flip V-belts to correct position

8h

0%

214h

09-Feb-13 04:00 12-Feb-13 06:00

-8h

FM39.13.2.2.SCP.20065269 Crusher Drum Repair - SCP.20065269


SCP.20065269.0030

Replace 24 Teeth

75-6T-1

FM.LIW21.NM

52h

0%

104h

09-Feb-13 04:00 11-Feb-13 08:00

-46h

SCP.20065269.0040

Replace 5 Bases and 30 Hard Face

75-6T-1

FM.LIWW21.NM

52h

0%

104h

10-Feb-13 00:00 12-Feb-13 04:00

-46h

Replace 5 Bases and 30 Hard Face

SCP.20065269.0050

Remove Barricade Scaffold at Hopper

75-6T-1

FM.LSCF.NM

2h

0%

6h

12-Feb-13 04:00 12-Feb-13 06:00

-46h

Remove Barricade Scaffold at Hopper

0h

0%

12h

10-Feb-13 16:00 11-Feb-13 00:00

0h

0h

0%

12h

10-Feb-13 16:00 11-Feb-13 00:00

0h

6h

0%

12h

10-Feb-13 16:00 11-Feb-13 00:00

-14h

7h

0%

306h

08-Feb-13 08:00 11-Feb-13 02:00

0h

7h

0%

124h

08-Feb-13 08:00 10-Feb-13 04:00

0h

FM39.13.2.4 Structure DRC 6


FM39.13.2.4.SCP.20045472 Repair grease system DRC-6 Rock Hammer - SCP.20045472
SCP.20045472.0010

Repair grease system DRC-6 Rock Hammer

75-6D-3

FM.LMW21.NM

FM39.13.3 Conveyor 3-1J


FM39.13.3.SCP.20068306 Change Out failed 1J M2 motor - SCP.20068306

Replace 24 Teeth

Repair grease system DRC-6 Rock Hammer

SCP.20068306.0010

Install Scaffold to C/O Motor to Disconnect

3-1JTM-2

FM.LSCF.NM

2h

0%

6h

08-Feb-13 08:00 08-Feb-13 10:00

-29h

Install Scaffold to C/O Motor to Disconnect

SCP.20068306.0020

Disconnect Motor

3-1JTM-2

FM.LEL22.NM

4h

0%

8h

08-Feb-13 10:00 08-Feb-13 14:00

-35h

Disconnect Motor

SCP.20068306.0030

Remove Motor

3-1JTM-2

FM.LMW21.NM

8h

0%

24h

08-Feb-13 14:00 09-Feb-13 00:00

-29h

Remove Motor

SCP.20068306.0090

Crane Support to C/O Motor

3-1JTM-2

FM.LCR

18h

0%

18h

08-Feb-13 14:00 09-Feb-13 08:00

6h

Crane Support to C/O Motor

SCP.20068306.0040

Reinstall Motor

3-1JTM-2

FM.LMW21.NM

6h

0%

18h

09-Feb-13 00:00 09-Feb-13 08:00

2h

Reinstall Motor

SCP.20068306.0100

Install Hoarding

3-1JTM-2

FM.LSCF.NM

4h

0%

12h

09-Feb-13 08:00 09-Feb-13 12:00

2h

Install Hoarding

SCP.20068306.0050

Alignment Motor

3-1JTM-2

FM.LMW21.NM

6h

0%

18h

09-Feb-13 12:00 09-Feb-13 20:00

2h

Alignment Motor

SCP.20068306.0110

Remove Hoarding

3-1JTM-2

FM.LSCF.NM

2h

0%

6h

09-Feb-13 20:00 09-Feb-13 22:00

2h

Remove Hoarding

SCP.20068306.0060

Reconnect Motor

3-1JTM-2

FM.LEL22.NM

4h

0%

8h

09-Feb-13 22:00 10-Feb-13 02:00

2h

Reconnect Motor

SCP.20068306.0070

Remove Scaffold

3-1JTM-2

FM.LSCF.NM

2h

0%

6h

10-Feb-13 02:00 10-Feb-13 04:00

2h

Remove Scaffold

7h

0%

146h

08-Feb-13 08:00 11-Feb-13 02:00

0h

3-1JB-20

FM.LSA28

20h

0%

60h

08-Feb-13 08:00 09-Feb-13 08:00

-32h

FM39.13.3.SCP.20065274 Inspect & Repairs Pulley Cleaners 1J - SCP.20065274


SCP.20065274.0010

Remaining Level of Effort

Sandblast all Pulley Cleaners

Milestone

FM39

Actual Level of Effort


Actual Work
Remaining Work
Critical Remaining Work

North Mine Majors - All Activities


Page 2 of 8

Sandblast all Pulley Cleaners

March
TF SS T

T FSS

Project:North Mine Majors


Layout:EHM-All Act WBS
TASK filter: 1-78-1-Jan 2013 (Revision 3191301S).
Activity ID

Data Date; 01-Feb-13


Print Date; 07-Feb-13 13:13

Extraction Hydrotransport Maintenance


(EHM)

Activity Name

Equipment

Resource

Orig
Dur

Duration %
Complete

BDBG Start
WF Hrs

Finish

Total
Float

SCP.20065274.0020

Inspect all Pulley Cleaners

3-1JB-20

FM.LMW21.NM

6h

0%

6h

08-Feb-13 20:00 09-Feb-13 02:00

-16h

SCP.20065274.0030

Repair & Adjustment all Pulley Cleaners

3-1JB-20

FM.LMW21.NM

40h

0%

80h

09-Feb-13 02:00 11-Feb-13 02:00

-16h

6h

0%

12h

08-Feb-13 08:00 08-Feb-13 14:00

2h
42h

FM39.13.3.SCP.20065273 Conveyor Regulatory Safety Switches PM - SCP.20065273


SCP.20065273.0010

Safety Switch PM Conveyors PJP# 17842P

3-1JB3

FM.LEL22.NM

6h

0%

12h

08-Feb-13 08:00 08-Feb-13 14:00

7h

0%

24h

08-Feb-13 08:00 08-Feb-13 20:00

0h

3-0T-1J

FM.LEL.NM

12h

0%

24h

08-Feb-13 08:00 08-Feb-13 20:00

36h

7h

0%

36h

08-Feb-13 08:00 09-Feb-13 08:00

0h

7h

0%

24h

08-Feb-13 08:00 09-Feb-13 08:00

0h

24h

0%

24h

08-Feb-13 08:00 09-Feb-13 08:00

24h

6h

0%

12h

08-Feb-13 08:00 08-Feb-13 14:00

2h

6h

0%

12h

08-Feb-13 08:00 08-Feb-13 14:00

42h

15h

0%

635h

08-Feb-13 08:00 11-Feb-13 22:00

-8h

0h

0%

142h

09-Feb-13 00:00 10-Feb-13 21:30

0h

FM39.13.3.SCP.20065272 Wound Rotor Motor Brush Checks/Cleaning


Checks
- SCP.20065272
SCP.20065272.0010

North Mine Change Motor Brushes

FM39.13.4 Surge Facility Train 1


FM39.13.4.SCP.20065276 Surge Minor Inst.
Inst PM - SCP.20065276
SCP.20065276.0010

Surge Minor Inst. PM

77-0T1

FM.LIN.NM

77-0B-8500

FM.LEL22.NM

FM39.13.4.SCP.20065275 Surge Regulatory Safety Switches PM - SCP.20065275


SCP.20065275.0010

Surge Regulatory Safety Switches PM

FM39.13.5 Conveyor 3-1G


FM39.13.5.SCP.20065539 Change out 1250HP motor S.N# 171675 - SCP.20065539

TF SS

February
T T FSS

TF SS

T FSS

Inspect all Pulley Cleaners


Repair & Adjustment all Pulley Cleaners

Safety Switch PM Conveyors PJP# 17842P

North Mine Change Motor Brushes

Surge Minor Inst. PM

Surge Regulatory Safety Switches PM

SCP.20065539.0010

Install Scaffold to C/O Motor

3-1GTM-3

FM.LSCF.NM

2h

0%

6h

09-Feb-13 00:00 09-Feb-13 02:00

-29h

Install Scaffold to C/O Motor

SCP.20065539.0020

Disconnect Motor (WHICH MOTOR)

3-1GTM-3

FM.LEL22.NM

4h

0%

8h

09-Feb-13 02:00 09-Feb-13 06:00

-35h

Disconnect Motor (WHICH MOTOR)

SCP.20065539.0030

Remove Motor

3-1GTM-3

FM.LMW21.NM

8h

0%

24h

09-Feb-13 07:30 09-Feb-13 15:30

-30h

SCP.20065539.0080

Crane Support to C/O Motor

3-1GTM-3

FM.E1007,
FM.LCR

18h

0%

36h

09-Feb-13 07:30 10-Feb-13 01:30

-16h

Crane Support to C/O Motor

SCP.20065539.0040

Reinstall Motor

3-1GTM-3

FM.LMW21.NM

6h

0%

18h

09-Feb-13 15:30 09-Feb-13 23:30

-16h

Reinstall Motor

SCP.20065539.0090

Install Hoarding

3-1GTM-3

FM.LSCF.NM

4h

0%

12h

09-Feb-13 23:30 10-Feb-13 03:30

-16h

Install Hoarding

SCP.20065539.0050

Alignment Motor

3-1GTM-3

FM.LMW21.NM

6h

0%

18h

10-Feb-13 03:30 10-Feb-13 11:30

-16h

Alignment Motor

SCP.20065539.0100

Remove Hoarding

3-1GTM-3

FM.LSCF.NM

2h

0%

6h

10-Feb-13 11:30 10-Feb-13 13:30

-16h

Remove Hoarding

SCP.20065539.0060

Reconnect Motor

3-1GTM-3

FM.LEL22.NM

4h

0%

8h

10-Feb-13 13:30 10-Feb-13 17:30

-19h

Reconnect Motor

SCP.20065539.0070

Remove Scafoold

3-1GTM-3

FM.LSCF.NM

2h

0%

6h

10-Feb-13 19:30 10-Feb-13 21:30

-17h

Remove Scafoold

12h

0%

169h

08-Feb-13 08:00 11-Feb-13 12:30

-5h

FM39.13.5.SCP.20062859 change out the 1G Tension Pulley - SCP.20062859

Remove Motor

SCP.20062859.0010

Sandblast rail and pulley cleaner

3-1GT-21

FM.LSA28

5h

0%

15h

08-Feb-13 08:00 08-Feb-13 13:00

-13h

Sandblast rail and pulley cleaner

SCP.20062859.0020

Tie off belt & release tension

3-1GT-21

FM.LIW21.NM

5h

0%

10h

08-Feb-13 13:00 08-Feb-13 20:00

-8h

Tie off belt & release tension

SCP.20062859.0030

Tie off belt and release tension

3-1GT-21

FM.LMW21.NM

5h

0%

10h

08-Feb-13 13:00 08-Feb-13 20:00

-13h

Tie off belt and release tension

SCP.20062859.0040

Disconnect pulley cleaner electrically

3-1GT-21

FM.LEL22.NM

2h

0%

2h

08-Feb-13 20:00 08-Feb-13 22:00

-10h

Disconnect pulley cleaner electrically

SCP.20062859.0050

Remove pulley cleaner

3-1GT-21

FM.LIW21.NM

4h

0%

8h

08-Feb-13 22:00 09-Feb-13 02:00

-8h

Remove pulley cleaner

SCP.20062859.0060

Remove pulley cleaner

3-1GT-21

FM.LMW21.NM

4h

0%

8h

08-Feb-13 22:00 09-Feb-13 02:00

-8h

Remove pulley cleaner

Remaining Level of Effort

Milestone

FM39

Actual Level of Effort


Actual Work
Remaining Work
Critical Remaining Work

North Mine Majors - All Activities


Page 3 of 8

March
TF SS T

T FSS

Project:North Mine Majors


Layout:EHM-All Act WBS
TASK filter: 1-78-1-Jan 2013 (Revision 3191301S).
Activity ID

Data Date; 01-Feb-13


Print Date; 07-Feb-13 13:13

Extraction Hydrotransport Maintenance


(EHM)

Activity Name

Equipment

Resource

Orig
Dur

Duration %
Complete

BDBG Start
WF Hrs

Finish

Total
Float

TF SS

February
T T FSS

TF SS

T FSS

SCP.20062859.0070

Remove pulley

3-1GT-21

FM.LIW21.NM

10h

0%

20h

09-Feb-13 02:00 09-Feb-13 14:00

-8h

Remove pulley

SCP.20062859.0080

Remove pulley

3-1GT-21

FM.LMW21.NM

10h

0%

20h

09-Feb-13 02:00 09-Feb-13 14:00

-8h

Remove pulley

SCP.20062859.0100

Replace Pulley

3-1GT-21

FM.LIW21.NM

10h

0%

20h

09-Feb-13 14:00 10-Feb-13 02:00

-8h

Replace Pulley

SCP.20062859.0110

Replace Pulley

3-1GT-21

FM.LMW21.NM

10h

0%

20h

09-Feb-13 14:00 10-Feb-13 02:00

-8h

Replace Pulley

SCP.20062859.0120

Replace pulley cleaner and adjust

3-1GT-21

FM.LIW21.NM

5h

0%

10h

10-Feb-13 02:00 10-Feb-13 09:00

-8h

Replace pulley cleaner and adjust

SCP.20062859.0130

Replace pulley cleaner and adjust

3-1GT-21

FM.LMW21.NM

5h

0%

10h

10-Feb-13 02:00 10-Feb-13 09:00

-8h

Replace pulley cleaner and adjust

SCP.20062859.0140

Check labyrinths

3-1GT-21

FM.LMW21.NM

2h

0%

4h

10-Feb-13 09:00 10-Feb-13 11:00

-8h

Check labyrinths

SCP.20062859.0150

Remove belt tie off rigging

3-1GT-21

FM.LIW21.NM

3h

0%

6h

11-Feb-13 09:30 11-Feb-13 12:30

-27h

Remove belt tie off rigging

SCP.20062859.0160

Remove belt tie off rigging

3-1GT-21

FM.LMW21.NM

3h

0%

6h

11-Feb-13 09:30 11-Feb-13 12:30

-27h

Remove belt tie off rigging

3h

0%

142h

09-Feb-13 15:30 11-Feb-13 09:30

-3h

SCP.20065581.0010

Install Scaffold to C/O Motor

3-1GTM-1

FM.LSCF.NM

2h

0%

6h

09-Feb-13 15:30 09-Feb-13 17:30

-30h

Install Scaffold to C/O Motor

SCP.20065581.0020

Disconnect Motor (WHICH MOTOR)

3-1GTM-1

FM.LEL22.NM

4h

0%

8h

09-Feb-13 17:30 09-Feb-13 21:30

-34h

Disconnect Motor (WHICH MOTOR)

SCP.20065581.0030

Remove Motor

3-1GTM-1

FM.LMW21.NM

8h

0%

24h

09-Feb-13 21:30 10-Feb-13 05:30

-28h

Remove Motor

SCP.20065581.0080

Crane Support to C/O Motor

3-1GTM-1

FM.E1007,
FM.LCR

18h

0%

36h

09-Feb-13 21:30 10-Feb-13 15:30

-30h

Crane Support to C/O Motor

SCP.20065581.0040

Reinstall Motor

3-1GTM-1

FM.LMW21.NM

6h

0%

18h

10-Feb-13 07:30 10-Feb-13 13:30

-28h

Reinstall Motor

SCP.20065581.0090

Install Hoarding

3-1GTM-1

FM.LSCF.NM

4h

0%

12h

10-Feb-13 13:30 10-Feb-13 17:30

-28h

Install Hoarding

SCP.20065581.0050

Alignment Motor

3-1GTM-1

FM.LMW21.NM

6h

0%

18h

10-Feb-13 19:30 11-Feb-13 01:30

-28h

Alignment Motor

SCP.20065581.0100

Remove Hoarding

3-1GTM-1

FM.LSCF.NM

2h

0%

6h

11-Feb-13 01:30 11-Feb-13 03:30

-28h

Remove Hoarding

SCP.20065581.0060

Reconnect Motor

3-1GTM-1

FM.LEL22.NM

4h

0%

8h

11-Feb-13 03:30 11-Feb-13 07:30

-33h

Reconnect Motor

SCP.20065581.0070

Remove Scaffold

3-1GTM-1

FM.LSCF.NM

2h

0%

6h

11-Feb-13 07:30 11-Feb-13 09:30

-27h

Remove Scaffold

6h

0%

12h

08-Feb-13 08:00 08-Feb-13 14:00

2h

3-1GB3

FM.LEL22.NM

6h

0%

12h

08-Feb-13 08:00 08-Feb-13 14:00

42h

FM39.13.5.SCP.20065581 Change out 1250HP motor S.N# 274616 - SCP.20065581

FM39.13.5.SCP.20065278 Conveyor Regulatory Safety Switches PM - SCP.20065278


SCP.20065278.0010

Safety Switch PM Conveyors PJP# 17842P

8h

0%

146h

09-Feb-13 08:00 11-Feb-13 22:00

-8h

SCP.20065279.0010

Sandblast all Pulley Cleaners

FM.LSA28

20h

0%

60h

09-Feb-13 08:00 10-Feb-13 08:00

-32h

SCP.20065279.0020

Inspect all Pulley Cleaners

FM.LMW21.NM

6h

0%

6h

09-Feb-13 14:00 09-Feb-13 22:00

-32h

SCP.20065279.0030

Repair & Adjustment all Pulley Cleaners

FM.LMW21.NM

40h

0%

80h

09-Feb-13 22:00 11-Feb-13 22:00

-32h

7h

0%

24h

08-Feb-13 08:00 08-Feb-13 20:00

0h

3-0T-1G

FM.LEL.NM

12h

0%

24h

08-Feb-13 08:00 08-Feb-13 20:00

36h

9h

0%

1187h

09-Feb-13 08:00 12-Feb-13 08:00

16455h

FM39.13.5.SCP.20065279 Inspect & Repairs Pulley Cleaners 1G - SCP.20065279

FM39.13.5.SCP.20065277 Wound Rotor Motor Brush Checks/Cleaning


Checks
- SCP.20065277
SCP.20065277.0010

North Mine Change Motor Brushes

FM39.13.6 Cyclo 78-1


Remaining Level of Effort

Milestone

FM39

Actual Level of Effort


Actual Work
Remaining Work
Critical Remaining Work

North Mine Majors - All Activities


Page 4 of 8

Safety Switch PM Conveyors PJP# 17842P

Sandblast all Pulley Cleaners


Inspect all Pulley Cleaners
Repair & Adjustment all Pulley Cleaners

North Mine Change Motor Brushes

March
TF SS T

T FSS

Project:North Mine Majors


Layout:EHM-All Act WBS
TASK filter: 1-78-1-Jan 2013 (Revision 3191301S).
Activity ID

Activity Name

Equipment

Resource

FM39.13.6.SCP.20065293 Cyclo Tower Minor .Inst. PM - SCP.20065293


SCP.20065293.0010

Minor Instr. PM As per PJP# 27650

78-1B6000

FM.LIN.NM

FM39.13.6.SCP.20065294 Cyclo Regulatory Safety Switches PM - SCP.20065294


SCP.20065294.0010

Safety Switch PM 78-1 CYCLO PJP#27787

Data Date; 01-Feb-13


Print Date; 07-Feb-13 13:13

Extraction Hydrotransport Maintenance


(EHM)

78-1B-7000

FM.LEL22.NM

FM39.13.6.2 Screens
FM39.13.6.2.SCP.20065286 Baffle Walls Screen Repair PM - SCP.20065286

Orig
Dur

Duration %
Complete

BDBG Start
WF Hrs

Finish

Total
Float

0h

0%

48h

09-Feb-13 08:00 10-Feb-13 08:00

0h

24h

0%

48h

09-Feb-13 08:00 10-Feb-13 08:00

0h

0h

0%

12h

09-Feb-13 08:00 09-Feb-13 14:00

0h

6h

0%

12h

09-Feb-13 08:00 09-Feb-13 14:00

18h

8h

0%

987h

09-Feb-13 08:00 12-Feb-13 05:00

16456h

8h

0%

248h

09-Feb-13 19:30 12-Feb-13 03:30

-8h

TF SS

February
T T FSS

TF SS

T FSS

Minor Instr. PM As per PJP# 27650

Safety Switch PM 78-1 CYCLO PJP#27787

SCP.20065286.0010

Install Scaffold for C/O Baffle Wall

78-1T-14

FM.LSCF.NM

14h

0%

56h

09-Feb-13 19:30 10-Feb-13 11:30

-36h

Install Scaffold for C/O Baffle Wall

SCP.20065286.0020

Visual Inspect Baffle Wall

78-1T-14

FM.LQA.NM

4h

0%

4h

10-Feb-13 11:30 10-Feb-13 15:30

-44h

Visual Inspect Baffle Wall

SCP.20065286.0030

C/O Baffle Wall Fix Screen

78-1T-14

FM.LMW21.NM,
FM.LIW21.NM

24h

0%

116h

10-Feb-13 15:30 11-Feb-13 21:30

-38h

C/O Baffle Wall Fix Screen

SCP.20065286.0050

Weld Support Repair Baffle Walls

78-1T-14

FM.LIWW21.NM

24h

0%

48h

10-Feb-13 15:30 11-Feb-13 21:30

-38h

Weld Support Repair Baffle Walls

SCP.20065286.0060

Remove Scaffold for C/O Baffle Wall

78-1T-14

FM.LSCF.NM

6h

0%

24h

11-Feb-13 21:30 12-Feb-13 03:30

-38h

Remove Scaffold for C/O Baffle Wall

8h

0%

461h

09-Feb-13 08:00 12-Feb-13 05:00

16456h

FM39.13.6.2.SCP.20065281 Fixed Screen Cloth Repairs - SCP.20065281

SCP.20065281.0010

Install Scaffold For Fixed Screens C/O A

78-1T-14

FM.LSCF.NM

10h

0%

40h

09-Feb-13 08:00 09-Feb-13 18:00

-45h

Install Scaffold For Fixed Screens C/O A

SCP.20065281.0020

Sandblast Fixed Screens A

78-1T-14

FM.LSA28

10h

0%

30h

09-Feb-13 18:00 10-Feb-13 04:00

-45h

Sandblast Fixed Screens A

SCP.20065281.0030

Inspect Fixed Screens A

78-1T-14

FM.LQA.NM

2h

0%

2h

10-Feb-13 04:00 10-Feb-13 06:00

-41h

Inspect Fixed Screens A

SCP.20065281.0060

Install Scaffold For Fixed Screens C/O

78-1T-14

FM.LSCF.NM

10h

0%

40h

10-Feb-13 04:00 10-Feb-13 14:00

-45h

SCP.20065281.0040

Fixed Screen Repair/Change Out

78-1T-14

FM.LIW21.NM,
FM.LIWW21.NM

18h

0%

108h

10-Feb-13 06:00 11-Feb-13 00:00

-41h

Fixed Screen Repair/Change Out

SCP.20065281.0070

Sandblast Fixed Screens

78-1T-14

FM.LSA28

10h

0%

30h

10-Feb-13 14:00 11-Feb-13 00:00

-45h

Sandblast Fixed Screens

SCP.20065281.0050

Remove Scaffold For Fixed Screen C/O A

78-1T-14

FM.LSCF.NM

7h

0%

28h

11-Feb-13 00:00 11-Feb-13 07:00

-30h

Remove Scaffold For Fixed Screen C/O A

SCP.20065281.0080

Inspect Fixed Screens

78-1T-14

FM.LQA.NM

4h

0%

4h

11-Feb-13 00:00 11-Feb-13 04:00

-45h

Inspect Fixed Screens

SCP.20065281.0090

Fixed Screen Repair/Change Out

78-1T-14

FM.LIW21.NM,
FM.LIWW21.NM

18h

0%

108h

11-Feb-13 04:00 11-Feb-13 22:00

-45h

Fixed Screen Repair/Change Out

SCP.20065281.0100

Remove Scaffold For Fixed Screen C/O B

78-1T-14

FM.LSCF.NM

7h

0%

28h

11-Feb-13 22:00 12-Feb-13 05:00

-45h

Remove Scaffold For Fixed Screen C/O B

SCP.20065281.0110

Remove Scaffold For Fixed Screen C/O

78-1T-14

FM.LIW21.NM,
FM.LSCF.NM

7h

0%

43h

11-Feb-13 22:00 12-Feb-13 05:00

69091h

Install Scaffold For Fixed Screens C/O

Remove Scaffold For Fixed Screen C/O

1h

0%

258h

09-Feb-13 08:00 11-Feb-13 08:00

-1h

SCP.20065280.0010

Install Scaffold For Impact Screens

78-1T-2

FM.LSCF.NM

6h

0%

24h

09-Feb-13 08:00 09-Feb-13 14:00

-48h

Install Scaffold For Impact Screens

SCP.20065280.0020

Inspect Impact Screens

78-1T-2

FM.LQA.NM

2h

0%

2h

09-Feb-13 14:00 09-Feb-13 16:00

-48h

Inspect Impact Screens

SCP.20065280.0030

Impact Screen Cloth Repair/Change Out

78-1T-2

FM.LIW21.NM,
FM.LIWW21.NM

36h

0%

216h

09-Feb-13 16:00 11-Feb-13 04:00

-48h

Impact Screen Cloth Repair/Change Out

SCP.20065280.0040

Remove Scaffold For Impact Screens

78-1T-2

FM.LSCF.NM

4h

0%

16h

11-Feb-13 04:00 11-Feb-13 08:00

-24h

Remove Scaffold For Impact Screens

0h

0%

20h

09-Feb-13 08:00 09-Feb-13 20:00

0h

78-1PW-15

FM.LPF21.NM

10h

0%

20h

09-Feb-13 08:00 09-Feb-13 20:00

10h

FM39.13.6.2.SCP.20065280 Impact Screen Cloth Repairs - SCP.20065280

FM39.13.6.2.SCP.20065284 Clean Spray Bars Service PM - SCP.20065284


SCP.20065284.0010

Remaining Level of Effort

Cleaning Spray Bars N/M

Milestone

FM39

Actual Level of Effort


Actual Work
Remaining Work
Critical Remaining Work

North Mine Majors - All Activities


Page 5 of 8

Cleaning Spray Bars N/M

March
TF SS T

T FSS

Project:North Mine Majors


Layout:EHM-All Act WBS
TASK filter: 1-78-1-Jan 2013 (Revision 3191301S).
Activity ID

Data Date; 01-Feb-13


Print Date; 07-Feb-13 13:14

Extraction Hydrotransport Maintenance


(EHM)

Activity Name

Equipment

Resource

FM39.13.6.5 Structure
FM39.13.6.5.SCP.20065282 Splitter Box Repairs - SCP.20065282

Orig
Dur

Duration %
Complete

BDBG Start
WF Hrs

Finish

Total
Float

9h

0%

140h

09-Feb-13 16:00 12-Feb-13 08:00

9h

0%

140h

09-Feb-13 16:00 12-Feb-13 08:00

-9h

Inspect Splitter Box

78-1T-4

FM.LQA.NM

2h

0%

2h

09-Feb-13 16:00 09-Feb-13 18:00

-32h

SCP.20065282.0020

Sandblast Splitter Box

78-1T-4

FM.LSA28

10h

0%

30h

10-Feb-13 10:00 10-Feb-13 20:00

-48h

SCP.20065282.0030

Repair Deflector Bars

78-1T-4

FM.LIWW21.NM,
FM.LIWW21.NM

36h

0%

108h

10-Feb-13 20:00 12-Feb-13 08:00

-48h

29h

0%

968h

08-Feb-13 00:00 13-Feb-13 12:00

16443h

0h

0%

21h

10-Feb-13 08:00 10-Feb-13 17:00

0h

0h

0%

21h

10-Feb-13 08:00 10-Feb-13 17:00

0h

FM39.13.8.1 78-1G-5A
FM39.13.8.1.SCP.20065288 Pump Impeller Adj 500 HTP - SCP.20065288

February
T T FSS

TF SS

Sandblast Splitter Box


Repair Deflector Bars

Impeller Adjustment

78-1G-5A

FM.LMW.NM

6h

0%

18h

10-Feb-13 08:00 10-Feb-13 14:00

-9h

Impeller Adjustment

SCP.20065288.0020

Inspection of Pump

78-1G-5A

FM.LQA.NM

1h

0%

1h

10-Feb-13 14:00 10-Feb-13 15:00

-9h

Inspection of Pump

SCP.20065288.0030

Final Review Pump

78-1G-5A

FM.LMW.NM

2h

0%

2h

10-Feb-13 15:00 10-Feb-13 17:00

-9h

Final Review Pump

16h

0%

366h

08-Feb-13 00:00 11-Feb-13 16:00

16456h

16h

0%

354h

08-Feb-13 00:00 11-Feb-13 16:00

16456h

FM39.13.8.2.SCP.20065289 Pump Impeller Adj 500 HTP - SCP.20065289


SCP.20065289.0006

Remove Drop Out Spool

78-1G-5B

FM.LPF21.NM

5h

0%

20h

08-Feb-13 00:00 08-Feb-13 05:00

-72h

Remove Drop Out Spool

SCP.20065289.0005

Install Scaffold for Pump Overhaul

78-1G-5B

FM.LSCF.NM

6h

0%

18h

08-Feb-13 00:00 08-Feb-13 06:00

-72h

Install Scaffold for Pump Overhaul

SCP.20065289.0010

Remove Cover & Impeller

78-1G-5B

FM.LMW21.NM

20h

0%

80h

08-Feb-13 05:00 09-Feb-13 01:00

-72h

Remove Cover & Impeller

SCP.20065289.0020

Inspection of Pump

78-1G-5B

FM.LQA.NM

2h

0%

2h

09-Feb-13 01:00 09-Feb-13 03:00

-72h

Inspection of Pump

SCP.20065289.0030

Change out Barrel

78-1G-5B

FM.LMW21.NM

10h

0%

40h

09-Feb-13 03:00 09-Feb-13 13:00

-72h

Change out Barrel

SCP.20065289.0031

Re-install pump Parts

78-1G-5B

FM.LMW21.NM

20h

0%

80h

09-Feb-13 13:00 10-Feb-13 09:00

-72h

Re-install pump Parts

SCP.20065289.0032

Perform Alignments

78-1G-5B

FM.LMW21.NM

20h

0%

80h

10-Feb-13 09:00 11-Feb-13 05:00

-72h

Perform Alignments

SCP.20065289.0035

Install Drop Out Spool

78-1G-5B

FM.LPF21.NM

5h

0%

20h

11-Feb-13 05:00 11-Feb-13 10:00

-28h

Install Drop Out Spool

SCP.20065289.0040

Final Inspection.

78-1G-5B

FM.LMW21.NM

2h

0%

2h

11-Feb-13 10:00 11-Feb-13 12:00

-28h

Final Inspection.

SCP.20065289.0036

Remove Scaffold for Pump Overhaul

78-1G-5B

FM.LSCF.NM

4h

0%

12h

11-Feb-13 12:00 11-Feb-13 16:00

69104h

0h

0%

12h

09-Feb-13 08:00 09-Feb-13 14:00

16464h

78-1GFNM-5B

FM.LEL22.NM

6h

0%

12h

09-Feb-13 08:00 09-Feb-13


14:00*

69154h

FM39.13.8.2.SCP.20066494 replace 78-1 5B cooling fan motor - SCP.20066494


SCP.20066494.0010

replace 78-1 5B cooling fan motor

FM39.13.8.4 78-1G-5C
FM39.13.8.4.SCP.20065290 Pump Impeller Adj. 500 SHD - SCP.20065290

Remove Scaffold for Pump Overhaul

replace 78-1 5B cooling fan motor

0h

0%

33h

09-Feb-13 08:00 09-Feb-13 17:00

0h

0h

0%

21h

09-Feb-13 08:00 09-Feb-13 17:00

-8h

SCP.20065290.0010

Impeller Adjustment

78-1G-5C

FM.LMW21.NM

6h

0%

18h

09-Feb-13 08:00 09-Feb-13 14:00

-48h

Impeller Adjustment

SCP.20065290.0020

Inspection of Pump

78-1G-5C

FM.LQA.NM

1h

0%

1h

09-Feb-13 14:00 09-Feb-13 15:00

-48h

Inspection of Pump

SCP.20065290.0030

Final Review Pump

78-1G-5C

FM.LMW21.NM

2h

0%

2h

09-Feb-13 15:00 09-Feb-13 17:00

-48h

Final Review Pump

0h

0%

12h

09-Feb-13 08:00 09-Feb-13 14:00

0h

FM39.13.8.4.SCP.20065295 Booster PH Regulatory Safety Switches PM - SCP.20065295


Remaining Level of Effort

Milestone

FM39

Actual Level of Effort


Actual Work
Remaining Work
Critical Remaining Work

North Mine Majors - All Activities


Page 6 of 8

T FSS

Inspect Splitter Box

SCP.20065288.0010

FM39.13.8.2 78-1G-5B

-9h

SCP.20065282.0010

FM39.13.8 Pumps

TF SS

March
TF SS T

T FSS

Project:North Mine Majors


Layout:EHM-All Act WBS
TASK filter: 1-78-1-Jan 2013 (Revision 3191301S).
Activity ID

Activity Name

SCP.20065295.0010

Data Date; 01-Feb-13


Print Date; 07-Feb-13 13:14

Extraction Hydrotransport Maintenance


(EHM)
Equipment

Safety Switch PM As per PJP# 27788

78-0B1000

Resource

FM.LEL22.NM

FM39.13.8.5 78-1G-5D
FM39.13.8.5.SCP.20065291 Pump Impeller Adj. 500 SHD - SCP.20065291

Orig
Dur

Duration %
Complete

BDBG Start
WF Hrs

Finish

Total
Float

6h

0%

12h

09-Feb-13 08:00 09-Feb-13 14:00

18h

9h

0%

274h

09-Feb-13 08:00 12-Feb-13 08:00

-9h

9h

0%

274h

09-Feb-13 08:00 12-Feb-13 08:00

-9h

TF SS

February
T T FSS

TF SS

T FSS

Safety Switch PM As per PJP# 27788

SCP.20065291.0005

Install Scaffold for Pump Overhaul

78-1G-5D

FM.LSCF.NM

6h

0%

18h

09-Feb-13 08:00 09-Feb-13 14:00

-44h

Install Scaffold for Pump Overhaul

SCP.20065291.0006

Remove Drop Out Spool

78-1G-5D

FM.LPF21.NM

5h

0%

20h

09-Feb-13 08:00 09-Feb-13 13:00

-44h

Remove Drop Out Spool

SCP.20065291.0010

Remove Cover & Impeller

78-1G-5D

FM.LMW21.NM

20h

0%

80h

09-Feb-13 17:00 10-Feb-13 13:00

-48h

Remove Cover & Impeller

SCP.20065291.0020

Inspection of Pump

78-1G-5D

FM.LQA.NM

2h

0%

2h

10-Feb-13 13:00 10-Feb-13 15:00

-48h

Inspection of Pump

SCP.20065291.0030

Re-Install New Pump Parts

78-1G-5D

FM.LMW21.NM

30h

0%

120h

10-Feb-13 15:00 11-Feb-13 21:00

-48h

Re-Install New Pump Parts

SCP.20065291.0035

Install Drop Out Spool

78-1G-5D

FM.LPF21.NM

5h

0%

20h

11-Feb-13 21:00 12-Feb-13 02:00

-48h

Install Drop Out Spool

SCP.20065291.0040

Final Inspection.

78-1G-5D

FM.LMW21.NM

2h

0%

2h

12-Feb-13 02:00 12-Feb-13 04:00

-48h

Final Inspection.

SCP.20065291.0036

Remove Scaffold for Pump Overhaul

78-1G-5D

FM.LSCF.NM

4h

0%

12h

12-Feb-13 04:00 12-Feb-13 08:00

-48h

Remove Scaffold for Pump Overhaul

29h

0%

274h

08-Feb-13 06:00 13-Feb-13 12:00

16443h

29h

0%

274h

08-Feb-13 06:00 13-Feb-13 12:00

16443h

FM39.13.8.3 78-1G-1
FM39.13.8.3.SCP.20065292 Pump Impeller Adj. Slurry Recycle - SCP.20065292
SCP.20065292.0005

Install Scaffold for Pump Overhaul

78-1G-1

FM.LSCF.NM

6h

0%

18h

08-Feb-13 06:00 08-Feb-13 12:00

-20h

Install Scaffold for Pump Overhaul

SCP.20065292.0006

Remove Drop Out Spool

78-1G-1

FM.LPF21.NM

5h

0%

20h

08-Feb-13 12:00 08-Feb-13 17:00

-20h

Remove Drop Out Spool

SCP.20065292.0010

Remove Cover & Impeller

78-1G-1

FM.LMW21.NM

20h

0%

80h

10-Feb-13 21:00 11-Feb-13 17:00

-72h

Remove Cover & Impeller

SCP.20065292.0020

Inspection of Pump

78-1G-1

FM.LQA.NM

2h

0%

2h

11-Feb-13 17:00 11-Feb-13 19:00

-72h

Inspection of Pump

SCP.20065292.0030

Re-Install New Pump Parts

78-1G-1

FM.LMW21.NM

30h

0%

120h

11-Feb-13 19:00 13-Feb-13 01:00

-72h

Re-Install New Pump Parts

SCP.20065292.0035

Install Drop Out Spool

78-1G-1

FM.LPF21.NM

5h

0%

20h

13-Feb-13 01:00 13-Feb-13 06:00

-72h

Install Drop Out Spool

SCP.20065292.0040

Final Inspection

78-1G-1

FM.LMW21.NM

2h

0%

2h

13-Feb-13 06:00 13-Feb-13 08:00

-72h

Final Inspection

SCP.20065292.0036

Remove Scaffold for Pump Overhaul

78-1G-1

FM.LSCF.NM

4h

0%

12h

13-Feb-13 08:00 13-Feb-13 12:00

69060h

8h

0%

326h

09-Feb-13 08:00 12-Feb-13 02:00

-8h

3h

0%

90h

09-Feb-13 08:00 11-Feb-13 10:00

-3h

12h

0%

24h

09-Feb-13
08:00*

-42h

FM39.13.9 Piping Internal


FM39.13.9.SCP.20074430 79-1
79 Slurry Inside Piping Repair / Repla - SCP.20074430
SCP.20074430.0010

Unbolt & Remove 12 Spools

79-0B4030

FM.LPF21.NM

09-Feb-13 20:00

Unbolt & Remove 12 Spools

SCP.20074430.0020

Inspect 12 Spools

79-0B4030

FM.LQA.NM

12h

0%

12h

09-Feb-13 20:00 10-Feb-13 08:00

-42h

SCP.20074430.0030

Repair and Rotate 3 Spls 79-P2-1E,1F,1G

79-0B4030

FM.LPF21.NM,
FM.LPW21.NM

10h

0%

22h

10-Feb-13 08:00 10-Feb-13 18:00

-42h

Replace 4 Spls 79-P1-1A,1C, P2-1B,1D

79-0B4030

FM.LPF21.NM

4h

0%

8h

10-Feb-13 18:00 10-Feb-13 22:00

-42h

SCP.20074430.0050

Bolt Up & Install 12 Spools

79-0B4030

FM.LPF21.NM

12h

0%

24h

10-Feb-13 22:00 11-Feb-13


10:00*

-42h

Milestone

FM39

Actual Level of Effort


Actual Work
Remaining Work
Critical Remaining Work

Inspect 12 Spools

Repair and Rotate 3 Spls 79-P2-1E,1F,1G

SCP.20074430.0040

Remaining Level of Effort

Remove Scaffold for Pump Overhaul

North Mine Majors - All Activities


Page 7 of 8

Replace 4 Spls 79-P1-1A,1C, P2-1B,1D

Bolt Up & Install 12 Spools

March
TF SS T

T FSS

Project:North Mine Majors


Layout:EHM-All Act WBS
TASK filter: 1-78-1-Jan 2013 (Revision 3191301S).
Activity ID

Data Date; 01-Feb-13


Print Date; 07-Feb-13 13:14

Extraction Hydrotransport Maintenance


(EHM)

Activity Name

Equipment

Resource

Orig
Dur

Duration %
Complete

BDBG Start
WF Hrs

Finish

Total
Float

TF SS

February
T T FSS

TF SS

T FSS

5h

0%

96h

11-Feb-13 10:00 12-Feb-13 02:00

-8h

SCP.20062876.0020

Replace Spool 79-1-1-5

79-0B4030

FM.LPW24.NM

8h

0%

48h

11-Feb-13 10:00 11-Feb-13 18:00

-42h

Replace Spool 79-1-1-5

SCP.20062876.0030

Rotate Spool 79-1-1-11 180 Degrees

79-0B4030

FM.LPW24.NM

8h

0%

48h

11-Feb-13 18:00 12-Feb-13 02:00

-42h

Rotate Spool 79-1-1-11 180 Degrees

FM39.13.9.SCP.20062876 79-1
79 scope for Jan. 21 - 24, 2013 outa - SCP.20062876

0h

0%

25h

09-Feb-13 08:00 09-Feb-13 23:00

0h

SCP.20065283.0010

Remove Piping on Hoses & Y-Strainer

78-1GW1

FM.LPF21.NM

2h

0%

4h

09-Feb-13 08:00 09-Feb-13 10:00

8h

Remove Piping on Hoses & Y-Strainer

SCP.20065283.0020

Visual Inspect Piping & Filter Basket.

78-1GW1

FM.LQA.NM

1h

0%

1h

09-Feb-13 10:00 09-Feb-13 11:00

9h

Visual Inspect Piping & Filter Basket.

SCP.20065283.0030

Check Drain/Flush

78-1GW1

FM.LPF21.NM

2h

0%

4h

09-Feb-13 11:00 09-Feb-13 13:00

7h

Check Drain/Flush

SCP.20065283.0040

Cleaning Orifices

78-1GW1

FM.LPF21.NM

2h

0%

4h

09-Feb-13 13:00 09-Feb-13 15:00

7h

Cleaning Orifices

SCP.20065283.0050

Inspect or C/O Flex Hose

78-1GW1

FM.LPF21.NM

2h

0%

4h

09-Feb-13 15:00 09-Feb-13 17:00

7h

Inspect or C/O Flex Hose

SCP.20065283.0060

Visual Inspect Straight Run & Elbows

78-1GW1

FM.LPF21.NM

2h

0%

4h

09-Feb-13 17:00 09-Feb-13 21:00

7h

Visual Inspect Straight Run & Elbows

SCP.20065283.0070

Re-Install Piping on Hoses & Y-Strainer

78-1GW1

FM.LPF21.NM

2h

0%

4h

09-Feb-13 21:00 09-Feb-13 23:00

7h

Re-Install Piping on Hoses & Y-Strainer

0h

0%

24h

09-Feb-13 08:00 09-Feb-13 22:00

0h

78-0PW6

FM.LPF21.NM

12h

0%

24h

09-Feb-13 08:00 09-Feb-13 22:00

8h

0h

0%

91h

09-Feb-13 08:00 11-Feb-13 02:00

0h

FM39.13.9.SCP.20065283 Gland Water & Y-Strainers


Y
Service PM - SCP.20065283

FM39.13.9.SCP.20063151 Repair pipe leak 78-PW 2G-2A - SCP.20063151


SCP.20063151.0010

Repair pipe leak 78-PW 2G-2A

FM39.13.9.1 Rejects Line (2nd


(2
Floor) 78-1

Repair pipe leak 78-PW 2G-2A

0h

0%

91h

09-Feb-13 08:00 11-Feb-13 02:00

0h

SCP.20066682.0010

Unbolt & Remove Spool

78-1P-18

FM.LPF21.NM

7h

0%

14h

09-Feb-13 08:00 09-Feb-13 15:00

-18h

Unbolt & Remove Spool

SCP.20066682.0020

Inspect Spool

78-1P-18

FM.LQA.NM

7h

0%

7h

09-Feb-13 15:00 09-Feb-13 22:00

-18h

Inspect Spool

SCP.20066682.0030

Repair and Rotate Spool

78-1P-18

FM.LPF21.NM,
FM.LPW21.NM

14h

0%

42h

09-Feb-13 22:00 10-Feb-13 12:00

-18h

FM39.13.9.1.SCP.20066682 78-1
78 Reject Line 1P18 Minor Repair PM - SCP.20066682

Repair and Rotate Spool

SCP.20066682.0050

Replace Spool

78-1P-18

FM.LPF21.NM

7h

0%

14h

10-Feb-13 12:00 10-Feb-13 19:00

-18h

Replace Spool

SCP.20066682.0060

Bolt Up & Install Spool

78-1P-18

FM.LPF21.NM

7h

0%

14h

10-Feb-13 19:00 11-Feb-13 02:00

-18h

Bolt Up & Install Spool

10h

0%

181h

09-Feb-13 08:00 12-Feb-13 09:00

-10h

FM39.13.10 Piping External

10h

0%

181h

09-Feb-13 08:00 12-Feb-13 09:00

-10h

SCP.20067223.0010

78-1 pipe scope for Jan. 2013 mini outag

78-1B4000

FM.LPF21.NM

1h

0%

1h

09-Feb-13 08:00 09-Feb-13 09:00

-41h

SCP.20067223.0020

Unbolt 12 items as per Scope

78-1B4000

FM.LPF21.NM

12h

0%

36h

09-Feb-13 09:00 09-Feb-13 23:00

-41h

SCP.20067223.0030

Replace 12 items as per Scope

78-1B4000

FM.LPF21.NM

36h

0%

108h

09-Feb-13 23:00 11-Feb-13 17:00

-41h

Replace 12 items as per Scope

SCP.20067223.0040

bolt up 12 items as per Scope

78-1B4000

FM.LPF21.NM

12h

0%

36h

11-Feb-13 17:00 12-Feb-13 09:00

-41h

bolt up 12 items as per Scope

18h

0%

4h

11-Feb-13 12:30 13-Feb-13 14:00

16442h

3-1GT-21

FM.LMW21.NM

2h

0%

4h

11-Feb-13 12:30 11-Feb-13 14:30

-27h

6h

0%

0h

13-Feb-13 08:00 13-Feb-13 14:00

69058h

FM39.13.10.SCP.20067223 78-1
78 pipe scope for Jan. 2013 mini outag - SCP.20067223

FM39.13.13 Safe In
SCP.20062859.0170

Purge bearings on startup

IST.3360

SAFE IN 78-1

Remaining Level of Effort

Milestone

FM39

Actual Level of Effort


Actual Work
Remaining Work
Critical Remaining Work

North Mine Majors - All Activities


Page 8 of 8

78-1 pipe scope for Jan. 2013 mini outag


Unbolt 12 items as per Scope

Purge bearings on startup


SAFE IN 78-1

March
TF SS T

T FSS