Professional Documents
Culture Documents
No. 180
480
Defendant, the City of Milwaukie (the city), used
highly pressurized water to clean the sewer lines adjacent to
plaintiffs house, which caused sewer water to back up through
plaintiffs toilets and bathroom fixtures. Plaintiff subsequently
brought this action against the city, alleging tort claims and a
claim for inverse condemnation. The trial court granted summary judgment against the tort claims on the ground that
plaintiff had failed to give the city notice of those claims within
180 days of the injury as required under ORS 30.275, but the
inverse condemnation claim was tried to a jury, which found
for plaintiff and awarded $58,333 in damages.
The city appealed, arguing that the trial court
should have directed a verdict in its favor on the inverse condemnation claim because plaintiff failed to prove a compensable taking of property under ArticleI, section 18, of the
Oregon Constitution. In response, plaintiff cross-assigned
error to the dismissal of her tort claims. We affirmed the
judgment in plaintiffs favor on the inverse condemnation
claim without reaching her cross-assignment of error, but
the Supreme Court subsequently reversed that decision on
the ground that plaintiffs evidence was insufficient to prove
the intentional invasion of property necessary for inverse
condemnation. Dunn v. City of Milwaukie, 241 Or App 95,
102, 250 P3d 7 (2011), revd, 355 Or 339, 328 P3d 1261 (2014).
The Supreme Court explained, however, that plaintiff was
not necessarily without any remedy as a result of its holding, because Oregon has abrogated its traditional sovereign
immunity; both the state and other governmental units can
be sued on common-law tort theories. Dunn, 355 Or at 362.
The court explained that plaintiff had in fact attempted to
recover in tort, and it remanded the case for us to consider
her cross-assignment of error regarding whether she had
provided a timely tort-claim notice. We now consider that
cross-assignment and conclude that the trial court correctly
dismissed plaintiffs tort claims for lack of timely notice
under ORS 30.275.
BACKGROUND
Although plaintiffs inverse condemnation claim
was tried to a jury, the issue before us concerns claims that
482
had gone down the heating vents. She assum[ed] that the
problem had been solved and without any obvious signs of
damage to the house, *** put the incident behind [her].
The following winter, plaintiff noticed that her average heating bills were higher, but she did not associate that
with the wastewater incident. In March 2006, she noticed
that her floors had buckled and were wet to the touch. She
also noticed that her paint and wallpaper was bubbling
and peeling in her entryway, near a heating vent. In April
2006, she detected a sewer smell coming from her heating
vents and decided to inspect the crawl space. She discovered pockets of sewer waste and wet insulation on the vent
pipes.
Throughout April and May 2006, plaintiff asked
various contractors to inspect the house, and they determined that wastewater from the August incident had made
its way to the furnace, which caused it to malfunction. They
also determined that water had likely saturated the subflooring and was the cause of the buckling in the floors. The
contractors were unable to assess the full scope of damage
without an assessment by an industrial hygienist.
Beginning in May 2006, plaintiff approached the
city about damage to her home. In November 2006, an
insurance agent for the city informed plaintiff that her
claims were being denied because she had not submitted a
tort claim notice within the applicable time period. Plaintiff
then filed this action in early 2007, alleging claims against
the city for negligence, nuisance, trespass, and inverse
condemnation.
The city moved for summary judgment on the negligence, nuisance, and trespass claims on the ground that
plaintiff failed to provide notice of her claim to the city
within 180 days of her injury or loss, as required by the
Oregon Tort Claims Act. See ORS 30.275(1), (2). Plaintiff, in
response, argued that the notice period did not begin to run
until she discovered that her home had suffered structural
damagesomething that she did not realize (and, because of
the latent nature of water damage, could not have realized)
until March 2006, less than 180 days before she approached
the city about her claim.
The trial court rejected that argument, concluding
that plaintiff knew that she was injured by the citys conduct
on the day of the wastewater incident, even if she did not
appreciate the full extent of the harm. The court explained:
Its very clear that [plaintiff] was present the day the sewage came into the house and knew that the person that
caused the sewage to come into the house was the City of
Milwaukie. I interpret the statute to mean that that was
the loss or injury date that triggered her obligation to send
a written notice to the City, Hey, something happened. I
might sue you over it.
Accordingly, the court granted the citys motion for summary judgment and dismissed plaintiffs negligence, nuisance, and trespass claims based on untimely notice under
ORS 30.275.
ANALYSIS
On appeal, plaintiff again argues that her notice
of claim was timely based on the application of the discovery rule. That is, she contends that the trial court erred
in ruling that the 180-day period began to run when the
water first entered plaintiffs home in August 2005 and
not when plaintiff discovered the water damage in March
and April 2006. As discussed below, plaintiffs argument
is inconsistent with the well-established principle that the
484
486
488