Professional Documents
Culture Documents
1. Safety Precautions
During preparation of the fiber and assembly, broken fiber debris may get into the eyes. For safety purposes,
always put on safety goggles during assembly. Also, because there is a danger that fiber debris may cause
injuries to parts of the body other than the eyes, please be careful when handling fiber debris.
2. Components
Cross Section
Wedge Unit
Connector
Wedge
Main Body
Housing
Tube
Boot
Internal
Structure
Fiber Clamp
Fiber
Fiber Clamp
Ferrule
Ferrule
Pre-installed Fiber
Matching Gel
Pre-installed Fiber
0.25mm Fiber
Matching Gel
0.9mm Fiber
3. Assembly procedure
3.1. Preparation
Front Wedge
Click
Click
3.2. Fiber tip processing (Fiber tip is processed using stripper, spacer and fiber cutter according to the pictures below)
Stripping Fiber cleaning Marking Screening Cut fiber with reference to the recommended procedure
Marking
Coating
10mm
No Gap
Stripped Edge
Fiber
10mm
Marking Position
Connecting Fiber Marking
Approx.10mm
Fiber
Keep an eye on
the opening and
the fiber in line.
Pre-installed Fiber
Marking
Grip at about 10mm position.
3.4. Maintaining connection force on fiber
Approx.10mm
3.2.
PNJHY-0001-82-02
Marking
0.9mm
Coating
7mm
3 - 4mm
Fiber
0.25mm Coating
13 - 14mm
Cleave
the
fiber
at
the
Marking Position
Keep an eye on
the opening and
the fiber in line.
Approx.10mm
Fiber
Pre-installed Fiber
Marking
Grip at about 10mm position.
3.4. Maintaining connection force on fiber
40-60mm
3.5. Wedge Release (Press side of wedge unit while maintaining connection to release wedge.)
Wedge Structure
Wedge
3.6. Housing assembly (Remove the lock and wedge, insert the housing and boot to complete.
Completed!
Remove