You are on page 1of 40

CHAPTER 13

LIST
Chapter 13
List
Exercise -11

Answer 1
Given:1.
2.
3.
4.

W = 5000t
GM = 0.3m
w = 20t
d = 5m

Tan = d * w
W * GM
Tan = 5 * 20
5000 * 0.3
Tan = 100
1500
Tan = 0.0667
= Tan-1(0.0667)
= 3.82 or 3 49
List of the ship is 3.82 or 3 49
Answer 2
Given:1 W (t) =
2 GM (m) =

8000
2

Item

W(t)

d (m)

Direction

Shifted
Shifted
Shifted
Shifted

200
100
100
50

4
2
4
20

Stbd
Port
Port
Stbd

Total

Moments
Port
Stbd
0
200
400
0

800
0
0
1000

600

1800
Page 1 of 40

CHAPTER 13
LIST

Total Moments =

Stbd Moments - Port Moments

Total Moments =

1800

Total Moments =

1200

Stbd

Tan =

Total Moments
W * GM

Tan =

1200
16000

Tan =

0.0750

600

4.29

Stbd

List of the ship is 4.29 to Stbd

Answer 3
Given:1 W (t) =
2 KG (m) =
3 KM (m) =

10000
7
7.4

Item

W (t)

KG /d (m)

Moments
(tm)

Ship
shifted down

10000
200

7
10

70000
-2000

Total

10000

68000

Final KG of vessel =

Total Moments
Total Weight

Final KG of vessel =

68000
10000

Final KG of vessel =

6.800 m
Page 2 of 40

CHAPTER 13
LIST

Final GM of vessel =

KM - Final KG of vessel

Final GM of vessel =

7.4

Final GM of vessel =

6.800

0.600 m

Item

W(t)

d (m)

Direction

Shifted

200

Stbd

Moments
Port
Stbd

Total
Total Moments =

1000

Total Moments =

1000

1000

Stbd

Total Moments
W * GM

Tan =

1000
6000

Tan =

0.1667

1000

Stbd Moments - Port Moments

Total Moments =

Tan =

9.46

Stbd

List of the ship is 9.46 to Stbd

Page 3 of 40

CHAPTER 13
LIST
Answer 4
Given:1 W (t) =
2 GM (m) =

12000
1.2

Item

W (t)

KG /d (m)

Moments
(tm)

shifted up

100

1.5

-150

Total

-150

Change in GM of vessel =

Total Moments
Total Weight

Change in GM of vessel =

-150
12000

Change in GM of vessel =

-0.013 m

Final GM of vessel =

Ininal GM of vessel + Change in GM

Final GM of vessel =

1.2

Final GM of vessel =

0.013

1.188 m

Item

Shifted

W(t)

d (m)

Moments

100

12

1200

Total
Total Moments =

1200
1200

Page 4 of 40

CHAPTER 13
LIST
Tan =

Total Moments
W * GM

Tan =

Tan =
=

1200
14250
0.0842
4.81

List of the ship is 4.81

Given:1 W (t) =
KM (m)
2 =
3 KG(m) =

12000
5.79
4.85

Item

W (t)

KG /d (m)

Moments
(tm)

Ship
Load

4950
50

4.85
1.25

24007.5
62.5

Total

5000

Final KG of vessel =

Final KG of vessel =

Final KG of vessel =

24070
Total Moments
Total Weight
24070
5000
4.814 m

Final GM of vessel =

KM - Final KG of vessel

Final GM of vessel =

5.79

Final GM of vessel =

4.814

0.976 m

Page 5 of 40

CHAPTER 13
LIST
Item
W(t)

Shifted

d (m)

50

Direction

Moments
Port

Port

Total
Total Moments =

200

200

Stbd Moments - Port Moments

Total Moments =

Total Moments =

200

Tan =

Total Moments
W * GM

Tan =

200
4880.0

Tan =

Stbd

200

Port

0.0410

2.35

Port

List of the ship is 2.35 to port


Answer 6
Given:1 W (t) =
2 KM (m) =
3 KG(m) =

10000
8.25
7.45

Item

W (t)

KG /d (m)

Moments
(tm)

Ship
Discharged

10000
-100

7.45
2.45

74500
-245

Total

9900

74255
Page 6 of 40

CHAPTER 13
LIST

Final KG of vessel =

Total Moments
Total Weight

Final KG of vessel =

Final KG of vessel =

74255
9900
7.501 m

Final GM of vessel =

KM - Final KG of vessel

Final GM of vessel =

8.25

Final GM of vessel =

7.501

0.749 m

Item

Discharged

W(t)

d (m)

Direction

-100

Port

Moments
Port
Stbd

Total
Total Moments =

600

600

Stbd Moments - Port Moments

Total Moments =

600

Total Moments =

600

Tan =

Total Moments
W * GM

Tan =

600
7420.0

Tan =

Stbd

0.0809
=

4.62

Stbd

List of the ship is 4.62 to stbd

Page 7 of 40

CHAPTER 13
LIST
Answer 7

Given:1 W (t) =
KM (m)
2 =
3 KG(m) =

10000
9.6
8.3

Item

W (t)

KG /d (m)

Ship
Discharged
Discharged
Discharged
Loads
Loads
Total

10000
-200
-800
-500
250
250
9000

8.3
10
2.3
5.2
8
12

Final KG of vessel =

Final KG of vessel =

Final KG of vessel =
Final GM of vessel =

83000
-2000
-1840
-2600
2000
3000
81560

Total Moments
Total Weight
81560
9000
9.062 m
KM - Final KG of vessel

Final GM of vessel =
Final GM of vessel =

Moments
(tm)

9.6

9.062

0.538 m

Item

Discharged
Discharged
Discharged
Loads
Loads
Total

W(t)

d (m)

Direction

-200
-800
-500
250
250

5
4
3

Port
Stbd
Port

Total Moments =

Moments
Port
Stbd
0
3200
0
0
0
3200

1000
0
1500
0
0
2500

Stbd Moments - Port Moments


Page 8 of 40

CHAPTER 13
LIST

Total Moments =

2500

Total Moments =

700

Tan =

Total Moments
W * GM

Tan =

700
4840.0

Tan =

3200

Port

0.1446
=

8.23

Port

List of ship is 8.23 Port

Answer 8
Given:1 W (t) =
KM (m)
2 =
3 KG(m) =

9000
8.95
8.3

Item

W (t)

KG /d (m)

Moments
(tm)

Ship
Loads
Discharged
Shifted Up
Shifted
Down

9000
600
-400
200

8.3
4
9
5

74700
2400
-3600
1000

300

-300

Total

9200

Final KG of vessel =

Final KG of vessel =

Final KG of vessel =

74200
Total Moments
Total Weight
74200
9200
8.065 m
Page 9 of 40

CHAPTER 13
LIST

Final GM of vessel =

KM - Final KG of vessel

Final GM of vessel =

8.95

Final GM of vessel =

8.065

0.885 m

Item
W(t)

Loads
Discharged
Shifted Up
Shifted Down
0
Total

600
-400
200
300
0

Total Moments =

d (m)

3
5
8
4

Port
Port
Stbd
port

Moments
Port

Stbd

1800
0
0
1200
0
3000

0
2000
1600
0
0
3600

Stbd Moments - Port Moments

Total Moments =

3600

Total Moments =

600

Tan =

Total Moments
W * GM

Tan =

600
8140.0

Tan =

Direction

3000

Stbd

0.0737
=

4.22

Stbd

List of ship is 4.22 Stbd

Page 10 of 40

CHAPTER 13
LIST
Answer 9
Given:1 W (t) =
KM (m)
2 =
3 KG(m) =

18000
8.935
7.75

Item

W (t)

KG /d (m)

Moments
(tm)

Ship
Discharged
Loads
Shifted Up
Shifted
Down

18000
-1500
500
500

7.75
6
10
2

139500
-9000
5000
1000

800

-1600

Total

17000

Final KG of vessel =

134900
Total Moments
Total Weight

Final KG of vessel =

134900
17000

Final KG of vessel =

7.935 m

Final GM of vessel =

KM - Final KG of vessel

Final GM of vessel =

8.935

Final GM of vessel =

1.000 m

7.935

Item

Discharged
Loads
Shifted Up
Shifted Down
0
Total

W(t)

d (m)

Direction

-1500
500
500
800
0

3
4
4
3

Port
Port
Stbd
port

Moments
Port
Stbd
0
2000
0
2400
0
4400

4500
0
2000
0
0
6500

Page 11 of 40

CHAPTER 13
LIST
Total Moments =

Stbd Moments - Port Moments

Total Moments =

6500

Total Moments =

2100

Tan =

4400

Stbd

Total Moments
W * GM

Tan =

2100
16995.0

Tan =

0.1236
=

7.04

Stbd

List of ship is 7.04 Stbd


Answer 10

Given:-

1
2
3
4

W (t) =
KM (m) =
KG(m) =
Initial List =

12000
7.54
6.8
8 P

Initial GM =

KM -

KG

Initial GM =

7.54 -

6.8

Initial GM =

0.74 m

Tan (8) = w * d
W *GM
0.1405 = w * 10
12000 * 0.74
124.8t = w
Weight to be shifted is 124.8t

Page 12 of 40

CHAPTER 13
LIST
Answer 11
Given:1
2
3
4
5

W (t) =
KM (m) =
KG(m) =
Initial List =
Final GM (m)

4000
10
9
10 P
1

Initial GM =

KM -

Initial GM =

10 -

Initial GM =
Tan =

KG
9

1 m
GG'
GM
Tan 10

GG'
1

0.176m =

GG'

Item

Ship
Loads
0
0
0
0
Total

W(t)

d (m)

Direction

4000
16000
0
0
0
0

0.176
3
4
4
3

Port

Total Moments =

Port
Stbd
port

Moments
Port
Stbd
705.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
705.3
0.0

Stbd Moments - Port Moments

Total Moments =

Total Moments =

705.3

705.308 Port

Tan =

Total Moments
W * GM

Tan =

705.3
Page 13 of 40

CHAPTER 13
LIST
20000.0
Tan =

0.0353
=

2.02

Port

Final List of ship will be 2.02 to port

Answer 12
Given:1.
2.
3.
4.

W =10000t
GM = 1.5m
Initial list = 5 Stbd
Final GM = 0.5m

Tan =

Tan (5)

GG'
GM
= GG'
1.5

0.131m = GG'
Item

Ship

W(t)

d (m)

Direction

10000

0.131

Stbd

Moments
Port
Stbd
0.0
1312.3

Total

0.0

Total Moments =

Stbd Moments - Port Moments

Total Moments =

1312.33

Total Moments =

1312.33 Stbd

Tan =

1312.3

Total Moments
W * GM

Page 14 of 40

CHAPTER 13
LIST
Tan =

1312.3
5000.0

Tan =

0.2625
=

14.71

Stbd

Final List of ship will be 14.71 to stbd

Answer 13
Given:1
2
3
4
5

W (t) =
KM (m) =
KG(m) =
Initial List =
Final KM (m)=

8500
9
8.3
8.5 P
9.3

Initial GM =

KM -

KG

Initial GM =

9 -

8.3

Initial GM =

0.7 m

Tan =

GG'
GM
Tan
(8.5)

GG'
0.7

0.105 =

GG'

Item

W (t)

KG /d (m)

Moments
(tm)

Ship
Discharged
Discharged
Loads
Shifted Up

8500
-200
-300
100
200

8.3
4
5
2
2

70550
-800
-1500
200
400

Total

8100

68850
Page 15 of 40

CHAPTER 13
LIST
Final GM = Final KM Final KG
Final GM = 9.3m 8.5m
Final GM = 0.8m
Item

W(t)

d (m)

Direction

Ship
Discharged
Discharged
Loads
Shifted Up

8500
-200
-300
100
200

0.105
5
2
4
3

Port
Stbd
Port
Stbd
Stbd

Moments

Total
Total Moments =

Stbd
0.0
0.0
600.0
400.0
600.0

1889.2

1600.0

Stbd Moments - Port Moments

Total Moments =

1600

Total Moments =
Tan =

Port
889.2
1000.0
0.0
0.0
0.0

1889

289.2335 Port
Total Moments
W * GM

Tan =

289.2
6480.0

Tan =

0.0446
=

2.56

Port

Final List of ship will be 2.56 to port

Page 16 of 40

CHAPTER 13
LIST
Answer 14
Given:1.
2.
3.
4.
5.

Displacement = 15000t
KG = 8.7m
KM = 9.5m
Initial List = 10 Port
D = 12m

Initial GM

= KM KG

Initial GM

= 9.5m 8.7m

Initial GM

= 0.8m

Tan

=w*d
W * GM

Tan(10) = w * d
15000 * 0.8
Item

W (t)

Ship
Loads
Discharged
Total

15000
+500
-300
15200

Direction

Moments
P (tm)
2115

Stbd
Port
2115

S (tm)
2500
1200
3700

Total moments = Stbd moments Port Moments


Total moments = 3700 2115
Total moments = 1585 tm
Total moments = w * d
1585

= w * 12

1585
12

=w

132.1t =w
Weight of SW that has to be transferred is 132.1t

Page 17 of 40

CHAPTER 13
LIST

Answer 15
Given:1
2
3
4
5

W (t) =
KM (m) =
KG(m) =
Initial List =
Final KM (m)=

12250
9.8
9
6.5 S
9.6

Initial GM =

KM -

KG

Initial GM =

9.8 -

Initial GM =

0.8 m

Tan =

GG'
GM
Tan (6.5)

GG'
0.8

0.091 =

GG'

Item

W (t)

KG /d (m)

Moments
(tm)

Ship
Loads
Discharged
Shifted Down

12250
1250
-250
160

9
8
2
9

110250
10000
-500
-1440

Total

13250

118310

Final KG of vessel =

Total Moments
Total Weight

Final KG of vessel =

118310
13250

Final KG of vessel =

8.929 m

Page 18 of 40

CHAPTER 13
LIST
Final GM = Final KM Final KG
Final GM = 9.6m 8.929m
Final GM = 0.671m

Item

W(t)

Ship
Loads
Discharged
Shifted

12250
1250
-250
160

d (m)

Direction

0.091
2
5
10

Moments

Stbd
Stbd
Stbd
port

Total
Total Moments =

Stbd Moments - Port Moments

Total Moments =

3616.569

Total Moments =

766.569

Tan =

Port
0.0
0.0
1250.0
1600.0

Stbd
1116.6
2500.0
0.0
0.0

2850.0

3616.6

2850

Stbd

Total Moments
W * GM

Tan =

766.6
8890.0

Tan =

0.0862
=

4.93

Stbd

Final List of ship will be 4.93 to Stbd

Page 19 of 40

CHAPTER 13
LIST
Answer 16
Given:1.
2.
3.
4.
5.
6.

W = 8000t
KM = 8.6m
KG = 8.0m
KG of cargo = 10m
Distance of CL = 8m
Resultant List = 3

GM

= KM KG

GM

= 8.6m 8.0m

GM

=0.6m
Item
Ship
Cargo washed
Total

Weight (t)
8000
-x
8000-x

KG (m)
8
10

Moments (tm)
64000
-10x
64000-10x

Distance of COL (m)


0
8

Moments (tm)
0
8x
8x

Final KG of ship = Total Moments


Total Weight
Final KG of ship = 64000-10x
8000-x
Final GM of ship = KM KG
Final GM of ship = 8.6 (64000-10x)
8000-x
Final GM of ship = 8.6(8000 x) 64000 + 10x
8000-x
Final GM of ship = 68800 8.6x 64000 +10x
8000 x
Final GM of ship = 4800 + 1.4x
8000 - x
Item
Ship
Cargo washed
Total

Weight (t)
8000
-x
8000-x

Final Moments = 8x
Tan

= Total Moments
W * GM
Page 20 of 40

CHAPTER 13
LIST
Tan

=
8x
(8000-x) * GM

Tan(3) = 8x * (8000 x)
(8000-x) * (4800 + 1.46x)
251.557 + 0.077x = 8x
251.557 = 7.923x
31.7 t =x
Weight of cargo washed is 31.7t
Answer 17
Given:1.
2.
3.
4.
5.
6.
7.
8.

W =16000t
KM = 7.5m
KG = 6.0m
TPC = 25t/cm
Initial list = 3 (Port)
Required draft = 8.8m
Present draft = 8.6m
Space available is 5m of center line on either side

GM = KM KG
GM = 7.5m 6m
GM = 1.5m
Tan = w *d
W * GM
Tan (3) = w * d
16000 * 1.5
1257.8tm =w * d
Initial transverse moments = 1275.8tm (Port)
Maximum permissible sinkage = Draft required Initial draft
Maximum permissible sinkage = 8.8m 8.6m
Maximum permissible sinkage = 0.2m/20cms
Cargo to load = TPC * Maximum permissible sinkage

Page 21 of 40

CHAPTER 13
LIST
Cargo to load = 25 * 20cms
Cargo to load = 500t

Item

W(t)

Distance of C.L (m)

Ship
Load
Load

16000
x
500-x

5
5

Total

16500

Direction

Port
Stbd

Moments (tm)
P
S
1257.8
5x
2500 5x
1257.8 + 5x

2500 5x

For ship to be upright Port moments = Stbd moments


1257.8 + 5x = 2500 5x
10x = 1242.2
x = 124.2t
Cargo to load in port side = 124.2t
Cargo to load in stbd side = 500t 124.2t
Cargo to load in stbd side = 375.8t

Answer 18
Given:1.
2.
3.
4.
5.
6.

W = 12000t
KM = 9m
KG = 7.25m
Cargo to load (w)=200t
Head of derrick = 24 m above keel
Outreach of wharf = 15m

i)
KG of head of derrick
KG of ship
d

= 24m
=-7.25m
= 16.75m

Change in VCG = w * d
W+w
Change in VCG = 200 * 16.75
12000 + 200

Page 22 of 40

CHAPTER 13
LIST
Change in VCG = 3350
12200
Change in VCG = 0.275m
Initial KG of vessel
Change in VCG
Final KG of vessel

= 7.25m
=+0.275m
= 7.525m

Final GM

= KM Final KG

Final GM

= 9m 7.525m

Final GM

= 1.475m

Tan

= w*d
(W + w)* GM

Tan = 200 * 15
(12000+200) * 1.475
Tan

= 200 * 15
12000 * 1.475

Tan

= 0.1667

= Tan-1 (0.1667)
= 9.46
List is 9.46 stbd

ii)
KG of deck
KG of ship
d

= 10m
=-7.25m
= 2.75m

Change in VCG = w * d
W+w
Change in VCG = 200 * 2.75
12000 + 200
Change in VCG = 550
12200
Change in VCG = 0.045m

Page 23 of 40

CHAPTER 13
LIST
Initial KG of vessel
Change in VCG
Final KG of vessel

= 7.25m
=+0.045m
= 7.295m

Final GM

= KM Final KG

Final GM

= 9m 7.295m

Final GM

= 1.705m

Tan

= w * dT
(W + w)* GM

Tan = 200 * 7
(12000+200) * 1.705
Tan

= 200 * 7
12000 * 1.705

Tan

= 0.0673

= Tan-1 (0.0673)
= 3.85
List is 3.85 stbd

Answer 19
Given:1.
2.
3.
4.
5.
6.
7.
8.

W = 10000t
KM = 7.3m
KG = 6.8m
Cargo to shift (w)=100t
KG of cargo = 10m
Head of derrick = 28 m above keel
KG of Lower Hold = 2m
Initial list = 5 Port

KM = KG + GM initial
KM KG = GM initial
7.3 6.8 = GM initial
0.5m

= GM initial

Page 24 of 40

CHAPTER 13
LIST
i)
Tan = w *d
W * GM
Tan (5) = w * d
10000 *0.5
437.4 = w * d
Initial Transverse Moment is 437.4tm to port
KG of head of derrick
KG of cargo
d

= 28m
=-10m
= 18m

Change in VCG = w * d
W
Change in VCG = 100 * 18
10000
Change in VCG = 0.18m
Initial KG of vessel
Change in VCG
Final KG of vessel

= 6.8m
=+0.18m
= 6.98m

Final GM

= KM Final KG

Final GM

= 7.3m 6.98m

Final GM

= 0.32m

Tan

= w*d
W * GM

Tan

= 437.4
10000 * 0.32

Tan

= 0.1367

= Tan-1 (0.1367)
= 7.78
List is 7.78 port

Page 25 of 40

CHAPTER 13
LIST
ii)
Tan = w *d
W * GM
Tan (5) = w * d
10000 *0.5
437.4 = w * d
KG of head of derrick
KG of cargo
d

= 28m
=-10m
= 18m

Change in VCG = w * d
W

Change in VCG = 100 * 18


10000
Change in VCG = 0.18m
Initial KG of vessel
Change in VCG
Final KG of vessel

= 6.8m
=+0.18m
= 6.98m

Final GM

= KM Final KG

Final GM

= 7.3m 6.98m

Final GM

= 0.32m

Item

W(t)

Distance of C.L (m)

Ship
Shift

10000
100

Total

10000

Direction

Stbd

Moments (tm)
P
S
437.4
600
437.4

600

Total Moments = Stbd moments port moments


Total Moments = 600 437.4
Total Moments = 163.6tm
Tan

Tan

= Total Moments
W * GM
= 163.6
10000 * 0.32
Page 26 of 40

CHAPTER 13
LIST
Tan

= 0.0511

= Tan-1 (0.0511)
= 2.92
List is 2.92 stbd

iii)
Tan = w *d
W * GM
Tan (5) = w * d
10000 *0.5
437.4 = w * d
KG of U.H
KG of L.H
d

= 10m
=-2m
= 8m

Change in VCG = w * d
W
Change in VCG = 100 * 8
10000
Change in VCG = 0.08m
Initial KG of vessel
Change in VCG
Final KG of vessel

= 6.8m
=-0.08m
= 6.72m

Final GM

= KM Final KG

Final GM

= 7.3m 6.72m

Final GM

= 0.58m

Item

W(t)

Ship
Shift

10000
100

Total

10000

Distance of C.L (m)

Direction

Moments (tm)
P
437.4

Stbd

S
600

437.4

600

Total Moments = Stbd moments port moments

Page 27 of 40

CHAPTER 13
LIST
Total Moments = 600 437.4
Total Moments = 163.6tm (stbd)
Tan

Tan

Tan

= Total Moments
W * GM
= 163.6
10000 * 0.58
= 0.0282

= Tan-1 (0.0282)
= 1.61
List is 1.61 stbd

Answer 20
Given:1.
2.
3.
4.
5.
6.
7.

W = 13000t
KM = 8.75 m
KG = 8m
Cargo to discharge (w)=150t
KG of cargo = 9m
Head of derrick = 22 m above keel
Initial list = 6 Stbd

KM = KG + GM initial
KM KG = GM initial
8.75 8 = GM initial
0.75m = GM initial
i)
Tan = w *d
W * GM
Tan (6) = w * d
13000 *0.75
1024.8 = w * d

Page 28 of 40

CHAPTER 13
LIST
Initial Transverse Moment is 1024.8 tm to stbd
KG of head of derrick
KG of cargo
d

= 22m
=- 9m
= 13m

Change in VCG = w * d
W
Change in VCG = 150 * 13
13000
Change in VCG = 0.15m
Initial KG of vessel
Change in VCG
Final KG of vessel

= 8m
=+0.15m
= 8.15m

Final GM

= KM Final KG

Final GM

= 8.75 m 8.15m

Final GM

= 0.6m

Tan

= w*d
W * GM

Tan

= 1024.8
13000 * 0.6

Tan

= 0.1312

= Tan-1 (0.1312)
= 7.47
List is 7.47 stbd
ii)

Item

W(t)

Ship
Shift

13000
150

Total

10000

Distance of C.L (m)

Direction

Moments (tm)
P

(5+10=15)

port

S
1024.8

2250
2250

1024.8

Page 29 of 40

CHAPTER 13
LIST
Total Moments = Port moments stbd moments
Total Moments = 2250 1024.8
Total Moments = 1225.2tm to Port
Tan

= Total Moments
W * GM

Tan

= 1225.2
13000 * 0.6

Tan

= 0.1571

= Tan-1 (0.1571)
= 8.92
List is 8.92 port

iii)
KG of Cargo
KG of ship
d

= 9m
=-8m
= 1m

Change in VCG = w * d
W-w
Change in VCG = 150 * 1
13000-150
Change in VCG = 150 * 1
12850
Change in VCG = 0.012m
Initial KG of vessel
Change in VCG
Final KG of vessel

= 8m
=-0.012m
= 7.988m

Final GM

= KM Final KG

Final GM

= 8.75m 7.988m

Final GM

= 0.762m

Page 30 of 40

CHAPTER 13
LIST
Item

W(t)

Ship
Discharge

13000
-150

Total

12850

Distance of C.L (m)

Direction

Moments (tm)
P

Port

S
1024.8

750
750

1024.8

Total Moments = Stbd moments Port moments


Total Moments = 1024.8 - 750
Total Moments = 274.8tm (port)
Tan

Tan

Tan

= Total Moments
W * GM
= 274.8
12850 * 0.762
= 0.0281

= Tan-1 (0.0281)
= 1.61
List is 1.61 stbd

Answer 21
Given:1.
2.
3.
4.
5.

Displacement = 10000t
KM = 10.8m
KG = 9m
Initial List = 10 Stbd
Dimensions of tank = 12m * 12m * 9m

RD of FW = 1.000

KM = KG + GM initial
KM KG = GM initial
10.8 8 = GM initial
1.8m

= GM initial

Page 31 of 40

CHAPTER 13
LIST

12m

9m

12m

12m

12m

Distance between center of gravity of two tanks is 12m


i)
Tan = w *d
W * GM
Tan (10) = w * d
10000 *1.8
3173.9 = w * d
Initial Transverse Moment is 3173.9 tm to stbd
To correct list stbd moments = port moments
Stbd moments = w * d
3173.9 = w *12
3173.9 = w
12
264.5t = w

Page 32 of 40

CHAPTER 13
LIST
ii

12m

3m
12m

9m

G
6m

12m

3m

12m

i = LB3
12
FSE = i * RD of FW
12 * Displacement
FSE = L * B3 * RD of FW
12 * Displacement
FSE = 12 * (12)3 * 1.000
12 * 10000
FSE = 0.173m
FSE of 1 tank = 0.173m
FSE of 2 tanks = 2 * 0.173m (Similar in dimensions)
FSE of 2 tanks = 0.346m
Weight shifted =1 * Volume of tank * RD of FW
3
Weight shifted = 1 * L * B * H * RD of FW
3
Weight shifted = 1 * 12 * 12 * 9 * 1.000
3
Page 33 of 40

CHAPTER 13
LIST
Weight shifted = 432t
KG of weight shifted = 6m + 3 m
2
KG of weight shifted
KG to where weight shifted
d

= 7.5m
=-1.5m
= 6m

Change in VCG = w * d
W
Change in VCG = 432 * 6
10000
Change in VCG = 0.259m
Initial KG of vessel
Change in VCG
KG(s) of vessel
FSE of 2 tanks
KG(f)

= 9m
=-0.259m
= 8.741m
=+0.346m
= 9.087m

Final GM

= KM KG (f)

Final GM

= 10.8m 9.087m

Final GM

= 1.713m

Transverse moments due to shifting = w * dT


Transverse moments due to shifting = 432 * 12
Transverse moments due to shifting = 5184tm (Port)
Initial Moments
=-3173.9 (stbd)
Net Moments
= 2010.1 (Port)
Tan

Tan

Tan

= Net Moments
W * GM
= 2010.1
10000 * 1.713
= 0.1173

= Tan-1 (0.1173)
= 6.69
List is 6.69 port

Page 34 of 40

CHAPTER 13
LIST
Answer 22
Given:1.
2.
3.
4.
5.
6.

Displacement (W) = 8000t


Weight shifted (w) = 50t
Transverse distance = 4m
FSM = 1216tm
KM = 7m
KG = 6.4m

FSE = FSM
Displacement
FSE = 1216
8000
FSE = 0.152m
KG (s) = 6.4m
FSE
=+0.152
KG (f) = 6.552m
KM
= 7m
KG (f) =-6.552m
GM (f) = 0.448m
Tan = Transverse Moments
W * GM (f)
Tan = w * d
W * GM (f)
Tan = 50 * 4
8000 * 0.448
Tan = 200
3584

= Tan-1(0.0558)

= 3.19

Final list of the vessel is 3.19

Page 35 of 40

CHAPTER 13
LIST
Answer 23
Given:1.
2.
3.
4.
5.
6.

W =10000t
KM = 7.8m
KG = 7.075m
RD of HFO = 0.95
Dimensions of each tank = 15m * 12m * 2m
No 3 stbd final sounding = 1.2m

15m

15m
12m

12m

0.8m
2m

2m

1.2m

GG'

HFO consumed = L * B * (H sounding ) * RD of oil


HFO consumed = 15 * 12 * 0.8 * 0.95
HFO consumed = 136.8t
KG of ship
KG of HFO consumed
d

= 7.075m
=-1.6m
= 5.475m

Change in VCG = w * d
W-w
Change in VCG = 136.8 * 5.475
10000 136.8
Change in VCG = 748.98
9863.2
Change in VCG = 0.076m

Page 36 of 40

CHAPTER 13
LIST
Initial KG
= 7.075m
Change in VCG =+0.076m
Final KG (s)
= 7.151m
i = LB3
12
FSE = i * RD of HFO
12 * Displacement
FSE = L * B3 * RD of HFO
12 * Displacement
FSE = 15 * (12)3 * 0.95
12 * 10000
FSE = 15 * 12 * 12 * 12 * 0.95
12 * 10000
FSE = 0.208m
KG (s) = 7.151m
FSE
=+0.208
KG (f) = 7.359m
KM
= 7.8m
KG (f) =-7.359m
GM (f) = 0.441m
Tan = Transverse Moments
W * GM (f)
Tan = w * d
W * GM (f)
Tan = 136.8 * 6
10000 * 0.441
Tan = 820.8
4410

= Tan-1(0.1887)

= 10.69

Final list of the vessel is 10.69 to Port

Page 37 of 40

CHAPTER 13
LIST
Answer 24
Given:1 W (t) =
2 KM (m) =
3 KG(m) =

9000
8.02
7.5
Moments
(tm)

Item
W (t)

KG /d (m)

Ship
Loads
Loads
Discharged
FSM

9000
250
1000
-250

7.5
12
3
8

Total

10000

67500
3000
3000
-2000
1200
72700

Final KG of vessel =

Total Moments
Total Weight

Final KG of vessel =

72700
10000

Final KG of vessel =

7.270 m

Final GM of vessel =

KM - Final KG of vessel

Final GM of vessel =

8.02

Final GM of vessel =

7.270

0.750 m

Item
W(t)
Ship
Loads
Loads
Discharged
Shifts

9000
250
1000
-250
100

d (m)
0.000
3
1
2
3

Direction
0
Stbd
Port
Stbd
Stbd

Total
Total Moments =

Moments
Port
0.0
0.0
1000.0
500.0
0.0

Stbd
0.0
750.0
0.0
0.0
300.0

1500.0

1050.0

Stbd Moments - Port Moments

Page 38 of 40

CHAPTER 13
LIST
Total Moments =

1050

Total Moments =

450

Tan =

1500

Port

Total Moments
W * GM

Tan =

450.0
7500.0

Tan =

0.0600
=

3.43

Port

Final List of ship will be 3.43 to Port


Answer 25
Given:1.
2.
3.
4.
5.
6.

Displacement (W) = 14000t


KM = 9m
KG = 7.8m
FSM = 2100tm
Initial List = 8 Port
Transverse distance = 10m

FSE = FSM
Displacement
FSE = 2100
14000
FSE = 0.15m
KG (s) = 7.8m
FSE
=+0.15
KG (f) = 7.95m
KM
= 9m
KG (f) =-7.95m
GM (f) = 1.05m
Tan = Transverse Moments
W * GM (f)
Tan(8) = w * d
W * GM (f)
Page 39 of 40

CHAPTER 13
LIST
2066 = w *d
To correct the list Port Moments = Starboard Moments
2066 = w * Transverse distance
2066 = w * 10
2066 = w
10
206.6t = w
Weight to transfer is 206.6t

-o0o-