Professional Documents
Culture Documents
201.1
600.1
PLAN
GENERAL NOTES:
1. CONSTRUCTION NOTES APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED.
Description
Materials Requirements
Description
This item shall consist of the construction of curb and gutter either
Precast or Cast in place, made of concrete in accordance with this
Specification at the location, and conformity with the lines, grades,
dimensions and design, shown on the Plans or as required by the
Engineer.
Construction Requirements
600.2
Material Requirements
600.2.2 Concrete
201.3.2 Placing
Cement mortar shall consist of one part of portland cement and two
parts of lines aggregates with water added as necessary to obtain the
required consistency. The mortar shall be used within 30 minutes of
preparation.
Description
600.3
601.2
Construction Requirements
600.3.1 Bedding
Excavation shall be made to the required depth and the base upon
which the curb and/or gutter is to be set shall be compacted to a firm
and even suface. All soft and unsuitable material shall be removed and
replaced with suitable material.
Material Requirements
600.3.2.1 Placing
601.2.4 Forms
Forms shall be of wood or metal as approved by the Engineer and
shall extend to the full depth of the concrete. All forms shall be straigth,
free from warps and of adequate strength to resist distortion.
SUMMARY
ITEM NO.
OF
QUANTITIES
DESCRIPTION
605.1
All forms shall be staked securely in position at the correct line and
level. Performed joint filler shall be set in position shown on the Plans
before placing of the concrete is started. The top of the joint filler shall
be placed 5 mm below the top surface of the finished sidewalk.
The road sign shall comply in all respects with the DPWH Highway
Safety Design Standards Part 2: Road Signs and Pavement Marking
Manual (February 2004) published by the DPWH. The categories of
road signs are designated in the Manual, namely, danger warnings,
regulatory signs and informative signs, or guide signs. These are
reffered to in the Contract as warnings signs and informatory signs,
respectively.
QUANTITY
UNITS
Description
101(3)c
2,000.75
SQ.M.
101(3)c.1
160.28
SQ.M.
101(4b)
493.70
L.M.
102(4)
272.12
CU.M.
201
272.12
CU.M.
502-9
15.12
SQ.M.
600(3)
606(2)a
PAVEMENT MARKINGS
SPL-1
SPL-2
SPL-3
G. I. PIPE BOLLARD
478.70
L.M.
25.65
SQ.M.
2,587.46
SQ.M.
160.80
SQ.M.
L.S.
L.S.
REFERENCE:
SPL-4
SPL-5
BARRICADES
SPL-6
2.00
PCS.
75.00
PCS.
L.S.
L.S.
* DPWH (Volume II) Standard Specifications for Highways Bridges and Airports
2013 Edition: (Blue Book)
PROJECT TITLE :
SHEET CONTENTS :
TECHNICAL SPECIFICATION
GENERAL NOTES
SUMMARY OF QUANTITIES
PREPARED BY :
CHECKED BY :
EDISON G. CORNEJO
SUBMITTED BY :
RECOMMENDING APPROVAL :
CARMELINO D. MANUGUID
APPROVED :
SHT. NO.
RAMON P. DEVANADERA
PLAN