You are on page 1of 8

AIRFORCE (SLAF) HOSPITAL COLOMBO

Democratic Socialist Republic of Sri Lanka


Democratic Socialist Republic of Sri Lanka

AIRFORCE (SLAF) HOSPITAL COLOMBO


Democratic Socialist Republic of Sri Lanka

CIVIL AND STRUCTURAL WORKS


GENERIC SPECIFICATIONS
FINISHING SCHEDULE

Democratic Socialist Republic of Sri Lanka


08/05/2015

1/8

AIRFORCE (SLAF) HOSPITAL COLOMBO


Democratic Socialist Republic of Sri Lanka
Democratic Socialist Republic of Sri Lanka

TABLE OF CONTENTS

1.

Civil works..............................................................................................3

1.1.

Site preparation...................................................................................................... 3

1.2.

Fence and access doors........................................................................................ 3

1.3. Roads, ramps and Parking....................................................................................3


1.3.1. Roads................................................................................................................. 3
1.3.2. Parkings and walkways......................................................................................3
1.3.3. Ramps............................................................................................................... 3
1.3.4. Patio on Ground floor........................................................................................ 3
1.4.

2.

Foundations............................................................................................................ 3

Construction works...............................................................................4

2.1.

Main structural system, load bearing structure...................................................4

2.2.

Outside and inside non bearing walls..................................................................4

2.3.

X-ray room walls..................................................................................................... 4

2.4. Facade, windows and outside doors....................................................................4


2.4.1. Facade external finish.....................................................................................4
2.4.2. Windows............................................................................................................ 4
2.4.3. Doors (outside).................................................................................................. 4
2.5. Roof.......................................................................................................................... 5
2.5.1. Substructure....................................................................................................... 5
2.5.2. Roofing.............................................................................................................. 5
2.6.

Floor, wall and ceiling finishes.............................................................................6

2.7.

Painting.................................................................................................................... 7

2.8. Internal doors.......................................................................................................... 8


2.8.1. Standard doors.................................................................................................. 8
2.8.2. Doors to Operation Theatres..............................................................................8
2.8.3. Double wing doors, partly glazed.......................................................................8
2.8.4. X-ray doors........................................................................................................ 8

Democratic Socialist Republic of Sri Lanka


08/05/2015

2/8

AIRFORCE (SLAF) HOSPITAL COLOMBO


Democratic Socialist Republic of Sri Lanka
Democratic Socialist Republic of Sri Lanka

1.

Civil works
1.1.

Site preparation

Approx site area is 14.350 m with access to existing main road via side road on
reserved site (see attached drawing: Site Plan). The erection of the side road
outside the site boundaries and the preparation of all needed media connections
(water, sewage, electricity, telecom, etc.) are excluded from VAMED scope of
work.
The site area is flat land .
Existing trees and bushes on the site have to be rooted out where necessary.
Main trenches for channels, (for building supplying services) potable water, fire
fighting water, electricity etc. will be excavated and backfilled with the soil placed
alongside the trenches. Electrical power supply cables will be protected with brick
layer and warning tape.
Gardening and landscaping:
Green areas around the buildings have to be covered with humus and planted with
suitable grassing and some trees. Trees and bushes have to be cultivated
according to the site-layout.
1.2.

Fence and access doors

The fence around the site has to be made of galvanized mesh 1.80 m height.
Total length according to drawings.
Site entering gates: metal, with galvanized mesh, manually operated 6 m width
(or 2x3m), H=1,8 m
1.3.

Roads, ramps and Parking


1.3.1. Roads
The roads inside hospital site area shall be tared, made with double
surface dressing on compacted under-layer with curbstones or blinded
hardcore shoulder on request.
Front area of the hospital - emergency, ambulant and main entrance
area - will be on the first floor level. Carefully designed and properly
executed infill, road, ramps, sidewalks and drainage system shall avid
possible sliding or erosions.
Design criteria are applicable to Local Regulations.
1.3.2. Parkings and walkways
Car parks as well as walkways shall be tared as well, made with
double surface dressing on compacted under-layer, designed for
loads of private cars, and motorcycles.
1.3.3. Ramps
Road ramps shall be designed according to Local Regulations or/and
BS.
1.3.4. Patio on Ground floor
The courtyard in the central area of the hospital building provide high
qualty landscape and good drainage.

1.4.

Foundations

Democratic Socialist Republic of Sri Lanka


08/05/2015

3/8

AIRFORCE (SLAF) HOSPITAL COLOMBO


Democratic Socialist Republic of Sri Lanka
Democratic Socialist Republic of Sri Lanka
The foundations provide typical piling foundations according to static calculations
and structural design requirements, based on the latest soil investigation report.
The area in front of the main hospital access will be filled up to the level of the
Hospital first floor level, as will be done for the helipad. Alongside the buildings a
proper rain water drainage system has to be designed according to ground
conditions and local climatic conditions.

2.

Construction works
2.1.

Main structural system, load bearing structure

The main structural system shall be designed as typical reinforced concrete


structure with columns and slabs, and solide concrete block work as infill.
Static calculations follow the design requirements of the preliminary design.
2.2.

Outside and inside non bearing walls

Outside and inside non-bearing walls shall be built of local made hollow blockwork
(or solid concrete blocks or red bricks where applicable) min.10 cm thick, incl. all
necessary lintels, girders, columns, inside and outside plastered, ready for
painting, tiling or laying of vinyl sheet.
All walls have to be able to carry wall mounted facilities, cupboards, MT
equipment, etc. wherever necessary, acc. to the approved detailed shop drawings.
Building parts within air-conditioned areas must have fully insulated walls (double
walls 10+5+10 cm, with 5 cm insulation)
Walls must be connected with wire loops to the main structural system to avoid
possible cracks in the joints.
2.3.

X-ray room walls

Walls shall be lead shielded for X-ray protection, thickness according to standards
for X-Ray facilities (max 150 kV) authoritys approval.
2.4.

Facade, windows and outside doors


2.4.1. Facade external finish
External finish to be 20 mm thick coat render with 3 mm grain
textured finish, traditional.
Color of facade coating according to the Contractor and the based on
Standard colors.Will be proposed by the Project Architect.
2.4.2. Windows
The windows shall be typical standard aluminum framing, single
glazed, including insect screens fixed on aluminum or metal frames.
Applicable details according to manufacturer and design standards.
2.4.3. Doors (outside)
Entrance doors - double wing, public and medical areas:
Doors for main entrances to the hospital and the departments shall be
made of aluminium framing, with security glazing, acc. to standard
hospital design requirements.

Democratic Socialist Republic of Sri Lanka


08/05/2015

4/8

AIRFORCE (SLAF) HOSPITAL COLOMBO


Democratic Socialist Republic of Sri Lanka
Democratic Socialist Republic of Sri Lanka
All main corridor doors shall be provided with standard handles,
cushions and cylinder type locks including cylinders and door
bumpers as necessary.
Details as standard by the manufacturer.
Doors for technical rooms:
Metal doors (galvanized steel or aluminium) manufactured of coated
or solid metal grid on metal frames. Internal doors in the main
corridors with trolley traffic have typical shutters with base plates and
push plates (approx. 15 cm high) made of 1 mm stainless steel or 2
mm aluminium, fixed on both sides.
Details as standard by the manufacturer.
Ventilation louvers according to standard design requirements.
2.5.

Roof
2.5.1. Structure and Substructure
Sloping roof structure shall be executed according proposed design
requirements and static calculations.
Roof truss shall be made of steel/metal. Main structural framing shall
be especially coated with aluminum-zinc coating to prevent rust.
All details according to the manufacturer's production details and
shop drawings.
2.5.2. Roofing
The roof shall be made of special coated profiled steel or aluminum
sheets, standard color acc. manufacturer (protection coat), outside
colored, support made of corrosion protected metal profiles.
The roof has to be watertight and insect tight.
All openings for ventilation with insect protection screen.

Democratic Socialist Republic of Sri Lanka


08/05/2015

5/8

AIRFORCE (SLAF) HOSPITAL COLOMBO


Democratic Socialist Republic of Sri Lanka
Democratic Socialist Republic of Sri Lanka
2.6.

H01

Floor, wall and ceiling finishes

HOSPITAL MEDICAL SERVICES


ROOMTYPE
FLOOR
FINISHES
consulting/examinat
vinyl sheet, antiion / treatment
slip
rooms

H02

patient bedrooms

vinyl sheet, antislip

H03

OT, ICU, NICU,


recovery,
labour&delivery
room

static conductive
vinyl sheet

H04

x-ray rooms

vinyl sheet, antislip, radiation


protection

H05

dirty utility, clean


utility, disposal,
pantry

ceramic tiles,
good quality, easy
to clean

H06

various stores,
cleaners room

ceramic tiles,
good quality, easy
to clean, anti-slip

H07

toilets, showers

H08

corridors, waiting
zones in closed
areas, nurse base,
various bays

ceramic tiles,
good quality, easy
to clean, anti-slip
ceramic tiles,
good quality, antislip

H09

laboratories

ceramic lab tiles,


anti-slip

H10

CSSD

vinyl sheet, antislip

Democratic Socialist Republic of Sri Lanka


08/05/2015

WALL FINISHES

CEILING

special (antibacterial)
paint, ceramic tiles
around basins,
skirting of same
material as floor
finish min. 10 cm
high
special (antibacterial)
paint, ceramic tiles
around basins,
skirting of same
material as floor
finish min. 10 cm
high
special (antibacterial)
paint, easy cleaning,
rounded molding and
skirting of same
material as floor
finish min. 10 cm
high or vinyl sheet,
rounded molding
facing plaster board
wall, radiation
protection, latex
paint, skirting of
same material as
floor finish min. 10
cm high
special (antibacterial)
paint, ceramic tiles
around basins,
skirting of same
material as floor
finish min. 10 cm
high
latex paint, skirting of
same material as
floor finish min. 10
cm high
ceramic tiles

latex paint

latex paint, easy


cleaning, skirting of
same material as
floor finish min. 10
cm high, wall
protections
special (antibacterial)
paint

suspended ceiling with


mineral board tiles or
plasterboard, latex paint

special (antibacterial)
paint, ceramic tiles
around basins,
skirting of same
material as floor
finish min. 10 cm
high

latex paint

suspended plasterboard
ceiling, special
(antibacterial) paint

suspended plasterboard
ceiling, radiation
protection, latex paint

latex paint

latex paint

latex paint

suspended ceiling with


mineral board tiles or
plasterboard, latex paint
suspended plasterboard
ceiling, special
(antibacterial) paint

6/8

AIRFORCE (SLAF) HOSPITAL COLOMBO


Democratic Socialist Republic of Sri Lanka
Democratic Socialist Republic of Sri Lanka

N01

NON MEDICAL SUPPORT SERVICES


FLOOR
FINISHES
offices, corridors
ceramic tiles,
and waiting zones
good quality, easy
in admin
to clean, anti-slip

WALL FINISHES

CEILING

latex paint, skirting of


same material as
floor finish min. 10
cm high
latex paint, skirting of
same material as
floor finish min. 10
cm high
latex paint, skirting of
same material as
floor finish min. 10
cm high

suspended ceiling with


mineral board tiles or
plasterboard, latex paint

ceramic tiles

latex paint

latex paint, skirting of


same material as
floor finish min. 10
cm high

latex paint

ceramic tiles,
heavy duty, antislip

ceramic tiles

suspended plasterboard
ceiling, latex paint

ceramic tiles,
easy to clean,
anti-slip

latex paint, skirting of


same material as
floor finish min. 10
cm high
latex paint

suspended ceiling with


mineral board tiles or
plasterboard, latex paint

latex paint, skirting of


same material as
floor finish min. 10
cm high

suspended ceiling with


mineral board tiles or
plasterboard, latex paint

N02

main entrance,
dining area

natural stone,
good quality, antislip

N03

staircases,
corridors, waiting
zones in open
areas

N04

waste management
services

N05

engineering
services, cleaning /
housekeeping,
hospital medical
stores
catering
department
(kitchen), laundry /
linen services
central staff
facilities, relatives
dormitories

natural stone,
terrazzo or
ceramic tiles,
good quality, antislip
ceramic tiles,
heavy duty, antislip
ceramic tiles,
heavy duty, antislip

N06

N07

N08
N09

open walkways on
ground floor, M&E
plants
terraces

N10

offices ground floor

sealed concrete,
anti-slip
concrete tiles,
anti-slip
ceramic tiles,
easy to clean,
anti-slip

suspended ceiling with


mineral board tiles or
plasterboard, latex paint
latex paint

concrete

Corner guards on wall corners and columns must be made of aluminum or


stainless steel and designed for heavy duty use, according to the function of the
relevant room.
Wall tiles range up to upper edge of doorframes, except in catering department,
laundry / linen services and CSSD, where the wall tiles shall be up to the
(suspended) ceiling.
The grouting will be the choice of SLAF adjusted to the purposes of the specific
rooms, acc. to design guidelines of the Project Architect.
In wet areas the walls must be impregnated by a water resistant liquid protection
prior to tiling or painting.
Suspended ceilings must have inspection openings for maintainance wherever
necessary.
2.7.

Painting

In general, all walls, gypsum boards and ceilings must be painted with emulsion
paint, primer and final coat. The colors shall be selected by SLAF and the Project
Architect.
Washable emulsion paint in corridors up to 1,5 m high shall be provided.

Democratic Socialist Republic of Sri Lanka


08/05/2015

7/8

AIRFORCE (SLAF) HOSPITAL COLOMBO


Democratic Socialist Republic of Sri Lanka
Democratic Socialist Republic of Sri Lanka
In the operating theatres, the painting of the walls shall be epoxy paint in three
layers or vinyl sheet. SLAF and the Project Architect shall select the colors.
2.8.

Internal doors
2.8.1. Standard doors
Door leaf: standard aluminium frame, melamine filling
Door frames: steel frames, manufactured from zinc coated steel,
ready for paint finish, acc. BS
Handles: stainless steel (hygienic areas e.g. OT-dept., CSSD) and
anodized aluminium, emergency escape doors with panic handle set,
all acc. to BS and design guideline by Project Architect
Hinges: stainless steel, acc. BS
Door bumpers, stoppers: where necessary
2.8.2. Doors to Operation Theatres
Door leaf: manually operated, standard aluminium frame, stainless
steel cover
Door frames: steel frames, manufactured from zinc coated steel,
ready for paint finish, acc. BS
Handles: stainless steel, acc. to BS and design guideline by Project
Architect
Hinges: stainless steel, acc. BS
Push plates: base plates and push plates (approx.15 cm high) made
of 1mm stainless steel or 2mm aluminum plates on both sides of the
door.
2.8.3. Double wing doors, partly glazed
Door leaf: standard aluminium frame, acc. to BS
Glazing: single glazed, acc. BS
Door frames: steel frames, manufactured from zinc coated steel,
ready for paint finish, acc. BS
Handles: stainless steel (hygienic areas e.g. OT-dept., CSSD) and
anodized aluminium, emergency escape doors with panic handle set,
all acc. to BS and design guideline by Project Architect
Hinges: stainless steel, acc. BS
Door bumpers, stoppers: where necessary
2.8.4. X-ray doors
Door leaf: standard aluminium frame, melamine filling, X-ray
protection acc. BS1178
Door frames: steel frames, manufactured from zinc coated steel,
ready for paint finish, X-ray protection acc. BS1178
Handles: stainless steel, acc. to BS and design guideline by Project
Architect
Hinges: stainless steel, acc. BS
Door bumpers, stoppers: where necessary

Democratic Socialist Republic of Sri Lanka


08/05/2015

8/8

You might also like