INSTRUCTIONS FOR INDUCED DRAFT COOLING TOWERS


DESIGN DATA SHEET EXH-DS-1317

INSTRUCTIONS FOR INDUCED DRAFT COOLING TOWERS


DESIGN DATA SHEET EXH-DS-1317

December 1989

Page 1 of 3

Chevron

Specification EXH-DG-1317

INSTRUCTIONS FOR INDUCED DRAFT COOLING TOWERS


DESIGN DATA SHEET EXH-DS-1317
This guide discusses the information required from the engineer on the Cooling Tower Institute
(CTI) Inquiry and Bid Form. (See CTI STD. 118 attached). This industry data sheet is used in
conjunction with EXH-EG-1317 to make up the job specification.
The data an engineer needs to provide are marked with an asterisk on the data sheets. Primarily,
they are the Design and Operating Conditions on the first page. There are a few isolated "fillins" on structural details, access to the top of tower, anchor bolts, the cold water basin, and the
electric motor drivers. Consult a civil and electrical engineer for assistance in these areas. If there
is no other support group, the major manufacturers bidding on the cooling tower can assist in these
areas.
The following information is required in the Design and Operating Conditions of the Data Sheets.
Also included is where to go for the required information.
Information Required

Source

Circulating water flow, GPM

Process Engineer

Hot (inlet) water temperature, F

Process Engineer

Cold (outlet) water temperature, F

Process Engineer

Wet bulb temperature, F., inlet or ambient

Section 2200

Design Wind Load, psf or Mi./hr

Civil and Structural Manual, Section 100

Design Seismic Load

Civil and Structural Manual, Section 100

Elevation above sea level, ft

Local Surveys

Tower Exposure (i.e., the direction


the tower faces)

Operating Representative

Other factors the manufacturers will follow up on to refine their designs, are:

Water quality
Plant life expectancy
Continuous or cyclical operation
Size or plot limit preference
How operating costs will be evaluated
Environmental restrictions

Page 2 of 3

December 1989

Chevron

Specification EXH-DG-1317

INSTRUCTIONS FOR INDUCED DRAFT COOLING TOWERS


DESIGN DATA SHEET EXH-DS-1317
Also note that the CTI has put a lot of effort into resolving past problems that the cooling tower
manufacturers have had in their completed towers meeting the design criteria.
The Model Specification EXH-EG-1317 (Part II) itemizes the following as the sole responsibility of
the Vendor:
1.

Meet the operating conditions of the Data Sheet.

2.

Be a CTI Code tower.

3.

Meet all applicable Codes and Ordinances.

To these requirements, the purchase order should also require the manufacturer to supply the
appropriate data so that a CTI Acceptance Test under ATC-105 can be performed (and appropriate
equations to financially penalize the manufacturer, if the tower does not meet "design.")