October 3rd, 2000

Statement of Work
Program Information:
Introduction Timing

Job#1 Sep.1st, 2001

Program Description

Program is to introduce 2002 Model Year for Escort SW, 4


& 5 doors (unique FSAO)

Assembly Plant

Ford Pacheco - Argentina

Volume Estimated

19.000 Escort SW, 4 & 5 doors per year

Full Service Supplier


Parts
Program Targets:
Design and development of the part mentioned above will be SUPPLIER responsibility with Ford Engineering
supervision and approval;
Meet component durability targets established for this program / WCR requirements / DVP and all Engineering
Specifications;
Component must support the tests at Tatui Proving Ground (Tatu Test Procedures P1 and E2);
Component is to be robust, safe and easy to handle and provide good ergonomics during assembly.
Commodity Assumption / Information:
Styling of Alloy Wheel 6J x 14x 41 must accord to information delivered by Ford Engineering;
See engineering drawing XXX-XXXX-XXX and Engineering Specification SXX-XXXX-XXX attached for
reference, which specifies the standards and regulations that must be considered for the construction of this part,
as well as material and finish notes (except when specified);
Part to be supplied including all components shown in the engineering drawing mentioned above; supplier will
be responsible for all of them, and for the approval of styling requirements;
Supplier will be responsible for the final appearance, and for the approval of Ford Styling requirements;
Detailed-tooling description is required;
Development timing is required;
CAD information (3D Model and 2D drawings) will be supplier responsibility, with logo Ford and part numbers
(according to drawing. Std. E3);
Production parts must have both logo Ford and part numbers inserted, according to spec. S86BB-1K266-AA.

The following is a Statement of Work defining the assignment of responsibilities to be accomplished by the Supplier and Ford
Motor Company:
(L) Lead
assumes primary role in accomplishing task and requests support only when necessary
(V) Verify
conducts a final check on work completed and assumes little/no responsibility in completing task
(S) Support assumes secondary role and assists when requested by team with lead responsibility

October 3rd, 2000


Responsibilities
FSAO Supplier
Design & Development
1 Agree on affordable targets - Cost, Weight, Quality, Function
L
S
2 Work with the Program Team to manage design and development to meet functional objectives and affordable V/S
L
targets
3 Support Program Timing
V/S
L
4 Detailed Assumptions
L
S
5 Component DVP&R (according to material specification)
V/S
L
6 WERS entry
L
S
7 Release responsibility
L
S/V
8 Design FMEA
V/S
L
9 Process FMEA
V/S
L
10 Perform Engineering Specifications (ES) tests and issue results
V/S
L
11 Computer Aided Engineering (CAE) as required
V
L
12 Develop Risk & Opportunity (R&O) list for cost / weight / investment / function for all targets set from program
V
L
inception to launch.
13 Provide all Test Plans (vehicles)
L
S
14 Fully support vehicle launch at vehicle assembly plant
S
L
15 Provide technical / engineering liaison for program support
V/S
L
16 Participate in PMT / PAT meetings as required
V/S
L
17 Report Design and Open issue status / resolution in support of Design meetings
V/S
L
18 Define & identify Critical & Significant Characteristics
V
L
19 Prepare vehicle layout information
L
V/S
20 Prepare detail drawings
V
L
21 Provide assembly drawings
V
L
22 Provide manufacturing feasibility sign-off
V/S
L
23 Provide build and parts requirements schedules
S
L
24 Utilize design software that is compatible with Ford (Usage of PDGS or equivalent/convertible)
S
L
Manufacturing Development
25 Implement complete Statistical Process Control in all areas of the mfg process
V
L
25 Acquire & provide PIST & PIPC data as required
V
L
26 Develop Process Control Plans
V
L
27 Develop Dimensional Control Plans
V
L
28 Conduct capability runs on each process prior to launch & and provide results
V
L
29 Demonstrate conformance to minimum Cpk as required by QS-9000
V
L
30 Arrange plant visits & facility reviews as requested
V
L
Quality
31 Develop plan to meet quality objectives
V
L
32 Develop quality improvement proposals for review with Ford Engineering and STA
V
L
33 Provide quality reports for surrogate and actual process upon request
V
L
34 Provide in-house quality plans
V
L
35 Provide sub-suppliers quality plans upon request
V
L
36 Review & report on assembly plant defects
V
L
37 Utilize Ford 8D problem resolution process throughout the program
V
L
38 Set Quality targets on a subsystem & component level
V
S
Service
39 Develop service part content (additional part content to production parts)
V/S
L
40 Develop service documentation
L
S
41 Provide service part drawings (6 months prior Job#1 latest)
V
L
The above Statement of Work is a guideline to the division of responsibilities between Ford Motor Company and the Supplier. It should
not be considered an all-inclusive list of tasks to be accomplished; it is expected new responsibilities will be added and that existing tasks
will change as the program progresses.