high-melting materials wash decomposition with polystyrene agent
7. When the process stopped, firstly set
machine to manual, The other operation is
False Injection molding machine operation will
on the turned off position OO, turn off the
cause poor quality, rejected plastic parts, lessen
barrel heating power and the pump motor,
machine life and the damaged screw. The
and finally turn off the power, all operation
following lists a detailed and comprehensive
finish.
description of the standard process to avoid
B: Procedure
misbehavior.
1. The steps should be taken before run the
A: Operational requirements
machine. First check the reliability of the security
Before starting to heat the injection
door. When the machine is running, hands should
machine, switch on the cooling valve,
never be placed into the clamping mechanism.
observe waterway.
While remove products, always open the security
Switch the injection machine on, and then
door. Confirm the safety of personnel
start the pump motor.
and tooling free of foreign material in, and then
For the first use or longtime-unused
close the security door. In the operation, hands
machines, after pump start, injection
cannot be placed between the nozzle and the
machine run without molding cycle, then
mold sprue. When mold need fix, pump motor
start the next operation.
must be switched off.
Turn on the machine to heat the barrel,
2. Due to variety of raw materials, different size
turn on the power to regulate thermostatic
and shape of the parts, the clamping force is
nozzle and temperature control on the
different. When test mould, set the
door. Set the temperature; observe the
lowest clamping force, which not only save power,
ammeter current to verify the electric
and significantly prolong machine life.
heating coil.
3. The hydraulic system pressure should be
The test should start from manual,
adjusted according to each operation separately.
semi-manual to automatic, and check and
Rational pressure could not only save energy, but
assure the fastening bolts are tight, any
also prolong the life of the machine. The position
abnormal occur should be immediately
of each limit switch should also be adjusted
stopped. After confirmation of clear of
according to the requirements, especially for
troubleshooting, test again.
injection and packing switching point. Otherwise it
When production downtime and material
would invite short filling, on the contrary, lead to
exchange, the barrel should be cleaned
excessive internal stress, flash and mold swells.
under heated. After cleaning, turn off the
4. When there is no material in the screw or barrel,
heating power .cleaning work is
screw speed should be slow, preferably at 30
particularly important for the processing
RPM or less. When the barrel is full and melt
decomposable plastic.
extrude from the nozzle, screw speed increases
Note:
to the desired value, So as to avoid high-speed or
When clean, injection seat should
long residual time to scratch screw or cylinder.
return.
5. It takes about thirty minutes to increase barrel
When change the plastic material, set
temperature from room temperature to the
www.myplasticmold.com
desired temperature. If residual cold material
turn off the heating power, pump motor, main
remains in the barrel, the time should prolong ten
electric power and cooling water.
minutes and then start to load.it could ensure that
clean and maintain the plastic injection
residual material is fully molten and avoid
machine.
damage the screw.
14. Electric heating coil may become loose for its
6. Dont change the safety valve in machine
expansion, check and assure it tight
pumps.
15. Thermocouple probe should have good
7. After machine starts running and the cooling
contact with the barrel thermometer hole. Before
water temperature increases by 5C -10C , and
injection machine operation, the probe should be
then gradually turns on the cooling water valve.
checked for tight.
During the operation, adjust the cooling water
volume; keep oil temperature below 55C . When starting cooler, quick valve opening is forbidden, for a large amount of cooling water flows through the cooler, it could lead to poor heat transfer cold layer. Even a large amount of water goes into the cooler, good cooling effect is still not achievable. 8. The machine lubrication. According to operational requirements, running in short of oil would badly wear parts, especially mechanical clamping rod and steel sleeve. Also it could invite the seizing of part. 9. As to the connecting screw rod in barrels and screws for plasticizing, for working under high temperature, it needs to be coated with heat-resistant grease (red lead or copper sulfide) to avoid seizing. 10. The clamping platen of the injection machine is with high precision; do not install plastic mold with bad mounting surface and the poor parallelism ,also bad screws is forbidden. All is to avoid damage the platen and clamping unit. 11. Dont keep mold close over 10 minutes under the clamping pressure to avoid the linkage pin and steel sleeve to be short of the oil, which may make the mold couldnt open. 12. Keep surface cleaning of moveable blocks. 13. in the end of each process: stop hopper feeding by hand, the injection seat retract and repeat pre-plastic feeding and injections, inject the remaining material inside the barrel as far as possible. set the manual mode, make the closed mold in a free state.