the temperature from the requirements of


high-melting materials
wash decomposition with polystyrene
agent

7. When the process stopped, firstly set


machine to manual, The other operation is

False Injection molding machine operation will

on the turned off position OO, turn off the

cause poor quality, rejected plastic parts, lessen

barrel heating power and the pump motor,

machine life and the damaged screw. The

and finally turn off the power, all operation

following lists a detailed and comprehensive

finish.

description of the standard process to avoid

B: Procedure

misbehavior.

1. The steps should be taken before run the

A: Operational requirements

machine. First check the reliability of the security

Before starting to heat the injection

door. When the machine is running, hands should

machine, switch on the cooling valve,

never be placed into the clamping mechanism.

observe waterway.

While remove products, always open the security

Switch the injection machine on, and then

door. Confirm the safety of personnel

start the pump motor.

and tooling free of foreign material in, and then

For the first use or longtime-unused

close the security door. In the operation, hands

machines, after pump start, injection

cannot be placed between the nozzle and the

machine run without molding cycle, then

mold sprue. When mold need fix, pump motor

start the next operation.

must be switched off.

Turn on the machine to heat the barrel,

2. Due to variety of raw materials, different size

turn on the power to regulate thermostatic

and shape of the parts, the clamping force is

nozzle and temperature control on the

different. When test mould, set the

door. Set the temperature; observe the

lowest clamping force, which not only save power,

ammeter current to verify the electric

and significantly prolong machine life.

heating coil.

3. The hydraulic system pressure should be

The test should start from manual,

adjusted according to each operation separately.

semi-manual to automatic, and check and

Rational pressure could not only save energy, but

assure the fastening bolts are tight, any

also prolong the life of the machine. The position

abnormal occur should be immediately

of each limit switch should also be adjusted

stopped. After confirmation of clear of

according to the requirements, especially for

troubleshooting, test again.

injection and packing switching point. Otherwise it

When production downtime and material

would invite short filling, on the contrary, lead to

exchange, the barrel should be cleaned

excessive internal stress, flash and mold swells.

under heated. After cleaning, turn off the

4. When there is no material in the screw or barrel,

heating power .cleaning work is

screw speed should be slow, preferably at 30

particularly important for the processing

RPM or less. When the barrel is full and melt

decomposable plastic.

extrude from the nozzle, screw speed increases

Note:

to the desired value, So as to avoid high-speed or

When clean, injection seat should

long residual time to scratch screw or cylinder.

return.

5. It takes about thirty minutes to increase barrel

When change the plastic material, set

temperature from room temperature to the

www.myplasticmold.com

desired temperature. If residual cold material

turn off the heating power, pump motor, main

remains in the barrel, the time should prolong ten

electric power and cooling water.

minutes and then start to load.it could ensure that

clean and maintain the plastic injection

residual material is fully molten and avoid

machine.

damage the screw.

14. Electric heating coil may become loose for its

6. Dont change the safety valve in machine

expansion, check and assure it tight

pumps.

15. Thermocouple probe should have good

7. After machine starts running and the cooling

contact with the barrel thermometer hole. Before

water temperature increases by 5C -10C , and

injection machine operation, the probe should be

then gradually turns on the cooling water valve.

checked for tight.

During the operation, adjust the cooling water


volume; keep oil temperature below 55C . When
starting cooler, quick valve opening is forbidden,
for a large amount of cooling water flows through
the cooler, it could lead to poor heat transfer cold
layer. Even a large amount of water goes into the
cooler, good cooling effect is still not achievable.
8. The machine lubrication. According to
operational requirements, running in short of oil
would badly wear parts, especially mechanical
clamping rod and steel sleeve. Also it could invite
the seizing of part.
9. As to the connecting screw rod in barrels and
screws for plasticizing, for working under high
temperature, it needs to be coated with
heat-resistant grease (red lead or copper sulfide)
to avoid seizing.
10. The clamping platen of the injection machine
is with high precision; do not install plastic mold
with bad mounting surface and the poor
parallelism ,also bad screws is forbidden. All is to
avoid damage the platen and clamping unit.
11. Dont keep mold close over 10 minutes under
the clamping pressure to avoid the linkage pin
and steel sleeve to be short of the oil, which may
make the mold couldnt open.
12. Keep surface cleaning of moveable blocks.
13. in the end of each process:
stop hopper feeding by hand, the injection
seat retract and repeat pre-plastic feeding and
injections, inject the remaining material inside the
barrel as far as possible.
set the manual mode, make the closed mold
in a free state.