Inspection
Rev. 4
CONTENTS
SECTION
PAGE
1. SCOPE.......................................................................................................................................................................................... 3
2. DEFINITIONS .............................................................................................................................................................................. 3
3. CODE INSPECTION .................................................................................................................................................................. 3
3.1 DETERMINATION OF CODE REQUIREMENTS.........................................................................................................................3
3.2 PERSONAL QUALIFICATIONS ....................................................................................................................................................3
4. NON-CODE INSPECTION........................................................................................................................................................ 4
4.1 GENERAL ......................................................................................................................................................................................4
5. OWNER PARTICIPATION ...................................................................................................................................................... 5
5.1 PARTIAL PARTICIPATION .........................................................................................................................................................5
5.2 COMPLETE PARTICIPATION .....................................................................................................................................................5
5.3 CODE OR THIRD PARTY INSPECTION ......................................................................................................................................6
6. GENERAL INSPECTION REQUIREMENTS ......................................................................................................................... 6
December, 1998
Page 2 of 8
Petrokemya
GES-025-01
Inspection
Rev. 4
1. SCOPE
This specification covers the general requirements for inspection of materials and equipment in a Vendor
shop, or at the jobsite for field fabricated equipment erected by the equipment Vendor.
2. DEFINITIONS
1. In applying the various codes, this specification defines the following two types of inspection:
a) Code Inspection - Functions performed by an authorized inspector, his delegates,
government agencies, or other independent third-party inspectors to verify compliance with
the applicable codes, government regulations, and, when specified, the engineering design.
b) Non-Code Inspection - Functions performed by OWNER and/or its authorized agent to:
1) Review, monitor, and conduct surveillance of the Vendors Quality Control Program
and its implementation.
2) Perform quality control functions required by OWNER standards or specifications that
are in addition to any code requirements.
2. Vendor, Sub-vendor, Sublet, Subsupplier - Any person or firm contracted to manufacture,
fabricate or supply an item; or to provide services incidental to the design, construction,
operation, or testing of any item or facility. However, the Vendor shall have the total
responsibility for the performance of his Sub-vendor(s), Sublets(s), and Sub-supplier(s).
3. Audit - An activity to determine through investigation the adequacy of, and adherence to,
required procedures and the effectiveness of their implementation.
3. CODE INSPECTION
3.1 Determination of Code Requirements
1. All equipment or materials purchased or specified in accordance with a code or government
regulation shall be inspected as required by that code regulation.
2.
The codes, laws, or regulations of record applicable to a project, together with any additional
requirements, shall be those referenced in the Project Design Data.
Page 3 of 8
Petrokemya
GES-025-01
Inspection
Rev. 4
3.
4. NON-CODE INSPECTION
4.1 General
1.
The inspection of a Vendor by OWNER or its inspection representative shall include, but is
not limited to, the complete or partial performance of the following:
a) Verification of the use of qualified welders and qualified welding procedures including
pre and post weld heat treatment.
b) Checks on materials, dimensions, and finishes.
c) Review of non-destructive examinations, including alloy verifications if required.
Ensuring that personnel are qualified to perform these examinations.
d) Witnessing of pressure test and equipment mechanical and performance tests.
e) Review of documentation.
f) Audit of the Vendors quality control program, including document control and
disposition of non-conforming work. Shop audits shall be conducted at the Vendor
shop. Audits of field fabricated items shall take place at the jobsite.
g) Verify paint and coating (type, thickness, etc.)
2.
The extent of inspection to be performed by each Vendor over and above the specified
requirements shall be determined by considering the Vendors quality control program and
previous experience of OWNER with the Vendor.
3.
4.
All materials, packaging, equipment, and fabricated items shall be subject to non-code
inspection during all stages of fabrication, testing, transportation, storage, and erection.
December, 1998
Page 4 of 8
Petrokemya
GES-025-01
Inspection
Rev. 4
5. OWNER PARTICIPATION
5.1 Partial Participation
1.
Partial participation is defined as limited OWNER participation in the inspection program;
i.e. when a contractor has the primary inspection responsibility.
2.
The contractors inspector shall act as the official spokesman in all discussions with Vendors
and will issue all criticisms, acceptances, and rejections. The OWNER inspector shall
submit all comments and criticisms to the contractors inspector.
3.
When OWNERs inspector is to accompany the contractors inspector, the contractor shall
notify OWNER at least three (3) calendar weeks prior to the date of the inspection. Failure
of OWNER to be present at the appointed time will serve as OWNERs waiver of that
particular inspection.
4.
In the event the contractors inspector is not present when the OWNER inspector
encounters an unacceptable condition which may cause a delay in shipment, the OWNER
inspector shall immediately sent complete information regarding the condition, proposed
corrective measures and estimated delay through the established channels for
Contractor/OWNER communication for contractor action.
Prior to start of purchasing, OWNER will provide the contractor a list of all materials and
equipment which OWNER wishes to inspect or audit the inspection thereof.
3.
All inspections shall be conducted in the Vendors shop, except that inspections shall be
conducted at the jobsite for items field fabricated by the Vendor.
4.
5.
OWNERs inspector shall coordinate the examinations so as not to restrict the Vendor in
meeting the delivery dates specified in the Purchase Orders.
6.
The imposition by OWNERs inspector of conditions more stringent that those specified in
the contractors Purchase Order shall not necessarily be a cause for rejection of an item.
December, 1998
Page 5 of 8
Petrokemya
GES-025-01
Inspection
Rev. 4
All parts are subject to inspection to ensure adequacy of the Vendors product quality. All
materials and equipment requiring alloy verification are subject to inspection.
2.
Vendor shall be required to present an inspection plan for the total supply at the inquiry stage
to be in line with Appendix 1 as a minimum and shall solicit the approval for the same from
OWNER.
December, 1998
Page 6 of 8
Petrokemya
GES-025-01
Inspection
Rev. 4
APPENDIX 1
Page 1 of 2
M INIMUM REQUIREMENTS FOR OWNER INVOLVEMENT
FOR ASME PRESSURE CONTAINING EQUIPMENT
Stages and extent to which OWNER or their assigned contractor shall be involved as a minimum
STAGES OF INSPECTION
MATERIAL
QUALIFICATIONS
NON-DESTRUCTIVE
TESTING
DESTRUCTIVE TESTING
FABRICATION
PREPARATION FOR
SHIPMENT
VENDOR
DOCUMENTATION
1)
2)
Pre-inspection
Material Test Certificates
Identification of material and transfer of
marking
Supplementary mechanical properties
Sub-orders
Welders/operators qualifications
Welding procedure specifications
WPS + repair procedures
Welding procedure qualifications
PQR records
NDT operator qualifications
NDT procedures
Manufacturing procedures
Dye penetrant/magnetic particle
Ultrasound
Radiographic
Hardness
Alloy verification
Production TEST COUPONS
Corrective actions for non-conformities
Bevel preparation/tacking
Back gauging
Weld parameters/operation + repairs
Forming
PWHT
Dimensional/visual
Hydro/pneumatic test
Tightness test
Sandblasting/painting
Drying/preservation
Packing/marking
Manufacturing reports
LEGEND:
W=Witness
I=Random inspection
Category 1, 2, and 3 are defined on next page
December, 1998
H=Hold point
EXTENT OF INVOLVEMENT
CATEGORY CATEGORY CATEGORY
1
2
3
H
H
H
R
R
R
W
I/R
R
R
R
W/R
R
H/R
R
R
R
R
R
W/R
W/R
I/R
W/R
H/R
W
R
R
W/R
R
H/R
R
R
R
R
R
I/R
I/R
I/R
I/R
H/R
I
R
R
R
R
R
R
R
R
R
R
I/R
I/R
I/R
I/R
H/R
R
I
I
I
I
I/R
H/W/
H/W/R/
H/W
I/R
W
W/R
H/R
I
I
I
R
R
H/I
H/W/R/
H/W
I/R
I
W/R
H/R
I
I
I
R
R
H/I
H/W/R
--I
I
I
H/R
Page 7 of 8
Petrokemya
GES-025-01
Inspection
Rev. 4
APPENDIX 1
Page 2 of 2
CATEGORIES FOR THE EXTENT OF INVOLVEMENT
CATEGORY 1
CATEGORY 2
CATEGORY 3
December, 1998