You are on page 1of 12

Townhall Meeting

17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

A L P H A

CLYDE

Last Updated:

February 2008

Buchan A is a 19,404 tonne (full load displacement) or 12,033 tonne (lightweight) semisubmersible platform with three main decks built on five columns in pentagon format. Each
column is mounted on a doughnut-shaped pontoon 7.5m high and 22m in diameter.

The deck arrangement consists of lower, intermediate and main decks, and a drill deck
located over the central area of the main deck. The main and drill decks are exposed to the
elements; the intermediate and lower decks other than the moonpool area, are enclosed,
heated and ventilated. One opening to the sea is located in the lower deck, a moonpool
6.3m x 8.76m for riser access and well intervention, drilling operations.

OPERATIONAL INFORMATION

Licences

P.241 and P.294

Licensees

Talisman Energy (UK) Limited (Op)

84.116509%

Talisman North Sea Limited

02.269070%

Transworld Petroleum (UK) Limited

12.706793%

First Oil Expro Limited

00.907628%

Location

UKCS Block 21/01a and 20/05a


156 km North East of Aberdeen

Co-ordinates

57 deg 54 13.08 N
00 deg 01 55.66 E

Water Depth

116m

Platform Type

Pentagon shaped semi-submersible

Platform Weight

19,400 tonnes (full load displacement)


12,000 tonnes (lightweight)

Production Deck
Buchan A, Infrastructure Code of Practice

44m x 28m
Page 1

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

A L P H A

CLYDE

Field Discovered

1974

First Production

1981

Ultimate Recovery

16 million barrels

(as of Jan 04)


Wells

Production

Injection

Produced water re-injection


started June 2005.

Drilling

Coiled tube drilling undertaken in 2001 and 2002

Associated Fields

Hannay

Subsea tie-back
13.5 km NW of Buchan
2 production wells

Accommodation

88 beds

Manning

48 Core Crew

Lifeboats

2 * 50 persons
2 * 47 persons

Life rafts

4 * 20 persons
2 * 25 persons

Buchan A, Infrastructure Code of Practice

Page 2

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

A L P H A

CLYDE

PROCESSING
The process systems on Buchan include separation, oil export, gas dehydration, gas
compression, OIW treatment and reinjection facilities with associated utilities.

The Separation train comprises two horizontal vessels, which operate in series at
successively lower pressure, separating the well fluids into oil, gas and water phases. Well
fluids pass to the HP separator where most of the gas is removed. The oil from the HP
separator is passed through a 10 line to the MP separator and on to the crude oil export
pumps. The oil is pumped through a metering unit and down the export riser for export.

The water is drawn off under level control to a water treatment unit before it is discharged to
the sea or pumped down hole with a PWRI pump for reservoir pressure maintenance.

There is no gas export from the Buchan platform. Lower pressure gas from the MP separator
is directed to flare, whereas gas from the HP is passed to the compression system. The gas
lift compressor is a 3rd-stage in-line centrifugal compressor. Gas is compressed by the 1st
stage, after which it passes through a dehydration unit. The dried gas then returns to the
compressor, where its pressure is further increased by the 2nd and 3rd stages, before being
discharged to the gas lift manifold.

The platform process system is nominally designed for the following quantities. However,
peak flowrates may exceed these values based on an analysis of the production profiles and
the actual equipment capacities at that time:

Oil production

20,000 BPD

Produced water

20,000 BPD

Produced water reinjection

16,000 BPD

Gas compression

19 MMscfd (2006)

Water injection

15,000 BWPO

Buchan A, Infrastructure Code of Practice

Page 3

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

A L P H A

CLYDE

ULLAGE PROJECTION

Description

Unit

Max
Capacity

1 Stage Separator

BPD

70,000

BPD

72,000

Oil Export

BPD

20,000

Produced Water Treatment

BPD

20,000

Produced Water Re-Injection

BPD

16,000

MMscfd

19

st

nd

Stage Separator

Lift Gas Compression

Projected ullage as a % of maximum capacity


2006

2007

2008

2009

2010

2011

2012

Available capacities:

2013

2014

2015

>25%
5% to 25%
<5%

Buchan A, Infrastructure Code of Practice

Page 4

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

BEAULY

HANNAY

Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

A L P H A

CLYDE

UTILITIES

Power Generation

Diesel generators
Caterpillar, 4 @ 1800 kW
Normally 2 online, 2 standby

Fuel Gas

Dried gas taken off before second


compression stage.

Sea Water Lift

Utilities cooling 570 m3/h


Process cooling 500 m3/h approx

Risers

Flexible riser assembly


8 production
8 gas lift
1 oil export
No spare risers, but space available to retro-fit

Weight Capacity

Assessment required of stabilisation


characteristics (location, balancing, ballast etc)

Process Constraints

Gas Compression due to gas lift and gas export


requirements

PIPELINES

Oil Export

122 * 48 km to Forties Charlie


Oil is then routed via the Forties Pipeline System
to Kinneil via Crude Bay.

Buchan A, Infrastructure Code of Practice

Page 5

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

A L P H A

CLYDE

ENTRY / EXIT SPECIFICATIONS

Crude Oil Export

TVP (True Vapour Pressure) 70 psia @ 60F

(Set by Forties pipeline)

Base Sediment & Water

2.0 % vol

Salt

1500 mg/l

H2S

0.1 ppm wt

CO2

0.2 % mol

N2

0.1 % mol

Mercaptans (as Sulphur)

0.1 ppm wt

Nickel/Vanadium

25 ppm wt total

Viscosity

100 cSt @ 4C

Produced Water

<30 ppm oil in water regulation

(Prevention of Oil Pollution


Act 1971)

MAJOR CONTRACTORS

Construction of
Drillmaster

CFEM, Le Havre, France

Conversion to Buchan
A

Lewis Offshore, Stornoway

Gas Lift Installation

Howard Doris, Loch Kishorn

Operations and
Maintenance

Wood Group

Buchan A, Infrastructure Code of Practice

Page 6

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

A L P H A

CLYDE

Figure 1: General view of Buchan platform

Buchan A, Infrastructure Code of Practice

Page 7

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

CLYDE

Figure 2: Buchan Field Location

Buchan A, Infrastructure Code of Practice

Page 8

A L P H A

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

CLYDE

Buchan A, Infrastructure Code of Practice

Page 9

A L P H A

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

CLYDE

Figure 3: Buchan Field Pipeline

Buchan A, Infrastructure Code of Practice

Page 10

A L P H A

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

CLYDE

Figure 4: Buchan Separation System

Buchan A, Infrastructure Code of Practice

Page 11

A L P H A

Townhall Meeting
17 December 2001

TLM Energy (UK) Limited


BRAE

Flotta

PIPER
CLAYMORE

Scotland

MacCULLOCH

BEATRICE

TARTAN

BLAKE

ROSS

HIGHLANDER
PETRONELLA

HANNAY

BEAULY
Andrew

BUCHAN

Nigg Bay
St. Fergus
Cruden Bay

Aberdeen

B U C H A N

Talisman inc. Lundin Interests


Oil Field

ACORN

BEECHNUT

Gas Field
HALLEY

Oil Pipeline
0

ORION

FULMAR

Gas Pipeline
Slide 15
Townhall 171201

100 km

CLYDE

Figure 5: Buchan Compression System

Buchan A, Infrastructure Code of Practice

Page 12