Professional Documents
Culture Documents
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Total
Project Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Project Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Highway Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Foundation/Pylon Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Safety Officer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Environmental Officer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
12 Scheduling Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
13 Quantity Surveyor
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
14 Administration Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Assistant Administration
Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
17 Administrators
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
18 Procurement Cordinator
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
19 Accountant
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
20 Document Controller
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
21 Construction Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
15
- 17 -
22 Site Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
23 CAD Operators
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
24 Foreman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
25 Carpenter
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
26 Piling Worker
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
27 Superstructure Worker
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
30 Mason
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
32 Topographic Surveyors
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
33 Chainman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
34 Laboratory Technician
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Laborers
35
(Casual Worker)
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
36 Operator
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
37 Welder
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
38 Driver
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
39 Mechanic
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
40 Auto Electrician
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
41 Tyreman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
42 Store Keeper
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
43 Checker
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
44 Watchman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Total
Daily Average
#REF!
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Total
Equipment
1
Excavator (0.8m3)
0.8m3(0.6)
unit
Excavator(1.1m3)
1.1m3(0.8)
unit
Bulldozer (15t)
15t
unit
Bulldozer (32t)
32t WR
unit
1.5m3
unit
10t
unit
4t
unit
Crawler Crane(50t)
50t
unit
Crawler Crane(100t)
100t
unit
10 Truck Crane(16t)
16t
unit
11 Truck Crane(25t)
25t
unit
200t.m
unit
13 Elevator (2t)
2t
unit
60KW
unit
120KW
unit
Dia 2m/1.5m
unit
60m3/hr
unit
18 Agitator Truck
5m3
unit
110m3
unit
30t/h
unit
21 Asphalt Finisher
2.4/4.5m
unit
22 Air Compressor
3.7m3
unit
25kVA
unit
45kVA
unit
200kVA
unit
W=24m
unit
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
27 Motor Grader
unit
28 Compact Roller
unit
29 Pneumatic Roller
unit
30 Fuel tanker
unit
- 18 -
31 Service Vans
unit
32 Water Browser
unit
33 Folk Lift
unit
unit
unit
unit
Bar Cutter
unit
Bar Bender
unit
Welding Machine
unit
Water Pump
unit
Concrete Vibrator
unit
Concrete Breaker
unit
Oxygen-Acetylene set
10 Chain Saw
unit
unit
11 Plate Rammer
unit
12 Rammer
unit
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
Total
#REF!
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Total
Project Manager
pers.
pers.
Project Engineer
pers.
pers.
pers.
Highway Engineer
pers.
Foundation/Pylon Engineer
pers.
Safety Officer
pers.
Environmental Officer
pers.
pers.
pers.
12 Scheduling Engineer
pers.
13 Quantity Surveyor
pers.
14 Administration Manager
pers.
Assistant Administration
Manager
pers.
pers.
17 Administrators
pers.
18 Procurement Cordinator
pers.
19 Accountant
pers.
20 Document Controller
pers.
21 Construction Engineer
pers.
22 Site Engineer
pers.
15
- 17 -
23 CAD Operators
pers.
24 Foreman
pers.
25 Carpenter
pers.
30 Mason
pers.
pers.
32 Topographic Surveyors
pers.
33 Chainman
pers.
34 Laboratory Technician
pers.
Laborers
35
(Casual Worker)
pers.
36 Operator
pers.
37 Welder
pers.
38 Driver
pers.
39 Mechanic
pers.
40 Auto Electrician
pers.
41 Tyreman
pers.
42 Store Keeper
pers.
43 Checker
pers.
44 Watchman
pers.
pers.
26 Piling Worker
27 Superstructure Worker
28 Cable Stay Worker
29 Mechanical & Electrical Worker
Total
Daily Average
0
0
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Total
Equipment
1
Excavator (0.8m3)
0.8m3(0.6)
unit
Excavator(1.1m3)
1.1m3(0.8)
unit
Bulldozer (15t)
15t
unit
Bulldozer (32t)
32t WR
unit
1.5m3
unit
10t
unit
4t
unit
Crawler Crane(50t)
50t
unit
Crawler Crane(100t)
100t
unit
10 Truck Crane(16t)
16t
unit
11 Truck Crane(25t)
25t
unit
200t.m
unit
13 Elevator (2t)
2t
unit
60KW
unit
120KW
unit
Dia 2m/1.5m
unit
60m3/hr
unit
18 Agitator Truck
5m3
unit
110m3
unit
30t/h
unit
21 Asphalt Finisher
2.4/4.5m
unit
22 Air Compressor
3.7m3
unit
25kVA
unit
45kVA
unit
200kVA
unit
W=24m
unit
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
27 Motor Grader
unit
28 Compact Roller
unit
29 Pneumatic Roller
unit
30 Fuel tanker
unit
- 18 -
31 Service Vans
unit
32 Water Browser
unit
33 Folk Lift
unit
unit
unit
unit
Bar Cutter
unit
Bar Bender
unit
Welding Machine
unit
Water Pump
unit
Concrete Vibrator
unit
Concrete Breaker
unit
Oxygen-Acetylene set
10 Chain Saw
unit
unit
11 Plate Rammer
unit
12 Rammer
unit
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
Total
#REF!
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Total
Project Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Project Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Highway Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Foundation/Pylon Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Safety Officer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Environmental Officer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
12 Scheduling Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
13 Quantity Surveyor
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
14 Administration Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Assistant Administration
Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
17 Administrators
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
18 Procurement Cordinator
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
19 Accountant
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
20 Document Controller
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
21 Construction Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
22 Site Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
15
- 17 -
23 CAD Operators
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
24 Foreman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
25 Carpenter
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
26 Piling Worker
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
27 Superstructure Worker
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
30 Mason
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
32 Topographic Surveyors
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
33 Chainman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
34 Laboratory Technician
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Laborers
35
(Casual Worker)
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
36 Operator
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
37 Welder
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
38 Driver
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
39 Mechanic
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
40 Auto Electrician
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
41 Tyreman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
42 Store Keeper
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
43 Checker
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
44 Watchman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Total
Daily Average
#REF!
Contractor
Consultant
Date:
1-May-15
ITEM
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Materials on Site
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Description
Personnel on Site
No.
Description
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
2-May-15
ITEM
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Status
Materials on Site
Description
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Description
Personnel on Site
No.
Description
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
3-May-15
ITEM
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Personnel on Site
Personnel on Site
Description
Description
No.
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
4-May-15
ITEM
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Personnel on Site
Description
Description
No.
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
5-May-15
ITEM
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Personnel on Site
Description
Description
No.
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
6-May-15
ITEM
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Equipment on site
Materials on Site
Description
No.
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Personnel on Site
Description
Description
No.
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
7-May-15
ITEM
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Materials on Site
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Description
Personnel on Site
No.
Description
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Consultant's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
8-May-15
Section:
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Description
Status
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
Remarks:
No.
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
9-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Status
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Driver
No.
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
10-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Qty
Description
No.
Status
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
No.
Personnel on Site
Description
No.
No.
Laborers
(Casual
Welder
Worker)
Driver
Description
Description
No.
No.
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
11-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Equipment on site
Qty
Description
No.
Status
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
No.
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
No.
No.
Laborers
(Casual
Welder
Worker)
Description
Description
No.
No.
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
12-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Qty
Description
No.
Status
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
No.
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
No.
No.
Laborers
(Casual
Welder
Worker)
Driver
Description
Description
No.
No.
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
13-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Description of Work
Equipment on site
Qty
Description
Qty
Description
No.
Description
Status
No.
Gabion boxes
Excavator (0.8m3)
Fuel
Excavator(1.1m3)
Plywood
Timber (3"X2")
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Timber (4"X2")
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
No.
No.
Laborers
(Casual
Welder
Worker)
Description
Description
No.
No.
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
14-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Gabion boxes
Qty
Description
No.
Description
Status
No.
Excavator (0.8m3)
Fuel
Excavator(1.1m3)
Plywood
Bulldozer (15t)
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
No.
Remarks:
Submitted by:
Approved By:
Name
Signature
Name
Designation
Designation
Signature
Resident Engineer
Checked By:
Name
Signature
Contractor's Representative
Consultant's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
15-May-15
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Description
Status
Qty
Equipment on site
Description
Qty
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Status
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
No.
Excavator (0.8m3)
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Description
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
CAD Operators
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Carpenter
Piling Worker
Driver
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Contractor
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
16-May-15
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Description
Status
Qty
Equipment on site
Description
Qty
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Status
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
No.
Excavator (0.8m3)
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Description
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
CAD Operators
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Carpenter
Piling Worker
Driver
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
17-May-15
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Description
Status
Qty
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Qty
Description
Status
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
No.
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Personnel on Site
Description
Description
No.
No.
Description
Description
No.
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
CAD Operators
Carpenter
Project Manager
Quantity Surveyor
Administration Manager
Assistant Administration Manager
Public Relations Officer
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
18-May-15
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Description
Status
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Qty
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Equipment on site
Qty
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
No.
Status
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Personnel on Site
Description
Description
No.
CAD Operators
No.
Laborers
(Casual
Welder
Worker)
Carpenter
Description
Description
No.
Project Manager
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Piling Worker
Driver
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
19-May-15
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Description
Status
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Qty
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Qty
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
No.
Status
Y20
Crawler Crane(100t)
Y25
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Personnel on Site
Description
Description
No.
No.
Description
Description
No.
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
CAD Operators
Carpenter
Project Manager
Quantity Surveyor
Administration Manager
Assistant Administration Manager
Public Relations Officer
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
20-May-15
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Equipment on site
Description
Status
Qty
Description
Qty
Description
No.
Hardcore
Gabion boxes
Excavator (0.8m3)
Cement 42.5N
Fuel
Excavator(1.1m3)
Cement 52.5N
Bulldozer (15t)
BRC
Plywood
Timber (3"X2")
Y8
Timber (4"X2")
Y10
Y12
Y16
Crawler Crane(50t)
Y20
Crawler Crane(100t)
Y25
Bulldozer (32t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
Status
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
Personnel on Site
Description
No.
CAD Operators
No.
Laborers
(Casual
Welder
Worker)
Carpenter
Description
Description
No.
Project Manager
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Piling Worker
Driver
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
21-May-15
RAINY
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Description
Qty
Equipment on site
Hardcore
Description
Gabion boxes
Cement 42.5N
Fuel
Excavator(1.1m3)
Cement 52.5N
Plywood
Bulldozer (15t)
BRC
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Bulldozer (32t)
Status
Y8
Y10
Y12
Y16
Y20
Y25
Qty
Description
No.
Excavator (0.8m3)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
Status
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
Personnel on Site
No.
CAD Operators
Description
Laborers
(Casual
Welder
Worker)
Carpenter
No.
Description
No.
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Piling Worker
Driver
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Description
Project Manager
Signature
Resident Engineer
Contractor's Representative
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Bill Item
Materials on Site
Description
No.
Description
Status
Qty
Description
Qty
Description
Hardcore
Excavator (0.8m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Description
No.
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Driver
Project Manager
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Bill Item
Materials on Site
Description
No.
Description
Status
Qty
Description
Qty
Description
Hardcore
Excavator (0.8m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Description
No.
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Procurement Cordinator
Driver
Project Manager
Document Controller
Construction Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Description
Bill Item
Materials on Site
No.
Description
Status
Qty
Description
Qty
Description
Hardcore
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Personnel on Site
Personnel on Site
Description
No.
Description
No.
No.
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Project Manager
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Description
Bill Item
Materials on Site
No.
Description
Status
Qty
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Qty
Description
Hardcore
Excavator (0.8m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
No.
Description
No.
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Laborers
(Casual
Welder
Worker)
Description
Project Manager
Driver
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Description
Bill Item
Materials on Site
No.
Description
Status
Hardcore
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Qty
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Qty
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Water Browser
Y20
Crawler Crane(100t)
Folk Lift
Y25
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
No.
Description
No.
No.
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Project Manager
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Bill Item
Materials on Site
Description
No.
Description
Status
Qty
Description
Qty
Description
Hardcore
Gabion boxes
Excavator (0.8m3)
Cement 42.5N
Fuel
Excavator(1.1m3)
Cement 52.5N
Bulldozer (15t)
Motor Grader
BRC
Plywood
Timber (3"X2")
Motor Grader
Y8
Timber (4"X2")
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Crawler Crane(50t)
Water Browser
Y20
Crawler Crane(100t)
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Bulldozer (32t)
Truck Crane(16t)
Description
No.
Personnel on Site
Description
No.
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Laborers
(Casual
Welder
Worker)
Description
Project Manager
Driver
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Bill Item
Equipment on site
Materials on Site
Description
No.
Description
Hardcore
Description
Gabion boxes
Cement 42.5N
Fuel
Excavator(1.1m3)
Cement 52.5N
Plywood
Bulldozer (15t)
Motor Grader
BRC
Bulldozer (32t)
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Status
Qty
Qty
Description
Excavator (0.8m3)
Description
No.
Personnel on Site
No.
Description
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Laborers
(Casual
Welder
Worker)
No.
Driver
Project Manager
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Name
Submitted b
Approved By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Contractor
Consultant
22-May-15
ITEM
FROM
RAINY
Jinja Side
Works Executed:
Bill Item
Equipment on site
No.
Materials on Site
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Qty
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
No.
Project Manager
Description
Description
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
No.
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
23-May-15
ITEM
FROM
RAINY
Jinja Side
Works Executed:
Bill Item
Equipment on site
No.
Status
Materials on Site
Description
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Qty
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
No.
Project Manager
Description
Description
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
No.
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
24-May-15
ITEM
FROM
RAINY
Jinja Side
Works Executed:
Bill Item
Equipment on site
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Sika 40
MC 30
Qty
Personnel on Site
Personnel on Site
Description
No.
Project Manager
Description
No.
Quantity Surveyor
CAD Operators
No.
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
25-May-15
ITEM
FROM
RAINY
Jinja Side
Works Executed:
Bill Item
Equipment on site
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Qty
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
Description
No.
Project Manager
Description
No.
Quantity Surveyor
CAD Operators
No.
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
26-May-15
ITEM
FROM
RAINY
Jinja Side
Works Executed:
Bill Item
Equipment on site
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Qty
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
Description
No.
Project Manager
Description
No.
Quantity Surveyor
CAD Operators
No.
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
27-May-15
ITEM
FROM
RAINY
Jinja Side
Works Executed:
Bill Item
Equipment on site
Materials on Site
No.
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Qty
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
Description
No.
Project Manager
Description
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
No.
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
28-May-15
ITEM
RAINY
Jinja Side
Works Executed:
Bill Item
FROM
Equipment on site
No.
Materials on Site
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Qty
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
No.
Project Manager
Description
Description
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
No.
Remarks:
Submitted by:
Checked By:
Name
Approved By:
Name
Designation
Signature
Contractor's Representative
Signature
Consultant's Representative
Resident Engineer
Client
Contractor
AMOUNT (mm)
Date:
29-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Equipment on site
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Description
Status
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
Remarks:
No.
Status
Submitted by:
Approved By:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
Client
Contractor
AMOUNT (mm)
Date:
30-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Equipment on site
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Status
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Driver
No.
Status
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Remarks:
Submitted by:
Approved By:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
Client
Contractor
AMOUNT (mm)
Date:
31-May-15
Section:
Jinja Side
Works Executed:
Bill Item
Materials on Site
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Qty
Description
No.
Status
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
No.
Status
Personnel on Site
Description
No.
Laborers
(Casual
Welder
Worker)
Driver
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
No.
Remarks:
Submitted by:
Approved By:
Name
Designation
Designation
Signature
Resident Engineer
TO
AMOUNT (mm)
Materials on Site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Signature
Contractor's Representative
Consultant
Qty
Checked By:
Name
Consultant's Representative
Description
No.
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners
Approved By:
Resident Engineer
Consultant
TO
AMOUNT (mm)
Materials on Site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Qty
Description
No.
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners
Approved By:
Resident Engineer
Consultant
TO
Materials on Site
AMOUNT (mm)
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners
Approved By:
Resident Engineer
Consultant
TO
AMOUNT (mm)
Materials on Site
Description
Gabion boxes
Qty
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners
Approved By:
Resident Engineer
No.
FROM
TO
AMOUNT (mm)
RAINY
Materials on Site
Description
Qty
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia
Personnel on Site
Description
CAD Operators
Carpenter
Piling Worker
No.
Description
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Auto Electrician
Tyreman/ Turn-man
Mason
Store Keeper
Checker/ Clerk
Topographic Surveyors
Watchman
Chainman
Laboratory Technician
Operator
No.
Checked By:
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
FROM
TO
AMOUNT (mm)
RAINY
Materials on Site
Description
Qty
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia
Personnel on Site
Description
CAD Operators
Carpenter
Piling Worker
No.
Description
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Auto Electrician
Tyreman/ Turn-man
Mason
Store Keeper
No.
Checker/ Clerk
Topographic Surveyors
Watchman
Chainman
Laboratory Technician
Operator
Checked By:
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
FROM
TO
AMOUNT (mm)
RAINY
Materials on Site
Description
Qty
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia
Concrete Culverts 1200Dia
Metallic Culverts
Sand
Gravel
Sika 10
Sika 40
MC 30
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Qty
Personnel on Site
Description
No.
Description
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Auto Electrician
Tyreman/ Turn-man
Mason
Store Keeper
Checker/ Clerk
Topographic Surveyors
Watchman
Chainman
CAD Operators
Carpenter
Laboratory Technician
Operator
Checked By:
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
No.
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Total
Equipment
1
Excavator (0.8m3)
0.8m3(0.6)
unit
Excavator(1.1m3)
1.1m3(0.8)
unit
Bulldozer (15t)
15t
unit
Bulldozer (32t)
32t WR
unit
1.5m3
unit
10t
unit
4t
unit
Crawler Crane(50t)
50t
unit
Crawler Crane(100t)
100t
unit
10 Truck Crane(16t)
16t
unit
11 Truck Crane(25t)
25t
unit
200t.m
unit
13 Elevator (2t)
2t
unit
60KW
unit
120KW
unit
Dia 2m/1.5m
unit
60m3/hr
unit
18 Agitator Truck
5m3
unit
110m3
unit
30t/h
unit
21 Asphalt Finisher
2.4/4.5m
unit
22 Air Compressor
3.7m3
unit
25kVA
unit
45kVA
unit
200kVA
unit
W=24m
unit
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
27 Motor Grader
unit
28 Compact Roller
unit
29 Pneumatic Roller
unit
30 Fuel tanker
unit
- 18 -
31 Service Vans
unit
32 Water Browser
unit
33 Folk Lift
unit
unit
unit
unit
Bar Cutter
unit
Bar Bender
unit
Welding Machine
unit
Water Pump
unit
Concrete Vibrator
unit
Concrete Breaker
unit
Oxygen-Acetylene set
10 Chain Saw
unit
unit
11 Plate Rammer
unit
12 Rammer
unit
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
Total
#REF!
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Total
Project Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Project Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Highway Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Foundation/Pylon Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Safety Officer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Environmental Officer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
12 Scheduling Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
13 Quantity Surveyor
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
14 Administration Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Assistant Administration
Manager
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
17 Administrators
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
18 Procurement Cordinator
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
19 Accountant
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
20 Document Controller
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
21 Construction Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
22 Site Engineer
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
15
- 17 -
23 CAD Operators
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
24 Foreman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
25 Carpenter
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
26 Piling Worker
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
27 Superstructure Worker
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
30 Mason
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
32 Topographic Surveyors
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
33 Chainman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
34 Laboratory Technician
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Laborers
35
(Casual Worker)
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
36 Operator
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
37 Welder
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
38 Driver
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
39 Mechanic
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
40 Auto Electrician
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
41 Tyreman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
42 Store Keeper
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
43 Checker
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
44 Watchman
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
pers.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
#REF!
Total
Daily Average
#REF!
Contractor
Consultant
Date:
1-Jan-15
ITEM
RAINY
Section:
Njeru Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Materials on Site
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Description
Personnel on Site
No.
Description
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
2-Jan-15
ITEM
RAINY
Section:
Njeru Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Status
Materials on Site
Description
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Description
Personnel on Site
No.
Description
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
3-Jan-15
ITEM
RAINY
Section:
Njeru Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Personnel on Site
Personnel on Site
Description
Description
No.
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
4-Jan-15
ITEM
RAINY
Section:
Njeru Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Personnel on Site
Description
Description
No.
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
5-Jan-15
ITEM
RAINY
Section:
Njeru Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Personnel on Site
Description
Description
No.
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
6-Jan-15
ITEM
RAINY
Section:
Njeru Side
Works Executed:
Bill Item
Equipment on site
Materials on Site
Description
No.
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Personnel on Site
Description
Description
No.
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Contractor
Consultant
Date:
7-Jan-15
ITEM
RAINY
Section:
Njeru Side
Works Executed:
Bill Item
Equipment on site
Description
No.
Materials on Site
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Bulldozer (15t)
Cement 52.5N
Bulldozer (32t)
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Truck Crane(16t)
Folk Lift
Y25
Truck Crane(25t)
Y32
Binding wire
Elevator (2t)
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Asphalt Finisher
Rammer
Sika 10
Air Compressor
Sika 40
MC 30
Description
Personnel on Site
No.
Description
Description
No.
Project Manager
Quantity Surveyor
CAD Operators
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Consultant's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
8-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Description
Status
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
Remarks:
No.
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
9-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Status
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Driver
No.
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
10-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Qty
Description
No.
Status
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
No.
Personnel on Site
Description
No.
No.
Laborers
(Casual
Welder
Worker)
Driver
Description
Description
No.
No.
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
11-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Equipment on site
Qty
Description
No.
Status
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
No.
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
No.
No.
Laborers
(Casual
Welder
Worker)
Description
Description
No.
No.
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
12-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Qty
Description
No.
Status
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
No.
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
No.
No.
Laborers
(Casual
Welder
Worker)
Driver
Description
Description
No.
No.
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
13-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Materials on Site
Description of Work
Equipment on site
Qty
Description
Qty
Description
No.
Description
Status
No.
Gabion boxes
Excavator (0.8m3)
Fuel
Excavator(1.1m3)
Plywood
Timber (3"X2")
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Timber (4"X2")
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
No.
No.
Laborers
(Casual
Welder
Worker)
Description
Description
No.
No.
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
Remarks:
Submitted by:
Approved By:
Name
Signature
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
e at Jinja
Client
Contractor
TO
AMOUNT (mm)
Date:
14-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Description of Work
Materials on Site
Qty
Equipment on site
Description
Gabion boxes
Qty
Description
No.
Description
Status
No.
Excavator (0.8m3)
Fuel
Excavator(1.1m3)
Plywood
Bulldozer (15t)
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
No.
Remarks:
Submitted by:
Approved By:
Name
Signature
Name
Designation
Designation
Signature
Resident Engineer
Checked By:
Name
Signature
Contractor's Representative
Consultant's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
15-Jan-15
Section:
Njeru Side
RAINY
Works Executed:
Bill Item
Materials on Site
Description
Status
Qty
Equipment on site
Description
Qty
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Status
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
No.
Excavator (0.8m3)
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Description
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
CAD Operators
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Carpenter
Piling Worker
Driver
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Contractor
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
16-Jan-15
Section:
Njeru Side
RAINY
Works Executed:
Bill Item
Materials on Site
Description
Status
Qty
Equipment on site
Description
Qty
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Status
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
No.
Excavator (0.8m3)
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Description
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
CAD Operators
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Carpenter
Piling Worker
Driver
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
17-Jan-15
Section:
Njeru Side
RAINY
Works Executed:
Bill Item
Materials on Site
Description
Status
Qty
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Qty
Description
Status
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
No.
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Personnel on Site
Description
Description
No.
No.
Description
Description
No.
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
CAD Operators
Carpenter
Project Manager
Quantity Surveyor
Administration Manager
Assistant Administration Manager
Public Relations Officer
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
18-Jan-15
Section:
Njeru Side
RAINY
Works Executed:
Bill Item
Materials on Site
Description
Status
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Qty
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Equipment on site
Qty
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
No.
Status
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Personnel on Site
Description
Description
No.
CAD Operators
No.
Laborers
(Casual
Welder
Worker)
Carpenter
Description
Description
No.
Project Manager
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Piling Worker
Driver
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
19-Jan-15
Section:
Njeru Side
RAINY
Works Executed:
Bill Item
Materials on Site
Description
Status
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Qty
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Qty
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
No.
Status
Y20
Crawler Crane(100t)
Y25
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Personnel on Site
Description
Description
No.
No.
Description
Description
No.
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
CAD Operators
Carpenter
Project Manager
Quantity Surveyor
Administration Manager
Assistant Administration Manager
Public Relations Officer
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
20-Jan-15
Section:
Njeru Side
RAINY
Works Executed:
Bill Item
Materials on Site
Equipment on site
Description
Status
Qty
Description
Qty
Description
No.
Hardcore
Gabion boxes
Excavator (0.8m3)
Cement 42.5N
Fuel
Excavator(1.1m3)
Cement 52.5N
Bulldozer (15t)
BRC
Plywood
Timber (3"X2")
Y8
Timber (4"X2")
Y10
Y12
Y16
Crawler Crane(50t)
Y20
Crawler Crane(100t)
Y25
Bulldozer (32t)
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
Status
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
Personnel on Site
Description
No.
CAD Operators
No.
Laborers
(Casual
Welder
Worker)
Carpenter
Description
Description
No.
Project Manager
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Piling Worker
Driver
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Representative
Construction of
Consultant
Client
FROM
TO
AMOUNT (mm)
Date:
21-Jan-15
Section:
Njeru Side
RAINY
Works Executed:
Bill Item
Materials on Site
Description
Qty
Equipment on site
Hardcore
Description
Gabion boxes
Cement 42.5N
Fuel
Excavator(1.1m3)
Cement 52.5N
Plywood
Bulldozer (15t)
BRC
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Bulldozer (32t)
Status
Y8
Y10
Y12
Y16
Y20
Y25
Qty
Description
No.
Excavator (0.8m3)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Aggregates(10/14)
Aggregates(14/20)
Status
Concrete Mixer
Metallic Culverts
Agitator Truck
Sand
Gravel
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
Personnel on Site
No.
CAD Operators
Description
Laborers
(Casual
Welder
Worker)
Carpenter
No.
Description
No.
Quantity Surveyor
Administration Manager
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Mason
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Topographic Surveyors
Watchman
Environmental Officer
ICT
Chainman
Construction Engineer
Laboratory Technician
Site Engineer
Operator
Scheduling Engineer
Foreman
Piling Worker
Driver
Remarks:
Checked By:
Submitted by:
Approved By:
Name
Name
Designation
Signature
Consultant's Representative
Description
Project Manager
Signature
Resident Engineer
Contractor's Representative
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Bill Item
Materials on Site
Description
No.
Description
Status
Qty
Description
Qty
Description
Hardcore
Excavator (0.8m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Description
No.
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Driver
Project Manager
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Bill Item
Materials on Site
Description
No.
Description
Status
Qty
Description
Qty
Description
Hardcore
Excavator (0.8m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Description
No.
Personnel on Site
No.
Description
Laborers
(Casual
Welder
Worker)
No.
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Procurement Cordinator
Driver
Project Manager
Document Controller
Construction Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Description
Bill Item
Materials on Site
No.
Description
Status
Qty
Description
Qty
Description
Hardcore
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Personnel on Site
Personnel on Site
Description
No.
Description
No.
No.
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Project Manager
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Description
Bill Item
Materials on Site
No.
Description
Status
Qty
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Qty
Description
Hardcore
Excavator (0.8m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
No.
Description
No.
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Laborers
(Casual
Welder
Worker)
Description
Project Manager
Driver
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Description
Bill Item
Materials on Site
No.
Description
Status
Hardcore
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Qty
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Qty
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Water Browser
Y20
Crawler Crane(100t)
Folk Lift
Y25
Truck Crane(16t)
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Personnel on Site
Description
No.
Description
No.
No.
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Project Manager
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Equipment on site
Bill Item
Materials on Site
Description
No.
Description
Status
Qty
Description
Qty
Description
Hardcore
Gabion boxes
Excavator (0.8m3)
Cement 42.5N
Fuel
Excavator(1.1m3)
Cement 52.5N
Bulldozer (15t)
Motor Grader
BRC
Plywood
Timber (3"X2")
Motor Grader
Y8
Timber (4"X2")
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Crawler Crane(50t)
Water Browser
Y20
Crawler Crane(100t)
Folk Lift
Y25
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Bulldozer (32t)
Truck Crane(16t)
Description
No.
Personnel on Site
Description
No.
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Laborers
(Casual
Welder
Worker)
Description
Project Manager
Driver
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Submitted b
Approved By:
Name
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Consultant
Client
ITEM
FROM
TO
AMOUNT (mm)
Date:
RAINY
Section:
Record
Works Executed:
Bill Item
Equipment on site
Materials on Site
Description
No.
Description
Hardcore
Description
Gabion boxes
Cement 42.5N
Fuel
Excavator(1.1m3)
Cement 52.5N
Plywood
Bulldozer (15t)
Motor Grader
BRC
Bulldozer (32t)
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Service Vans
Y16
Water Browser
Y20
Folk Lift
Y25
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Y32
Truck Crane(25t)
Binding wire
Aggregates(6/10)
Elevator (2t)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Concrete Mixer
Oxygen-Acetylene set
Metallic Culverts
Agitator Truck
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Asphalt Finisher
Sika 40
Air Compressor
MC 30
Status
Qty
Qty
Description
Excavator (0.8m3)
Description
No.
Personnel on Site
No.
Description
Description
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Piling Worker
Superstructure Worker
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Tyreman/ Turn-man
Highway Engineer
Mason
Store Keeper
Foundation/Pylon Engineer
Checker/ Clerk
Safety Officer
Topographic Surveyors
Watchman
Environmental Officer
Chainman
Procurement Cordinator
Document Controller
Construction Engineer
Laborers
(Casual
Welder
Worker)
No.
Driver
Project Manager
Laboratory Technician
Operator
Scheduling Engineer
Remarks:
Checked By:
Name
Submitted b
Approved By:
Name
Name
Designation
Designation
Signature
Signature
Consultant's Representative
Signature
Resident Engineer
Contractor's Repres
Contractor
Consultant
22-Jan-15
ITEM
FROM
RAINY
Njeru Side
Works Executed:
Bill Item
Equipment on site
No.
Materials on Site
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Qty
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
No.
Project Manager
Description
Description
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
No.
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
23-Jan-15
ITEM
FROM
RAINY
Njeru Side
Works Executed:
Bill Item
Equipment on site
No.
Status
Materials on Site
Description
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Qty
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
No.
Project Manager
Description
Description
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
No.
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
24-Jan-15
ITEM
FROM
RAINY
Njeru Side
Works Executed:
Bill Item
Equipment on site
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Sika 40
MC 30
Qty
Personnel on Site
Personnel on Site
Description
No.
Project Manager
Description
No.
Quantity Surveyor
CAD Operators
No.
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
25-Jan-15
ITEM
FROM
RAINY
Njeru Side
Works Executed:
Bill Item
Equipment on site
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Qty
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
Description
No.
Project Manager
Description
No.
Quantity Surveyor
CAD Operators
No.
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
26-Jan-15
ITEM
FROM
RAINY
Njeru Side
Works Executed:
Bill Item
Equipment on site
No.
Status
Description
Materials on Site
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Qty
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
Description
No.
Project Manager
Description
No.
Quantity Surveyor
CAD Operators
No.
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
27-Jan-15
ITEM
FROM
RAINY
Njeru Side
Works Executed:
Bill Item
Equipment on site
Materials on Site
No.
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Qty
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
Description
No.
Project Manager
Description
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
No.
Remarks:
Submitted by:
Checked By:
Approved By:
Name
Name
Designation
Signature
Signature
Consultant's Representative
Contractor's Representative
Resident Engineer
Contractor
Consultant
28-Jan-15
ITEM
RAINY
Njeru Side
Works Executed:
Bill Item
FROM
Equipment on site
No.
Materials on Site
Description
Status
No.
Description
Status
Excavator (0.8m3)
Hardcore
Excavator(1.1m3)
Cement 42.5N
Cement 52.5N
Motor Grader
BRC
Motor Grader
Y8
Pneumatic Roller
Y10
Fuel tanker
Y12
Crawler Crane(50t)
Service Vans
Y16
Crawler Crane(100t)
Water Browser
Y20
Folk Lift
Y25
Y32
Binding wire
Aggregates(6/10)
Bar Cutter
Aggregates(10/14)
Bar Bender
Aggregates(14/20)
Welding Machine
Water Pump
Concrete Vibrator
Concrete Breaker
Oxygen-Acetylene set
Metallic Culverts
Chain Saw
Sand
Plate Rammer
Gravel
Rammer
Sika 10
Qty
Sika 40
Power Generator (45kVA)
MC 30
Personnel on Site
No.
Project Manager
Description
Description
No.
Quantity Surveyor
CAD Operators
Administration Manager
Carpenter
Project Engineer
Piling Worker
Superstructure Worker
Administrators
Highway Engineer
Procurement Cordinator
Foundation/Pylon Engineer
Accountant
Mason
Safety Officer
Document Controller
Environmental Officer
ICT
Topographic Surveyors
Construction Engineer
Chainman
Site Engineer
Laboratory Technician
Scheduling Engineer
Foreman
Operator
No.
Remarks:
Submitted by:
Checked By:
Name
Approved By:
Name
Designation
Signature
Contractor's Representative
Signature
Consultant's Representative
Resident Engineer
Client
Contractor
AMOUNT (mm)
Date:
29-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Materials on Site
Equipment on site
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Description
Status
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist Cable Stayed Bridge
Manager)
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Driver
Remarks:
No.
Status
Submitted by:
Approved By:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
Client
Contractor
AMOUNT (mm)
Date:
30-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Materials on Site
Equipment on site
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Status
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
Personnel on Site
Description
Laborers
(Casual
Welder
Worker)
No.
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Driver
No.
Status
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
Remarks:
Submitted by:
Approved By:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Resident Engineer
Consultant's Representative
Contractor's Representative
Client
Contractor
AMOUNT (mm)
Date:
31-Jan-15
Section:
Njeru Side
Works Executed:
Bill Item
Materials on Site
Equipment on site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Qty
Description
No.
Status
Description
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Motor Grader
Motor Grader
Pneumatic Roller
Fuel tanker
Crawler Crane(50t)
Service Vans
Crawler Crane(100t)
Water Browser
Truck Crane(16t)
Folk Lift
Truck Crane(25t)
Elevator (2t)
Bar Cutter
Bar Bender
Welding Machine
Water Pump
Concrete Vibrator
Concrete Mixer
Concrete Breaker
Agitator Truck
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Asphalt Finisher
Rammer
Air Compressor
Power Generator (45kVA)
Legend: Status: W - Working, I - Idle, B - Brokendown
No.
Status
Personnel on Site
Description
No.
Laborers
(Casual
Welder
Worker)
Driver
Description
No.
Description
Project Manager
Quantity Surveyor
Administration Manager
Mechanic
Quality Control
Manager
Project Engineer
(Deputy Project
Specialist
Manager) Cable Stayed Bridge
Auto Electrician
Administrators
Tyreman/ Turn-man
Highway Engineer
Procurement Cordinator
Store Keeper
Foundation/Pylon Engineer
Accountant
Checker/ Clerk
Safety Officer
Document Controller
Watchman
Environmental Officer
ICT
Construction Engineer
Site Engineer
Scheduling Engineer
Foreman
No.
Remarks:
Submitted by:
Approved By:
Name
Designation
Designation
Signature
Resident Engineer
TO
AMOUNT (mm)
Materials on Site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Signature
Contractor's Representative
Consultant
Qty
Checked By:
Name
Consultant's Representative
Description
No.
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners
Approved By:
Resident Engineer
Consultant
TO
AMOUNT (mm)
Materials on Site
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Qty
Description
No.
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners
Approved By:
Resident Engineer
Consultant
TO
Materials on Site
AMOUNT (mm)
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
No.
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners
Approved By:
Resident Engineer
Consultant
TO
AMOUNT (mm)
Materials on Site
Description
Gabion boxes
Qty
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Description
Laborers
(Casual
Welder
Worker)
Driver
Mechanic
Auto Electrician
Tyreman/ Turn-man
Store Keeper
Checker/ Clerk
Watchman
Cooks and Cleaners
Approved By:
Resident Engineer
No.
FROM
TO
AMOUNT (mm)
RAINY
Materials on Site
Description
Qty
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia
Personnel on Site
Description
CAD Operators
Carpenter
Piling Worker
No.
Description
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Auto Electrician
Tyreman/ Turn-man
Mason
Store Keeper
Checker/ Clerk
Topographic Surveyors
Watchman
Chainman
Laboratory Technician
Operator
No.
Checked By:
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
FROM
TO
AMOUNT (mm)
RAINY
Materials on Site
Description
Qty
Description
Qty
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia
Personnel on Site
Description
CAD Operators
Carpenter
Piling Worker
No.
Description
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Auto Electrician
Tyreman/ Turn-man
Mason
Store Keeper
No.
Checker/ Clerk
Topographic Surveyors
Watchman
Chainman
Laboratory Technician
Operator
Checked By:
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
FROM
TO
AMOUNT (mm)
RAINY
Materials on Site
Description
Qty
Cement 42.5N
Cement 52.5N
BRC
Y8
Y10
Y12
Y16
Y20
Y25
Y32
Binding wire
Aggregates(6/10)
Aggregates(10/14)
Aggregates(14/20)
Concrete Culverts 450Dia
Concrete Culverts 600Dia
Concrete Culverts 900Dia
Concrete Culverts 1200Dia
Metallic Culverts
Sand
Gravel
Sika 10
Sika 40
MC 30
Description
Gabion boxes
Fuel
Plywood
Timber (3"X2")
Timber (4"X2")
Wire nails 1"
Wire nails 2"
Wire nails 3"
Wire nails 4"
Wire nails 5"
Hardcore
Qty
Personnel on Site
Description
No.
Description
Piling Worker
Laborers
(Casual
Welder
Worker)
Driver
Superstructure Worker
Mechanic
Auto Electrician
Tyreman/ Turn-man
Mason
Store Keeper
Checker/ Clerk
Topographic Surveyors
Watchman
Chainman
CAD Operators
Carpenter
Laboratory Technician
Operator
Checked By:
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
No.
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Total
Equipment
1
Excavator (0.8m3)
0.8m3(0.6)
unit
Excavator(1.1m3)
1.1m3(0.8)
unit
Bulldozer (15t)
15t
unit
Bulldozer (32t)
32t WR
unit
1.5m3
unit
10t
unit
4t
unit
Crawler Crane(50t)
50t
unit
Crawler Crane(100t)
100t
unit
10 Truck Crane(16t)
16t
unit
11 Truck Crane(25t)
25t
unit
200t.m
unit
13 Elevator (2t)
2t
unit
60KW
unit
120KW
unit
Dia 2m/1.5m
unit
60m3/hr
unit
18 Agitator Truck
5m3
unit
110m3
unit
30t/h
unit
21 Asphalt Finisher
2.4/4.5m
unit
22 Air Compressor
3.7m3
unit
25kVA
unit
45kVA
unit
200kVA
unit
W=24m
unit
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
27 Motor Grader
unit
28 Compact Roller
unit
29 Pneumatic Roller
unit
30 Fuel tanker
unit
- 18 -
31 Service Vans
unit
32 Water Browser
unit
33 Folk Lift
unit
unit
unit
unit
Bar Cutter
unit
Bar Bender
unit
Welding Machine
unit
Water Pump
unit
Concrete Vibrator
unit
Concrete Breaker
unit
Oxygen-Acetylene set
10 Chain Saw
unit
unit
11 Plate Rammer
unit
12 Rammer
unit
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Total
Project Manager
pers.
pers.
Project Engineer
pers.
pers.
pers.
Highway Engineer
pers.
Foundation/Pylon Engineer
pers.
Safety Officer
pers.
Environmental Officer
pers.
pers.
pers.
12 Scheduling Engineer
pers.
13 Quantity Surveyor
pers.
14 Administration Manager
pers.
Assistant Administration
Manager
pers.
pers.
17 Administrators
pers.
18 Procurement Cordinator
pers.
19 Accountant
pers.
20 Document Controller
pers.
21 Construction Engineer
pers.
22 Site Engineer
pers.
15
- 17 -
23 CAD Operators
pers.
24 Foreman
pers.
25 Carpenter
pers.
26 Piling Worker
pers.
27 Superstructure Worker
pers.
pers.
pers.
30 Mason
pers.
pers.
32 Topographic Surveyors
pers.
33 Chainman
pers.
34 Laboratory Technician
pers.
Laborers
35
(Casual Worker)
pers.
36 Operator
pers.
37 Welder
pers.
38 Driver
pers.
39 Mechanic
pers.
40 Auto Electrician
pers.
41 Tyreman
pers.
42 Store Keeper
pers.
43 Checker
pers.
44 Watchman
pers.
pers.
Total
Daily Average
Contractor
Consultant
1-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
2-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
3-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
4-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
5-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
6-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
7-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Contractor
Consultant
8-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
9-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
10-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
11-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
12-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
13-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
14-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Contractor
Consultant
15-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
16-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
17-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
18-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
19-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
20-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
21-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Contractor
Consultant
22-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
23-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
24-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
25-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
26-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
27-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
28-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Contractor
Consultant
29-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
30-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
31-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Total
Project Manager
pers.
pers.
Project Engineer
pers.
pers.
pers.
Highway Engineer
pers.
Foundation/Pylon Engineer
pers.
Safety Officer
pers.
Environmental Officer
pers.
pers.
pers.
12 Scheduling Engineer
pers.
13 Quantity Surveyor
pers.
14 Administration Manager
pers.
Assistant Administration
Manager
pers.
pers.
17 Administrators
pers.
18 Procurement Cordinator
pers.
19 Accountant
pers.
20 Document Controller
pers.
21 Construction Engineer
pers.
22 Site Engineer
pers.
15
- 17 -
23 CAD Operators
pers.
24 Foreman
pers.
25 Carpenter
pers.
26 Piling Worker
27 Superstructure Worker
30 Mason
pers.
pers.
32 Topographic Surveyors
pers.
33 Chainman
pers.
34 Laboratory Technician
pers.
Laborers
35
(Casual Worker)
pers.
36 Operator
pers.
37 Welder
pers.
38 Driver
pers.
39 Mechanic
pers.
40 Auto Electrician
pers.
41 Tyreman
pers.
42 Store Keeper
pers.
43 Checker
pers.
44 Watchman
pers.
pers.
Total
Daily Average
Unit
Monthly
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Total
Equipment
1
Excavator (0.8m3)
0.8m3(0.6)
unit
Excavator(1.1m3)
1.1m3(0.8)
unit
Bulldozer (15t)
15t
unit
Bulldozer (32t)
32t WR
unit
1.5m3
unit
10t
unit
4t
unit
Crawler Crane(50t)
50t
unit
Crawler Crane(100t)
100t
unit
10 Truck Crane(16t)
16t
unit
11 Truck Crane(25t)
25t
unit
200t.m
unit
13 Elevator (2t)
2t
unit
60KW
unit
120KW
unit
Dia 2m/1.5m
unit
60m3/hr
unit
18 Agitator Truck
5m3
unit
110m3
unit
30t/h
unit
21 Asphalt Finisher
2.4/4.5m
unit
22 Air Compressor
3.7m3
unit
25kVA
unit
45kVA
unit
200kVA
unit
W=24m
unit
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
27 Motor Grader
unit
28 Compact Roller
unit
29 Pneumatic Roller
unit
30 Fuel tanker
unit
- 18 -
31 Service Vans
unit
32 Water Browser
unit
33 Folk Lift
unit
unit
unit
unit
Bar Cutter
unit
Bar Bender
unit
Welding Machine
unit
Water Pump
unit
Concrete Vibrator
unit
Concrete Breaker
unit
Oxygen-Acetylene set
10 Chain Saw
unit
unit
11 Plate Rammer
unit
12 Rammer
unit
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Contractor
Consultant
1-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
2-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
3-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
4-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
5-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
6-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
7-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Contractor
Consultant
8-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
9-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
10-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
11-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
12-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
13-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
14-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Contractor
Consultant
15-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
16-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
17-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
18-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
19-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
20-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
21-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Contractor
Consultant
22-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
23-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
24-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
25-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
26-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
27-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
28-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Contractor
Consultant
29-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
30-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Contractor
Consultant
31-Jul-14
Weather
Section: ..
Excel Subcontractor
Afternoon: Temp:
Temperature
0C
Site Record
Site Record
Works Executed:
Bill Item
Equipment on site
Description
No.
Excavator (0.8m3)
Excavator(1.1m3)
Bulldozer (15t)
Bulldozer (32t)
Wheel Loader (1.5m3)
Dump Truck (10t)
Truck With Crane(4t)
Crawler Crane(50t)
Crawler Crane(100t)
Truck Crane(16t)
Truck Crane(25t)
Tower Crane (200t.m)
Elevator (2t)
Vibration Hammer 60KW
vibration Hammer for Rock
Pile
All Casing Pile Rig
Concrete Batch Plant
(1m3/bt)
Agitator Truck
Concrete Pump (Boom)
Asphalt Plant 500kg/bt
Asphalt Finisher
Air Compressor
Power Generator (25kVA)
Power Generator (45kVA)
Power Generator (200kVA)
Description
Materials on Site
No.
Description
Hardcore
Motor Grader
cement
Compact Roller
sand
Pneumatic Roller
Y12
Fuel tanker
Y16
Service Vans
Y20
Water Browser
Y25
Folk Lift
Y32
Aggregates(6/14)
Aggregates(14/20)
Gabion boxes
Bar Cutter
Metallic Culverts
Bar Bender
Concrete Culverts
Welding Machine
Fuel
Water Pump
Plywood
Concrete Vibrator
Timber (3"X2")
Concrete Breaker
Timber (4"X2")
Oxygen-Acetylene set
Chain Saw
Plate Rammer
Rammer
Description
Personnel at site
Description
Qty
No.
Description
Project Manager
Quality Control Manager
(Deputy
Project Manager)
Project Engineer
Quantity Surveyor
Scheduling Engineer
Foreman
Administration Manager
Assistant Administration Manag
Administrators
Procurement Cordinator
Accountant
Document Controller
Construction Engineer
Site Engineer
CAD Operators
Personnel at site
No.
Description
Carpenter
Piling Worker
Superstructure Worker
Cable Stay Worker
Mechanical & Electrical
Worker
Mason
Steel Fixer (Bar bender)
Topographic Surveyors
Chainman
Laboratory Technician
Laborers
(Casual Worker)
Operator
Description
No.
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
Submitted by:
Checked By:
Name
Name
Designation
Designation
Signature
Signature
Contractor's Representative
Approved By:
Name
Signature
Consultant's Representative
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer
Materials on Site
Description
Qty
Personnel at site
Description
Welder
Driver
Mechanic
Auto Electrician
Tyreman
Store Keeper
Checker
Watchman
Cooks and Cleaners
No.
Approved By:
Resident Engineer