Professional Documents
Culture Documents
Detailed Syllabus of
Technician Engineering
Civil (Part-2)
Evolution Scheme:
Maximum Time: 3 Hrs., Minimum Aggregate Pass Marks: 50% Passing Marks Per Subject 40%
25 Marks
Section B
Section C
30 Marks
45 Marks
Subjects
Subject
Code
CL-2.1
CL-2.2
CL-2.3
CL-2.4
CL-2.5
CL-2.6
CL-2.7
CL-2.8
CL-2.9
CL-2.10
CL-2.11
CL-2.12
CL-2.13
CL-2.14
CL-2.15
CL-2.16
CL-2.17
CL-2.18
Subject Name
Total Marks
Surveying
Fluid Mechanics
Building Construction
Soil and foundation engineering
Transportation Engineering
Strength of Material
Civil Engineering Drawing
Structural Machines
Concrete Technology
Construction Material
Earth quake resistant building construction
Civil Engineering drawing
Steel Structure design
Irrigation Engineering
Estimating & Costing
Environmental Engineering / Health Engineering
Elements of RCC Design
Theory of Structure
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
CL-2.1 SURVEYING
1. SURVEYING (1.2 Introduction
1.3 Define Surveying
1.4 Plane and Geodetic Surveying
1.5 Scale of map
1.6 Principles Of surveying
1.7 Classification Of surveying
1.8 Errors In surveying Works
1.9 Temporary adjustment and permanent adjustment.
2. TAPE (CHAIN) MEASURMENT (-2)
2.1 Type of chain
2.2 Accessories of chain
2.3 Ranging
2.4 Chaining
3. COMPASS SURVEYEING (--3)
3.1 Types of compass
3.2 Some basic definitions
3.3 Temporary adjustment of compass
3.4 Local attraction
3.5 Whole circle bearing
3.6 Fore bearing
3.7 Relation between fore bearing and whole bearing
3.8 Included angles
3.9 Calculation of bearing of subsequent lines from included angle
4. LEVELLING :
4.1
Definitions
4.2
Level surface
4.3
Level line
4.4
Horizontal line
4.5
Vertical line
4.6
Mean sea level
4.7
Reduced level
4.8
Names and function of different parts of 4.9
Dumpy level
THE INDIAN INSTITUTION OF ENGINEERS ( IIE)
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
4.20
Tilting level
Difference in dumpy and tilting level.
Internal and external focusing telescope
Temporary adjustments of dumpy and tilting level
Levelling staff
4.14.1 Self reading
4.14.2 Telescope staff
4.14.3 Target staff
Reading a levelling staff
Levelling with dumpy and tilting levels
4.16.1 Taking observations
4.16.2 Recording in a level book.
Calculation of R.L.
4.17.1 Height of instrument method
4.17.2 Rise and fall method
4.17.3 Arithmetical checks
Types of levelling
4.18.1 Fly levelling
4.18.2 Differential levelling
4.18.3 Profile levelling
4.18.4 Reciprocal levelling
4.18.5 Precise levelling
Effect of curvature and refraction in levelling and their corrections.
Permanent adjustment
4.20.1 Dumpy level
4.20.2 Tilting level
5. CONTOURING:
5.1 Concept
5.2 Purpose of contouring
5.3 Contour interval
5.4 Horizontal equivalent
5.5 Factors affecting contour interval
5.6 Characteristics of contours
5.7 Methods of contouring - direct and indirect
5.8 Uses of contour maps
6. MINOR INSTRUMENTS (--6)
6.1 Study and use of
6.2 Hand level
6.3 Abney level
6.4 Clinometer
6.5 Plan meter
THE INDIAN INSTITUTION OF ENGINEERS ( IIE)
6.6 Pantographs
6.7 Sextant
6.8 Cylonghat tracer
7 THEODOLITE
7.2 Introduction
7.3 Different parts of a vernier transit theodolite
7.4 Temporary adjustment
7.5 Transiting
7.6 Swinging
7.7 Measurement of horizontal angle
7.8 Measurement of vertical angle
8 TRAVERSE
8.2 Types- open and closed traverse
8.3 Methods of traversing
8.4 Latitude and departure
8.5 Balancing the traverse
8.5.1 Bowditchs rule
8.5.2 Transit rule
9 TACHEOMETRY SURVEYING
9.2 General introduction and calculation methods
9.3 Annalitic lens
9.4 Errors in tachometry surveying
10 TRIGNOMETRICAL LEVELLING
10.2 Determination of height and distance of a point
10.2.1 Base accessible
10.2.2 Base inaccessible
11 CURVES
11.2 Introduction and types of curves
11.3 Classification of circular curves
11.4 Vertical curves its types
11.5 Transition curves and its types
12 PLANE TABLE SURVEYING :
Description and uses of plane table and its accessories
Advantages of plane table surveying
Centering, levelling and orientation of plane table
Radiation
Intersections
Traversing
Resection
Two point problems
THE INDIAN INSTITUTION OF ENGINEERS ( IIE)
REFERENCE BOOKS : 1. Fluid Mechanics & Machines Dr. Jagdish Lal 2. Fluid Mechanics &
Machines Dr. R.K.Bansal
3. Fluid Mechanics & Machines R.S.Khurmi.
4. Hydraulics & Pneumatics H.L. Stewart.
2.
3.
4.
5.
6.
7.
8.
9.
INTRODUCTION (--1)
1.1Define Building
1.2Classification of building based on occupancy
1.3Explanation of different parts of building
BUILDING MATERIAL (--2)
2.1 Define building materials
2.2 Classification of building material
2.3 Objective of building material.
FOUNDATION (--3)
3.1 Concept of foundation
3.2 Factors affecting selection of foundation
3.3 Definition and importance of bearing capacity
3.4 Types of foundation: shallow and deep
3.5 Causes of failure of foundation
WALLS (--4)
4.1 Purpose of walls
4.2 Types of walls
4.3 Partition walls
4.4 Cavity walls
BRICK MASONARY (--5)
5.1 Definition related to brick masonry
5.2 Types of bonds
5.3 Construction of brick walls method of laying brick in walls.
STONE MASONARY (--6)
6.1 Definition related to stone masonry
6.2 Dressing of stone: hammer dressing and chisel dressing
6.3 General principles for construction of stone masonry
6.4 Different types of stone masonry
SCAFFOLDING, SHORING AND UNDERPINNING (--7)
7.1 Application of different types of shores and scaffolding
7.2 Meaning and need for underpinning
DAMPONESS AND ITS PREVENTION (--8)
8.1 Causes of dampness and principles of its prevention
8.2 Material commonly used for damp proofing
8.3 Damp proof course.
8.4 Anti termite treatment for building before and after construction.
BUILDINF BY LAWS (CHAPTTER-9)
9.1 study of building by laws as per 1256-1967
9.2 Terminology related to residential building, building permit occupancy,
certificate, unsafe building, enforcement code, offence and penalties.
THE INDIAN INSTITUTION OF ENGINEERS ( IIE)
10
9.3 Health sanitation, and other requirement, means of access, open space
requirements, plinth area, projections, covered area in residential plots.
9.4 Distance from electric line, plinth regulation, height regulations, lighting and
ventilation, construction of water cosset.
10.
11
12
REFERENCE BOOKS :
1. Soil Engg B.C. Punmmia
2. Basic Soil Engg. Dr. Alam Singh
3. Modern Geo- Technical Engg. Alam Singh
4. Soil and Foundation Engineering (Hindi) B.C. Punmia
13
14
15
16
6. TORSION (--6)
6.1 Introduction
6.2 Assumption for torsion equation
6.3 Torsion equation for solid shaft
6.4 Torsion equation for hollow circular shaft
6.5 Comparison between hollow ad solid shafts
6.6 Power transmitted
6.7 Stiffness of a shaft
6.8 Concept of mean and maximum torque
6.9 When shaft in series
6.10 When shaft in parallel
7. SPRINGH (--7)
7.1 Definition
7.2 Close coild helical spring subjected to axial load
7.3 Spring under impact load
7.4 Composite springs
7.5 Close coil helical spring subjected to axial twist
7.6 Leaf spring
8. COLUMN AND STRUTS (--8)
8.1 Definition
8.2 Types of Column
8.3 strength of column
8.4 End conditions
8.5 Eulers theory
8.6 Assumptions made Eulers theory
8.7 Eulers derivations
8.8 Limitations of Eulers formula
8.9 Rankine formula
9. SHARE FORCE AND BENDING MOMENT DIAGRAMS (--9)
9.1 Beam
9.2 Classification of beams
THE INDIAN INSTITUTION OF ENGINEERS ( IIE)
17
18
19
20
21
22
23
24
25
26
6. DIMENSIONING (--6)
6.1 Introduction
6.2 Dimensioning & types of dimensioning
6.3 Dimensioning terms and notations
6.4 Elements of dimensioning
6.5 Systems & rules of dimensioning
7. ORTHOGRAPHIC PROJECTIONS (--7)
7.1 Introduction
7.2 Projection and Projectors or projection lines
7.3 Types of projection
7.4 Oblique projection
7.5 Planes of projection
7.6 Orthographic projection
7.7 Four quadrants
7.8 Types of orthographic
7.9 Symbol of first angle projection
7.10 Symbol of third angle projection
7.11 Comparison of first & third angle projections
7.12 Common rules followed while drawing the orthographic projection
7.13 Sequence of steps followed while making orthographic projection
8. IDENTIFICATION OF SURFACE (--8)
8.1 Introduction
8.2 Identification of surface from pictorial view to orthographic views
8.3 Identification of surface from orthographic view of pictorial views
8.4 Identification of surface from pictorial view to orthographic views and
Identification of surface from pictorial view to orthographic views
9. PROJECTIONS OF POINTS (--9)
9.1 Introduction
9.2 Projection of point in the first Quadrant
9.3 Projection of point in the second Quadrant
9.4 Projection of point in the third Quadrant
9.5 Projection of point in the fourth Quadrant
9.6 Octants
9.7 Positions and projections of point lying in the different octants
27
28
29
Preparation of a working drawing (elevation, plan, details of joints as ridge, eaves and
other conections) for a riveted steel roof truss resting on a masonry wall with the given
span, shape of the truss and the design data regarding the size of the members and the
connections. Also calculate the quantity of steel for the truss.
2. Steel connections (a,b,c,d) riveted and (e) welded all unstiffened
Beam to beam connections (Seated and franed)
Beam to column (Seated and franed)
Column base connections (Slab base and gusetted base)
Details of column splices
Connections of a steel bracket with flange of a column
3. Detailed drawing showing plan and elevation for a riveted plate girder with the given
design data regarding the sizes of its parts, with details at the supports and connections of
stiffeners, flange angles and cover plates with the web.
30
31
32
33
34
35
5.2.3
Prismoidal formula method
5.2.4
Graphical method
5.3 Using longitudinal and typical cross sections
5.4 Cross section for different stations.
5.5 Finding earth work by these sections
5.6 Calculation of permanent and temporary lands for roads
5.7 Economical depth of digging
6. VALUATION OF PROPERTY AND RENT FIXATION :
6.1 Objects of valuation
6.2 Free-hold property
6.3 Lease-hold property
6.4 Property income
6.5 Obsolescence
6.6 Market-value
6.7 Book value
6.8 Distress value
6.9 Monopoly value
6.10 Salvage value
6.11 Scrap value
6.12 Accommodation value
6.13 Replacement value
6.14 Sentimental value
6.15 Speculative value
6.16 Factors affecting the value of the property
6.17 Annuity
6.18 Capital cost
6.19 Capitalized value
6.20 Years purchase
6.21 Methods of determining depreciation
6.22 Valuation of property
6.23 Method of determining valuation of property
6.24 Typical valuation report
6.25 Types of rents
6.26 Rules of capital cost fixation for govt. buildings
6.27 Rules for calculation of standard rent
7. CONTRACT SYSTEM :
7.1 Requirements of contracts
7.2 Types of contracts
7.3 Lumpsum contract
7.4 Item rate contract
7.5 Percentage contract
7.6 Contract documents
THE INDIAN INSTITUTION OF ENGINEERS ( IIE)
36
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
8. PROCEDURE OF WORKS :
8.1 Main staff structure of engineering department
8.2 Duties of junior engineer
8.3 Administrative approval
8.4 Expenditure sanction or approval
8.5 Technical sanction or an approval
8.6 Appropriation and re-appropriation of funds
8.7 Procedure for original minor and major works
8.8 Repair works
8.9 Types of estimates
8.10 Preliminary estimate.
8.11 Cubical content estimate.
8.12 Plinth area estimate.
8.13 Revised estimate CIVIL ENGINEERING 66
8.14 Supplementary estimate
8.15 Daily labour on muster roll system
8.16 Completion report
9. PUBLIC WORKS ACCOUNTS :
9.1 Payment to labourers
9.2 Payment to contractors and suppliers
9.3 Standard measurement book
9.4 First and final bill
9.5 Running account bill
37
38
39
10. APPURTENANCES :
10.1 Manholes
10.2 Drop manhole
10.3 Inlets
10.4 Catch basin
10.5 Inverted syphon
10.6 Flushing tanks
10.7 Ventilating shaft
10.8 Lamp holes
11. SEWAGE DISPOSAL :
11.1 General composition of sewage
11.2 Strength of sewage
11.3 Land disposal
11.4 Dilution method of disposal
12. TREATMENT AND DISPOSAL :
12.1 Primary treatment
12.2 Secondary treatment
12.3 Function and construction of
12.3.1 Screening chambers
12.3.2 Grit chambers
12.3.3 Clarifier chambers
12.3.4 Trickling filters
12.3.5 Aeration tank
40
41
42
REFERENCE BOOKS :
1. Strength of Material & Theory of Structures. Vol I & II B.C. Punmia
2. Mechanics of Structure S.B. Junarkar.
3. Strength of Material S. Ramamurtham
43