You are on page 1of 15

REQUIRED ATTACHMENT PER SCENARIO

Site Details
A1
A2
A3

Site Development Works Details


AC & DC Power Details
BTS & Antenna Details

Scenario 1
RRU on TOP




Photo's and Sketches


B1
B2
B3
B4
B5
B6
B7
B8

Site Layout
Antenna Placement Layout
RRU Placement Layout
Equipment Layout and Propose Cable Layout
Coverage Details
Indoor Site Picture Details
Outdoor Site Picture Details
Manual Hauling Report










Scenario 2
RRU Below

Scope: NEW DBS TD LTE


SMART Site ID: 763
SMART Site Name: Iloilo Jaro-Plaza
SUN Site ID:
SUN Site Name:
Area: Visayas
GPS Coordinates: Map Datum Longitude
WGS 84

Site Address:

122 33'30"

Decimal

Latitude

122.558333 10 43'21.2"

Decimal

Elevation

10.722556

21m ASL

JAIME ST. NEAR E.LOPEZ ST., Brgy Fatima, Iloilo City

Survey Date:

Table of Contents

Site Details
A1
A2
A3

Attached




Site Development Works Details


AC & DC Power Details
BTS & Antenna Details

Photo's and Sketches


B1
B2
B3
B4
B5
B6
B7
B8










Site Layout
Antenna Placement Layout
RRU Placement Layout
Equipment Layout and Propose Cable Layout
Coverage Details
Indoor Site Picture Details
Outdoor Site Picture Details
Manual Hauling Report

Vendor Rep.

SMART BUILD

SMART ROMC

SMART ENG - AP&E

SMART ENG - TPE

SMART ENG - P&E Supp.

DOCUMENT NO.
SSR_00000_RET_REV_0

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

2 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

A1 - Site Development Works Details


STRUCTURE DETAILS
Tower location & type:

Equipment room type:


Equipment room size:
Ventilation type:
Site accessibility:

No.

Building site

Building name
No. of floors
Radio room location
Tripod ht
m(AGL)
Pole mounted ht
m(AGL)
Others
ht
m(AGL)
Lot site
3 Legged SST
4 Legged SST
Monopole
Guyed pole
Guyed trilon
Structure height
45
m
Leased Area
Yes
Concrete Room
Van
Outdoor installation
Others pls specify
12-footer (2.75m x 4.01m)
20-footer (2.75m x 6m)
Others pls specify
Split ACU
Natural ventilation
Others pls specify
Window ACU
24/7
Office hours
Mall/Bldg hours
Others pls specify
Manned
Manned

DESCRIPTION

INDOOR & OUTDOOR


Floor space (for new equipment)
New van/equipment room needed?
Van/equipment room extension needed?
Cable ladder space for new feeder line cable(Indoor)
Cable ladder space for new feeder line cable(Outdoor)
Mounting pole for additional antenna
Band: 900 GSM
Height:
m AGL
Band: 1800 GSM
Height:
m AGL
Band: 2100 UMTS
Height:
m AGL
Band: 850 UMTS
Height:
m AGL
Band: 2100 LTE FDD
Height:
m AGL
Band: 3500 LTE TDD
Height:
m AGL
7 Mounting pole for RRU
Height:
m AGL
8 Indoor grounding busbar termination
9 Grounding busbar termination
Below RRU
Above RRU
Near antenna
Middle of tower
Lower part of tower( before the bend)
Before the porthole( after the bend)
10 Porthole available for new feeder line?
11 Cable gland available for new feeder line?
12 New
feeder /
fiber line cable
A
1
2
3
4
5
6

13
14
15
16
17
B
18
19
20
C
21
22

No.

New feeder line grounding kit


DDF block termination available?
DDF block termination for external alarm available?
Requires jumper cable from feeder tapping point to BTS?
TMA Installed
POWER
Circuit breaker available for new equipment
Note: Required breaker ampere (40A).
AC power upgrade required
Air-Conditioning upgrade required
OTHERS
For pullout of idle battery bank/equipment to free up
space for new equipment
Triplexer installation recommended?

REMARKS
Available
Needed
Needed
Available
Available

Not
Not
Not
Not
Not

Available
Needed
Needed
Available
Available

Needed
Needed
Needed
Needed
Needed
Needed
Needed
Available

Not
Not
Not
Not
Not
Not
Not
Not

Needed
Needed
Needed
Needed
Needed
Needed
Needed
Available

Available
Available
Available
Available
Available
Available
Needed

Not
Not
Not
Not
Not
Not
Not

Available
Available
Available
Available
Available
Available
Needed

Needed
Available
Available
Needed
Yes

Not
Not
Not
Not
No

Needed
Available
Available
Needed

Available
Not Available
Yes
Yes

Ampere:
Required ampere:
No
No

Yes
No
Recommended

Equipment type:

OTHER WORKS REQUIRED FOR SITE READINESS


15m-DCDU cable to rectifier
15m-BBU grounding cable
70m-CPRI cable @ 3 runs
70m-RRU dc cable @ 3 runs
10m-RRU grounding cable @ 3 runs
15m-GPS coax cable
2pcs-cable glands
10m-LAN cable

Direct mount on tower leg


Requires new grounding bar
Requires new grounding bar
Ohm Reading
Requires new grounding bar
Ohm Reading
Requires new grounding bar
Ohm Reading
Requires new grounding bar
Ohm Reading
hole's needed:
,hole size
Qty needed:
2
pcs, cable gland size
7/8
If needed, length & size required:
GSM
GSM
UMTS UMTS
LTE
LTE
900
1800
2100
850
2100
3500
70
Length
Size
Runs
3
Qty needed:
pcs
New DDF block required
New DDF block required
Required length of jumper cable:
m x
pcs

Qty:
Qty:

pc
pc

Not recommended

RESPONSIBLE TEAM

REMARKS

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

3 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

A2 - AC & DC Power Details


AC Power System
CONCRETE
NO LABEL
Powercity
60
N
NO LABEL
Main Distribution Panel

SHELTER TYPE (VAN, CONCETE SHELTER, BLDG):


TRANSFORMER QUANTITY & CAPACITY (KVA):
MCB RATING (AT):
GENSET 1 BRAND:
GENSET RATING (KVA):
GENSET WITH PAD & FUEL LINE (Y/N):
ACU BRAND:

ACU RATING (HP): 2HP


SHELTER AREA: INDOOR
TYPE OF VAN (COLLAPSIBLE, RIGID) N/A

AC Loading @ MAIN (AMPERES): 13.6A


SIZE OF WIRE @ MDP - MAIN(mm/AWG): 30mm
MAIN BREAKER RATING(AT): 150
Load
Breaker Ratings(AT)
70
CB1
CB2
70
CB3
40

Load Description
Rectifier 1
Rectifier 1
Indoor lights

CB4
CB5
CB6
CB7
CB8
CB9

40
40
40
30
30
30

SPARE
ACU1
ACU2
Tower lights
Perimeter lights
C.O.

CB10
CB11
CB12
CB13

30

SPARE

CB14
CB15
CB16
CB17
CB18
RECTIFIER EQUIPMENT DETAILS
Rectifier 1 (Loading Inventory)

Rectifier 2 (Loading Inventory)

CB Battery

Breaker Rating

Status (ON/OFF)

Breaker Rating

Status (ON/OFF)

FB1

100A

ON

100A

ON

FB2

100A

ON

100A

ON

CB Branch

Breaker Rating

Load Description

Breaker Rating

Load Description

F1

100A

SPARE

100A

SPARE

F2

100A

SPARE

100A

SPARE

F3

100A

SPARE

100A

SPARE

F4

100A

SPARE

100A

SPARE

F5

80A

SPARE

80A

SPARE

F6

80A

SPARE

80A

SPARE

F7

80A

SPARE

80A

SPARE

F8

80A

BTS 3900 Upper

80A

BTS 3900 Lower

F9

63A

SPARE

63A

SPARE

F10

63A

SPARE

63A

SPARE

F11

63A

SPARE

63A

NO LABEL

F12

63A

SPARE

63A

SPARE

F13

40A

Huawei 2100 LTE/3G

40A

SPARE

F15

40A

TDD LTE Breaker

40A

SPARE

F15

40A

SPARE

40A

SPARE

F16

40A

SPARE

40A

SPARE

F17

20A

BRO

20A

NO LABEL

F18

20A

ECI A

20A

NO LABEL

F19

20A

SPARE

20A

SPARE

F20
Rectifier Brand :

Eltek Valere

# of Rectifier Module :

# Battery Bank :

Battery Brand & Capacity :


Rectifier Voltage :
Distribution Current :

Powerone
4
2

Narada 2V/600Ah

Sacred Sun 2V/600AH

53.29V

54.10V

N/A

N/A

Rectifier 3 (Loading Inventory)


Breaker Rating

Status (ON/OFF)

Breaker Rating

Load Description

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

4 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

A3 - BTS & Antenna Details


Band:

GSM 900

DCS 1800

UMTS 2100

UMTS 850

LTE 2100

LTE 3500

Existing BTS/Node B:

New eqpt BTS/eNodeB:

Existing configuration:

New configuration:

Application:

Macro

Pico

Installation type:

Indoor

Outdoor

Micro

Marcro + Pico

NEW ANTENNA/FIBER

NEW ANTENNA/FEEDER

SECTOR 1

ANTENNA CONFIGURATION
ITEM
Center height( meters)
Orientation (degrees)
Mechanical tilt

1 + 1 + 1

SECTOR 2

SECTOR 2

TX/RX

RXD

TX/RX

RXD

TX/RX

RXD

45m

45m

45m

45m

45m

45m

60

60

180

180

280

280

N/A

N/A

N/A

Electrical tilt(if any)

N/A

N/A

N/A

Application

MACRO

MACRO

MACRO

Antenna model

no label

no label

no label

Fiber/Feeder cable label

N/A

N/A

N/A

Fiber cable

70 m

70 m

70 m

7/8" Feeder cable

N/A

N/A

N/A

1 5/8" Feeder cable

N/A

N/A

N/A

(Jumper) BTS to feeder

5m

5m

5m

(Jumper) Feeder to antenna

5m

5m

5m

Triplexer used (Yes/No)

No

No

(Jumper) BTS to Triplexer

N/A

N/A

N/A

(Jumper) Triplexer to feeder

N/A

N/A

N/A

Grounding kits installed 3


TMA

set

N/A

No

set

m
m
set

set

N/A

N/A

Other remarks

SECTOR 1

RRU CONFIGURATION
EXISTING
Installation Height in Tower

SECTOR 2
Proposed
45m

EXISTING

SECTOR 2
Proposed
45m

EXISTING

Proposed
45m

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

5 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B1 - SITE CONSTRUCTION LAYOUT


Proposed
antenna
location for
Sector 2. At
45m with
azimuth of
180 deg

Proposed
antenna
location for
Sector 3. At
45m with
azimuth of
280 deg

Proposed
antenna
location for
Sector 1. At
45m with
azimuth of
60 deg

Proposed
RRU location
for Sector 3.
At 45m with
azimuth of
280 deg

Proposed
RRU location
for Sector 1.
At 45m with
azimuth of 60
deg

Proposed
RRU location
for Sector 2.
At 45m with
azimuth of
180 deg

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

6 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B2 - ANTENNA PLACEMENT LAYOUT


Sector 1

Proposed
antenna
location for
Sector 1. At
45m with
azimuth of
60 deg

Sector 2

Proposed
antenna
location for
Sector 2. At
45m with
azimuth of
180 deg

Sector 3

Proposed
antenna
location for
Sector 3. At
45m with
azimuth of
280 deg

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

7 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B3 RRU PLACEMENT LAYOUT


Sector 1

Proposed
RRU location
for Sector 1.
At 45m with
azimuth of 60
deg

Sector 2

Proposed
RRU location
for Sector 2.
At 45m with
azimuth of
180 deg

Sector 3

Proposed
RRU location
for Sector 3.
At 45m with
azimuth of
280 deg

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

8 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B4 - EQUIPMENT LAYOUT AND PROPOSED CABLE LAYOUT

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

9 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B5 - COVERAGE DETAILS
PANORAMIC VIEW 30 degrees

PANORAMIC VIEW 60 degrees

PANORAMIC VIEW 90 degrees

PANORAMIC VIEW 120 degrees

PANORAMIC VIEW 150 degrees

PANORAMIC VIEW 180 degrees

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

10 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B5 - COVERAGE DETAILS
PANORAMIC VIEW 210 degrees

PANORAMIC VIEW 240 degrees

PANORAMIC VIEW 270 degrees

PANORAMIC VIEW 300 degrees

PANORAMIC VIEW 330 degrees

PANORAMIC VIEW 360 degrees

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

11 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B5 - INDOOR SITE PICTURE DETAILS


FLOOR SPACE

INDOOR CABLE LADDER SPACE

Proposed BBU and DCDU location


GROUNDING BUSBAR TERMINATION

PORTHOLE/CABLE GLAND AVAILABILITY

Proposed porthole. For additional 2 cable glands


CIRCIUT BREAKER

Proposed 40A breaker

OTHERS

SITE SURVEY REPORT

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

12 of 13

TECHNICAL SERVICES DIVISION


VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B7 - OUTDOOR SITE PICTURE DETAILS


TOWER PICTURES

OUTDOOR CABLE LADDER SPACE

GROUNDING BUSBAR TERMINATION

NEAR ANTENNA BUSBAR

GPS PROPOSE LOCATION

OTHERS

Propose
d GPS
location

DOCUMENT NO

PAGE

SSR_00000_RET_REV_0

13 of 13

SITE SURVEY REPORT


TECHNICAL SERVICES DIVISION
VENDOR

Scope:
SMART Site No.:
SMART Site Name:
SUN Site No.:
SUN Site Name:
Area:

NEW DBS TD LTE


763
Iloilo Jaro-Plaza

Visayas

B8 - MANUAL HAULING REPORT

HAULING SURVEY REPORT


DATE:
REV NO.
SITE NO.

SITE NAME
SITE ADDRESS

CITY/TOWN

REGION

PROVINCE

AREA

BARANGAY
BLDG NO,STREET

I. FROM SOURCE TO POINT OF DELIVERY


( Check if w/ in Island)

( Check if Provinces )

ACCESS ROAD DESCRIPTION (joining the main road and point of delivery)
FROM:

TO:

( Source ) Specify location

( Main road )
( Specify pier, airport, terminal location) if in provinces

( main road )

( Point of Delivery ) specify location

II. POINT OF DELIVERY TO SITE ( Stage that cover the cost of hauling )

TO:
( Nearest SITE Location )

III. MODES OF TRANSPORTATION

TRUCKS:

VAN
(type, no. of units)

specify if others
(type, no. of units)

HAULING DISTANCE
LOT PROFILE ( angle of inclination )

DEGREE OF HAULING DIFFICULTIES


EASY
DIFFICULT
EXTREMELY DIFFICULT

(degrees)

IV. DISTANCE OF MANPOWER HAULING(if any)

(meters)

V. TOTAL HAULING DISTANCE FROM PONT OF DELIVERY TO SITE

SITE ELEVATION

(type, no. of units)

(kilometers)

(kilometers)

(meters)

relative to nearest main road)

FLOOD HISTORY

(meters)
YES

NO

If YES (Indicate water level)

Sketch Plan / Vicinity Map

Attachments:
1. PICTURES
2. OTHERS

PREPARED BY: ( CONTRACTOR )

SIGNATURE OVER PRINTED NAME

CHECKED / APPROVED BY: ( NSA/ NCM-PM)

DATE

SIGNATURE OVER PRINTED NAME

NOTED BY: ( NCM ENGR.)

DATE

SIGNATURE OVER PRINTED NAME

DATE

You might also like