Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
INSTRUMENTATION
Report.
3 copies of the monthly monitoring report.

sum

GEOTECHNICAL WORKS
SLOPE STABILISATION WORKS
HORIZONTAL DRAINS
Supply and install 100mm diameter horitonzal darins
with 75mm diameter perforated pvc pipe wrapped with
non-woven geotextile as shown in the drawing.
12.00 m long

no

GEOTECHNICAL WORKS
SLOPE STABILISATION WORKS
HORIZONTAL DRAINS
Channel drain
Supply and construct concrete Grade 20/20 channel
drain from weephole of horizontal drain to berm drain
as shown in the drawing to serve as outlet for
horizontal drain

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out field calibration test
on an area of 20m x 20m

no

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns and prefabricated
Vertical Drains
Carry out dynamic replacement (DR) column of 2.5m
diameter + prefabricated vertical drain(PVD) works to
achieve Acceptance Criteria to treatment depth with
DR not exceeding 5m from working platform and PVD
installed in between to maximum depth of 15m from
the working platform level or refusal depth, which ever

m2

Overall Average (RM)


Location

Range (RM)

Average (RM)

250.00 - 250.00

250.00

Location

Range (RM)

Average (RM)

744.00 - 744.00

744.00

Location

Range (RM)

Average (RM)

30.85 - 30.85

30.85

Location

Range (RM)

Average (RM)

50000.00 - 50000.00

50000.00

Location

Range (RM)

Average (RM)

RM 250.00

RM 744.00

RM 30.85

RM 50000.00

RM 40.00

1/7

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

comes first as specified in the specification exclusive


of supply, place and level selected granular fill.
GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Excavate unsuitable material below O.G.L as shown in
drawing or as per specification as approved by S.O
and dispose to contractor's dump site approved by S.O

m3

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Surcharge
Transport, placement and compaction suitable fill
materials from stockpile as surcharge

m3

GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dewatering using Water Pumps of adequate capacity
(including the construction of earth drains) to keep
earthworks free from water from whatever causes.

sum

GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Supply and install 400mm thick single size rock as
rock toe as described in accordance to drawing

m3

GEOTECHNICAL WORKS
SLOPE STABILISATION WORKS
HORIZONTAL DRAINS
Supply and install 100mm diameter horitonzal darins
with 75mm diameter perforated pvc pipe wrapped with
non-woven geotextile as shown in the drawing.
9.00 m long

no

Overall Average (RM)


F

40.00 - 40.00

40.00

Location

Range (RM)

Average (RM)

12.00 - 12.00

12.00

Location

Range (RM)

Average (RM)

3.00 - 3.00

3.00

Location

Range (RM)

Average (RM)

70000.00 - 70000.00

70000.00

Location

Range (RM)

Average (RM)

50.00 - 50.00

50.00

Location

Range (RM)

Average (RM)

558.00 - 558.00

558.00

RM 12.00

RM 3.00

RM 70000.00

RM 50.00

RM 558.00

2/7

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Surcharge
Removal of surplus surcharge material to stockpile
including compaction

m3

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns
Supply, deliver, place and level selected granular fill
from Contractor's own source of 1000mm thick to
establish working platform, backfilling the DR column
using material taken from 1000mm, top up back
granular fill to maintain the working platform to
1000mm thick as drainage blanket and to carry out
surface roller compaction

m3

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out post treatment in-situ field test to depth not
exceeding 15m from working platform or refusal depth
whichever come first:
Pressuremeter test (PMT)

no

GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Type A non-woven geotextile as separator.

m2

GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Placement and compaction of excavated suitable
material from the road way.

m3

Overall Average (RM)


Location

Range (RM)

Average (RM)

3.00 - 3.00

3.00

Location

Range (RM)

Average (RM)

28.00 - 28.00

28.00

Location

Range (RM)

Average (RM)

4000.00 - 4000.00

4000.00

Location

Range (RM)

Average (RM)

5.47 - 5.47

5.47

Location

Range (RM)

Average (RM)

28.00 - 28.00

28.00

RM 3.00

RM 28.00

RM 4000.00

RM 5.47

RM 28.00

3/7

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns
Carry out dynamic replacement (DR) column of 2.5m
diameter works to achieve Acceptance Criteria to
required treatment depth with DR not exceeding 5m
from working platform as specified in the specification
exclusive of supply, place and level selected granular
fill.

m2

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out post treatment in-situ field test to depth not
exceeding 15m from working platform or refusal depth
whichever come first:
Cone penetration (CPT)

no

GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Engineering submission consisting of detailed shop
drawing, as-bulit drawing, method statement,
pre-engineering report and final report.

sum

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out post treatment in-situ field test to depth not
exceeding 15m from working platform or refusal depth
whichever come first:
Plate bearing test (PBT)

no

GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
INSTRUMENTATION
Surface settlement marker.
Supply and install settlement gauge.

no

Overall Average (RM)


Location

Range (RM)

Average (RM)

30.00 - 30.00

30.00

Location

Range (RM)

Average (RM)

3000.00 - 3000.00

3000.00

Location

Range (RM)

Average (RM)

50000.00 - 50000.00

50000.00

Location

Range (RM)

Average (RM)

6300.00 - 6300.00

6300.00

Location

Range (RM)

Average (RM)

2000.00 - 2000.00

2000.00

RM 30.00

RM 3000.00

RM 50000.00

RM 6300.00

RM 2000.00

4/7

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns and prefabricated
Vertical Drains
Supply, deliver, place and level selected granular fill
from Contractor's own source of 1000mm thick to
establish working platform, backfilling the DR column
using material taken from 1000mm, top up back
granular fill to maintain the working platform to
1000mm thick as drainage blanket and to carry out
surface roller compaction

m3

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns and prefabricated
Vertical Drains
Supply and deliver prefabricated vertical drain(PVD)
including all necessary fixing accessories as specific
and shown in the drawings. (PVD shall have minimum
weight filter of 130g/m2 and tensile strength of 2.1KN

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out pre-engineering in-situ field tests to depth
not exceeding 15m from working platform or refusal
depth which ever come first:
Pressuremeter test (PMT)

no

GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out pre-engineering in-situ field tests to depth
not exceeding 15m from working platform or refusal
depth which ever come first:
Cone penetration (CPT)

no

GEOTECHNICAL WORKS

no

Overall Average (RM)


Location

Range (RM)

Average (RM)

28.00 - 28.00

28.00

Location

Range (RM)

Average (RM)

0.60 - 0.60

0.60

Location

Range (RM)

Average (RM)

4000.00 - 4000.00

4000.00

Location

Range (RM)

Average (RM)

3000.00 - 3000.00

3000.00

Location

Range (RM)

Average (RM)

RM 28.00

RM 0.60

RM 4000.00

RM 3000.00

RM 100.00

5/7

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item
GEOTECHNICAL WORKS
INSTRUMENTATION
Surface settlement marker.
Supply and install surface settlement marker.

Unit

Overall Average (RM)


F

100.00 - 100.00

100.00

6/7

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Nota
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

Catatan

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my

7/7