Professional Documents
Culture Documents
Work Item
Unit
GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
INSTRUMENTATION
Report.
3 copies of the monthly monitoring report.
sum
GEOTECHNICAL WORKS
SLOPE STABILISATION WORKS
HORIZONTAL DRAINS
Supply and install 100mm diameter horitonzal darins
with 75mm diameter perforated pvc pipe wrapped with
non-woven geotextile as shown in the drawing.
12.00 m long
no
GEOTECHNICAL WORKS
SLOPE STABILISATION WORKS
HORIZONTAL DRAINS
Channel drain
Supply and construct concrete Grade 20/20 channel
drain from weephole of horizontal drain to berm drain
as shown in the drawing to serve as outlet for
horizontal drain
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out field calibration test
on an area of 20m x 20m
no
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns and prefabricated
Vertical Drains
Carry out dynamic replacement (DR) column of 2.5m
diameter + prefabricated vertical drain(PVD) works to
achieve Acceptance Criteria to treatment depth with
DR not exceeding 5m from working platform and PVD
installed in between to maximum depth of 15m from
the working platform level or refusal depth, which ever
m2
Range (RM)
Average (RM)
250.00 - 250.00
250.00
Location
Range (RM)
Average (RM)
744.00 - 744.00
744.00
Location
Range (RM)
Average (RM)
30.85 - 30.85
30.85
Location
Range (RM)
Average (RM)
50000.00 - 50000.00
50000.00
Location
Range (RM)
Average (RM)
RM 250.00
RM 744.00
RM 30.85
RM 50000.00
RM 40.00
1/7
Work Item
Unit
m3
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Surcharge
Transport, placement and compaction suitable fill
materials from stockpile as surcharge
m3
GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dewatering using Water Pumps of adequate capacity
(including the construction of earth drains) to keep
earthworks free from water from whatever causes.
sum
GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Supply and install 400mm thick single size rock as
rock toe as described in accordance to drawing
m3
GEOTECHNICAL WORKS
SLOPE STABILISATION WORKS
HORIZONTAL DRAINS
Supply and install 100mm diameter horitonzal darins
with 75mm diameter perforated pvc pipe wrapped with
non-woven geotextile as shown in the drawing.
9.00 m long
no
40.00 - 40.00
40.00
Location
Range (RM)
Average (RM)
12.00 - 12.00
12.00
Location
Range (RM)
Average (RM)
3.00 - 3.00
3.00
Location
Range (RM)
Average (RM)
70000.00 - 70000.00
70000.00
Location
Range (RM)
Average (RM)
50.00 - 50.00
50.00
Location
Range (RM)
Average (RM)
558.00 - 558.00
558.00
RM 12.00
RM 3.00
RM 70000.00
RM 50.00
RM 558.00
2/7
Work Item
Unit
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Surcharge
Removal of surplus surcharge material to stockpile
including compaction
m3
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns
Supply, deliver, place and level selected granular fill
from Contractor's own source of 1000mm thick to
establish working platform, backfilling the DR column
using material taken from 1000mm, top up back
granular fill to maintain the working platform to
1000mm thick as drainage blanket and to carry out
surface roller compaction
m3
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out post treatment in-situ field test to depth not
exceeding 15m from working platform or refusal depth
whichever come first:
Pressuremeter test (PMT)
no
GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Type A non-woven geotextile as separator.
m2
GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Placement and compaction of excavated suitable
material from the road way.
m3
Range (RM)
Average (RM)
3.00 - 3.00
3.00
Location
Range (RM)
Average (RM)
28.00 - 28.00
28.00
Location
Range (RM)
Average (RM)
4000.00 - 4000.00
4000.00
Location
Range (RM)
Average (RM)
5.47 - 5.47
5.47
Location
Range (RM)
Average (RM)
28.00 - 28.00
28.00
RM 3.00
RM 28.00
RM 4000.00
RM 5.47
RM 28.00
3/7
Work Item
Unit
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns
Carry out dynamic replacement (DR) column of 2.5m
diameter works to achieve Acceptance Criteria to
required treatment depth with DR not exceeding 5m
from working platform as specified in the specification
exclusive of supply, place and level selected granular
fill.
m2
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out post treatment in-situ field test to depth not
exceeding 15m from working platform or refusal depth
whichever come first:
Cone penetration (CPT)
no
GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Engineering submission consisting of detailed shop
drawing, as-bulit drawing, method statement,
pre-engineering report and final report.
sum
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out post treatment in-situ field test to depth not
exceeding 15m from working platform or refusal depth
whichever come first:
Plate bearing test (PBT)
no
GEOTECHNICAL WORKS
GEOTECHNICAL WORKS
INSTRUMENTATION
Surface settlement marker.
Supply and install settlement gauge.
no
Range (RM)
Average (RM)
30.00 - 30.00
30.00
Location
Range (RM)
Average (RM)
3000.00 - 3000.00
3000.00
Location
Range (RM)
Average (RM)
50000.00 - 50000.00
50000.00
Location
Range (RM)
Average (RM)
6300.00 - 6300.00
6300.00
Location
Range (RM)
Average (RM)
2000.00 - 2000.00
2000.00
RM 30.00
RM 3000.00
RM 50000.00
RM 6300.00
RM 2000.00
4/7
Work Item
Unit
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns and prefabricated
Vertical Drains
Supply, deliver, place and level selected granular fill
from Contractor's own source of 1000mm thick to
establish working platform, backfilling the DR column
using material taken from 1000mm, top up back
granular fill to maintain the working platform to
1000mm thick as drainage blanket and to carry out
surface roller compaction
m3
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Dynamic Replacement Columns and prefabricated
Vertical Drains
Supply and deliver prefabricated vertical drain(PVD)
including all necessary fixing accessories as specific
and shown in the drawings. (PVD shall have minimum
weight filter of 130g/m2 and tensile strength of 2.1KN
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out pre-engineering in-situ field tests to depth
not exceeding 15m from working platform or refusal
depth which ever come first:
Pressuremeter test (PMT)
no
GEOTECHNICAL WORKS
SOFT GROUND IMPROVEMENT
SOFT GROUND REPLACEMENT / STABILITY
Carry out pre-engineering in-situ field tests to depth
not exceeding 15m from working platform or refusal
depth which ever come first:
Cone penetration (CPT)
no
GEOTECHNICAL WORKS
no
Range (RM)
Average (RM)
28.00 - 28.00
28.00
Location
Range (RM)
Average (RM)
0.60 - 0.60
0.60
Location
Range (RM)
Average (RM)
4000.00 - 4000.00
4000.00
Location
Range (RM)
Average (RM)
3000.00 - 3000.00
3000.00
Location
Range (RM)
Average (RM)
RM 28.00
RM 0.60
RM 4000.00
RM 3000.00
RM 100.00
5/7
Work Item
GEOTECHNICAL WORKS
INSTRUMENTATION
Surface settlement marker.
Supply and install surface settlement marker.
Unit
100.00 - 100.00
100.00
6/7
Nota
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur
Catatan
7/7