METHOD STATEMENT
( INTERIM )
Dowel Bar
1.0
INTRODUCTION
1.1
2.0
SCOPE OF WORKS
2.1
2.2
3.0
DOCUMENT NO :
IDX/QAP/MS/RF
Reference :
Start
Material to be zinc
galvanisation before installing
into abutment or piers
End
METHOD STATEMENT
( INTERIM )
4.0
Dowel Bar
Method Statements
DOCUMENT NO :
IDX/QAP/MS/RF
Reference :
Surveyor will determine alignment level and intervals of the dowel bar accurately
according to site condition and construction drawing for approval by the S.O.
Setting out and control pegs of the dowel bar shall be installed on site according to
shop drawing after approval by S.O.
Where to determine fix point, the site supervisor shall hacked or drill the existing
structure in to find out if the structures is either joint or not and shall be witness by
S.O. representatives for confirmation. If the abutment is joint with the beam than the
structure will be fix joint..
The dowel bar shall be installed as specified in clause 13.2.7.6 in JKR/SPJ/1988.
The dowel bar shall be protected against corrosion by zink galvanisation coating
according to construction drawing or as and this material shall be used after
approval by S.O.
Before installed dowel bar, the existing structure shall be hacked or by any suitable
equipment to hacked a holes onto an existing structure according to construction
drawing or as directed by the S.O.
The holes shall all be thoroughly cleaned out, free from dust, mud or other debris and
deleterious matter by using appropriae tools and equipment.
Dowel bar shall fill the holes in the existing structure according to construction
drawing and an epoxy grout shall filled into it according to construction as a grip
mechanism.
5.0
MATERIALS
Dowel bar with Hot Dip Zinc galvanisation coating according to construction drawing
6.0
Refer to Bearing
Plinth's Method
of Statement
METHOD STATEMENT
( INTERIM )
7.0
Dowel Bar
8.0
Reference :
MANPOWER
Land Surveyors
Site Supervisor
General Workers
Chainman
1
1
2
1
PRODUCTIVITY TARGET
Every Fixed Point at Bridges according to Construction Drawing
9.0
10.0
11.0
11.1
DOCUMENT NO :
IDX/QAP/MS/RF
METHOD STATEMENT
( INTERIM )
Dowel Bar
The site supervisor is responsible for the adherence to Health and Safety
requirements on site
H&S Supervisor will perform reviews of the adherence to the H&S matters during the
works
11.2
Working at night
Being aware of surroundings at all times.
Wearing high visibility apparel.
Arranging good work area lighting
Setting up proper trafic controls.
Standing supervision by site supervisor
11.3
DOCUMENT NO :
IDX/QAP/MS/RF
Reference :