Professional Documents
Culture Documents
Foundation Elev.
Ground Surface Elev.
Water table Elev.
Layer
Type
N.
COMP.
=
=
=
15.00 (m)
15.00 (m)
15.00 (m)
V. stress increment =
98.10 (kNsm)
9.81 (kNcm)
Coefficient
Thick. Comp. Recomp. Swell.
(m)
15.0
0.360
N.
Sublayer
Thick. Elev.
(m)
(m)
1
2
3
4
5
6
7
8
9
10
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
14.25
12.75
11.25
9.75
8.25
6.75
5.25
3.75
2.25
0.75
0.000
Primary
Settlement
(cm)
Secondary
Settlement
(cm)
14.91
170.91
0.00
Total Settlement =
170.91
0.00
Initial
(kNsm)
3.83
11.47
19.13
26.78
34.42
42.07
49.72
57.38
65.03
72.68
0.000
Unit
Weight
(kNcm)
Soil Stresses
Increment Max.Past Press.
(kNsm)
(kNsm)
98.10
98.10
98.10
98.10
98.10
98.10
98.10
98.10
98.10
98.10
3.83
11.47
19.13
26.78
34.42
42.07
49.72
57.38
65.03
72.68
Total Settlement =
Settlement
(cm)
36.66
25.20
20.25
17.20
15.05
13.44
12.17
11.13
10.27
9.54
170.91 (cm)
Stratum thickness
Coeff. of consolidation
Number of sublayers
Drainage Conditions
Load #
Init. Pore
Pressure
(kNsm)
98.10
Load
Type
INST
=
15.00 (m)
=
1.000 (m*m/months)
=
10
= Drainage at top/bottom
Placement
Time
(months)
0.00
Ramp
Time
(months)
-----
Ultimate
Settlement
(cm)
170.91
Load 1
(kNsm)
Total
(kNsm)
0.00
1.50
3.00
4.50
6.00
7.50
9.00
10.50
12.00
13.50
15.00
0.00
69.76
94.77
97.96
98.10
98.10
98.10
97.96
94.77
69.76
0.00
0.00
69.76
94.77
97.96
98.10
98.10
98.10
97.96
94.77
69.76
0.00
0.02
15.05
25.71
15.05
25.71
T
=
U (%)
=
Settlement =
Load 1
(kNsm)
Total
(kNsm)
0.00
1.50
3.00
4.50
6.00
7.50
9.00
10.50
12.00
13.50
15.00
0.00
45.10
76.45
91.60
96.67
97.67
96.67
91.60
76.45
45.10
0.00
0.00
45.10
76.45
91.60
96.67
97.67
96.67
91.60
76.45
45.10
0.00
0.05
26.06
44.54
26.06
44.54
T
=
U (%)
=
Settlement =
Load 1
(kNsm)
Total
(kNsm)
0.00
1.50
3.00
4.50
6.00
7.50
9.00
10.50
12.00
13.50
15.00
0.00
32.85
60.13
78.84
89.01
92.14
89.01
78.84
60.13
32.85
0.00
0.00
32.85
60.13
78.84
89.01
92.14
89.01
78.84
60.13
32.85
0.00
0.11
36.85
62.98
36.85
62.98
T
=
U (%)
=
Settlement =
Load 1
(kNsm)
Total
(kNsm)
0.00
1.50
3.00
4.50
6.00
7.50
9.00
10.50
12.00
13.50
15.00
0.00
23.10
43.72
59.81
69.96
73.42
69.96
59.81
43.72
23.10
0.00
0.00
23.10
43.72
59.81
69.96
73.42
69.96
59.81
43.72
23.10
0.00
0.21
52.04
88.94
52.04
88.94
T
=
U (%)
=
Settlement =
Number of loads
Stratum Thickness
Vert. Coeff. of Consolidation
Radial Coeff. of Consolidation
Drain Diameter
Effective Diameter
Number of sublayers
Drainage Conditions
Load #
Init. Pore
Pressure
(kNsm)
98.10
Load
Type
INST
Placement
Time
(months)
0.00
=
=
=
=
=
=
=
=
1
15.00 (m)
1.00 (m*m/months)
2.00 (m*m/months)
0.25 (m)
5.00 (m)
10
Drainage at top/bottom
Ramp
Time
(months)
-----
Ultimate
Settlement
(cm)
170.91
Load 1
(kNsm)
Total
(kNsm)
0.00
1.50
3.00
4.50
6.00
7.50
9.00
10.50
12.00
13.50
15.00
0.00
51.54
70.01
72.36
72.47
72.47
72.47
72.36
70.01
51.54
0.00
0.00
51.54
70.01
72.36
72.47
72.47
72.47
72.36
70.01
51.54
0.00
37.24
63.65
63.65
U (%)
=
Settlement =
1.00
Load 1
(kNsm)
Total
(kNsm)
0.00
1.50
3.00
4.50
6.00
7.50
9.00
10.50
12.00
13.50
15.00
0.00
19.15
32.46
38.90
41.05
41.47
41.05
38.90
32.46
19.15
0.00
0.00
19.15
32.46
38.90
41.05
41.47
41.05
38.90
32.46
19.15
0.00
68.60
117.25
117.25
U (%)
=
Settlement =
3.00
Load 1
(kNsm)
Total
(kNsm)
0.00
1.50
3.00
4.50
6.00
7.50
9.00
10.50
12.00
13.50
15.00
0.00
6.08
11.13
14.59
16.47
17.05
16.47
14.59
11.13
6.08
0.00
0.00
6.08
11.13
14.59
16.47
17.05
16.47
14.59
11.13
6.08
0.00
88.32
150.94
150.94
U (%)
=
Settlement =
6.00
Load 1
(kNsm)
Total
(kNsm)
0.00
1.50
3.00
4.50
6.00
7.50
9.00
10.50
12.00
13.50
15.00
0.00
0.81
1.54
2.10
2.46
2.58
2.46
2.10
1.54
0.81
0.00
0.00
0.81
1.54
2.10
2.46
2.58
2.46
2.10
1.54
0.81
0.00
98.31
168.03
168.03
U (%)
=
Settlement =
12.00