You are on page 1of 25

OVERVIEW OF OFFSHORE

PLATFORM

Engineering
Procurement
Construction
Installation
& Commissioning
Presented by
Mr. Therasap Rattanapat

World Primary Energy Demand

Concession in Thailand
-Bongkot Field Development (PTTEP)
-Arthit Field Development (PTTEP)
-Erawan Group
-Nang Nuan
-Tantawan
-etc

Joint Development Area (JDA) Thailand / Malaysia

-Carigali - Triton Company Sdn.Bhd (CTOC)


-Carigali PTTEPI Operating Company Sdn.Bhd (CPOC)
-etc

PTT EXPLORATION AND PRODUCTION

Type of Offshore Structure

-Fixed Platform Gravity Base Platform, Jacket Type Platform


-Compliant Tower Compliant Piled Tower, Guyed Tower
-Tension Leg Platform
-Floating Platform Semi-Submersible, Extendable Draft Platform, FSO, FPSO
-Spar

Drilling Rig
Jack-Up

Tender Rig

Offshore Platform in Thailand


Fixed Platform, Jacket Type
More economical
Rich gas reserve- less
storage requirement
Expected long field life easy
expansion
Suitable for shallow water
(The water Depth In Gulf of
Thailand is 80m Approx.)

Field Development Organization

Field
Development

Legal and
Contracting

HSE

Schedule and
Planning

Project
Development

Exploration
Drilling

Conceptual
Design

Financing and
Accounting

Detailed
Design

Procurement

Operation

Fabrication

Major
Modification

Load-out,
Transportation,
Installation

Abandonment

Hook-up &
Commissioning

E : Engineering
Engineering Design
Feasibility Study
Conceptual Design
FEED ( Front End Engineering Design)
Detail Engineering
HAZOP
ENGINEERING

Process

Structure

Piping

Mechanical

Electrical

Instrument

Field Development Plan


Facilities for the first stage of the development
Central Processing Complex
CPP
QP, bridge connected to the CPP
WP, bridge connected to the CPP
FP/T, bridge connected to the CPP
Five remote Wellheads
Gas gathering pipelines connecting the remote wellhead
platform
A gas pipeline to export the gas
A condensate line to export to Silver FSO

42 GA

FSO

E
RT LIN
S EXPO

14

WP4

E
L IN

E L
INE

16

6 C
ON
DE

NS
AT

RISE
KWIN
TO EA

FP

WP3

18

E
L IN

8
1

14

18

WP1
CPP

E
L IN

LIN

LIN

LIN

WP6

QP

WP2

Field
Development

WP5

High-Pressure Flare (HP)


Low-Pressure Flare (LP)

Riser Platform
(RP)

Wellhead Platform
(WP)

Processing Platform
(PP)

Living Quarter
Platform (LP)

Design condition

Reservoirs
Characteristic of wave
Direction of wind
100 years storm
30 years design life.
80 meters water depth
No seismic.

CPP Facilities Design


Overall Processing facilities

Receiving facilities
Mercury removal facilities
Gas processing facilities
Condensate processing
facilities
Produced water treatment
and pumping facilities

CPP Facilities Design


Topsides Layout
All high pressure gas handling equipment should be located on either
the top or main deck and preferably be located at the west end of the
platform
All major rotating equipment including gas turbine driven Process
Compressors and Main Power Generation Units shall be located on the
top deck
Two cranes shall be used, one probably located on the west side of the
platform and the other crane on the opposite side (i.e east side) of the
platform
Boat landing facilities are not required on the CPP, only on the LQ and
the DWP-1. However bumper bars are required to facilitate supply boat
access for diesel fill
Use of a single-level bridge access between LQ and CPP shall be
used. The bridge will connect the main deck level of the CPP and the
LQ.

CPP Facilities Design


Structure Design

Fixed platform 8 legs


84 diameters piles
Skirt pile (if 8 legs are inadequate)
Topside - Float-over installation
Jacket -Launching and crane assisted upending
20 years of sacrificial anodes

CPP Facilities Design


Gas
Metering
Compression

Glycol

Wellhead

Pipeline

Contactor

Platform

Separator
Wellhead

Platform

Condensate
Stabilization
Wellhead

Platform

FSO
Water
Treatment

QP Facilities Design
Diamond Living Quarters Building
Designed for modular construction with maximaum capacity
of 150 personnel
A Helideck to land a Sikorsky S-61, S-76 or a Eurocopter
EC155 helicopter
Dining/mess facilities designed to accommodate 90
personnel
at one serving
A medical centre
A gymnasium and outdoor recreation facilities (at roof level
just below the Helideck).
A TV/cinema/training room provided to accommodate 80
personnel

QP Facilities Design
TopsideLayout
Three deck levels are envisaged which include a Main
deck, a Mezzanine deck, and a Lower deck.
The LQB shall be installed on the Main deck.
The Central Control Room building will be installed on a
cantilever on the QP.
All other facilities shall be located either on the Mezzanine
deck, Lower deck or in spaces available on the Main Deck.
A single level bridge shall be used to connect the CPP to
the LQ.

QP Facilities Design
Structure Design
Fixed platform 4 legs
Through-leg piles and grouted
annuli
Side-lifting and crane
assisted upending
20 years of sacrificial anodes

FP/T Design
A flare tower, bridge connected to the CPP shall be
provided. The tower will support the flare tips of the HP, LP
and Acid Gas flare systems.
Preliminary flare and dispersion studies have initially set
the bridge length to be 120 m and tower height to be 25 m
above the flare platform deck.
Structure Design
A 3 legged tripod structure
Ungrouted leg piles
15 years of sacrificial anodes

WP Design

The function of the wellhead is to


maintain surface control of the well.
All actuated wellhead valves will be
hydraulically operated.
Wells will be drilled by tender rig.
All of Christmas trees that be used
in the project are dry type.
Structure Design
4 legs with though leg piles
Sided lifting and crane
assisted upending
20 years of sacrificial anodes

3D Design

Approx Tonnage of Platform


Facilities
CPP
Jacket
Topside

Approx. weight
(Tons / Each)
6000
15000

QP
Jacket
Topside

800
1500

FP/T
Jacket
Topside

500
500

Bridge (2 bridges)

100

Wellhead ( 6 WH)
Jacket
Topside

1000
1200