You are on page 1of 41

Pearl GTL

Project

LINDE ENGINEERING

Shell Project No: HP-3000-QAT


Project Document Number: T- 4.250.921

Contractor Project No :
Project Rev.: A

Purchase Order Number:

2MH127

Tag/Item Number(s):

1A-2121, 1A-2221, 1A-2321, 1A-2421


2A-2121, 2A-2221, 2A-2321, 2A-2421

Unit(s):

1-2100, 1-2200, 1-2300, 1-2400


2-2100, 2-2200, 2-2300, 2-2400

PCWBS:

FA02, FB02, FC02, FD02


GA02, GB02, GC02, GD02

Page 2 of 18

5887

QATAR SHELL GTL PROJECT (PEARL)


C2 AIR SEPARATION UNITS CONSTRUCTION

20.01.09

Company Comments Incorporated

SK

EO

AG

CCI

17.01.09

Ready for Construction

SK

EO

AG

RFC

15.03.08

Issued for Company Comments

BR

AU/MC

ZG

ICC

03.02.08

Issued for Review

BR

AU/MC

ZG

IFR

31.01.08

Issued for Internal Review

BR

AU/MC

ZG

IIR

Date

Description

GAMA
Rev.
No.

Project
Rev
No.

Prepared Checked Approved


By
By
By
ORIGINATOR

Status

Document Title:

LINDE ENGINEERING AG

INSPECTION TEST PLAN FOR AIR COOLED STEAM


CONDENSER
Document No.

Contractor

Gama Qatar Co. W. L. L.

LOC470
GAM

MTS

QAC

GTL

034

Org.
Code

Doc.
Type

Disc.
Code

Geogr.
Area

Seq.
No

Rev.
No

Project Document Number: T-4.250.921

Vendor Code

Rev No: A

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Activity

Test
Frequency

1.0

GENERAL

1.1

Contractor drawings, project


specifications, manuals, codes

100%

1.2

Lifting studies (For Heavy


Equipments)

100%

1.3

Paint /Galvanize touch up

100%

1.4

Procedures

100%

T.4.186.019;T.4.121.350

2.0

EQUIPMENT

2.1

Equipment identification and


name plate verification and
visual inspections

100%

T.4184.662;
T-4.250.944

2.2

Receiving inspection

100%

Item

2.3

Storage, preservation and


documentation (FSI)

2.4

Periodic Preventive
maintenance

2.5

Inspection measuring and test


equipment calibration

3.0

STRUCTURAL STEEL

T-4.250.921 REV-A

100%

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

TECHINICAL
OFFICE

HSSE

T.4.234.084

QCI

GAM-QCR-QAC-GTL-056
(T.4.318.598)

QCI

Verify the documents

Approved drawing
DEP 31.10.03.10, DEP
31.29.00.10,T.4.121.350

STORE
INCHARGE

GAM-QCR-QAC-GTL-080
(T.4.318.599)

FSI

GAM-QCR-QAC-GTL-069
(T.4.318.599)

QCI

Calibration certificate

Refer Painting ITP T.4.250.919/T.4.096.672

Shifted to Item no: 2.1

T.4.186.019;T-4.250.932,
T-4.250.944;T.13.377.360E

Approved drawing,
DEP 70.10.70.11,
T.4.121.350,Vendor
instruction
Deleted

100%

T-4.250.915,

Valid Certificate

Page 4 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

3.1

Activity

Test
Frequency

Reference Document

3.1.1

3.1.2

Verifying Documents

QCI

GAM-QCR-QAC-GTL-113
(T.4.318.599)

W
/
R

Approved drawing DEP


34.19.20.31, T.4.121.350

QCI

GAM-QCR-QAC-GTL-120
(T.4.318.600)

W/R

W
/
R

Approved drawing DEP


34.19.20.31

Accepted (Including chipping,


anchor bolt control and pocket
cleaning)

100%

T-4.250.944;T.4.186.019

DEP 34.28.00.31;

T.13.376.359E;T.4.121.350

Foundation chipping to sound

Ref. Item Code 3.1.0

metal

Anchor bolts control & pocket

Ref. Item Code 3.1.0

cleaning

3.1.4

Temporary earthing

100%

3.1.5

Preassembly/installation
Fixation and reinstallation of
bracings

100%

T-4.250.944: T-4.250.907
T.4.186.019

Vendor specification DEP


34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

3.1.6

Paint Temporary bolts blue

All

T-4.250.944: T.4.186.019

Approved drawing DEP


34.28.00.31;T.13.376.351G,
T.4.121.350Vendor
specification

QCI

3.1.7

Main Structure
Foundations complete and

3.1.0

Responsible
Party

Acceptance Criteria

Leveling, orientation,
Alignment/Elevation

T-4.234.075 Rev. A

100%

T-4.250.944

T-4.250.907;T.13.377.360;
T.4.193.320

Page 5 of 18

GAM-QCR-QAC-GTL-037;
GAM-QCR-QAC-GTL-040
(T.4.318.598)
Visual Check
GAM-QCR-QAC-GTL-038
GAM-QCR-QAC-GTL-039
(T.4.318.598)

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

3.1.8

Activity

Final bolting up/torqueing

3.1.9

Remove Temporary bolts blue

3.1.3

Grouting

3.2
3.2.1

Test
Frequency

100%

Reference Document

Acceptance Criteria

T-4.250.944: T.13.377.360
T.4.186.019;T.4.193.320

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

Responsible
Party

Verifying Documents

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

All temporary bolts removed


after completion of erection

No blue bolts

QCI

Visual Check

100%

T-4.250.944, T-4.234.545

DEP 34.19.20.31
T.13.376.358; T.4.121.350

QCI

GAM-QCR-QAC-GTL-025
(T.4.318.598)

T-4.250.944

DEP 31.29.00.10
T.4.121.350

QCI

GAM-QCR-QAC-GTL-121
(T.4.318.600)

Approved drawing DEP


31.29.00.10 T.4.121.350,
T.4.245.161(SPX)
T.4.233.731(SPX)

QCI

GAM-QCR-QAC-GTL-119
(T.4.318.600)

W/R

QCI

GAM-QCR-QAC-GTL-119
(T.4.318.600)

W/R

DEP 31.29.00.10
T.4.121.350; T.13.376.351G

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

Approved Drawing ;DEP


34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-040
(T.4.318.598)

W
/
R

Upper Structure/Fans Deck/Fan Screens


Installation/Location Cut outs
fixation

100%

Fan Tip Clearance

100%

T-4.250.944;T.13.377.360E

3.2.3

Vane Angle

100%

T.4.250.944

Approved Drawing DEP


31.29.00.10,T.4.121.350;
Vendor Instruction Manual

3.9
3.9.1

All

3.2.2

3.2.4

Final Bolting Up/Torqueing

100%

T-4.250.944;T.13.377.360
T.4.186.019

Stairs & Ladders/Walkways and Platforms/Hand Rails


Foundations

T-4.234.075 Rev. A

100%

T-4.250.944: T-4.250.907

Page 6 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

3.9.2

Installation/elevation fixation

100%

T-4.250.944: T-4.250.907
T.4.186.019

Approved Drawing ;DEP


34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

3.9.3

Final Bolting-up/ Torquening

100%

T.4.250.897;T.13.377.360
T.4.186.019

DEP 31.29.00.10
T.4.121.350; T.13.376.351G

QCI

GAM-QCR-QAC-GTL-040
(T.4.318.598)

S/R

S/R

100%

T-4.250.944: T-4.250.907

QCI

Confirm to drawing No
openings toe plate to
Grating

100%

T-4.250.944: T-4.250.907

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

100%

T-4.250.944: T-4.250.907

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

T-4.250.944;T.13.377.360
T.4.186.019

DEP 31.29.00.10
T.4.121.350

QCI

GAM-QCR-QAC-GTL-038
GAM-QCR-QAC-GTL-039
(T.4.318.598)

W/
R

W/R

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

3.9.4
3.8
3.8.1

3.8.2

Grating & clips toe plate


hand railings

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

Fan Bells
Preassembly segments
Fixation
Installation Air Inlet bells
fixation

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350
DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

3.8.3

Alignment

100%

3.8.4

Final Bolting up / Torqueing

100%

T-4.250.944;T.13.377.360
T.4.186.019

DEP 31.29.00.10
T.4.121.350; T.13.376.351G

100%

T-4.250.907; T.4.186.019

Approved Drawing;DEP
34.28.00.31;

3.3

3.3.1

Motor Bridge support structure

Top under structure

T.13.376.351G, T.4.121.350

T-4.234.075 Rev. A

Page 7 of 18

W/R

W/R

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Test
Frequency

Reference Document

Acceptance Criteria

preassembly/Installation
fixation

100%

T-4.250.907

Approved Drawing DEP


34.28.00.31;

Alignment/elevation

100%

Item

3.3.2

3.3.3

3.3.4

3.3.5
4.3
4.3.1

Activity

Responsible
Party

Verifying Documents

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

Approved Drawing ;DEP


31.29.00.10 T.4.121.350

QCI

GAM-QCR-QAC-GTL-038
GAM-QCR-QAC-GTL-039
(T.4.318.598)

W/R

W/R

DEP 31.29.00.10
T.4.121.350; T.13.376.351G

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

QCI

Confirm to drawing No
openings toe plate to
Grating

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-115
(T.4.318.600)

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

Check oil Type/level

W/R

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-121
(T.4.318.600)

W/R

W
/
R

T.13.376.351G, T.4.121.350

Final Bolting up
/Torqueing
Grating & Clips toe plate
hand railings

T-4.250.944;T.13.377.360
T.4.186.019

100%

T-4.250.944;T.13.377.360
T.4.186.019

100%

T-4.250.907

100%

T.4.250.944,T.4.250.945
T.4.186.019

100%

T.4.250.944,T.4.250.945
T.4.186.019

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

Gear Boxes/Motors/Fans
Preassembly motor-gear box
coupling Motor-gear box

4.3.2

Installation
fixation

4.3.3

First oil fill gearbox

100%

T.4.250.944,T.4.250.945
T.4.186.019

4.4.4

Installation hub plate/retaining


plate fixation

100%

T.4.250.944,T.4.250.945
T.4.186.019

T-4.234.075 Rev. A

Motor-gear

box

Approved Drawing;
T.4.121.350;Vendor
Specifications

Page 8 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

4.4.5

Installation of fan blades blade


angle fixation

100%

T.4.250.944,T.4.250.945
T.4.186.019

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-121
(T.4.318.600)

W/R

W
/
R

4.4.6

Tip clearance

100%

T.4.250.944,T.4.250.945
T.4.186.019

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-121
(T.4.318.600)

W/R

W
/
R

T.13.377.360 T.4.186.019

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

W/R

W/R

100%

T-4.250.944: T-4.250.907
T.4.186.019

Approved Drawing;DEP
34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

W/R

W/R

W
/
R

100%

T-4.250.944: T-4.250.907

Approved Drawing;DEP
34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

100%

T-4.250.944;T.13.377.360
T.4.186.019

Approved Drawing ;DEP


31.29.00.10 T.4.121.350

QCI

GAM-QCR-QAC-GTL-038
GAM-QCR-QAC-GTL-039
(T.4.318.598)

W/R

W
/
R

100%

T.13.377.360;T-4.250.907
T.4.186.019

DEP 31.29.00.10
T.4.121.350; T.13.376.351G

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

100%

T-4.250.944: T-4.250.907

QCI

Confirm to Drawing, Check


correct opening (direction)

Final Bolting up/torqueing gear


box, retaining plate fixation
4.4.7

Hub plate fixation fan blade

T.4.250.944,T.4.250.945,
100%

Fixation
3.4
3.4.1

3.4.2

3.4.3

3.4.4

3.4.5

" A Frames/Sliding & fixed supports


Top under structure
Preassembly /Installation
fixation
Alignment/elevation( A frames
and sliding & fixed supports)
Final Bolting Up
/Torqueing
Doors(Removable parts for
Hoist device)

T-4.234.075 Rev. A

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

Page 9 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

3.4.6
3.4.7
3.5

3.5.1

Activity

Sheeting install/Location cut


outs fixation
Remove temporary bolts

Test
Frequency

Reference Document

100%

T-4.250.944: T-4.250.907

100%

All temporary bolts removed


after completion of erection.

Acceptance Criteria

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

Responsible
Party

Verifying Documents

QCI

Confirm to drawing, Check


cable/Pipe protrusionCheck Fixation type/length

3.5.3

3.5.4

3.5.5

3.5.6
3.6
3.6.1

No blue bolts

QCI

Visual Check

Approved Drawing; DEP


34.28.00.31;

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

Approved Drawing ;DEP


31.29.00.10 T.4.121.350

QCI

GAM-QCR-QAC-GTL-038
GAM-QCR-QAC-GTL-039
(T.4.318.598)

W/R

W
/
R

DEP 31.29.00.10
T.4.121.350; T.13.376.351G

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

QCI

Confirm to Drawing, Check


correct opening (direction)

S/R

S/R

QCI

Confirm to drawing, Check


cable/Pipe protrusionCheck Fixation type/length

QCI

Confirm to Drawing /Check


Visual Installation

Wind wall structure & Sheeting

Top under Structure

100%

T-4.250.944: T-4.250.907

T.13.376.351G, T.4.121.350
3.5.2

Pre assembly/installation
fixation

Alignment/elevation
Final Bolting up
/Torqueing
Doors
Sheeting install/Location cutouts fixation

100%

T-4.250.944: T-4.250.907

100%

T-4.250.944;T.13.377.360
T.4.186.019

Approved Drawing ;DEP


34.28.00.31;
T.13.376.351G, T.4.121.350

100%

T-4.250.944;T.13.377.360
T.4.186.019

100%

T-4.250.944: T-4.250.907

100%

T-4.250.944: T-4.250.907

100%

T-4.250.944: T-4.250.907

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350
DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

Air Seal Plates


Installation/Location cut-outs
fixation

T-4.234.075 Rev. A

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

Page 10 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

3.7
3.7.1

3.7.2

Activity

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

100%

T-4.250.944: T-4.250.907

Approved Drawing ;DEP


34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

100%

T-4.250.944;T.13.377.360

DEP 31.29.00.10
T.4.121.350; T.13.376.351G

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

QCI

LOAD TEST REPORTS


(TPI)

H/R

H/R

Hoisting beam
Installation fixation
Final Bolting up
/Torqueing

3.7.3

Load Test

100%

T-4.250.944: T-4.250.907;
T.13.377.360 T.4.186.019

3.7.4

Mark Hoisting Beam

100%

T-4.250.944: T-4.250.907

Approved Drawing ;DEP


34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

Mark Certified SWL on


beam

5.3

DEP 34.28.00.31;
T.13.376.351G, T.4.121.350

Steam Distribution Manifold (CCM)

5.3.1

Top "A" Frames/supports

100%

T.4.250.944,T.4.250.945

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

S/R

S/R

5.3.2

Installation
Condensate
collecting Manifold (CCM)

100%

T.4.250.944,T.4.250.945

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-115
(T.4.318.600)

100%

T.4.250.944,T.4.250.945
T.13.377.360

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-115
(T.4.318.600)

S/R

100%

T.4.250.944,T.4.250.945

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

Check Position/Assembly

100%

T.4.250.897;T.13.377.360

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

5.3.3

Alignment/elevation(Manifoldsconnection risers + Tack


welding)

5.3.4

Fixed/Sliding saddle
Final Bolting up-

5.3.5
4.0

Torqueing(Fixed/Sliding
Support)
Air Cooled Condenser Equipment

T-4.234.075 Rev. A

Page 11 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

4.1

Activity

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

T-4.250.944: T-4.250.907

Approved Drawing DEP


34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-124
(T.4.318.600)

W/R

W/R

T-4.250.944:

DEP 34.28.00.31;

T-4.250.907;T.13.377.360

T.13.376.351G, T.4.121.350

QCI

GAM-QCR-QAC-GTL-124
(T.4.318.600)

W/R

W
/
R

Secondary Bundles

4.1.1

Installation

100%

4.1.2

Alignment/Elevation

100%

4.1.3

welding

100%

T.4.250.944; T.4.121.350

T.13.377.441;DEP
31.38.01.31;T.13.376.796E;

QCI

GAM-QCR-QAC-GTL-161
(T.4.318.600)

4.1.4

Jacking Screws

100%

T.4.250.944; T.4.250.945

T.13.376.351G, T.4.121.350

QCI

GAM-QCR-QAC-GTL-124
(T.4.318.600)

4.1.1

Primary Bundles

4.1.1.1

Installation

100%

T-4.250.944: T-4.250.907

Approved Drawing DEP


34.28.00.31;T.13.376.351G,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-124
(T.4.318.600)

W/R

W/R

4.1.1.2

Alignment/Elevation

100%

T-4.250.944:

DEP 34.28.00.31;

T-4.250.907;T.13.377.360

T.13.376.351G, T.4.121.350

QCI

GAM-QCR-QAC-GTL-124
(T.4.318.600)

W/R

W
/
R

4.1.1.3

welding

100%

T.4.250.944; T.4.121.350

T.13.377.441;DEP
31.38.01.31;T.13.376.796E;

QCI

GAM-QCR-QAC-GTL-161
(T.4.318.600)

4.1.1.4

Jacking Screws

100%

T.4.250.944; T.4.250.945

T.13.376.351G, T.4.121.350

QCI

GAM-QCR-QAC-GTL-124
(T.4.318.600)

100%

T.4.250.944; T.4.250.945

Approved Drawing ,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

W/R

W
/
R

4.2

Condensate Tanks

4.2.1

Supporting Structure

T-4.234.075 Rev. A

Page 12 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

4.2.2

4.2.3

Activity

Installation/tank expansion
fixation
Check condition of flange
faces, Gaskets and fixings

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

100%

T.4.250.944; T.4.250.945

Approved Drawing ,
T.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

100%

T.4.250.944; T.4.250.945
T.4.186.019

Approved Drawing ,
T.4.121.350 DEP
31.38.01.31;T.13.376.796E

QCI

GAM-QCR-QAC-GTL-142
(T.4.318.600)

T.4.250.944;
T.4.250.945;T.13.377.360
T.4.186.019

DEP 70.10.70.11,
T.4.121.350;Vendor
Instructions Manual

FSI

GAM-QCR-QAC-GTL-070
(T.4.318.599)

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

QCI

VISUAL

FSI

GAM-QCR-QAC-GTL-070
(T.4.318.599)

QCI

VISUAL

QCI

GAM-QCR-QAC-GTL-094
(T.4.318.599)

4.2.4

Cleanliness (FSI)

100%

4.2.5

Final bolting-up/torqueing

100%

4.2.6

closure of Manholes

100%

5.5

T.4.250.897,T.4.250.944;

DEP34.28.00.31,

T.13.377.360

T.13.376.351G,T.4.121.350

T.4.250.944; T.4.250.945
T.4.186.019

T.13.376.351G, T.4.121.350

Main steam duct and Risers (Steam Distribution Manifold)


T.4.121.350,

5.5.1

Cleanliness(FSI)

100%

T.4.250.930 T.13.377.360

5.5.2

Closure of Man Holes

100%

T.4.250.944,T.4.250.945

5.5.3

Check of Duct fixed & Sliding


supports, Expansion

100%

T.4.250.944,T.4.250.945

4.4

DEP 70.10.80.11;Vendor
Specifications
Vendor Specifications;
Approved
Drawings;T.4.121.350
DEP 31.38.01.31
T.13.376.796E

pumps

T-4.234.075 Rev. A

Page 13 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

Reference Document

T.4.250.944,T.4.250.945,
T.4.186.019
4.4.1

Foundations/Grout

100%

T.4.250.944,T.4.250.945,
T.4.186.019
4.4.2

4.4.3

4.4.4

4.4.5

Installation fixation

Alignment/elevation
(Pump-Motor)

Check Condition of flange


faces, Gaskets and fixings

Internal cleanliness(FSI)

100%

T.4.250.944,T.4.250.945,
T.13.377.360 T.4.186.019
100%

100%

T.4.250.944,T.4.250.945,
T.4.186.019

100%

T.4.250.944,T.4.250.945,
T.13.377.360 T.4.186.019

Acceptance Criteria

Responsible
Party

Verifying Documents

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-120
(T.4.318.600)

S/R

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-120
(T.4.318.600)

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-115
(T.4.318.600)

S/R

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-142
(T.4.318.600)

FSI

GAM-QCR-QAC-GTL-070
(T.4.318.599)

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

W/R

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

Check oil Type/level

W/R

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

DEP 70.10.80.11
4.4.6

4.4.7
4.5

Final Bolting up
/torqueing

First oil fill pump

T.4.250.944,T.4.250.945,
100%

T.13.377.360 T.4.186.019

100%

T.4.250.944,T.4.250.945,
T.4.186.019

Vacuum Equipments

T-4.234.075 Rev. A

Page 14 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

4.5.1

Foundations

100%

4.5.2

Installation fixation

100%

4.5.3

Final Bolting up
/torqueing

100%

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

T.4.250.944,T.4.250.945,

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

S/R

S/R

T.4.250.944,T.4.250.945,

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

W/
R

W/R

T.4.250.944,T.4.250.945,

Approved drawings; DEP


31.29.00.10,Vendor
SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

W/
R

W/R

T.13.377.360

5.0

Air cooled Condenser Ducting

5.1

Turbine exhaust steam duct/Risers & expansion Bellows

5.1.1
5.2

Foundations
(turbine exhaust steam duct)

100%

T.4.250.944,T.4.250.945

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-113
(T.4.318.599)

100%

T.4.250.944,T.4.250.945

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-115
(T.4.318.600)

100%

T.4.250.944,T.4.250.945

Approved drawings;, Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-115
(T.4.318.600)

100%

T.4.250.944,T.4.250.945
T.13.377.360

Approved drawings;, Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-115
(T.4.318.600)

S
/
R

100%

T.4.250.945;T.13.377.360

Approved drawings;, Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

Main steam Duct


Preassembly Positioning

5.2.1

(Horizontal part exhaust duct)


(Vertical riser + V-piece)

5.2.2

5.2.3
5.2.4
5.4

Installation/Positioning
(Expansion bellow-Hinge)
Alignment to
turbine/elevation
Bolting up /torqueing
Risers

T-4.234.075 Rev. A

Page 15 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

5.4.1

Pre assembly(risers-expansion
bellows)

100%

T.4.250.944

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

5.4.2

Installation (Risers)

100%

T.4.250.944

Approved drawings; Vendor


SpecificationsT.4.121.350

QCI

GAM-QCR-QAC-GTL-037
(T.4.318.598)

5.4.3

welding

100%

T.4.250.938

QCI

PQR,WPS,WELDER ID

S/R

S/R

QCI

GAM-QCR-QAC-GTL-161
(T.4.318.600)

S/R

S/R

QCI

NDT REPORTS

QCI

GAM-QCR-QAC-GTL-091
(T.4.318.599)

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

QCI

GAM-QCR-QAC-GTL-142
(T.4.318.600)

ASME B 31.3;DEP
31.38.01.11

T.13.377.441;T.13.376.796E
5.4.4

Visual Examination of Welds

100%

T.4.250.931

ASME B 31.3;DEP
31.38.01.11
T.13.377.441;T.13.376.796E

5.4.5

NDT

100%

NDT PROCEDURE
T.13.377.360

5.4.6

Safety Valves (If any)

100%

T.4.250.918 T.13.377.360

5.4.7

Final Bolting up /torqueing

100%

T.4.250.897

6.0

Interconnecting Piping/Valves

6.1

Inter connecting Piping

6.1.1

Installation Pipe supports

6.1.2

Check condition of flange


faces, Gaskets and fixings

T-4.234.075 Rev. A

DEP 31.38.01.31;ASME B
31.3,T.13.376.796E
DEP 31.38.01.31
T.13.376.796E
Approved drawings;DEP
31.29.00.10,Vendor
SpecificationsT.4.121.350

Refer ITP 033

100%

T.4.250.944; T.4.250.945

T.13.376.351G, T.4.121.350

Page 16 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

6.1.3

Activity

Final Bolting up
Torqueing

Test
Frequency

Reference Document

100%

T.4.250.897 T.13.377.360

Alignment/elevation/Draining

Acceptance Criteria

Vendor Specifications;
T.4.121.350
DEP 31.38.01.31

6.1.4

(Inter connecting piping)+Tack


welding

100%

T.4.250.944,T.4.250.945
T.13.377.360

T.13.376.796E;T.4.121.350

6.1.5

Welding

100%

T.4.250.938

ASME B 31.3;DEP
31.38.01.31

Responsible
Party

Verifying Documents

QCI

GAM-QCR-QAC-GTL-041
(T.4.318.598)

S/R

S/R

QCI

GAM-QCR-QAC-GTL-115
(T.4.318.600)

S/R

S/R

QCI

PQR,WPS,WELDER ID

S/R

S/R

T.13.377.441;T.13.376.796E

6.1.6

Visual Examination of Welds

100%

T.4.250.931

ASME B 31.3; DEP


31.38.01.31;T.13.377.441;T.
13.376.796E

QCI

GAM-QCR-QAC-GTL-161
(T.4.318.600)

S/R

S/R

6.1.7

NDT

100%

NDT PROCEDURE
T.13.377.360

DEP 31.38.01.31;ASME B
31.3,T.13.376.796E

QCI

NDT REPORTS

6.1.8

Pressure Testing

100%

T.4.250.908 T.13.377.360

Approved Drawings; DEP


31.40.40.38,T.4.121.350

QCI

GAM-QCR-QAC-GTL-065
(T.4.318.599)

6.2

Valves/Strainers

QCI

GAM-QCR-QAC-GTL-091
(T.4.318.599)

QCI

GAM-QCR-QAC-GTL-091
(T.4.318.599)

DEP 31.38.01.31,
6.2.1

Valve internals in Place

100%

T.4.250.918

6.2.3

Installation of Valves

100%

T.4.250.918

T.13.376.815E;Approved
Drawings
DEP 31.38.01.31,

T-4.234.075 Rev. A

T.13.376.815E;Approved
Drawings

Page 17 of 18

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-034

ITP FOR INSTALLATION OF AIR COOLED


STEAM CONDENSER
S. GAMA QATAR

X. CONTRACTOR QC

DATE: DATE: 20.01.2009

C. COMPANY

REV. E

A. VENDOR-(SPX)

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

6.2.3

Set Point operation of Relief


Valves

100%

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

FSI

GAM-QCR-QAC-GTL-070
(T.4.318.599)

Deleted

7.0

AIR COOLED STEAM CONDENSER

7.1

Internal check of ACC Steam


ducts, piping Cleanliness (FSI)

100%

T.4.250.930 T.13.377.360

7.5

Equipment Box up

100%

T-4.250.944

QCI

GAM-QCR-QAC-GTL-133
(T.4.318.600)

7.4

MC Inspection

100%

T-4.250.944

QCI

MC Inspection Reports

7.8

Handover
Documents

100%

Quality Documents

T.13.377.555G

QCI

QC Inspection Reports

T-4.234.075 Rev. A

of

Quality

DEP 70.10.80.11,
T.4.121.350

Page 18 of 18

You might also like