You are on page 1of 9

DESIGN CALCULATION

SHEET
Subject

Date

1 of 9
Checked by

Approved by

Computed by

Wall Number:
Wall Location :

Project No.
Sheet No.

From Sta. :
To Sta. :

SOIL PARAMETERS

(DL+EP+LL)
(DL+EP+EQ)

Kh =

0.095
30
0.60

Zone B
(Degrees)

s
Ka =
Kp =
Kae =
Kpe =
%p=
Qall =

1.90
0.350
3.000
0.452
2.831
100.00

(T/m3)

35.00

(T/m2)

Qall =
=

52.50
10

(T/m2)
(Degrees)

(percent)

(Percentage of Passive pressure to be mobilized)

REINFORCED CONCRETE PARAMETERS


c

2.5

(T/m3)

f'c =

250

(Kg/cm2)

(DL+EP+LL)

fs =

1800

(Kg/cm2)

(DL+EP+EQ)

2399.4

(Kg/cm2)

(DL+EP+LL)

fs =
vcall =

3.983

(Kg/cm2)

(DL+EP+EQ)

vcall =

5.310

(Kg/cm2)

fy =

4000

(Kg/cm2)

RETAINING WALL DIMENSIONS(SLOPE IN WALL TOWARDS FILL)


A=
B=
Twt =
Twb =
Tf =
D=
H=
Hf =
Cover =
Tsk =
Hsk =

1.00
4.75
0.25
1.05
1.50
5.55
8.00
0.60
0.05
0.50
0.30

(m)
(m)
(m)
(m)
(m)
(m)
(m)
(m)
(m)
(m)
(m)

Twt

D=B+Twb-Twt

Hf
Tf
Hsk
Tsk
B

B
B

Twb

DESIGN CALCULATION
SHEET
Subject

Project No.
-

Date

Sheet No.
2 of 9

Computed by
-

Checked by
-

Approved by
-

STABILIZING and ACTING FORCES


Pav =

6.33

(T/m)

LL =
Ww1 =
Ww2 =
Wb =
WS1 =
WS2 =
WS3 =
WS4 =

0.50
5.00
8.00
25.50
73.47
3.78
6.08
0.11
1.14
8.19
35.90
46.47
10.57
13.57
12.80
1.80
0.32

(T/m2)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)
(T/m)

Wf =
Paev =
Pah =

(DL+EP+LL)
(DL+EP+EQ)

Paeh =
paeh=
Pp =
Ppe =
Pllh =
Pllv =

MINIMUM and MAXIMUM REINFORCEMENT RATIOS


fr =

yt =
Ig =
Mcr =
Mcr/fbd2=
min =

b =
max =

31.45
(Kg/cm2)
Wall Stem Wall Stem
at Bottom
at Top
0.53
0.33

Wall Heel & Wall Shear


Toe
Key
0.75
0.25
(m)

0.096
57.78

0.023
22.14

0.281
117.93

0.010
13.10

(m4)
(T-m/m)

6.42
0.00196
0.85
0.0273
0.0205

6.83
0.00209

6.23
0.00190

7.19
0.00220

(Kg/cm2)

Project No.
-

DESIGN CALCULATION
SHEET
Subject

Sheet No.

Computed by

3 of 9
Checked by
-

Approved by
-

I. STABILITY CHECK (DL+EP+LL)


A. Sliding Check
Fa =
Fr =

37.71
91.40

F.S =

2.42

(T/m)
(T/m)
> = 1.5 verified

B. Overturning Check
Mo =
Mr =

134.86
506.11

F.S =

3.75

(T.m/m)
(T.m/m)
> = 2.0 verified

C. Bearing Check
Wt =
L=
Xr =
e=
qmax =

129.73
6.80
2.86
0.54

(T/m)
(m)
(m)
(m)

28.14

< = Qall verified

(T/m2)

qmin =

10.02

< = Qall verified

(T/m2)

=> resultant load inside middle third (verified)

II. STABILITY CHECK (DL+EP+EQ)


A. Sliding Check
Fa =
Fr =

58.06
91.56

F.S =

1.58

(T/m)
(T/m)
> = 1.125 verified

B. Overturning Check
Mo =
Mr =

245.93
516.62

F.S =

2.10

(T.m/m)
(T.m/m)
> = 1.5 verified

C. Bearing Check
Wt =
L=
Xr =
e=
qmax =

131.27
6.80
2.06
1.34

(T/m)
(m)
(m)
(m)

42.10

< = Qall verified

(T/m2)

qmin =

-3.49

< = Qall verified

(T/m2)

Date

=> warning: resultant load outside middle third

Project No.
DESIGN CALCULATION
SHEET
Subject

Sheet No.

Computed by

4 of 9
Checked by
-

Approved by
-

SERVICE LOAD DESIGN


III. DESIGN OF RETAINING WALL (DL+EP+LL)
A. Wall Stem
Pah =
Pllh =
Vw =

20.93
1.38
22.30

(T/m)
(T/m)
(T/m)

vc =
Mw =

2.23
61.32

(Kg/cm2)
(T.m/m)

Asw1 =
Asw2(min) =
Asw3 =
Asw4(min) =

45.35
19.60
11.34
9.45

(cm2/m)

qmax =

28.14

(T/m2)

qmin =

10.02

(T/m2)

qh =
Vh =

22.68
24.07

(T/m2)
(T/m)

vc =
Mh =

1.660
99.75
43.93
27.57
13.50
13.50

(Kg/cm2)
(T.m/m)
(cm2/m)

qmax =

28.14

(T/m2)

qmin =

10.02

(T/m2)

qt =
Vt =

25.47
21.92

(T/m2)
(T/m)

vc =
Mt =

1.511
11.18

(Kg/cm2)
(T.m/m)

Ast1 =
Ast2(min) =
Ast3 =
Ast4(min) =

4.92
13.50
13.50
13.50

(cm2/m)

vc<=vc(all) verified

(Longitudinal Reinforcement in Direction of Flexure, cm2/m)


(Longitudinal Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

B. Wall Heel

Ash1 =
Ash2(min) =
Ash3 =
Ash4(min) =

vc<=vc(all) verified

( Reinforcement in Direction of Flexure, cm2/m)


( Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

C. Wall Toe

vc<=vc(all) verified

( Reinforcement in Direction of Flexure, cm2/m)


( Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

D. Wall Shear Key


Msk =

0.59

(T.m/m)

Assk1 =
Assk2(min) =
Assk3 =
Assk4(min) =

0.84
4.50
4.50
4.50

(cm2/m)

Date

(Longitudinal Reinforcement in Direction of Flexure, cm2/m)


(Longitudinal Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

Project No.
DESIGN CALCULATION
SHEET
Subject

Sheet No.

Computed by

5 of 9
Checked by
-

Approved by
-

SERVICE LOAD DESIGN


IV. DESIGN OF RETAINING WALL (DL+EP+EQ)
A. Wall Stem
Pah =

20.93
27.09
6.16
36.25

(T/m)
(T/m)
(T/m)
(T/m)

vc =
Mw =

3.62
123.89

(Kg/cm2)
(T.m/m)

Asw1 =
Asw2(min) =
Asw3 =
Asw4(min) =

66.92
19.60
16.73
9.45

(cm2/m)

Paeh =
paeh=
Vw =

vc<=vc(all) verified

(Longitudinal Reinforcement in Direction of Flexure, cm2/m)


(Longitudinal Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

B. Wall Heel
qmax =

42.10

(T/m2)

qmin =

-3.49

(T/m2)

qh =
Vh =

28.35
44.20

(T/m2)
(T/m)

vc =
Mh =

3.048
187.29

(Kg/cm2)
(T.m/m)

Ash1 =
Ash2(min) =
Ash3 =
Ash4(min) =

61.87
27.57
15.47
13.50

(cm2/m)

qmax =

42.10

(T/m2)

qmin =

-3.49

(T/m2)

qt =
Vt =

35.39
33.85

(T/m2)
(T/m)

vc =
Mt =

2.335
17.49

(Kg/cm2)
(T.m/m)

Ast1 =
Ast2(min) =
Ast3 =
Ast4(min) =

5.78
13.50
13.50
13.50

(cm2/m)

Date

vc<=vc(all) verified

( Reinforcement in Direction of Flexure, cm2/m)


( Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

C. Wall Toe

vc<=vc(all) verified

( Reinforcement in Direction of Flexure, cm2/m)


( Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

D. Wall Shear Key


Msk =

0.56

(T.m/m)

Assk1 =
Assk2(min) =
Assk3 =
Assk4(min) =

0.59

(cm2/m)

4.50
4.50
4.50

(Longitudinal Reinforcement in Direction of Flexure, cm2/m)


(Longitudinal Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

DESIGN CALCULATION
SHEET
Subject

Project No.
-

Date

Sheet No.
6 of 9
Checked by

Computed by
Approved by

LOAD FACTOR DESIGN

V. DESIGN OF RETAINING WALL (DL+EP+LL)


A. Wall Stem
Pah =
Pllh =
Vuw =
Muw =
VC=
Muw/bd2=
=
Asw1 =
Asw2(min) =
Asw3 =
Asw4(min) =

35.37
2.99
38.36
106.27
71.28

(T/m)
(T/m)
(T/m)
(T.m/m)
(T/m)

11.81
0.00303

(Kg/cm2)

35.14
19.60
9.45
9.45

(cm2/m)

171.80
599.17
168.92
6.80
2.53
0.87

(T.m/m)
(T.m/m)
(T/m)
(m)
(m)
(m)

43.91

(T/m2)

5.77

(T/m2)

>=Vuw: Verified - No shear reinforcement is required


<= r max: Verified

(Minimum Longitudinal Reinforcement in Direction of Flexure, cm2/m)


(Longitudinal Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

B. Wall Heel
Mou =
Mru =
Wtu =
L=
Xr =
e=
qmax u=
qmin u=
qhu =
Vuh =
Muh =
VC=

32.41
41.82
174.49
103.36

(T/m2)
(T/m)
(T.m/m)
(T/m)

Muh/bd2=
=
Ash1 =
Ash2(min) =
Ash3 =
Ash4(min) =

9.22
0.0024

(Kg/cm2)

34.14
27.57
13.50
13.50

(cm2/m)

qmaxu =

43.91

(T/m2)

qminu =

5.77

(T/m2)

=> resultant load inside middle third (verified)

>=Vuh: Verified
<= r max: Verified

( Reinforcement in Direction of Flexure, cm2/m)


( Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

C. Wall Toe

qt =
Vut =
Mut =
VC=

38.30
34.75
17.84
103.36

(T/m2)
(T/m)
(T.m/m)
(T/m)

Mut/bd2=
=
Ast1 =
Ast2(min) =
Ast3 =
Ast4(min) =

0.94
0.0002

(Kg/cm2)

3.42
13.50
13.50
13.50

(cm2/m)

>=Vut: Verified
<= r max: Verified

( Reinforcement in Direction of Flexure, cm2/m)


( Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

D. Wall Shear Key


Musk =
Musk/bd2=
=
Assk1 =
Assk2(min) =
Assk3 =
Assk4(min) =

1.00

(T.m/m)

0.55
(Kg/cm2)
0.000137
0.62
4.50
4.50
4.50

<= r max: Verified

(cm2/m)
(Longitudinal Reinforcement in Direction of Flexure, cm2/m)
(Longitudinal Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

DESIGN CALCULATION
SHEET
Subject

Project No.
-

Date

Sheet No.
7 of 9
Checked by

Computed by
Approved by

LOAD FACTOR DESIGN

VI. DESIGN OF RETAINING WALL (DL+EP+EQ)


A. Wall Stem
Pah =

20.93
27.09
6.16
36.25
123.89
71.28

(T/m)
(T/m)
(T/m)
(T/m)
(T.m/m)
(T/m)

13.77
0.00356

(Kg/cm2)

40.09
19.60
9.45
9.45

(cm2/m)

qmax =

42.10

(T/m2)

qmin =

-3.49

(T/m2)

qh =
Vuh =
Muh =
VC=

28.35
44.20
187.29
103.36

(T/m2)
(T/m)
(T.m/m)
(T/m)

Muh/bd2=
=
Ash1 =
Ash2(min) =
Ash3 =
Ash4(min) =

9.90
0.0025

(Kg/cm2)

36.71
27.57
13.50
13.50

(cm2/m)

qmax =

42.10

(T/m2)

qmin =

-3.49

(T/m2)

qt =
Vut =
Mut =
VC=

35.39
33.85
17.49
103.36

(T/m2)
(T/m)
(T.m/m)
(T/m)

Mut/bd2=
=
Ast1 =
Ast2(min) =
Ast3 =
Ast4(min) =

0.92
0.0002

(Kg/cm2)

3.35
13.50
13.50
13.50

(cm2/m)

Paeh =
paeh=
Vuw =
Muw =
VC=
Muw/bd2=
=
Asw1 =
Asw2(min) =
Asw3 =
Asw4(min) =

>=Vuw: Verified
<= r max: Verified

(Longitudinal Reinforcement in Direction of Flexure, cm2/m)


(Longitudinal Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

B. Wall Heel

>=Vuh: Verified
<= r max: Verified

( Reinforcement in Direction of Flexure, cm2/m)


( Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

C. Wall Toe

>=Vut: Verified
<= r max: Verified

( Reinforcement in Direction of Flexure, cm2/m)


( Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

D. Wall Shear Key


Msk =
Mut/bd2=
=
Assk1 =
Assk2(min) =
Assk3 =
Assk4(min) =

0.56

(T.m/m)

0.31
(Kg/cm2)
0.000076
0.34
4.50
4.50
4.50

<= r max: Verified

(cm2/m)
(Longitudinal Reinforcement in Direction of Flexure, cm2/m)
(Longitudinal Reinforcement in Other Direction , cm2/m)
(Transverse Reinforcement on One Side only , cm2/m)

Project No.
-

DESIGN CALCULATION
SHEET
Subject

Sheet No.
8 of 9

Computed by
-

Checked by
-

Approved by
-

LOAD FACTOR DESIGN


VII. CHECK SERVICEABILITY REQUIREMENTS
Es =

2100000.00 (Kg/cm2)

Ec =
n=

238998.44 (Kg/cm2)
8.79
200.00
(mm)

Bar Spacing=

(DL+EP+LL)

f'c (all)=

100

(Kg/cm2)

(DL+EP+EQ)

f'c (all)=

133.30

(Kg/cm2)

(DL+EP+LL)

fs (all)=

2400

(Kg/cm2)

(DL+EP+EQ)

fs (all)=

3192

(Kg/cm2)

NOTE:
1. If f'c
(all) is not satisfied the user should go back and modify the
corresponding section thickness (Twb or Tf).
2. If only fs (all) is not satisfied,
the area of reinforcement As will be automatically increased
by the program to satisfy fs (all).

A. Wall Stem
DL+EP+LL

As =
=
c (kd)=
fc =
fs =
(DL+EP+LL)
(DL+EP+EQ)
(DL+EP+LL)
(DL+EP+EQ)

DL+EP+EQ

35.14
40.09
0.00351
0.00401
0.22
0.23
60.27
115.51
1882.41
3349.79
fc<=f'c(all) verified
fc<=f'c(all) verified
fs<=fs(all) verified
fs>fs(all) Increase As to:

42

(cm2/m)

43

(cm2/m)

B. Wall Heel

As =
=
c (kd)=
fc =
fs =
(DL+EP+LL)
(DL+EP+EQ)
(DL+EP+LL)
(DL+EP+EQ)

DL+EP+LL

DL+EP+EQ

34.14
0.00235
0.27

36.71
0.00253
0.28

(cm2/m)

54.38

100.18

(Kg/cm2)

2146.43
3756.33
fc<=f'c(all) verified
fc<=f'c(all) verified
fs<=fs(all) verified
fs>fs(all) Increase As to:

(m)
(Kg/cm2)

C. Wall Toe

As =
r=
c (kd) =
fc =
fs =
(DL+EP+LL)
(DL+EP+EQ)
(DL+EP+LL)
(DL+EP+EQ)

DL+EP+LL

DL+EP+EQ

13.50
0.00093
0.17

13.50
0.00093
0.17

(cm2/m)

9.23

14.44

(Kg/cm2)

594.94
699.61
fc<=f'c(all) verified
fc<=f'c(all) verified
fs<=fs(all) verified
fs<=fs(all) verified

(Kg/cm2)

(m)

Date

DESIGN CALCULATION
SHEET
Subject

Project No.
Sheet No.

Date

9 of 9
Checked by

Approved by

Computed by

VIII. SCHEDULE OF STEEL REINFORCEMENT

5.23
8.84
1.49
14.78

As (cm2/m)

6.77
1.54
28.26

Bar

Service Load

Load Factor

Number

Design

Design

01

66.92

42.08

(cm2/m)

4.56

02

49.46

13.35

(cm2/m)

0.001151

0.002224

02

03

16.73

9.45

(cm2/m)

6.91

13.35

04

04

5.85

5.85

(cm2/m)

05

5.85

5.85

(cm2/m)

06

13.50

13.50

(cm2/m)

07

61.87

43.20

(cm2/m)

08

9.45

9.45

(cm2/m)

09

13.50

13.50

(cm2/m)

10

4.50

4.50

(cm /m)

11

4.50

4.50

(cm2/m)

12

4.50

4.50

(cm2/m)

05

8.72
12.53

08

H/2
07

03
C.J
09

01

12

06

10

11

C.J: Construction Joint

IX. QUANTITIES
A.Reinforced Concrete
Wall Stem :
Wall Foundation and Shear Key :
Total volume :

5.2 (m3/m)
10.35 (m3/m)
15.55 (m3/m)

Area of Excavation

B.Excavation & Backfilling


Total volume :

60.386 (m3/m)

C.Concrete Blinding
Input Thickness:
Volume :

0.050 (m)
0.32 (m3/m)

D.Concrete Surface Area for Dampproofing (1 Coat)


Surface :

17.35 (Kg/m)

E. Steel Reinforcement
Bar No.
01
02
03
04
05
06
07
08
09
10
11
12
Weight:

Bar Diamter Bar Spacing


(mm)
(mm)
25
200.00
20
200.00
14
150.00
12
200.00
10
150.00
12
200.00
14
200.00
16
150.00
20
150.00
10
200.00
12
200.00
10
150.00

NOTE:
1. User
should input Bar Diameter based on steel reinforcement
areas give in Section VIII.
2. Bar
Spacing for Bar No.'s 01,02,03,04,06,07,10 and 11 are taken
to be equal to that input by the user in Section VII. All other
bar spacings can be input by the user in this Section.
3. Bar Diameter includes:
8,10,12,14,16,18,20,22,24,25,28,32

711.11 (Kg/m)

You might also like