MINISTRY OF SUSTAINABLE
DEVELOPMENT & TOURISM
MAY 2013.
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
BOOK 1
GENERAL BOOK
BOOK 2
SEWAGE NETWORK
BOOK 3
ATMOSPHERIC NETWORK
BOOK 4
BOOK 5
Volume 5.1
Process design
Volume 5.2
Hydraulic design
Volume 5.3
Architectural design
Volume 5.4
Mechanical design
Volume 5.5.1
Volume 5.5.2
Volume 5.5.3
Volume 5.6
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
TERMS OF REFERENCE
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
TABLE OF CONTENT
1. TECHNICAL DESCRIPTION OF ARCHITECTURAL DESIGN ..............................................................3
1.1. INTRODUCTION ............................................................................................................................................ 3
1.2. LOCATION ................................................................................................................................................... 3
1.3. PLANT LAYOUT ........................................................................................................................................... 3
1.4. (A) (01.) FENCE SURROUNDING LAND, WITH (02) VEHICLE AND PEDESTRIANS GATES ..................................... 4
1.5. (B) INTERNAL ROADS .................................................................................................................................. 4
1.6. (C) ARCHITECTURAL STRUCTURES .............................................................................................................. 4
1.7. (D) HYDROTECHNICAL STRUCTURES ............................................................................................................ 7
1.8. OBJECTS ON THE WATER LINE ..................................................................................................................... 7
1.9. OBJECTS ON THE SLUDGE LINE.................................................................................................................... 8
2. GENERAL TECHNICAL CONDITIONS FOR EXECUTION OF BUILDING AND TRADE WORKS ...10
2.1. GENERAL CONDITIONS ............................................................................................................................... 10
2.2. PRELIMINARY WORKS ON BUILDING SITE ..................................................................................................... 12
2.3. EARTH WORKS .......................................................................................................................................... 12
2.4. MASONRY WORKS ..................................................................................................................................... 13
2.5. CONCRETE AND REINFORCED-CONCRETE WORKS ....................................................................................... 14
2.6. WATERPROOF REINFORCED-CONCRETE WORKS ......................................................................................... 15
2.7. REINFORCING WORKS ................................................................................................................................ 15
2.8. CERAMICS WORKS ..................................................................................................................................... 15
2.9. VEHICLEPENTRY WORKS ............................................................................................................................ 16
2.10. JOINERY WORKS........................................................................................................................................ 16
2.11. TIN WORKS................................................................................................................................................ 16
2.12. METALWORKS ........................................................................................................................................... 17
2.13. PAINTING WORKS ...................................................................................................................................... 17
2.14. FACING WORKS ......................................................................................................................................... 17
2.15. INSULATING WORKS .................................................................................................................................. 18
2.16. ROOF COVERING WORKS ........................................................................................................................... 18
2.17. GLAZING WORKS ....................................................................................................................................... 18
2.18. FLOORS FINISHING WORKS......................................................................................................................... 18
3. ARCHITECTURAL PHYSICS.................................................................................................................20
4. BILL OF QUANTITIES ............................................................................................................................50
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
PAGE 1
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
4.1. PRELIMINARY WORKS WITH (01) FENCE AND (02) GATES ............................................................................ 50
4.2. (03) GUARDHOUSE.................................................................................................................................... 53
4.3. SUMMARY FOR (03.) GUARDHOUSE ........................................................................................................... 63
4.4. (12.) COMMAND BUILDING ......................................................................................................................... 63
4.5. SUMMARY FOR (12.) COMMAND BUILDING ................................................................................................. 74
4.6. (05.) SEPARATING CHAMBER AND (06.) PRIMARY TREATMENT ................................................................... 75
4.7. SUMMARY FOR (05.) SEPARATING CHAMBER AND (06.) PRIMARY TREATMENT............................................ 77
4.8. (07.) EQUALIZATION TANK......................................................................................................................... 78
4.9. SUMMARY FOR (07.) EQUALIZATION TANK ................................................................................................. 80
4.10. (08.) SBR BASIN ...................................................................................................................................... 81
4.11. SUMMARY FOR (08.) SBR BASIN ............................................................................................................... 83
4.12. (08.) COLLECTING BASIN .......................................................................................................................... 84
4.13. SUMMARY FOR (08.) COLLECTING BASIN ................................................................................................... 86
4.14. (10.) THICKENER ....................................................................................................................................... 87
4.15. SUMMARY FOR (10.) THICKENER ............................................................................................................... 89
4.16. TOTAL SUMMARY ...................................................................................................................................... 89
5. DRAWINGS.............................................................................................................................................91
PAGE 2
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
1.2. LOCATION
Cetinje, defined as the royal capital, belongs to the central region of Montenegro, and
covers an area of 910 km with a low population density. The city core is situated in
Cetinje field, at the foot of the mountain Loven, the average altitude of 670 m. Nearby
fields are karst, bare and steep slopes, with caves as a typical karst formations of the
terrain. There is Cetinje cave in the town, which is particularly attractive, and nearby is
Lipska cave.
On the territory of the town is community Rijeka Cmojevia on the banks of Skadar Lake,
with 330 inhabitants, in which the EU funds built WWTP of compatible capacity. The
municipality of Cetinje numbered 18 482 inhabitants in 2003., of which 15 137 in the
Capital (4707 households).
Complex of WWTP Cetinje is located north of the village Lipa and west of the village
Dobrsko selo, with the access road to the north side. Terrain is at altitude of 525.00 to
540.00 meters above sea level. The total enclosed area of the plot is 6600.00 m, but
should leave a zone of about min. 5.00 m in front of the fence for controling access and
maintenance of the fence. The total length of fence is 320 m. Enclosed surface provides
the necessary space for the construction of complete plant for both construction phases.
Total area of leveled ground is 8 360,00 m2. Projected slope diagonally on the plot is ~
0,75% (northwest - southeast).
The site is located in the third building - climatic zone.
Plant shall be accessed from the north side with newly designed asphalt road 6.00 m
width. Enclosure of the complex is planned with (01) fence with pedestrian gate while
the truck and car traffic was carried over the main entrance (02) sliding gate with the
electric drive. (03) Guardhouse is to be located at the entrance of the complex, on the
northeast, near the entrance gate and the road that leads to a complex. Parking lots for
passenger vehicles, staff and guests are situated rihgt behind the guardhouse.
PAGE 3
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
From the Northwest of the complex, are located: (04.) Flowmeter input, on the south:
(05.) Separating chamber, (06.) Primary treatment Huber unit, (07.) Equalization
tank, (10.) Thickener, (12.) Command building, (09.) Collecting basin i (13.) Energy
block.
Parallel on the south side are located (08.) SBR basins. On the east side, by the iner
road, is (11.) Flowmeter output.
1.4. (A) (01.) FENCE SURROUNDING LAND, WITH (02) VEHICLE AND PEDESTRIANS
GATES
Enclosure of the complex is planned with fence with pedestrian gate and sliding gate with
the electric drive for vehicles.
Fence posts are designed with steel tubular profiles L= 3.00m, founded on concrete single
foundations, with inter-space of 2.00m.
Fance is to be made of galvanized, steel, wire-netting, strained hight of 2.40m, with one
row of barbed wire above, and total hight of 2.50 m. Tightening of wire-netting is to be
done using galvanized steel wire d=4mm, in upper, middle and lower zone, with bracing
struts in every field.
Entrance gate is designed with automatic slide with electronic drive for motor vehicles
transportation and one wing gate made of steel tubular profile with hinges for pedestrian
access. Gate and fence posts have to be anti-corrosive protected, with epoxide resin.
PAGE 4
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Guard house is to be founded on reinforced concrete continuous footing and ground
beams. Reinforced concrete skeleton construction (posts and beams) is to be used for
this building.
Hipped roof with wooden construction, covered with trapezoidal, coloured aluminium
sheet metal is designed for this building.
External walls are made of brick wall 12 cm, 3 cm layer of air, insulation 5 cm, PE foil and
bricks 12 cm, the total thickness of 12 +12 +4 +5 = 33 cm. Thickness of partition is
d=12cm. All walls should be plastered on both side and painted with dispersion paint, and
in moisture rooms covered with ceramics tiles.
The inner surface of the wall shall be painted by dispersion color. Walls of the toilet shall
be coverd with ceramics tiles up to 1.50m hight from the finished floor.
Floors are to be covered with ceramics tiles.
All ceilings are to be plastered with mortar and painted with dispersion colors.
External doors and windows are made of eloxi aluminium, glazed with thermal insulating
glass. Glazing is designed with thermal insulating glass, sized 4+12+4 mm.
All the gutters and linings shall be made out of aluminium, plasticized sheet metal, in the
same colour as metalworks.
Exterior finishing of facade is a silicate brick with processed, open joints, up to the level of
a window beams or upper horizontal beam.
1.6.2. (12.) COMMAND BUILDING
Command building is multi-level structure, rectangular shape, overall dimensions 17:44 x
11.54 m, 9.25 m height. Object is accessed from the plateau on the north and northwest
sides. Ground floor elevation of the building is raised for 0.15m in relation to the elevation
of plateau at the site of construction. Ground elevation is on the absolute elevation of
528.95 mals.
In the basement is provided: space for compressors, filters and UV disinfection and stairs.
The ground floor contains the following facilities:
Hallway and stairs to the first floor and basement;
Office;
Two toilets with sink;
Warehouse;
Workshop;
Room for sludge treatment;
Mounting hole for the basement.
All rooms are accessible through the central hall, and for workshop, room for sludge
treatment and mounting hole is also provided direct access from the outside.
First floor contains the following facilities:
Command room;
Director office;
Two working office;
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
PAGE 5
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 6
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Selected type and shape of the roof, with shallow eaves, in a simple manner gives final
contour to the construction, and use of the metal sheet for roofing has a long tradition in
this region.
The fence around the plant has been constructed in the traditional manner, prescribed for
this type of facility.
All facilities have direct and easy access from the roads.
PAGE 7
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
After the primary (mechanical) treatment, it is provided the construction of two
equalization tanks (one in the first phase of construction) that would control the future flow
of the process line, on the SBR basins.
The structure is planed as monolithic, massive construction, designed with waterproof
reinforced concrete on site. It is planed one unit for the first phase and one for the second
phase of the construction. The object dimensions are 12,60 x 4,86m. The active depth of
the object is 4,00m.
1.8.3. (08.) SBR BASIN
Sequential Batch Reactor (SBR) is a treatment with activ sludge, which is based on
charge and discharge, and that provides the performance of different treatments in a
single reactor.
There are four basic cycles in a process that takes place in the SBR:
The sequence of filling
The sequence of reactione
The sequence of deposition
The sequence of discharge
After the sequence of discharge follows the sequence mode whose duration varies.
During the sequence mode can drop the mud can be dropped, if not removed during the
discharge phase of the SBR. During this phase the SBR is being prepared for the next
cycle.
In construction plans, building of structures is planed in pairs. In the first phase one pair is
planed, and in the final phase additional two pairs. The structure is planed as monolithic,
massive construction, designed with waterproof reinforced concrete on site. The object
dimensions are 22,90 x 21,60m. The active depth of the object is 4,50m.
PAGE 8
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Sludge thickening is the first step in reducing the volume of sludge. The process of
thickening mainly increase concentration of the sludge collected in the SBR. Thickening
process has the following advantages:
Thickener is gravity type, with the circular cross section. Raw sludge is being deposited
and thickened. Scraper directs thickened sludge in the hub from which is extracted and
taken to the filter press.
Clear water in the thickener overflows in circumferential channel and by drain pipe is
directed to the separating chamber, which is situated before the fine screen.
Elevation of water in the thickener is 73.50 masl. It is planed that the device has a
continuous operation. It is expected that after treatment obtains 4% sludge.
It is planed construction of one primary thickener in the first and one in the second stage.
The structure is planed as monolithic, massive construction, designed with waterproof
reinforced concrete on site. The object diametar is 11,10m. The active depth of the object
is 3,50m.
PAGE 9
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 10
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Contract manager, in front of Contractor, is obliged to ask for Clients instructions
considering locations for executing certian types of work, before beggining certian types of
work. After receiving instructions, and using Construction diary, Contractor should conduct
commission and begin building works. If building works are to be executed against
instructions according to Construction diary, details, drawings, Contractor loses rights for
shortage claim. If Constructor conducts certian building works, against designed
description, drawings and details, no justifications will be accepted, further more it is
Contractors obligation to demolish and remove all the works that were executed,
regardingless on quantity of finished work. After demolishion Contractor is also obliged to
conduct rebuilding works, according to forseen drawings, specification and details, unless
if changes were made with Clients approval and according to Construction diary.
Contractor doesnt have the right to demand extra payment if conducts building works with
more quality and with higher expenses then designed, and if those works were executed
without Clients approval.
Contractor is obliged to maintain structures and whole building site at all times, also,
before finishing and delivering structures, to conduct following works: backfill all blind
holes, septic tanks, holes from scaffolds etc., as well as to levell whole area and conduct
everything good and solid (so that settlement doesnt aprear). Contractor is obliged to
despose off all muck, scaffolds and dust from structures, and also is obliged to arrange
external surfaces and pepair whole structure for delivery.
Contractor is, also, obliged to repair any demage, that was developed on site, and to
come to original appearance, on his expense. Possible structural changes, including
completly or partialy increasing or removing certian works from specification, cousing
extra expences, Contractor is obliged to accept without complains, limitations and make
claim which will be calculated by agreed prices. In case of necessity for works that dont
have the agreed price in bill of quantities, Contractor is obliged to set cost, with Clients
approval, and note it in Construction diary.
Contractor has the right to demand written quality assurance, from firms engaged for
execution of specialist works (roof insulation, WPR penetration compound, new materials
etc.). Contractor is obliged to coordinate all sub-contractors that work individualy, so they
dont demage each other works. If demage conduct sub-contractors are obliged to repair
coused demage on their expense. Otherwise, expanses becomes Contractor duty. Same
procedure refers to disturbance of works.
Supervisor has the right to demaind that Contractor provide samples of new materials
(with certificate of compliance). Choise will be made on these samples. Acquiring of
samples shall not be payed extra.
Besides all temporary structures necessary for building works, Contractor is obliged
provide premise for Supervisor office, and keep it in order, with lightening, heating,
cleaning and necessary office equipment.
Contractor is obliged to provide approval, from legislative authority, if more land is needed
for material storage. Expenses for these works shall not be payed extra.
Constructor shall submit certificate that the building is set at the right location ( Certificate
of location inspection) as well as receipts for water and electrical use.
After delivering complet structure to Client, Contractor is responsible for everything during
warranty period, and according to leagal regulations. Any possible demage or failure
Contractor is obliged to repair on his expense.
PAGE 11
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Construction book and diary, are to be conducted according to valid leagal regulations,
inscribeing necessary data daily. Contractor and Clients representative daily examin and
authorize books with signature on each page.
General conditions for development of building structures and works and valid clauses
for development, as well as Bill of quantities and prices are, beside general conditons an
integral part of contract.
PAGE 12
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
If damp, wet, slushed soil appears while digging, strutting and insurance of such soil shall
not be payed extra, which means it will be considered as basic soil classification.
Underground water lift, if necessary, is to be considered as unforeseen work. Under ater
excavation, shall be considered as extra works and will be payed as such. Atmospheric
water lifting shall not be payed extra.
Selected, excavated soil shall be used as filling around foundations, walls and underneath
floors. Top soil is to be separately removed and dumped and store for later use. Top soil
or soil with organic admixture can not be used as filling.
Excevatin works in open cut, are to be conducted mechanicly, with all necessary side
insurance. Excevation works for countinous footings, single foundations are to be
executed with engines, according to conditions of buildings.
Filling and thumping are to be conducted manualy and mechanicly in layers of 10-30cm,
with possible wetting, and up to designed density given within structural analysis. If, while
digging, one comes accross of soil unfavourable for foundations (muck, peat, different
organic and anorganic waste) digging must conduct till solid ground, and with cost for
open cut excevation. Filling should be done with appropriate materials in layers of 15cm,
with thumping and according to price for soil fillings underneath groun-floors. In case if
some parts of foundations are to be digged out, those parts shall be filled with thin
concrete and and on Contractors expense.
Concrete works for foundations shall beggin only after Supervisors approval of excevation
works, which is reported in Construction diary. Remaining earth, which is not used for
filling, is transported away from the site and placed on locations determined by public
utility. Transportational length shall be determinated within bill of quantities and prices,
which can be changed for aproximatly 1km, without changing price.
Calculation is to be conducted per m3 naturally-moist earth excevation work in autochthon
state, and according to site surveying. Contractor is obliged to survey cross sections on
terrain before beggining earth works and according to designed excevations, which are
approved by Supervisor.
Unit price include: clearing of terrain, staking out, excevation works, external and internal
transportations, lifting-conveying of atmospheric water, strutting and insurance, triming,
rough and fine finishing.
PAGE 13
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Water must be clean, clear without any sludge admixture and organic constituents.
Cement should meet certain regulations.
Rendering should be made according to designed proportions, mix properly, remove balls
of sod from the mixture.
All necessary materials should be conveid to the building site in due time.
Rendering should start after the walls are dried out and building settled. Cleaning and
pointing should be done befor rendering, so plaster can bond better. Concrete walls are
renderd with compo or cement plaster. Rendering of face wall , must not start before
internal rendering has finished and dried out. Rendered surfaces must be flat, without
surges, and extensions correct, sharp and straight. Repeted usage of descendig plaster is
prohibited.
Calculation of masonry works shall be daone per m or m, and it shall be noted for every
work item. Proposed unit prices include work, material, rolling and facing scaffold as well
as all the other direct or indirect expenses.
Calculation of rendering works shall be per m. Price unit include: all necessary materials
as well as work needed for certian positions, work and facade scaffolds, hand or motor
lifts, mortar pumps, tools, placing og pallet pieces and anchors for joinery works,
metalworks or sanitaries, executing of all oppenings for instalations, patching, steel lathing
and rendering of ceramics tiles joints and part of wall overhead, collecting and removing of
muck during construction.
PAGE 14
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Payment is to be conducted according to unit prices per m of completly placed concrete,
that is approved by Supervisor. Contractors demainds for additional payment of any
expenses for concrete works will not be approved, as it is Contractors obligation to include
all the expenses within unit price for concrete.
PAGE 15
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 16
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
2.12. METALWORKS
Before executing metalworks, Contractor and Consultant must agree on every item,
description of technical detail, check construction measurments on site, execute all
workshop prints and get Consultants approval.
All external elements need to fulfill certain conditions and regulations, also these elements
must not have thermal bridges and must have appropriate certificate of compliance.
Metalworks, also, needs to fulfill functionl, comunicational, acoustic, thermal and aesthetic
conditions of certain structure (with Consultants agreement).
Calculation is executed for complete developed and accepted works, including glazing
works.
PAGE 17
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 18
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Measurement and calculation are based on actual executed works, unless technical report
proposses diferently.
PAGE 19
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
3. ARCHITECTURAL PHYSICS
PAGE 20
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 21
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 22
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 23
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 24
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 25
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 26
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 27
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 28
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 29
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 30
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 31
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 32
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 33
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 34
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 35
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 36
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 37
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 38
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 39
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 40
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 41
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 42
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 43
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 44
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 45
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 46
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 47
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 48
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
PAGE 49
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
4. BILL OF QUANTITIES
4.1. PRELIMINARY WORKS WITH (01) FENCE AND (02) GATES
1.1
1.2
1.3
1.4
1.5
QTY
D
Total
Price
EUR
D*E
PRELIMINARY WORKS
Acquisition of land, with possible displacing of electrical instalation as well as removing
existing buildings shall not be part of this design.
Bill of quantities and prices include earth works relative to newly designed terrain levell,
respectively on made up ground and solid state of terrain.
Round-trip, staking out of complex plot
and clearanse for excavation works.
m
8,360.00
0.20
1,672.00
Account per m.
Providing necessary front (approximatly
five meters) for placing works building
fence and gate around plant complex.
Account per lump-sum price.
lumpsum
1,000.00
lumpsum
1,000.00
piece
20.00
25.00
500.00
m3
46,600.00
2.00
93,200.00
m3
8,220.00
2.50
20,550.00
1.6
UNIT
C
Unit
Price
EUR
E
PAGE 50
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
1, 10
Excevation
for
post
and
fence
foundations, with finishing of bottom and
dissposal of excevated materilas away
from
work
area.
(dimensions
0.80x0.50x0.50 m on every 2,00m)
Account per piece.
1.13
QTY
D
m3
38,380.00
2.00
76,760.00
m1
320.00
1.00
320.00
piece
160.00
2.50
400.00
m3
4.00
14.00
56.00
m3
19.20
120.00
2,304.00
piece
160.00
30.00
4,800.00
m1
1,862.00
1.00
1,862.00
1.12
UNIT
C
1.11
Total
Price
EUR
D*E
1.9
Unit
Price
EUR
E
PAGE 51
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Unit
Price
EUR
E
Total
Price
EUR
D*E
UNIT
C
QTY
D
m2
768.00
6.00
4,608.00
m1
320.00
1.20
384.00
piece
1.00
400.00
400.00
piece
1.00
2,500.00
2,500.00
m2
6,100.00
2.40
14,640.00
m1
300,00
m2
1.352,50
1.16
Acquiring, transportation and placing of
entrance one wing steel (pedestrian)
gate. Gate is to be supplied with
necessary hardware. Gate needs to be
protected with anti corrosion inhibitor.
Account per piece.
dim. 0,90m x 2,10m
1.17
1.18
1,19
1,20
500,00
150.000,00
40,00
54.100,00
PAGE 52
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
C
PRELIMINARY WORKS
QTY
D
Unit
Price
EUR
E
TOTAL
Total
Price
EUR
D*E
431.056,00
1.2
Unit
Price
EUR
E
Total
Price
EUR
D*E
UNIT
C
QTY
D
m3
14.13
12.00
169.56
m3
0.61
14.00
8.54
m3
1.73
14.00
24.28
m3
1.15
14.00
16.13
EARTH WORKS
Excavation for continous footings with
bottom finishing and lateral dismissing of
excavated materials away from work site.
III and IV class of soil. Trench depth of
0.00 - 2.00 m.
Account per m3
Acquiring, transportation and thumping of
gravel buffer layer up to designed dencity
according to structural analysis.
Underneath building foundations.
Account per m of thunped gravel
Underneathe building foundation
Underneath foundation slab
Underneath pavement of the object
PAGE 53
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
1.3
1.4
m3
7.50
2.50
18.75
m3
6.63
2.00
13.26
EARTH WORKS
2
CONCRETE
WORKS
TOTAL
AND
250.51
REINFORCED
6.72
5.50
36.96
11.56
5.50
63.58
PAGE 54
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
2.2
Acquiring of materials and concrete
sidewalks with concrete MB20 thickness
d= 10 cm above the processing area.
The upper surface of the pavement at
the slope of the building. For each 2.00
m sidewalks do expansion Joints 2 cm
wide and fill them with hot bitumen.
Dividers to separate the sidewalk width
of 2 cm along the entire building and fill it
with hot bitumen.
Account per m2.
0.6 *19.2 =
Reinforced concrete
2.3
m2
11.52
6.00
69.12
m3
5.32
120.00
638.40
m3
1.83
150.00
273.78
m3
0.40
170.00
68.00
m3
1.52
170.00
258.40
15.21
55.00
836.55
2.4
2.5
2.6
2.7
Acquiring of materials and manufacturing
floor ceiling TM-3, 16 +4 cm thick. Blocks
pre-treated by placing reinforcement in
grooves and filling with cement mortar.
Finished mounts fitted over fetni carrier.
Plate and rib reinforced by the project
and details. Concrete, concrete MB 30.
Formwork must remain at least 14 days.
Account per m.
PAGE 55
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
CONCRETE AND REINFORCED WORKS
3
TOTAL
2,244.79
REINFORCED WORKS
The unit price includes the purchase of materials, transport, placing and binding
reinforcement kit.
3.1
Supply, stretching, cutting, cleaning,
bending, placing and tying reinforcing
steel - reinforcing the formwork
Account per kg.
contininous footings (80kg/m)
kg
425.60
0.80
340.48
kg
152.10
0.80
121.68
kg
288.00
0.80
230.40
kg
380.25
0.80
304.20
TOTAL
996.76
MASONRY WORKS
Masonry may be used only bricks and blocks of brick machine made, the proper format,
straight edges and surfaces, well-baked, no cracks.
Building made exactly according to plans and static calculations, clean, horizontal lines,
with no fragments smaller than 1/4 brick.
Connections must be correct, and the edges of the walls of the straight and vertical podvisak.
The unit price includes the purchase of materials, mortar preparation, installation, all
labor and tools, transportation, moving and stationary scaffolding, masonry arches
templates and production
4.1
Masonry walls of brick sandwich 12 cm,
4 cm layer of air, insulation 5 cm, PE film
and bricks 12 cm, the total thickness of
12 +12 +4 +5 = 33 cm. Walls to work in
the compo proportions 1:2:6, ensuring
that air does not fill the gap with mortar.
The walls are interconnected anchors, 4
pieces per m2 of wall. Insulation derived
from hard-pressed mineral wool slab and
vapor barrier PE sheets. The price
includes the extra scaffolding.
Calculation per m2 kit-built sandwich wall
openings shall be rejected.
Account per m.
m2
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
20.40
31.00
PAGE 56
632.40
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
4.2
Acquiring of building materials and
interior walls 12 cm thick full brick facade
in the compo proportions 1:2:6. To use
the entire brick masonry and a half
straight cut-off edges. Couplings carried
out using a square or circular iron rod
sections corresponding to the coupling.
Bricks should not be soiled plaster.
According to the final building of the wall
fugue technique is choice of the
designer. The price also includes
grouting, corners and extra scaffolding.
Account per m.
m2
8.65
14.00
121.10
m2
15.21
7.50
114.08
m2
99.60
6.00
597.60
4.3
Acquiring of of material and cement
screed 1:3 scale as the substrate for
floors. The upper surface is smooth and
prepared to take the final floor covering.
Account per m2.
3.9*3.9 =
4.4
MASONRY WORKS
5
5.1
TOTAL
1,465.18
CARPENTRY WORKS
Allow phonetic typing
Acquiring of materials and installation of
wooden roof construction, and quality of
dry fir timber, according to JUS. The
square roof with a drop of 22 . Do
everything required to do carpentry and
roof elements of Flash reinforcing iron,
anchors, clamps and screws alike.
Dimension of roof construction:
rafters 12/14 cm, at distance of 90 cm
cornea 12/14 cm
crest 12/14 cm
Allow phonetic typing
Wooden elements protect against
moisture and insects, the coating is
choice of the designer.
Calculation per m2 of horizontal
projection of the built and protected roof.
m
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
29.16
25.00
PAGE 57
729.00
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
5.2
Acquiring of of material and boarding
planks thickness d = 24 mm, of
coniferous wood, which are mounted to
the touch. Boarding and bituminous
cardboard sets as a basis for a roof of
tin. Wooden elements to protect against
moisture and insects, the coating is
choice of the designer.
Calculation per m, the horizontal
projection of the roof, installed and
protected floorboards flashings from
roofing paper.
m2
CARPENTRY WORKS
6
29.16
10.00
TOTAL
291.60
1,020.60
INSULATING WORKS
All Insulating work must be performed meticulously and accurately according to the
requirements of the project, estimate of works and details.
The used materials must comply with applicable regulations and stardandima, provided
with certificates accredited institution, proven in use, and how permanent facility or
designed so that their possible replacement.
Any errors in the structure must be adequately remedied or repaired prior to application
of insulation materials.
The unit price includes the purchase of materials, transport and production
6.1
6.2
m2
14.44
13.00
187.72
m2
3.51
11.00
38.61
INSULATING WORKS
7
TOTAL
226.33
METAL WORKS
PAGE 58
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
All positions are made from the adopted typical profile, all in accordance with the
scheme, details and workshop drawings. Door frames are installed on the system of dry
mounting, via steel bevel anchored at the wall. Throughout the volume of openings to
perform sealing pur foam. According to the size of the wing hinge to determine the
number and strength (for a minimum of three door pieces per lap). Throughout the extent
of the wing is a double gasket profile (minimum three-fold). The schemes are
podprozorna lumber and aluminum coating comprehensive profiles (to do with the wall).
Sealing glass and sashes to provide custom-fit rubber bands. All fields covered in
locksmith work raditiu all the schemes and details. Measures taken on the spot. Opening
to view the grounds. Workshop documentation gives the contractor on the basis of their
technological solutions, and the authorization for the program of the workshop
documentation signed by the designer, or supervisor.
7.1
Acquiring of materials, fabrication and
installation of facade metal works, made
of aluminum profiles with required
stiffeners and thermal barrier. The finish
is aluminum color coating in choice of
the designer. Metal works is glazed
thermal glass d = 4 +12 +4 mm.
Positions equipped with appropriate
fittings, all in accordance with the
manner of opening, and the choice of the
designer.
Single-glazed door , double coated sheet
with mineral wool.
dim. 100/205+45
piece
300.00
300.00
piece
100.00
300.00
piece
80.00
80.00
piece
350.00
350.00
7.2
Acquiring of materials, fabrication and
installation of interior doors, made in the
construction of aluminum profiles with
required stiffeners. The finish is
aluminum color coating in choice of the
designer. Skylights glazed with plain
glass is d = 6 mm. Positions equipped
with appropriate fittings, all in
accordance with the manner of opening,
and the choice of the designer.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
PAGE 59
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
7.3
piece
piece
1
1
150.00
180.00
150.00
180.00
piece
60.00
60.00
1,420.00
TIN WORKS
All tin works will be carried out of plastic, aluminum sheet with the appropriate tourniquet,
merger passes. Sheet thickness less than 0.60mm for a tourniquet 1-2 mm type.
Connections for the substructure shall be suitable nails (for wood) and the appropriate
screws and anchors (for concrete).
All visible surfaces, boards, gutters, standing and lying hinge must be perfectly straight,
true and equally distant from the surface of walls, slabs and the like.
All plumbing works are taught entirely free of mortar and other impurities.
The unit price includes the purchase of materials, fabrication and installation.
8.1
Acquiring of materials and TR plasticized
aluminium sheet d = 0.7 mm. An integral
part of the mounting position of all fittings
to cover the ridge, bay, lying toward the
end of the roof eaves flashings around
penetrations through the roof and others.
Roof cover is placed over boarding with
roofing paper (which is counted
separately).
Account per m
m2
33.84
22.50
761.40
m1
22.56
16.00
360.96
m1
6.30
12.50
78.75
8.2
Acquiring of of material and aluminum
gutters hanging plasticized sheet d = 0.6
mm, complete with fittings for
attachment. Lamination in the tone of the
designer of choice.Hanging gutter square
section 12/12 mm
Obraun po m1.
8.3
Acquiring of materials, fabrication and
installation of vertical drains gutters
coated aluminum sheet thickness d = 0.6
mm., Complete with fittings for
attachment. Lamination in the tone of the
designer of choice.
Circular gutter pipe 100 mm
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
PAGE 60
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m1.
8.4
TIN WORKS
9
6.40
15.00
TOTAL
96.00
535.71
CERAMIC WORKS
For all of the pottery works may be used only tiles of class, project the required
dimensions and quality, glazed or unglazed, equipped with the necessary certificates.
When tiling avoid cutting board and, if necessary, cut pieces shall not be narrower than 5
cm, and the cut edges sanded. Vertical and horizontal joints must be absolutely coincide.
Derived, oploane surface must be flat and smooth, without vitopernih tiles.
The unit price includes the purchase of materials, transport, all tools, scaffolding needed.
9.1
9.2
m2
9.00
16.00
144.00
m2
11.15
22.00
245.30
CERAMIC WORKS
10
TOTAL
389.30
FACING WORKS
The used material for the facade works must be first class, and the works carried out
only with skilled labor.
The unit price includes the purchase of materials necessary scaffolding, all the
necessary tools and development.
10.1
FACING WORKS
11
32.24
5.00
TOTAL
161.20
PAINTING WORKS
161.20
PAGE 61
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
The used material for painters' works must be first class, and the works carried out only
with a skilled work force.
Painting works include proper preparation of surfaces depending on the substrate and
the type of paint that is applied.
Applied colors must be the same tone and completely cover the surface, absolutely and
uniformly related to the substrate.
The unit price includes the purchase of materials necessary scaffolding, all the
necessary tools and development kit.
11.1
PAINTING WORKS
12
12.1
45.28
3.00
TOTAL
135.83
135.83
MISCALENIOUS WORKS
Acquiring and placing of PVC - pipes
100 mm for conducting electrical
insulation through wall foundation.
Account m1.
12.2
12.3
12.4
m1
1.00
10.00
10.00
kom
1.00
10.00
10.00
kom
1.00
20.00
20.00
m2
3.40
65.00
221.00
lump
sum
100.00
12.5
MISCALENIOUS WORKS
361.00
PAGE 62
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
EARTH WORKS
CONCRETE AND REINFORCED
WORKS
EUR
250.51
2,244.79
REINFORCED WORKS
MASONRY WORKS
1,465.18
CARPENTRY WORKS
1,020.60
INSULATING WORKS
226.33
METAL WORKS
TIN WORKS
535.71
CERAMIC WORKS
389.30
10
FACING WORKS
161.20
11
PAINTING WORKS
135.83
12
MISCALENIOUS WORKS
361.00
TOTAL
996.76
1,420.00
9,207.20
UNIT
C
QTY
D
m3
2,100.00
Unit
Price
EUR
E
Total
Price
EUR
D*E
EARTH WORKS
Excavation works for foundation slab and
basement with bottom finishing and
lateral dismissing of axcavated materials
away from work site. III and IV class of
soil.Trench depth of 0.00 - 2.00 m.
Account per m3.
1.2
12.50
PAGE 63
26,250.00
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m3.
underneath foundation slab
m3
47.20
14.00
660.80
m3
9.30
14.00
130.20
m3
1,073.50
3.00
3,220.50
m3
1,026.50
5.00
5,132.50
underneath pavement
1.3
1.4
EARTH WORKS
2
CONCRETE
WORKS
TOTAL
AND
35,394.00
REINFORCED
251.00
10.00
PAGE 64
2,510.00
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
2.2
2.3
m2
62.00
6.00
372.00
172.00
40.00
6,880.00
m3
105.00
120.00
12,600.00
m3
68.00
150.00
10,200.00
m3
45.00
150.00
6,750.00
m3
8.25
170.00
1,402.50
m3
4.20
170.00
714.00
m3
44.00
180.00
7,920.00
m3
10.20
180.00
1,836.00
2.4
2.5
2.6
2.7
2.8
PAGE 65
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m3 .
2.9
4.30
200.00
TOTAL
860.00
52,044.50
REINFORCED WORKS
The unit price includes the purchase of materials, transport, placing and binding
reinforcement kit.
3.1
Supply, stretching, cutting, cleaning,
bending, placing and tying reinforcing
steel - reinforcing the formwork
foundation slab and basement walls
(100kg/m)
173,00x100=
floor ceiling (125kg/m)
45,00*125=
posts (150kg/m)
12,45x150=
kg
17300.00
0.80
13,840.00
kg
5625.00
0.80
4,500.00
kg
1867.50
0.80
1,494.00
kg
8800.00
0.80
7,040.00
kg
1530.00
0.80
1,224.00
kg
387.00
0.80
309.60
TOTAL
28,407.60
MASONRY WORKS
Masonry may be used only bricks and blocks of brick machine made, the proper format,
straight edges and surfaces, well-baked, no cracks.
Building made exactly according to plans and static calculations, clean, horizontal lines,
with no fragments smaller than 1/4 brick.
Connections must be correct, and the edges of the walls of the straight and vertical podvisak.
The unit price includes the purchase of materials, mortar preparation, installation, all labor
and tools, transportation, moving and stationary scaffolding, masonry arches templates
and production
4.1
PAGE 66
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m
thickness of wall d=20 cm
m
257.00
12.00
3,084.00
224.00
12.00
2,688.00
150.00
9.00
1,350.00
m2
416.20
18.00
7,491.60
m2
162.50
18.00
2,925.00
m2
495.10
18.00
8,911.80
m2
495.10
7.50
3,713.25
4.2
Interior masonry walls, gas concrete
blocks of thickness d = 20cm d = 10cm
with cement mortar, 1:3 scale gas or glue
for concrete, according to the
manufacturer's instructions. The price
includes the extra scaffolding
Account per m
thickness of wall d=20 cm
thickness of wall d=10 cm
4.3
Making full cladding silicate bricks 12 cm
thick, the first class in the extended
mortar proportions 1:1:6. To use the
entire brick masonry and a half straight
cut-off edges. Couplings carried out
using a square or circular iron rod
sections corresponding to the coupling.
Bond has to be correct. Constructive
relationship with the wall anchors to
perform, with 5 pieces per m. When
masonry taken to avoid leakage of
mortar. Joints treated with cement mortar
1:2 scale, as instructed by the designer.
The price includes the grouting.
Account per m
4.4
Protection of basement wall insulation on
the outside wall of solid brick masonry on
the edge 7cm. Walls to work in the
compo proportions 1:2:6.
Account per m
4.5
4.6
PAGE 67
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m
4.7
MASONRY WORKS
5
5.1
5.2
6.1
6.00
TOTAL
12,000.00
42,163.65
CARPENTRY WORKS
Acquiring of materials and roof wood
construction 50/100 mm, as the surface
of the roofing sheet. Strips placed at a
distance of 70 cm.
Account per m
m2
231.25
10.00
2,312.50
m2
231.25
10.00
2,312.50
CARPENTRY WORKS
6
2,000.00
TOTAL
4,625.00
UNSULATING WORKS
All Insulating work must be performed meticulously and accurately according to the
requirements of the project, estimate of works and details.
The used materials must comply with applicable regulations and stardandima, provided
with certificates accredited institution, proven in use, and how permanent facility or
designed so that their possible replacement.
Any errors in the structure must be adequately remedied or repaired prior to application of
insulation materials.
The unit price includes the purchase of materials, transport and production
Acquiring of of material and the
horizontal and vertical waterproofing of
the foundation slab and basement walls.
Work through the insulation completely
dry and clean concrete surfaces and wall
surfaces.
Account per m
6.2
m2
482.10
13.00
6,267.30
m2
231.25
11.00
2,543.75
PAGE 68
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
6.3
Acquiring of of material and thermal
insulation of faade walls with insulating
material of thickness d = 4 cm insulation
is placed and fixed with glue and dowels
for wall cladding, in the following layers:
TP mineral wool d = 4 cm, breathable
waterproof sheeting.
Account per m
m2
UNSULATING WORKS
7
416.20
TOTAL
10.00
4,162.00
12,973.05
METAL WORKS
All positions are made from the adopted typical profile, all in accordance with the scheme,
details and workshop drawings. Door frames are installed on the system of dry mounting,
via steel bevel anchored at the wall. Throughout the volume of openings to perform sealing
pur foam. According to the size of the wing hinge to determine the number and strength
(for a minimum of three door pieces per lap). Throughout the extent of the wing is a double
gasket profile (minimum three-fold). The schemes are podprozorna lumber and aluminum
coating comprehensive profiles (to do with the wall). Sealing glass and sashes to provide
custom-fit rubber bands. All fields covered in locksmith work raditiu all the schemes and
details. Measures taken on the spot. Opening to view the grounds. Workshop
documentation gives the contractor on the basis of their technological solutions, and the
authorization for the program of the workshop documentation signed by the designer, or
supervisor.
7.1
Acquiring of materials, fabrication and
installation of facade metal works, made
of aluminum profiles with required
stiffeners and thermal barrier. The finish
is aluminum color coating in choice of
the designer. Metal works is glazed
thermal glass d = 4 +12 +4 mm.
Positions equipped with appropriate
fittings, all in accordance with the
manner of opening, and the choice of the
designer.
Account per piece
Double glazed entrance door.
dim. 200/335 + 60 cm
Double glazed entrance doo
dim. 200/220 + 70 cm
Double wing window
dim. 200/175 cm
Double wing window
dim. 170/175 cm
Multin wing window
dim. 200/230+60 cm
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
piece
800.00
800.00
piece
550.00
550.00
piece
280.00
2,520.00
piece
220.00
440.00
piece
300.00
300.00
PAGE 69
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Single wing window
dim. 125/70 cm
Single wing window
dim. 80/60 cm
piece
120.00
960.00
piece
90.00
360.00
piece
1,500.00
3,000.00
piece
1,100.00
1,100.00
dim. 100/210 cm
piece
220.00
1,320.00
piece
200.00
800.00
piece
220.00
880.00
16.85
40.00
674.00
7.2
7.3
7.4
Acquiring of materials, fabrication and
installation of stair railings, a set of
mutually welded steel seamless pipe
50 and 30. Guardrail fence is cooked
oak dim. 5x3cm. Fence height is 110 cm.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
PAGE 70
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
7.5
piece
130.00
TOTAL
130.00
13,834.00
TIN WORKS
All tin works will be carried out of plastic, aluminum sheet with the appropriate tourniquet,
merger passes. Sheet thickness less than 0.60mm for a tourniquet 1-2 mm type.
Connections for the substructure shall be suitable nails (for wood) and the appropriate
screws and anchors (for concrete).
All visible surfaces, boards, gutters, standing and lying hinge must be perfectly straight,
true and equally distant from the surface of walls, slabs and the like.
All plumbing works are taught entirely free of mortar and other impurities.
The unit price includes the purchase of materials, fabrication and installation.
8.1
Acquiring of materials and TR plasticized
aluminium sheet d = 0.7 mm. An integral
part of the mounting position of all fittings
to cover the ridge, bay, lying toward the
end of the roof eaves flashings around
penetrations through the roof and others.
Roof cover is placed over boarding with
roofing paper (which is counted
separately).
Account per m
m2
245.00
22.50
5,512.50
m1
37.00
16.00
592.00
m1
31.20
14.00
436.80
8.2
Acquiring of of material and aluminum
gutters hanging plasticized sheet d = 0.6
mm, complete with fittings for
attachment. Lamination in the tone of the
designer of choice.
Hanging gutter square section 10/10 mm
Account per m1.
8.3
Acquiring of materials, fabrication and
installation of vertical drains gutters
coated aluminum sheet thickness d = 0.6
mm., Complete with fittings for
attachment. Lamination in the tone of the
designer of choice. Gutter square section
10/10 mm
Account per m1.
PAGE 71
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
8.4
TIN WORKS
9
36.60
TOTAL
15.00
549.00
7,090.30
CERAMIC WORKS
For all of the pottery works may be used only tiles of class, project the required dimensions
and quality, glazed or unglazed, equipped with the necessary certificates.
When tiling avoid cutting board and, if necessary, cut pieces shall not be narrower than 5
cm, and the cut edges sanded. Vertical and horizontal joints must be absolutely coincide.
Derived, oploane surface must be flat and smooth, without vitopernih tiles.
The unit price includes the purchase of materials, transport, all tools, scaffolding needed.
9.1
9.2
76.80
15.00
1,152.00
m2
78.60
30.00
2,358.00
m2
113.10
20.00
2,262.00
m2
281.40
25.00
7,035.00
m2
42.80
35.00
1,498.00
9.3
CERAMIC WORKS
10
10.1
10.2
TOTAL
14,305.00
FLOORING WORKS
The used material for the flooring works must be first class.
The unit price includes the purchase of materials, all the necessary tools and development.
Procurement
of
materials
and
manufacturing vinfleks floor.
Account per m2.
m2
82.85
15.00
1,242.75
Procurement of materials and production
of double antistatic floor.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
m2
21.20
25.00
PAGE 72
530.00
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m2.
FLOORING WORKS
11
11.1
TOTAL
1,772.75
PAINTING WORKS
The used material for painters' works must be first class, and the works carried out only
with a skilled work force.
Painting works include proper preparation of surfaces depending on the substrate and the
type of paint that is applied.
Applied colors must be the same tone and completely cover the surface, absolutely and
uniformly related to the substrate.
The unit price includes the purchase of materials necessary scaffolding, all the necessary
tools and development.
Painting the interior and ceiling surfaces,
dispersion paint resistant to moisture.
Account per m2.
11.2
m2
1,500.00
3.00
4,500.00
m2
510.10
3.00
1,530.30
PAINTING WORKS
13
13.1
6,030.30
MISCALENIOUS WORKS
Procurement of materials and installation
of lower ceilings, sound absorbing
plaster cardboard plates d = 12.5 mm,
corresponding to the metal framing,
which is fixed over the grid and the
corresponding profile and attach to the
ceiling over suspenders, with a lowering
of the projected level. Ceiling move away
from the wall, and placed at the junction
of L lajsnu profile.
TOTAL
164.10
15.00
2,461.50
29.55
18.00
531.90
m1
1.00
10.00
10.00
PAGE 73
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
13.3
13.4
13.5
piece
2.00
10.00
20.00
piece
1.00
80.00
80.00
495.10
1.00
495.10
MISCALENIOUS WORKS
TOTAL
3,598.50
EUR
EARTH WORKS
35,394.00
52,044.50
REINFORCED WORKS
28,407.60
MASONRY WORKS
42,163.65
CARPENTRY WORKS
4,625.00
INSULATING WORKS
12,973.05
METAL WORKS
13,834.00
TIN WORKS
CERAMIC WORKS
7,090.30
14,305.00
10
FLOORING WORKS
1,772.75
11
PAINTING WORKS
6,030.30
13
MISCALENIOUS WORKS
3,598.50
TOTAL
222,238.65
PAGE 74
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
Total
Price
EUR
m3
343.5
12.0
4,122.0
m3
12.5
14.0
175.0
with compacting.
Account per m3.
m3
279.0
2.5
697.5
m3
124.0
2.0
248.0
m3
1.4
14.0
18.9
I Earth works
Total
5,261.4
Plain concrete
m2
128.0
PAGE 75
6.0
768.0
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
m3
4.6
170.0
773.5
foundation slabs
exterior walls
concrete tickness up to 30cm
walls (curtain)
concrete tickness up to 30cm
posts
m3
43.0
120.0
5,160.0
m3
36.3
150.0
5,445.0
m3
m3
26.3
150.0
3,945.0
channels
m3
2.8
170.0
476.0
Total
Price
EUR
reinforced concrete
2
Total
16,567.5
kg
10,840.0
0.8
Total
8,672.0
8,672.0
IV Insulating works
1
m2
125.0
7.0
875.0
m2
114.0
6.0
684.0
PAGE 76
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
m2
19.0
15.0
285.0
m2
339.0
9.0
3,051.0
IV Insulating works
Total
Total
Price
EUR
4,895.0
V Metal works
m'
7.8
50.0
390.0
m2
71.6
50.0
3,580.0
V Metal works
Total
3,970.0
VI Miscalenious works
1
piece
12.0
15.0
180.0
lump
sum
1.0
150.0
150.0
VI Miscalenious works
Total
4.7. SUMMARY FOR (05.) SEPARATING CHAMBER AND (06.) PRIMARY TREATMENT
PAGE 77
330.0
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
SUMMARY
I Earth works
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Metal works
VI Miscalenious works
5,261.4
16,567.5
8,672.0
4,895.0
3,970.0
330.0
TOTAL
39,695.9
UNIT
QTY
Unit
Price
EUR
Total
Price
EUR
07.EQUALIZATION BASIN
I Phase-1 of quantities for building
I Earth works
m3
384.0
12.0
4,608.0
m3
7.8
14.0
109.2
m3
112.0
2.5
280.0
m3
1.5
14.0
21.0
PAGE 78
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
by
UNIT
QTY
Unit
Price
EUR
m3
271.0
2.0
Total
Price
EUR
the
I Earth works
Total
542.0
5,560.2
Plain concrete
m2
71.5
6.0
foundation slab
m3
21.5
120.0
2,580.0
horiyontal slabs
walls
radial walls
0.6
170.0
102.0
m
m3
54.0
150.0
8,100.0
channels
dropping layer
m3
m3
1.2
16.0
150.0
100.0
180.0
1,600.0
429.0
reinforced concrete
2
Total
12,991.0
unloading,
kg
9,330.0
0.8
Total
7,464.0
IV Insulating works
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
7,464.0
PAGE 79
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
m2
129.0
9.0
1,161.0
m2
169.0
7.0
1,183.0
m2
56.6
6.0
339.6
of
concrete
Total
Price
EUR
surface
IV Insulating works
Total
2,683.6
V Metal works
m2
V Metal works
1.0
50.0
Total
50.0
50.0
VI Miscalenious works
1
piece
15.0
15.0
225.0
lump
sum
1.0
100.0
100.0
Total
325.0
SUMMARY
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
07.EQUALIZATION BASIN
PAGE 80
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
I Earth works
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Metal works
VI Miscalenious works
TOTAL
5,560.2
12,991.0
7,464.0
2,683.6
50.0
325.0
5,885.2
UNIT
QTY
Unit
Price
EUR
Total
Price
EUR
08.SBR BASIN
I Phase (1 par = 2 basins)
I Earth works
m3
3,302.0
12.0
39,624.0
m3
564.0
14.0
7,896.0
m3
498.5
2.5
1,246.3
m3
2,803.5
2.0
5,607.0
I Earth works
Total
54,373.3
PAGE 81
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
m2
659.5
6.0
3,957.0
m3
13.0
120.0
1,560.0
foundation slab
walls
cantilever channels
m3
m3
m3
330.0
795.0
2.3
120.0
150.0
170.0
39,600.0
119,250.0
391.0
cantilever trail
m3
0.6
170.0
102.0
Total
Price
EUR
Plain concrete
Total
164,860.0
kg
115,000.0
0.8
Total
92,000.0
92,000.0
IV Insulating works
m2
1,072.0
9.0
9,648.0
PAGE 82
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
m2
308.0
7.0
2,156.0
m2
550.0
6.0
3,300.0
IV Insulating works
Total
Total
Price
EUR
15,104.0
V Metal works
1
m'
68.0
50.0
3,400.0
m2
2.0
50.0
100.0
V Metal works
Total
3,500.0
VI Miscalenious works
1
piece
32.0
15.0
480.0
lump
sum
1.0
100.0
100.0
Total
580.0
SUMMARY
I Earth works
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
08.SBR BASIN
54,373.3
PAGE 83
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Metal works
VI Miscalenious works
TOTAL
164,860.0
92,000.0
15,104.0
3,500.0
580.0
330,417.3
UNIT
QTY
Unit
Price
EUR
Total
Price
EUR
09.COLLECTING BASIN
I Earth works
m3
1,110.0
12.0
13,320.0
m3
144.0
14.0
2,016.0
m3
518.5
2.5
1,296.3
m2
12.0
14.0
168.0
m3
591.5
2.0
1,183.0
PAGE 84
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
I Earth works
QTY
Unit
Price
EUR
Total
Total
Price
EUR
17,983.3
Plain concrete
m2
156.0
6.0
foundation slab
m3
61.6
120.0
7,392.0
horizontal slabs
exterior walls
m
m3
22.1
52.0
170.0
150.0
3,757.0
7,800.0
interior walls
coronas
m3
m3
15.9
4.8
150.0
160.0
2,377.5
768.0
posts
beams
m3
m3
0.6
170.0
102.0
936.0
reinforced concrete
2
Total
23,132.5
kg
15,700.0
Total
0.8
12,560.0
12,560.0
IV Insulating works
PAGE 85
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
m2
390.5
9.0
3,514.5
m2
211.0
7.0
1,477.0
m2
123.5
6.0
741.0
IV Insulating works
Total
Total
Price
EUR
5,732.5
V Metal works
m2
V Metal works
5.0
50.0
Total
250.0
250.0
VI Miscalenious works
piece
15.0
15.0
225.0
lump
sum
1.0
100.0
100.0
VI Miscalenious works
Total
325.0
SUMMARY
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
09.COLLECTING BASIN
PAGE 86
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
I Earth works
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Metal works
VI Miscalenious works
TOTAL
17,983.3
23,132.5
12,560.0
5,732.5
250.0
325.0
59,983.3
UNIT
QTY
Unit
Price
EUR
Total
Price
EUR
10.THICKENER
I Earth works
1
270.5
12.0
3,246.0
m3
6.5
14.0
90.3
m3
92.5
2.5
231.3
m3
171.5
2.0
343.0
m3
2.0
Total
14.0
28.0
3,938.6
I Earth works
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
PAGE 87
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
Total
Price
EUR
m2
36.5
6.0
m3
13.9
120.0
1,668.0
29.5
150.0
4,425.0
Plain concrete
219.0
reinforced concrete
concreting WTP concrete
MB 30 (WTP8)
Account per m3.
foundation slab
walls, channels, bridge
Total
6,312.0
kg
4,340.0
0.8
Total
3,255.0
3,255.0
IV Insulating works
m2
116.0
9.0
1,044.0
m2
124.0
7.0
868.0
34.0
Total
6.0
204.0
2,116.0
vertical
foundation walls
foundation slab
IV Insulating works
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012
PAGE 88
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
UNIT
QTY
Unit
Price
EUR
piece
1.0
630.0
630.0
lump
sum
1.0
100.0
100.0
Total
Price
EUR
V Miscalenious works
V Miscalenious works
Total
730.0
SUMMARY
10.THICKENER
I Earth works
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Miscalenious works
TOTAL
3,938.6
6,312.0
3,255.0
2,116.0
730.0
16,351.6
TOTAL SUMMARY
STRUCTURE
A.
C.
03.GUARD HOUSE
EUR
431,056.00
9,207.20
PAGE 89
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
C.
12.COMMAND BUILDING
222,238.65
D.
D.
07.EQUALIZATION BASIN
D.
08.SBR BASIN
D.
09.COLLECTING BASIN
59,983.25
D.
10.THICKENER
16,351.55
39,695.90
5,885.20
330,417.25
TOTAL
1,114,835.00
PAGE 90
PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
5. DRAWINGS
Number
1017- IP - A-A0001
Name
Geodetic plan with marked borders and vertices of the plot and cadastral
plan, R=1:1000
02. Sliding gate with electric drive and pedestrian gate Gate scheme
plan view, sections and details, R=1:20
1017- IP - A-A0502
1017- IP - A-A0801 08. SBR basins Plan view of underground level, R=1:100
1017- IP - A-A0802 08. SBR basins Plan view of above ground level, R=1:100
1017- IP - A-A0803 08. SBR basins Sections 1-1 i 2-2, R=1:100
1017- IP - A-A0901
09. Collecting basin Plan views of underground and above ground level
and sections, R=1:100
1017- IP - A-A1001 10. Thickener Plan views and sections I-I i II-II, R=1:100
PAGE 91