GOVERNMENT OF MONTENEGRO

MINISTRY OF SUSTAINABLE
DEVELOPMENT & TOURISM

PRELIMINARY DESIGN FOR WWTP CETINJE &


SEWERAGE NETWORK WITH FACILITIES

BOOK 5 WASTE WATER TREATMENT


PLANT
Volume 5.3 Architectural Design

MAY 2013.

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

GENERAL PROJECT CONTENT


No.

NAME OF PROJECT PART


GEOTECHNICAL STUDY
HYDROLOGICAL STUDY ON RAINFALL AND FLOW

BOOK 1

GENERAL BOOK

BOOK 2

SEWAGE NETWORK

BOOK 3

ATMOSPHERIC NETWORK

BOOK 4

HYDRAULIC TUNNEL BELVEDER

BOOK 5

WASTE WATER TREATMENT PLANT (WWTP)

Volume 5.1

Process design

Volume 5.2

Hydraulic design

Volume 5.3

Architectural design

Volume 5.4

Mechanical design

Volume 5.5.1

Electrical design new TS

Volume 5.5.2

Electrical design electrical equipment for the treatment process and


SCADA

Volume 5.5.3

Electrical design additional installations

Volume 5.6

Previous expropriation study

Note: All general documentation of project is located in Book 1 General book.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

TERMS OF REFERENCE

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

TABLE OF CONTENT
1. TECHNICAL DESCRIPTION OF ARCHITECTURAL DESIGN ..............................................................3
1.1. INTRODUCTION ............................................................................................................................................ 3
1.2. LOCATION ................................................................................................................................................... 3
1.3. PLANT LAYOUT ........................................................................................................................................... 3
1.4. (A) (01.) FENCE SURROUNDING LAND, WITH (02) VEHICLE AND PEDESTRIANS GATES ..................................... 4
1.5. (B) INTERNAL ROADS .................................................................................................................................. 4
1.6. (C) ARCHITECTURAL STRUCTURES .............................................................................................................. 4
1.7. (D) HYDROTECHNICAL STRUCTURES ............................................................................................................ 7
1.8. OBJECTS ON THE WATER LINE ..................................................................................................................... 7
1.9. OBJECTS ON THE SLUDGE LINE.................................................................................................................... 8

2. GENERAL TECHNICAL CONDITIONS FOR EXECUTION OF BUILDING AND TRADE WORKS ...10
2.1. GENERAL CONDITIONS ............................................................................................................................... 10
2.2. PRELIMINARY WORKS ON BUILDING SITE ..................................................................................................... 12
2.3. EARTH WORKS .......................................................................................................................................... 12
2.4. MASONRY WORKS ..................................................................................................................................... 13
2.5. CONCRETE AND REINFORCED-CONCRETE WORKS ....................................................................................... 14
2.6. WATERPROOF REINFORCED-CONCRETE WORKS ......................................................................................... 15
2.7. REINFORCING WORKS ................................................................................................................................ 15
2.8. CERAMICS WORKS ..................................................................................................................................... 15
2.9. VEHICLEPENTRY WORKS ............................................................................................................................ 16
2.10. JOINERY WORKS........................................................................................................................................ 16
2.11. TIN WORKS................................................................................................................................................ 16
2.12. METALWORKS ........................................................................................................................................... 17
2.13. PAINTING WORKS ...................................................................................................................................... 17
2.14. FACING WORKS ......................................................................................................................................... 17
2.15. INSULATING WORKS .................................................................................................................................. 18
2.16. ROOF COVERING WORKS ........................................................................................................................... 18
2.17. GLAZING WORKS ....................................................................................................................................... 18
2.18. FLOORS FINISHING WORKS......................................................................................................................... 18

3. ARCHITECTURAL PHYSICS.................................................................................................................20
4. BILL OF QUANTITIES ............................................................................................................................50
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 1

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
4.1. PRELIMINARY WORKS WITH (01) FENCE AND (02) GATES ............................................................................ 50
4.2. (03) GUARDHOUSE.................................................................................................................................... 53
4.3. SUMMARY FOR (03.) GUARDHOUSE ........................................................................................................... 63
4.4. (12.) COMMAND BUILDING ......................................................................................................................... 63
4.5. SUMMARY FOR (12.) COMMAND BUILDING ................................................................................................. 74
4.6. (05.) SEPARATING CHAMBER AND (06.) PRIMARY TREATMENT ................................................................... 75
4.7. SUMMARY FOR (05.) SEPARATING CHAMBER AND (06.) PRIMARY TREATMENT............................................ 77
4.8. (07.) EQUALIZATION TANK......................................................................................................................... 78
4.9. SUMMARY FOR (07.) EQUALIZATION TANK ................................................................................................. 80
4.10. (08.) SBR BASIN ...................................................................................................................................... 81
4.11. SUMMARY FOR (08.) SBR BASIN ............................................................................................................... 83
4.12. (08.) COLLECTING BASIN .......................................................................................................................... 84
4.13. SUMMARY FOR (08.) COLLECTING BASIN ................................................................................................... 86
4.14. (10.) THICKENER ....................................................................................................................................... 87
4.15. SUMMARY FOR (10.) THICKENER ............................................................................................................... 89
4.16. TOTAL SUMMARY ...................................................................................................................................... 89

5. DRAWINGS.............................................................................................................................................91

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 2

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

1. TECHNICAL DESCRIPTION OF ARCHITECTURAL DESIGN


1.1. INTRODUCTION
Following documentation was used for this project:
Terms of reference
Feasibility study for Waste Water Treatment Plant Cetinje (Energoprojekt
Hidroinzenjering a.d., december 2009.)
Geodetic plan
Cadastral plan

1.2. LOCATION
Cetinje, defined as the royal capital, belongs to the central region of Montenegro, and
covers an area of 910 km with a low population density. The city core is situated in
Cetinje field, at the foot of the mountain Loven, the average altitude of 670 m. Nearby
fields are karst, bare and steep slopes, with caves as a typical karst formations of the
terrain. There is Cetinje cave in the town, which is particularly attractive, and nearby is
Lipska cave.
On the territory of the town is community Rijeka Cmojevia on the banks of Skadar Lake,
with 330 inhabitants, in which the EU funds built WWTP of compatible capacity. The
municipality of Cetinje numbered 18 482 inhabitants in 2003., of which 15 137 in the
Capital (4707 households).
Complex of WWTP Cetinje is located north of the village Lipa and west of the village
Dobrsko selo, with the access road to the north side. Terrain is at altitude of 525.00 to
540.00 meters above sea level. The total enclosed area of the plot is 6600.00 m, but
should leave a zone of about min. 5.00 m in front of the fence for controling access and
maintenance of the fence. The total length of fence is 320 m. Enclosed surface provides
the necessary space for the construction of complete plant for both construction phases.
Total area of leveled ground is 8 360,00 m2. Projected slope diagonally on the plot is ~
0,75% (northwest - southeast).
The site is located in the third building - climatic zone.

1.3. PLANT LAYOUT

Plant shall be accessed from the north side with newly designed asphalt road 6.00 m
width. Enclosure of the complex is planned with (01) fence with pedestrian gate while
the truck and car traffic was carried over the main entrance (02) sliding gate with the
electric drive. (03) Guardhouse is to be located at the entrance of the complex, on the
northeast, near the entrance gate and the road that leads to a complex. Parking lots for
passenger vehicles, staff and guests are situated rihgt behind the guardhouse.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 3

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
From the Northwest of the complex, are located: (04.) Flowmeter input, on the south:
(05.) Separating chamber, (06.) Primary treatment Huber unit, (07.) Equalization
tank, (10.) Thickener, (12.) Command building, (09.) Collecting basin i (13.) Energy
block.
Parallel on the south side are located (08.) SBR basins. On the east side, by the iner
road, is (11.) Flowmeter output.

1.4. (A) (01.) FENCE SURROUNDING LAND, WITH (02) VEHICLE AND PEDESTRIANS
GATES
Enclosure of the complex is planned with fence with pedestrian gate and sliding gate with
the electric drive for vehicles.
Fence posts are designed with steel tubular profiles L= 3.00m, founded on concrete single
foundations, with inter-space of 2.00m.
Fance is to be made of galvanized, steel, wire-netting, strained hight of 2.40m, with one
row of barbed wire above, and total hight of 2.50 m. Tightening of wire-netting is to be
done using galvanized steel wire d=4mm, in upper, middle and lower zone, with bracing
struts in every field.
Entrance gate is designed with automatic slide with electronic drive for motor vehicles
transportation and one wing gate made of steel tubular profile with hinges for pedestrian
access. Gate and fence posts have to be anti-corrosive protected, with epoxide resin.

1.5. (B) INTERNAL ROADS


Location shall be accessed from the north side with newly designed asphalt road 6.00 m
width (not the subject of this project). The plant shall be served on the north side by twoway traffic d = 6.00 m and one-way traffic d=3,00m organized from the entrance gate as a
ring around the buildings at the plant, which provides access to all objects, as well as the
entrance to the command building from the plateau at elevation 528.95 masl.

1.6. (C) ARCHITECTURAL STRUCTURES


1.6.1. (03.) GUARDHOUSE
Guard house is located on leveled plateau at elevation +528.80 masl, near the entrance
gate, from which it is direct, visual and physical access control or exit from the area of
plants on the access road.
Guard house is designed as ground-floor building, square shaped, dimensions 4,20 x
4,20m and contains office (for one or two persons), entrance hall and bathroom.
Ground floor elevation of the building is raised for 0.15m in relation to the elevation of the
plateau at the site of construction.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 4

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Guard house is to be founded on reinforced concrete continuous footing and ground
beams. Reinforced concrete skeleton construction (posts and beams) is to be used for
this building.
Hipped roof with wooden construction, covered with trapezoidal, coloured aluminium
sheet metal is designed for this building.
External walls are made of brick wall 12 cm, 3 cm layer of air, insulation 5 cm, PE foil and
bricks 12 cm, the total thickness of 12 +12 +4 +5 = 33 cm. Thickness of partition is
d=12cm. All walls should be plastered on both side and painted with dispersion paint, and
in moisture rooms covered with ceramics tiles.
The inner surface of the wall shall be painted by dispersion color. Walls of the toilet shall
be coverd with ceramics tiles up to 1.50m hight from the finished floor.
Floors are to be covered with ceramics tiles.
All ceilings are to be plastered with mortar and painted with dispersion colors.
External doors and windows are made of eloxi aluminium, glazed with thermal insulating
glass. Glazing is designed with thermal insulating glass, sized 4+12+4 mm.
All the gutters and linings shall be made out of aluminium, plasticized sheet metal, in the
same colour as metalworks.
Exterior finishing of facade is a silicate brick with processed, open joints, up to the level of
a window beams or upper horizontal beam.
1.6.2. (12.) COMMAND BUILDING
Command building is multi-level structure, rectangular shape, overall dimensions 17:44 x
11.54 m, 9.25 m height. Object is accessed from the plateau on the north and northwest
sides. Ground floor elevation of the building is raised for 0.15m in relation to the elevation
of plateau at the site of construction. Ground elevation is on the absolute elevation of
528.95 mals.
In the basement is provided: space for compressors, filters and UV disinfection and stairs.
The ground floor contains the following facilities:
Hallway and stairs to the first floor and basement;
Office;
Two toilets with sink;
Warehouse;
Workshop;
Room for sludge treatment;
Mounting hole for the basement.
All rooms are accessible through the central hall, and for workshop, room for sludge
treatment and mounting hole is also provided direct access from the outside.
First floor contains the following facilities:
Command room;
Director office;
Two working office;
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 5

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

Two toilets with sink


Recraetion room with kitchen for workers;
Physical and chemical laboratory;
Microbiological laboratory;
Hallway with stairs.

Building shall be founded on reinforced waterproof concrete foundation slab over


compacted gravel d=20cm and PVC foil.
Reinforced concrete skeleton construction (posts and beams) filled with gas concrete
blocks, thickness d = 20 cm, is to be used for this building.
Floor ceiling is reinforced concrete slab thickness 15cm.
Double-pitch roof (slope 12%), shall be made of gas concrete slabs ans covered with
trapezoidal, plasticized, aluminium sheet metal with all the required insulation.
All exterior and interior walls are made of gas concrete blocks. Exterior walls are 20cm
thickness, and partition walls are 10cm and 20cm thickness. All walls should be plastered
on both side and painted with dispersion paint, and in moisture rooms covered with
ceramics tiles up to 2.10m hight from finished floor.
Floors are covered, depending on the purpose of the room, with various of materials. In
the offices are vinflex floor tiles, in laboratories acid tiles, while in the other rooms ceramic
tiles, including the stairs.
All ceilings on the ground floor are to be plastered with mortar and painted with dispersion
colors. Suspended ceiling shall be made in all the rooms on the first floor from the hight
2.70m from the finished floor.
External doors and windows are made of eloxi aluminium, glazed with thermal insulating
glass. Glazing is designed with thermal insulating glass, sized 4+12+4 mm. Interior doors
are made of aluminum, plastic, single glazed tempered glass (d = 6 mm).
All the gutters and linings shall be made out of aluminium, plasticized sheet metal, in the
same colour as metalworks.
Exterior finishing of facade is a silicate brick with processed, open joints, up to the level of
a window beams or upper horizontal beam
Choosing colors for facades, windows and doors, interior surfaces of walls and floors shall
be done in consultation with the designer.
Architectural-formative aspect
As for the architectural and formative aspects, command building was designed as object
of compact form, adopted to the environment and the functional requirements as such
plant requires. When choosing materials for the finishing of the facade and the roof, it was
taken into account that the solution does not differ from the architectural style which is
represented in this region.
For the materialization of the facade is chosen full silicate brick, which not only meets
aesthetic criteria, but is very resistant to weather conditions. This supports its long
duration, which significantly reduces maintenance costs of facilities.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 6

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Selected type and shape of the roof, with shallow eaves, in a simple manner gives final
contour to the construction, and use of the metal sheet for roofing has a long tradition in
this region.
The fence around the plant has been constructed in the traditional manner, prescribed for
this type of facility.
All facilities have direct and easy access from the roads.

1.7. (D) HYDROTECHNICAL STRUCTURES


Based on hydrotechnical profile, technological layouts and measuring sketches, as well as
on structural calculations were performed architectural and construction projects for the
enclosed objects.
All objects on the water line and on the sludge line are considered. Groundwater was not
registered in the zones of foundation of structures.
When designing, it was accepted principle that water levels in all hydrotechnical structures
should be around as the elevation of the surrounding terrain.
All facilities have direct and easy access from the roads.

1.8. OBJECTS ON THE WATER LINE


1.8.1. (05.) SEPARATING CHAMBER AND (06.) PRIMARY TREATMENT(HUBER UNIT)
Function of separating chamber is whan necessary to distribute water that comes to the
WWTP on two Huber units, which makes the package with the coarse screen, grit
chamber and fine screen. Within the building is provided by pass for water that comes to
the WWTP and accrued water engages to the recipient.
The function of Huber's unit is to remove coarse material, which could reduce the
efficiency of the process or to contaminate waste water routes. Waste can be transported
directly into the container, and then carried to the dumpsite by trucks. It is planed
construction of two Huber units (one for the first phase) capacity 60l/s.
Coarse screens are used for protection of pumps, valves, piping and pipe fittings of
coarse materials that could damage them.
Aerated grit chamber provides the necessary retention time of waste water resulting in a
separation of gravel and sand, while simultaneously providing aeration for mixing of
wastewater in grit chamber.
Fine screens remove particles to protect the process equipment located downstream.
The structure is planed as monolithic, massive construction, designed with waterproof
reinforced concrete on site. The structure is planed for the final phase. The object
dimensions are 14,60 x 7,80m. The active depth of the object is from 2,50 to 3,00m.
1.8.2. (07.) EQUALIZATION TANK

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 7

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
After the primary (mechanical) treatment, it is provided the construction of two
equalization tanks (one in the first phase of construction) that would control the future flow
of the process line, on the SBR basins.
The structure is planed as monolithic, massive construction, designed with waterproof
reinforced concrete on site. It is planed one unit for the first phase and one for the second
phase of the construction. The object dimensions are 12,60 x 4,86m. The active depth of
the object is 4,00m.
1.8.3. (08.) SBR BASIN
Sequential Batch Reactor (SBR) is a treatment with activ sludge, which is based on
charge and discharge, and that provides the performance of different treatments in a
single reactor.
There are four basic cycles in a process that takes place in the SBR:
The sequence of filling
The sequence of reactione
The sequence of deposition
The sequence of discharge
After the sequence of discharge follows the sequence mode whose duration varies.
During the sequence mode can drop the mud can be dropped, if not removed during the
discharge phase of the SBR. During this phase the SBR is being prepared for the next
cycle.
In construction plans, building of structures is planed in pairs. In the first phase one pair is
planed, and in the final phase additional two pairs. The structure is planed as monolithic,
massive construction, designed with waterproof reinforced concrete on site. The object
dimensions are 22,90 x 21,60m. The active depth of the object is 4,50m.

1.8.4. (09.) COLLECTING BASIN


After treatment in the SBR basins, it is provided the construction of the collecting basin
(one in the first phase of construction) that would further control the flow of tertiary
treatment, the filters and UV disinfection, located in the basement of the command
building.
The structure is planed as monolithic, massive construction, designed with waterproof
reinforced concrete on site. The complete structure is planed for the first phase. The
object dimensions are 11,10 x 11,10m. The active depth of the object is 3,40 + 0,50m.

1.9. OBJECTS ON THE SLUDGE LINE


1.9.1. (10.) THICKENER

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 8

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Sludge thickening is the first step in reducing the volume of sludge. The process of
thickening mainly increase concentration of the sludge collected in the SBR. Thickening
process has the following advantages:
Thickener is gravity type, with the circular cross section. Raw sludge is being deposited
and thickened. Scraper directs thickened sludge in the hub from which is extracted and
taken to the filter press.
Clear water in the thickener overflows in circumferential channel and by drain pipe is
directed to the separating chamber, which is situated before the fine screen.
Elevation of water in the thickener is 73.50 masl. It is planed that the device has a
continuous operation. It is expected that after treatment obtains 4% sludge.
It is planed construction of one primary thickener in the first and one in the second stage.
The structure is planed as monolithic, massive construction, designed with waterproof
reinforced concrete on site. The object diametar is 11,10m. The active depth of the object
is 3,50m.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 9

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

2. GENERAL TECHNICAL CONDITIONS FOR EXECUTION OF


BUILDING AND TRADE WORKS
2.1. GENERAL CONDITIONS
All positions within bill of quantities and prices include execution of every work completly
according to drawings, technical report, calculation of quantities and prices, structural
analysis, details as well as subsequent details made by Consultant, valid technical
regulations, standards and Supervisors or Consultants instructions, implicitly, highly
skilled and precise.
All works and materials included in specification of items in this bill of quantities must be
included in price proposed by Contractor. Contractor is obliged to include sales prices in
bill of quantities. These prices consists of: all work expensis, material with standard
dispersion, scaffolds, water, light, driving material and power for engines, overhead
expenses, construction, social contribution, all municipalties and state duties, Contractors
earnings as well as any other expenses, but only according to valid regulations for sales
price development. These last extra expenses include building material, including all the
expenses for special work conditions and which are foreseen in Civil engineering
standards.
Contractor can not demand higher prices then those in bill of quantities, except if its
diferently noted in individual work item. Calculation and specification of executed work is
to be conducted according to mean civil engineering standards, which is also covenants
by client. Work description from these standards are binding for Contractor, unless
diferently described. Contractor is obliged to execute all the works according to general
description of individual work items, if described as such, unless its diferently forseen.
With all construstion and trade works the use of quality materials is required. Materials
must meet valid technical conditions, standards description of appertained work item from
bill of quantities. Materials that are being placed must be of high quality, designed type,
unless its work position include less quality material. Contractor is obliged to immediatly
remove material that doesnt fulfill designed specifications and conditions, and by Clients
information. Also Client is obliged to stop the works if Contractor decides to use these
materials. In controversial situations, material should be sent to Institut for material testing,
providing results with value for both Client and Contractor. If Contractor decides to use
unappropriate material regardingless to testing results, all material demage coused by this
decision is Contractors responsibility, without the rights to complain and object caused for
demolition, made by Client, and Contractor is obliged to accept Clients decision.
All construction and trade works require use of skilled, suitable, qualified labour, as
forseen for individual positions, and according to mean civil engineering standards.
Contractor is obliged to remove inscrupulous and unqualified workers.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 10

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Contract manager, in front of Contractor, is obliged to ask for Clients instructions
considering locations for executing certian types of work, before beggining certian types of
work. After receiving instructions, and using Construction diary, Contractor should conduct
commission and begin building works. If building works are to be executed against
instructions according to Construction diary, details, drawings, Contractor loses rights for
shortage claim. If Constructor conducts certian building works, against designed
description, drawings and details, no justifications will be accepted, further more it is
Contractors obligation to demolish and remove all the works that were executed,
regardingless on quantity of finished work. After demolishion Contractor is also obliged to
conduct rebuilding works, according to forseen drawings, specification and details, unless
if changes were made with Clients approval and according to Construction diary.
Contractor doesnt have the right to demand extra payment if conducts building works with
more quality and with higher expenses then designed, and if those works were executed
without Clients approval.
Contractor is obliged to maintain structures and whole building site at all times, also,
before finishing and delivering structures, to conduct following works: backfill all blind
holes, septic tanks, holes from scaffolds etc., as well as to levell whole area and conduct
everything good and solid (so that settlement doesnt aprear). Contractor is obliged to
despose off all muck, scaffolds and dust from structures, and also is obliged to arrange
external surfaces and pepair whole structure for delivery.
Contractor is, also, obliged to repair any demage, that was developed on site, and to
come to original appearance, on his expense. Possible structural changes, including
completly or partialy increasing or removing certian works from specification, cousing
extra expences, Contractor is obliged to accept without complains, limitations and make
claim which will be calculated by agreed prices. In case of necessity for works that dont
have the agreed price in bill of quantities, Contractor is obliged to set cost, with Clients
approval, and note it in Construction diary.
Contractor has the right to demand written quality assurance, from firms engaged for
execution of specialist works (roof insulation, WPR penetration compound, new materials
etc.). Contractor is obliged to coordinate all sub-contractors that work individualy, so they
dont demage each other works. If demage conduct sub-contractors are obliged to repair
coused demage on their expense. Otherwise, expanses becomes Contractor duty. Same
procedure refers to disturbance of works.
Supervisor has the right to demaind that Contractor provide samples of new materials
(with certificate of compliance). Choise will be made on these samples. Acquiring of
samples shall not be payed extra.
Besides all temporary structures necessary for building works, Contractor is obliged
provide premise for Supervisor office, and keep it in order, with lightening, heating,
cleaning and necessary office equipment.
Contractor is obliged to provide approval, from legislative authority, if more land is needed
for material storage. Expenses for these works shall not be payed extra.
Constructor shall submit certificate that the building is set at the right location ( Certificate
of location inspection) as well as receipts for water and electrical use.
After delivering complet structure to Client, Contractor is responsible for everything during
warranty period, and according to leagal regulations. Any possible demage or failure
Contractor is obliged to repair on his expense.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 11

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Construction book and diary, are to be conducted according to valid leagal regulations,
inscribeing necessary data daily. Contractor and Clients representative daily examin and
authorize books with signature on each page.
General conditions for development of building structures and works and valid clauses
for development, as well as Bill of quantities and prices are, beside general conditons an
integral part of contract.

2.2. PRELIMINARY WORKS ON BUILDING SITE


Before making tender offer, Contractor must visite terrain, and get familiar with local,
climatic and other conditiones, as well as terrain characteristic, building possibilities and
other elements important for setting up appropriate rates. It is important that the
Contractor, before building begins, gets familiar with local conditiones, regulations, access
roads, possible waste locations and other elements that are influencal on undisturbed
execution of work.
If technical documentation, that was given to Cotractor, doesnt contain detail topografic
drawings, site surveying must be condacted before the beggining of building works. Site
surveying, as well as making suitable drawings with enough levels, fixed points,profiles
and other elements important for future works is Clients or by their authorizide body
responibility. Client is obliged, along with Contractor, to determine most suitable locations
for temporary-ancillary works, such as: barracks, store houses, siloes an other. After
finnishing structure development, these structures are demolitioned.
Client should intervene with local authority, so that certain administrative jobs, related to
development, could be solved in apropriate time. Clients responsibilities are also
interducing Contractor, in due time, with building site, delivery of designed routes, list of
bench marks and other geodetic points and mark their locations on terrein, as well as to
deliver technical documentation and documentation parts necessary for execution of work.
Contractor is obliged to, in due time, acquiring and feed building site with all neccesary
material, tools, constructional plant and all the other equipment neccesary for building to
take place on time and complet at agreed time. Contractor must have enough amount of
professional skilled stuff.

2.3. EARTH WORKS


Before beggining of earth works, Contractor is obliged to conduct following works: weed,
trees and bushes needs to be removed from building terrain, and than in Supervisor
presence representative of Client, stake guilding on terrain, determine permanent points
and elevations, also to survey levels for whole building site. Surveying is to be done
transversaly as well as longitudinaly with distance of 5m, which shall be entered in
Measurment book. References from measurment book shall be used for calculation of
earth works. All these works are to be calculated within excavation costs and will not be
payed individualy. Unit price for excevation works should include protection of remaining
trees. Demolition of massive structures shall be included within special work position.
All excevation works are to be executed with even-cutt side edges, designed declination
angle and fine finishing. These works are, also, to be included within unit price of
excevation work. Possible drainage, coused by Contractors mistake, shall not be
recognited and payed extra. Possible strutting and insurance of trenches and excevation
edges should meet valid regulations, in means of stopping earth caving in and protecting
workers.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 12

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
If damp, wet, slushed soil appears while digging, strutting and insurance of such soil shall
not be payed extra, which means it will be considered as basic soil classification.
Underground water lift, if necessary, is to be considered as unforeseen work. Under ater
excavation, shall be considered as extra works and will be payed as such. Atmospheric
water lifting shall not be payed extra.
Selected, excavated soil shall be used as filling around foundations, walls and underneath
floors. Top soil is to be separately removed and dumped and store for later use. Top soil
or soil with organic admixture can not be used as filling.
Excevatin works in open cut, are to be conducted mechanicly, with all necessary side
insurance. Excevation works for countinous footings, single foundations are to be
executed with engines, according to conditions of buildings.
Filling and thumping are to be conducted manualy and mechanicly in layers of 10-30cm,
with possible wetting, and up to designed density given within structural analysis. If, while
digging, one comes accross of soil unfavourable for foundations (muck, peat, different
organic and anorganic waste) digging must conduct till solid ground, and with cost for
open cut excevation. Filling should be done with appropriate materials in layers of 15cm,
with thumping and according to price for soil fillings underneath groun-floors. In case if
some parts of foundations are to be digged out, those parts shall be filled with thin
concrete and and on Contractors expense.
Concrete works for foundations shall beggin only after Supervisors approval of excevation
works, which is reported in Construction diary. Remaining earth, which is not used for
filling, is transported away from the site and placed on locations determined by public
utility. Transportational length shall be determinated within bill of quantities and prices,
which can be changed for aproximatly 1km, without changing price.
Calculation is to be conducted per m3 naturally-moist earth excevation work in autochthon
state, and according to site surveying. Contractor is obliged to survey cross sections on
terrain before beggining earth works and according to designed excevations, which are
approved by Supervisor.
Unit price include: clearing of terrain, staking out, excevation works, external and internal
transportations, lifting-conveying of atmospheric water, strutting and insurance, triming,
rough and fine finishing.

2.4. MASONRY WORKS


Materials for masonry works needs to be of high quality with skilled development.
Clay bricks and blocks need to fulfill following: to be of machine construction, hard-burnt,
straight formed, flat edges and surfaces, without fissures, also without lime and saltpetre,
porous.
Masonry works needs to be conducted exectly according to design and structural
analysis, clean in horizontal rows, also brick peases should not be smaller than of total
brick size.
Bonding needs to be straight shape, and edges and wall surfaces levelled and vertical.
Sand needs to be clean, sharp, organic admixture and sludge.
Lime must be burnt, corectly slaked, also maturing for brick masonry lasts 30 days while
for rendering works maturing lasts 8 weeks.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 13

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Water must be clean, clear without any sludge admixture and organic constituents.
Cement should meet certain regulations.
Rendering should be made according to designed proportions, mix properly, remove balls
of sod from the mixture.
All necessary materials should be conveid to the building site in due time.
Rendering should start after the walls are dried out and building settled. Cleaning and
pointing should be done befor rendering, so plaster can bond better. Concrete walls are
renderd with compo or cement plaster. Rendering of face wall , must not start before
internal rendering has finished and dried out. Rendered surfaces must be flat, without
surges, and extensions correct, sharp and straight. Repeted usage of descendig plaster is
prohibited.
Calculation of masonry works shall be daone per m or m, and it shall be noted for every
work item. Proposed unit prices include work, material, rolling and facing scaffold as well
as all the other direct or indirect expenses.
Calculation of rendering works shall be per m. Price unit include: all necessary materials
as well as work needed for certian positions, work and facade scaffolds, hand or motor
lifts, mortar pumps, tools, placing og pallet pieces and anchors for joinery works,
metalworks or sanitaries, executing of all oppenings for instalations, patching, steel lathing
and rendering of ceramics tiles joints and part of wall overhead, collecting and removing of
muck during construction.

2.5. CONCRETE AND REINFORCED-CONCRETE WORKS


All concrete and RC works, must conduct according to Code of technical measurment and
regulations for concrete and reinforced concrete, also according to Technical
specifications for execution of concrete and reinforced concrete works, valid regulations,
design, structural analysis and reinforcing details and with Supervisors approval, which is
being noted in concrete works diary.
Contractor is obliged to conduct all the extra works on reconstruction, removal and
repeated concrete works, according to Supervisors orders. Repeated concrete works on
designed elements and constructions are being conducted, when results of control and
subsequent review shows that placed concrete does not fulfill standartds and regulations,
but without the right on compensation of expenses because of the pause caused with
these extra works. Supervisor needs to approve all excavations, concrete forms and
reinforcing, before the beggining of concrete works, and the necessary material needs to
be conveid and storaged on building site.
The same type of cement must be used for conduction of one concrete construction.
Secondary concrete is a type of concrete that is easily placed ulteriorly making jointless
bond with primary construction (concrete) in order to make conections with equipment that
is being placed ulteriorly, sloping, bearings etc.
Concrete forms and supports shall not be calculated individually. Contractor is obliged to
deliver concrete works design, with concrete forms and supports design which they attend
to use, build, place, take down, dismantle and remove from site, to Supervisor for
approval.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 14

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Payment is to be conducted according to unit prices per m of completly placed concrete,
that is approved by Supervisor. Contractors demainds for additional payment of any
expenses for concrete works will not be approved, as it is Contractors obligation to include
all the expenses within unit price for concrete.

2.6. WATERPROOF REINFORCED-CONCRETE WORKS


Waterproof RC works include hydraulic concrete grade 30, waterproof standard V-8 and
frost resistance standard M-100.
Penetration system is used for deep capillary protection. Penetration compound must
possess appropriate certificate of compliance based as well as to fulfill certain satndards
and regulations for usage of drinking water.
Works are being approved by Supervisor, after waterproof testing.

2.7. REINFORCING WORKS


All of the reinforsing works are to be vehicleried out with shapes and dimensiones
according to structural analysis and reinforcing details, approved by Supervisor, and noted
in measurment book.
Reinforcement placed according to structural analysis and reinforcing details, needs to be
cleaned from rought rust coat, even-placed and cranked, and approved by Supervisor.
Principal reinforcement will be of high quality ribbed bars RB 400/500-2, round steel bar
SB 240/360 and wire mesh.
All work, material, plant and equipment including expenses of acquiring, transportation,
storage, splicing, cutting, cranking of all shapes, cleaning and placing of reinforcing, as
well as all welding needed for grounding, are included in unit price.
All works needs to be approved by Supervisor, and only after waterproof testing.

2.8. CERAMICS WORKS


All materials that are being used must meet I-A class standards in means of quality and
size, materials needs to be new, unused, clean, even-sized, undemaged, without soluble
salts and constituents, with regulated water absorption ratio, with even and consistant
colour and shade (by Consultants choice according to colour vehicled).
Only specialist companies can conduct this type of work, according to JUS U.F2.011
standards.
Base must be of good quality and prepaired for placing (flat, dry, solid, clean) which has to
be noted in measurement book.
Veneered construction is to be leveled, without surges, and with right angled edges or
accordingt to design.
Paviour work needs to be leveled or with certain inclination towards floor drain grating,
according to design.
Calculation is to be done per m of constructioned surfaces and approved by Supervisor.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 15

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

2.9. VEHICLEPENTRY WORKS


All vehiclepentry work needs to be done assording to project, details and Clients
instructions. Grain, used as permanent in constructions, must be clean timber, dry, and to
corespond to valid technical regulations, dimensions according to project and right
bonding according to calculations.

2.10. JOINERY WORKS


All the joiners work is to be done with dry, quality grain, without fissures and worm holes,
overhanging knots and ruptures, with complitly straight and sharp edges, clean and
smothly dressed.
Wood slips, frames and all conections with wall must be set in concrete (anchoraged) in
full wall length and hight.
All wooden and veneered parts, have to be stained and painted with special matt varnish.
Consultant according to Contractors (Manufacturer) propossition, chooses hardware,
locks etc. Joinery works needs to setisfy functional, comunicational, thermal and acoustic,
as well as estetic demainds of space and ambiance.
Contractor is obliged to control all measurment within joinery layouts, on building site.
Joinery cost consists of: joinery grain, accessory and bonding material, fluid for saturation,
work, tools, whole hardware, oppening mechanisam (Ventus, shears etc.), quality varnish,
repairs after possible damage and before painting, including glass and glazing works,
unless its diferently written in work items.

2.11. TIN WORKS


New materials are to be used for tin works. These new materials with their quality and
dimensions needs to fulfil certain standards and possess appropriate certificate of
compliance.
All the tin work shall be made of plasticized aluminium sheet-metal with coresponding
shines. Sheet-metal width is min 0.55 mm.
Bonding for substructure are to be done with nails, screws and screw anchors.
All visible surfaces, drip channel, flumes need to be completly flat, straight with equal
distance from wall surfaces, slabs etc.
Before the beggining of all works, Contractor is obliged to coordinate details with
Consultant and also to check construction measurments in site. Parts of different metals
must not be in touch (electrolysis).
Calculations per m, m, are to be executed after completing works along with materials,
work, tools, transportation, placing materials, cleaning, only after Supervisor accepts
works.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 16

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

2.12. METALWORKS
Before executing metalworks, Contractor and Consultant must agree on every item,
description of technical detail, check construction measurments on site, execute all
workshop prints and get Consultants approval.
All external elements need to fulfill certain conditions and regulations, also these elements
must not have thermal bridges and must have appropriate certificate of compliance.
Metalworks, also, needs to fulfill functionl, comunicational, acoustic, thermal and aesthetic
conditions of certain structure (with Consultants agreement).
Calculation is executed for complete developed and accepted works, including glazing
works.

2.13. PAINTING WORKS


Only specialist Contractor can execute pinting works, and according to technical
conditions and regulations.
Painting works can be done manualy or mechanicaly. Coating or spraying are executed
several times, and gained shade needs to be clean, even, to complitly cover base and it
cant have traces from paint brush or roller.
Before painting Contractor is obliged to inspect quality of base and closing of shafts and
wings and inform of any irregularities. Base needs to be clean and dry ( wood needs to
have enough moisture content). Contractor is obliged to execute painting works with
materials provided for cirtain type of work with coresponding basic coating, filling, grinding
etc.
Measurment and calculation are to be done per m.

2.14. FACING WORKS


Facing works include facing with artificial stone, also plastering with fine and ductile
plaster and facing paint. Main goal of the external finishing is protection surfaces from
atmospheric, heat and sound influances, fire and leading atmospheric precipitation and
effluent vapour away.
FACING DISPERSION PAINT shall be used for coating bases with cement and extented
rendering, concrete, asbestos-cement corrugated sheet, coreboard etc. Before painting,
preliminary filling with dispersion putty as well as grounding, should be done.
External finishing are to be executed after finishing concrete, masonry, metal, joinery,
covering and insulating works, but at the same time as tin works. External finishing must
not be vehicleried out under bed weather (rain, snow, hail, heavy moisture, storm and
strong wind, high or low temperature).
Works should be calculated per m2. Areas needs to be finished developed and accepted
by Supervisor, or as it is given in work items.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 17

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

2.15. INSULATING WORKS


Under ground building parts needs to be moisture and water protected (under
pressure),with high quality, as well as increesing their durability under external physycal
and agresive influance so thay can be used.
Waterproof layer must be continuous and make waterproof coat.
Unit price per m or m include acquiring, transportation to the site and assembly, of
complete materials, tools, fuel, cleaning and ground preperation, construction and working
crew, as well as site guard and finishing off operations delivery.

2.16. ROOF COVERING WORKS


Roof is a complex construction, with a purpose to complity and longlastingly protect the
building from influance of atmospheric water and moisture, and also to protect attic
premisis from loosing heat in the winter and penetration of heat and solar radiation in the
summer.
Materials from which roofing covers are being made must have following features: I class
materials, same colour and shape everywere without grazed and broken peaces.
Roofing covers must be constructed flat and equally.
Acquiring, transportation, construction and assembly are included in unit price.

2.17. GLAZING WORKS


Basic material for glazing is glass with suitable features and dimensiones, all depending
on assigned purpose and function:
Glass that will be placed must be colourless, transparent without surges, bubbles and
stains.
Materials for glass sealing are used only as sealing materials, and not as a stiffening
agent.Fillings have purpose to seal glass in its frame, leaving it air and atmospheric
resistant.
Weather stripes can be made of rubber, PVC or neoprene. Sealing must be complete and
stop air and atmospheric conduct.
Cleaning the frame must be done after glazing.
Acquiring, construction and assembly are included in unit price.

2.18. FLOORS FINISHING WORKS


Bearing in mind the assigned purpose, following features are very important for choosing
the appropriate floor covering: abrasion resistance, crushing strength and rested
deformation, water and chemical resistance, cigarette coals, non-flammable, anti sliding,
soundproofing, electric conductance, thermal insulation, flexibility and bending strength,
dimensional stability, ageing resistance etc.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 18

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Measurement and calculation are based on actual executed works, unless technical report
proposses diferently.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 19

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

3. ARCHITECTURAL PHYSICS

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 20

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 21

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 22

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 23

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 24

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 25

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 26

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 27

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 28

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 29

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 30

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 31

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 32

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 33

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 34

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 35

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 36

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 37

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 38

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 39

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 40

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 41

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 42

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 43

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 44

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 45

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 46

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 47

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 48

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 49

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

4. BILL OF QUANTITIES
4.1. PRELIMINARY WORKS WITH (01) FENCE AND (02) GATES

POS. DESCRIPTION OF WORKS


A
B
1

1.1

1.2

1.3

1.4

1.5

QTY
D

Total
Price
EUR
D*E

PRELIMINARY WORKS
Acquisition of land, with possible displacing of electrical instalation as well as removing
existing buildings shall not be part of this design.
Bill of quantities and prices include earth works relative to newly designed terrain levell,
respectively on made up ground and solid state of terrain.
Round-trip, staking out of complex plot
and clearanse for excavation works.
m
8,360.00
0.20
1,672.00
Account per m.
Providing necessary front (approximatly
five meters) for placing works building
fence and gate around plant complex.
Account per lump-sum price.

lumpsum

1,000.00

Clearing of bushes and other vegetation,


with stockpiling away from work site, to
waste land determinated by Client or
Supervisor.
Account per lump-sum price.

lumpsum

1,000.00

Cutting down trees with trimming, pulling


out stupms and removing such materials
to suitable waste. Approximate width of
trees is 10-30cm.
Account per piece.

piece

20.00

25.00

500.00

m3

46,600.00

2.00

93,200.00

m3

8,220.00

2.50

20,550.00

Surface excavation by GN 200, VI VI


category, the leveling of the terrain on
complex .
Account per m3.

1.6

UNIT
C

Unit
Price
EUR
E

Filling of the field selected material from


excavation, leveling in the field of the
complex. Soil backfilled in layers of 20
cm, wet with water and huddle up to the
required density. Land used for road
deposited during excavation.
Account per m3.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 50

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

POS. DESCRIPTION OF WORKS


A
B
1.7
Removal of excess excavated material,
within the complex terrain was leveled at
the plant, out of a particular landfill site,
with loading and unloading soil from
vehicles, and rough soil planning in the
landfill, up to 5 km away.
Account per m3.
1.8

1, 10

Excevation
for
post
and
fence
foundations, with finishing of bottom and
dissposal of excevated materilas away
from
work
area.
(dimensions
0.80x0.50x0.50 m on every 2,00m)
Account per piece.

1.13

QTY
D

m3

38,380.00

2.00

76,760.00

m1

320.00

1.00

320.00

piece

160.00

2.50

400.00

m3

4.00

14.00

56.00

m3

19.20

120.00

2,304.00

piece

160.00

30.00

4,800.00

m1

1,862.00

1.00

1,862.00

Concrete works for fence foundations


(posts grouting). Concrete works are to
be executed using concrete grad 30, with
thumping and smoothening of surface (
in shape of shallow pyramid).
Account per m3.
0.4 x 0.4 x 0.75 x 160 = 54.00

1.12

UNIT
C

Acquiring, transportation and thumping of


gravel buffer layer. Density should be set
out according to structural analysis.
Account per m3.
0.5 x 0.5 x 0.1 x 160 =

1.11

Total
Price
EUR
D*E

Staking of line and steps-axis for placing


gate and fencing posts, as well as
cleaning and finishing of terrain.
Account per m1.

1.9

Unit
Price
EUR
E

Development or acquiring and placing


precast fence posts made of steel
cylinders with diameter of 50 mm,
(H=50+240+10cm).
Account per piece.
Acquiring and placing five rows of
galvanized steel wire d = 4mm, with
straining of framework in upper, midle
and lower zone, and diagonal braces in
every field.
Account per m1.
320,00 x 3 + 320,00 x 2.0x1.41 =
1862,50

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 51

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

POS. DESCRIPTION OF WORKS


A
B
1.14
Acquiring, transportation and placing of
galvanized, chicken wire, with diameter
of 2mm with mesh of 4 mm, strained
hight of H = 2.40m, with hanging and
tying. Framework is to be strained in
upper and lower zone, to posts and
diagonal braces in every field.
Account per m2.
320,00 x 2.4 = 768,00
1.15

Unit
Price
EUR
E

Total
Price
EUR
D*E

UNIT
C

QTY
D

m2

768.00

6.00

4,608.00

m1

320.00

1.20

384.00

piece

1.00

400.00

400.00

piece

1.00

2,500.00

2,500.00

m2

6,100.00

2.40

14,640.00

m1

300,00

m2

1.352,50

Acquiring and placing of three rows of


galvanized barb wire, d=4mm, in upper
zone, and in every field of the fence.
Account per m1.
320,00 =

1.16
Acquiring, transportation and placing of
entrance one wing steel (pedestrian)
gate. Gate is to be supplied with
necessary hardware. Gate needs to be
protected with anti corrosion inhibitor.
Account per piece.
dim. 0,90m x 2,10m
1.17

1.18

Acquiring, transportation and placing of


entrance, two wing, steel (vhiecle) gate.
Gate is to be supplied with necessary
hardware. Gate needs to be protected
with anti corrosion inhibitor. All
fabrication drawings shall be done by the
Supplier and Contractor.
Account per piece.
dim. 6,00m x 2,10m
Grassing of all free land area, with
maintenance to the first mowing.
Account per m2.

1,19

1,20

Construction of the access road to the


plant site according to the regulations for
this type of works.
The road is of length L=300,00 m, width
of 3.50 m. Unit price includes all the
necessary
work
and
materials
(excavation in the VI category material,
the buffer 25 cm, BNS asphalt 6 cm, AB
4 cm, the necessary concrete work)
Construction of the access road within
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

500,00

150.000,00

40,00

54.100,00

PAGE 52

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

POS. DESCRIPTION OF WORKS


A
B
the plant area according to the
regulations for this type of works. Unit
price includes all the necessary materials
(the buffer 25 cm, BNS asphalt 6 cm, AB
4 cm)

UNIT
C

PRELIMINARY WORKS

QTY
D

Unit
Price
EUR
E

TOTAL

Total
Price
EUR
D*E

431.056,00

4.2. (03) GUARDHOUSE

POS. DESCRIPTION OF WORKS


A
B
1
1.1

1.2

Unit
Price
EUR
E

Total
Price
EUR
D*E

UNIT
C

QTY
D

m3

14.13

12.00

169.56

m3

0.61

14.00

8.54

m3

1.73

14.00

24.28

m3

1.15

14.00

16.13

EARTH WORKS
Excavation for continous footings with
bottom finishing and lateral dismissing of
excavated materials away from work site.
III and IV class of soil. Trench depth of
0.00 - 2.00 m.
Account per m3
Acquiring, transportation and thumping of
gravel buffer layer up to designed dencity
according to structural analysis.
Underneath building foundations.
Account per m of thunped gravel
Underneathe building foundation
Underneath foundation slab
Underneath pavement of the object

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 53

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
1.3

Filling of healthy soil to the layers of 20


cm with compaction to full density and
possible wetting if required by the
supervisor. The calculation is given for
filling and transportation of the soil from
landfill construction site.
Account per m3.

1.4

m3

7.50

2.50

18.75

m3

6.63

2.00

13.26

Removal of excess excavated material,


within the complex terrain was leveled at
the plant, out of a particular landfill site,
with loading and unloading soil from
vehicles, and rough soil planning in the
landfill, up to 5 km away.
Account per m3 transported soil

EARTH WORKS
2

CONCRETE
WORKS

TOTAL
AND

250.51

REINFORCED

Installation is only permitted mechanical made concrete, characteristics and quality


required in the static calculation.
Provides for the use of smooth formwork except as specifically stated otherwise in the
positions of quantities.
Deviations from the projected plane dimensions and elevation must not exceed +5 mm.
All bad derived places or parts of the structure (deviations from the required dimensions,
segregation, inadequate stamp concrete, etc.) will be removed and re-done or repaired if
possible, as determined by the designer and construction supervisor of the Investor, at
the expense of the contractor.
The unit price includes the purchase of materials, preparation and installation, all labor
and tools, transportation, moving or stationary scaffolding, formwork, masonry arches
templates and production kit.
Plain concrete
2.1

Concrete works for double layer buffer


sized d=5 cm using plain concrete grade
20
Underneath building foundation
m

6.72

5.50

36.96

11.56

5.50

63.58

Underneath foundation slab

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 54

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
2.2
Acquiring of materials and concrete
sidewalks with concrete MB20 thickness
d= 10 cm above the processing area.
The upper surface of the pavement at
the slope of the building. For each 2.00
m sidewalks do expansion Joints 2 cm
wide and fill them with hot bitumen.
Dividers to separate the sidewalk width
of 2 cm along the entire building and fill it
with hot bitumen.
Account per m2.
0.6 *19.2 =
Reinforced concrete
2.3

m2

11.52

6.00

69.12

m3

5.32

120.00

638.40

m3

1.83

150.00

273.78

m3

0.40

170.00

68.00

m3

1.52

170.00

258.40

15.21

55.00

836.55

Acquiring of materials and concrete


continious footings MB30 leaving the
necessary anchors. Work in all the static
calculation and details of reinforcement.
Account per m3 with necessary formwork.

2.4

Acquiring of materials and concrete


foundation slabs (floating pod) MB30.
Work in all the static calculation and
details
of
reinforcement.
Tickness of the slab d=12cm
Account per m3 with necessary formwork.

2.5

2.6

Concrete works for vertical beams in


smooth forms using concrete grade 30.
Square shaped profil 20/20 cm
Account per m3.
Concrete works for beams is to be done
using smooth forms and concrete grade
30.
Account per m3.

2.7
Acquiring of materials and manufacturing
floor ceiling TM-3, 16 +4 cm thick. Blocks
pre-treated by placing reinforcement in
grooves and filling with cement mortar.
Finished mounts fitted over fetni carrier.
Plate and rib reinforced by the project
and details. Concrete, concrete MB 30.
Formwork must remain at least 14 days.
Account per m.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 55

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
CONCRETE AND REINFORCED WORKS
3

TOTAL

2,244.79

REINFORCED WORKS
The unit price includes the purchase of materials, transport, placing and binding
reinforcement kit.

3.1
Supply, stretching, cutting, cleaning,
bending, placing and tying reinforcing
steel - reinforcing the formwork
Account per kg.
contininous footings (80kg/m)
kg

425.60

0.80

340.48

kg

152.10

0.80

121.68

kg

288.00

0.80

230.40

kg

380.25

0.80

304.20

foundation slab (10kg/m)


vertical and horizontal beams (150kg/m)
floor ceiling (125kg/m)
REINFORCED WORKS
4

TOTAL

996.76

MASONRY WORKS
Masonry may be used only bricks and blocks of brick machine made, the proper format,
straight edges and surfaces, well-baked, no cracks.
Building made exactly according to plans and static calculations, clean, horizontal lines,
with no fragments smaller than 1/4 brick.
Connections must be correct, and the edges of the walls of the straight and vertical podvisak.
The unit price includes the purchase of materials, mortar preparation, installation, all
labor and tools, transportation, moving and stationary scaffolding, masonry arches
templates and production

4.1
Masonry walls of brick sandwich 12 cm,
4 cm layer of air, insulation 5 cm, PE film
and bricks 12 cm, the total thickness of
12 +12 +4 +5 = 33 cm. Walls to work in
the compo proportions 1:2:6, ensuring
that air does not fill the gap with mortar.
The walls are interconnected anchors, 4
pieces per m2 of wall. Insulation derived
from hard-pressed mineral wool slab and
vapor barrier PE sheets. The price
includes the extra scaffolding.
Calculation per m2 kit-built sandwich wall
openings shall be rejected.
Account per m.
m2
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

20.40

31.00
PAGE 56

632.40

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
4.2
Acquiring of building materials and
interior walls 12 cm thick full brick facade
in the compo proportions 1:2:6. To use
the entire brick masonry and a half
straight cut-off edges. Couplings carried
out using a square or circular iron rod
sections corresponding to the coupling.
Bricks should not be soiled plaster.
According to the final building of the wall
fugue technique is choice of the
designer. The price also includes
grouting, corners and extra scaffolding.
Account per m.
m2

8.65

14.00

121.10

m2

15.21

7.50

114.08

m2

99.60

6.00

597.60

4.3
Acquiring of of material and cement
screed 1:3 scale as the substrate for
floors. The upper surface is smooth and
prepared to take the final floor covering.
Account per m2.
3.9*3.9 =
4.4

Rendering of internal and external walls


and ceilings using compo mortar 1:2:6 in
two layers with fine floating.
Account per m2.

MASONRY WORKS
5
5.1

TOTAL

1,465.18

CARPENTRY WORKS
Allow phonetic typing
Acquiring of materials and installation of
wooden roof construction, and quality of
dry fir timber, according to JUS. The
square roof with a drop of 22 . Do
everything required to do carpentry and
roof elements of Flash reinforcing iron,
anchors, clamps and screws alike.
Dimension of roof construction:
rafters 12/14 cm, at distance of 90 cm
cornea 12/14 cm
crest 12/14 cm
Allow phonetic typing
Wooden elements protect against
moisture and insects, the coating is
choice of the designer.
Calculation per m2 of horizontal
projection of the built and protected roof.
m
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

29.16

25.00
PAGE 57

729.00

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
5.2
Acquiring of of material and boarding
planks thickness d = 24 mm, of
coniferous wood, which are mounted to
the touch. Boarding and bituminous
cardboard sets as a basis for a roof of
tin. Wooden elements to protect against
moisture and insects, the coating is
choice of the designer.
Calculation per m, the horizontal
projection of the roof, installed and
protected floorboards flashings from
roofing paper.
m2
CARPENTRY WORKS
6

29.16

10.00

TOTAL

291.60
1,020.60

INSULATING WORKS
All Insulating work must be performed meticulously and accurately according to the
requirements of the project, estimate of works and details.
The used materials must comply with applicable regulations and stardandima, provided
with certificates accredited institution, proven in use, and how permanent facility or
designed so that their possible replacement.
Any errors in the structure must be adequately remedied or repaired prior to application
of insulation materials.
The unit price includes the purchase of materials, transport and production

6.1

Acquiring and installation foundation


slabs of hydro and thermo insulation
thickness d=5 cm, one layer of sheathing
paper, two hot and one cold bituminous
emulsion coating.
Account per m2.

6.2

m2

14.44

13.00

187.72

m2

3.51

11.00

38.61

Supply of material and thermal insulation


of the ceiling, according to an unheated
attic of hard mineral wool d = 5 cm in the
sandwich of PVC film d = 0.2 mm.
Account per m2.

INSULATING WORKS
7

TOTAL

226.33

METAL WORKS

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 58

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

All positions are made from the adopted typical profile, all in accordance with the
scheme, details and workshop drawings. Door frames are installed on the system of dry
mounting, via steel bevel anchored at the wall. Throughout the volume of openings to
perform sealing pur foam. According to the size of the wing hinge to determine the
number and strength (for a minimum of three door pieces per lap). Throughout the extent
of the wing is a double gasket profile (minimum three-fold). The schemes are
podprozorna lumber and aluminum coating comprehensive profiles (to do with the wall).
Sealing glass and sashes to provide custom-fit rubber bands. All fields covered in
locksmith work raditiu all the schemes and details. Measures taken on the spot. Opening
to view the grounds. Workshop documentation gives the contractor on the basis of their
technological solutions, and the authorization for the program of the workshop
documentation signed by the designer, or supervisor.
7.1
Acquiring of materials, fabrication and
installation of facade metal works, made
of aluminum profiles with required
stiffeners and thermal barrier. The finish
is aluminum color coating in choice of
the designer. Metal works is glazed
thermal glass d = 4 +12 +4 mm.
Positions equipped with appropriate
fittings, all in accordance with the
manner of opening, and the choice of the
designer.
Single-glazed door , double coated sheet
with mineral wool.
dim. 100/205+45

piece

300.00

300.00

One wing window - wing opens lower


around the horizontal axis (ventus
mechanism).
dim. 100/150 cm

piece

100.00

300.00

One wing window - wing opens lower


around the horizontal axis (ventus
mechanism).
dim. 100/50 cm

piece

80.00

80.00

Multi wing window - wing opens lower


around the horizontal axis (ventus
mechanism).
dim. 300/150 cm

piece

350.00

350.00

7.2
Acquiring of materials, fabrication and
installation of interior doors, made in the
construction of aluminum profiles with
required stiffeners. The finish is
aluminum color coating in choice of the
designer. Skylights glazed with plain
glass is d = 6 mm. Positions equipped
with appropriate fittings, all in
accordance with the manner of opening,
and the choice of the designer.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 59

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

7.3

Calculation per unit built, glazed and


finally processed position ..
Single door, single-coated sheet metal.
dim. 80/205+45
dim. 100/205+45

piece
piece

1
1

150.00
180.00

150.00
180.00

Metal grid used as doormats is


complitely built from flat steel with frame.
dim. 100/60 cm.
Obraun po komadu.

piece

60.00

60.00

UKUPNO BRAVARSKI RADOVI:


8

1,420.00

TIN WORKS

All tin works will be carried out of plastic, aluminum sheet with the appropriate tourniquet,
merger passes. Sheet thickness less than 0.60mm for a tourniquet 1-2 mm type.
Connections for the substructure shall be suitable nails (for wood) and the appropriate
screws and anchors (for concrete).
All visible surfaces, boards, gutters, standing and lying hinge must be perfectly straight,
true and equally distant from the surface of walls, slabs and the like.
All plumbing works are taught entirely free of mortar and other impurities.
The unit price includes the purchase of materials, fabrication and installation.
8.1
Acquiring of materials and TR plasticized
aluminium sheet d = 0.7 mm. An integral
part of the mounting position of all fittings
to cover the ridge, bay, lying toward the
end of the roof eaves flashings around
penetrations through the roof and others.
Roof cover is placed over boarding with
roofing paper (which is counted
separately).
Account per m
m2

33.84

22.50

761.40

m1

22.56

16.00

360.96

m1

6.30

12.50

78.75

8.2
Acquiring of of material and aluminum
gutters hanging plasticized sheet d = 0.6
mm, complete with fittings for
attachment. Lamination in the tone of the
designer of choice.Hanging gutter square
section 12/12 mm
Obraun po m1.
8.3
Acquiring of materials, fabrication and
installation of vertical drains gutters
coated aluminum sheet thickness d = 0.6
mm., Complete with fittings for
attachment. Lamination in the tone of the
designer of choice.
Circular gutter pipe 100 mm
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 60

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m1.
8.4

Plasticized flashing window sills,


aluminum sheet thickness d = 0.60 mm,
width 35 cm developed.
Account per m1.
m1

TIN WORKS
9

6.40

15.00

TOTAL

96.00
535.71

CERAMIC WORKS

For all of the pottery works may be used only tiles of class, project the required
dimensions and quality, glazed or unglazed, equipped with the necessary certificates.
When tiling avoid cutting board and, if necessary, cut pieces shall not be narrower than 5
cm, and the cut edges sanded. Vertical and horizontal joints must be absolutely coincide.
Derived, oploane surface must be flat and smooth, without vitopernih tiles.
The unit price includes the purchase of materials, transport, all tools, scaffolding needed.
9.1

Lining the walls, ceramic glazed tiles


(flysch) in cement mortar 1:3 at the
height of 1.50 m.
Account per m2.

9.2

m2

9.00

16.00

144.00

m2

11.15

22.00

245.30

Flooring with the development of the


socle in cement mortar 1:3. Height Sokle
the longer side plate (20cm)
Sintered ceramic glazed tiles broadcast
Account per m2.

CERAMIC WORKS
10

TOTAL

389.30

FACING WORKS
The used material for the facade works must be first class, and the works carried out
only with skilled labor.
The unit price includes the purchase of materials necessary scaffolding, all the
necessary tools and development.

10.1

Painting wall faces with acrylic paint


resistant to atmospheric and enviroment
influence
Account per m2.
m2

FACING WORKS
11

32.24

5.00

TOTAL

161.20

PAINTING WORKS

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

161.20

PAGE 61

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

The used material for painters' works must be first class, and the works carried out only
with a skilled work force.
Painting works include proper preparation of surfaces depending on the substrate and
the type of paint that is applied.
Applied colors must be the same tone and completely cover the surface, absolutely and
uniformly related to the substrate.
The unit price includes the purchase of materials necessary scaffolding, all the
necessary tools and development kit.
11.1

Painting of internal wall and cellings


surfaces, with moisture resistant
dispersion colour.
Account per m2.
m2

PAINTING WORKS
12
12.1

45.28

3.00

TOTAL

135.83
135.83

MISCALENIOUS WORKS
Acquiring and placing of PVC - pipes
100 mm for conducting electrical
insulation through wall foundation.
Account m1.

12.2

12.3

12.4

m1

1.00

10.00

10.00

Acquiring and placing of external shoe


scraper.
Account per piece

kom

1.00

10.00

10.00

Development and placing of metal


cantilever with steel bar 50 mm. Bar
needs to be coloured in the same colour
as metalworks and anticorrossive
protected
Account per piece

kom

1.00

20.00

20.00

m2

3.40

65.00

221.00

lump
sum

100.00

Acquiring of materials, fabrication and


installation of a wooden desk on the
inside and outside of the front of the
application. Pult do the fine oak boards
covered, protected and polished
Account per m2.

12.5

Cleaning and washing of whole building


after finishing works
Account lump-sum price

MISCALENIOUS WORKS

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

361.00

PAGE 62

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

4.3. SUMMARY FOR (03.) GUARDHOUSE


SUMMARY FOR GUARD HOUSE
(03.)
1
2

EARTH WORKS
CONCRETE AND REINFORCED
WORKS

EUR
250.51
2,244.79

REINFORCED WORKS

MASONRY WORKS

1,465.18

CARPENTRY WORKS

1,020.60

INSULATING WORKS

226.33

METAL WORKS

TIN WORKS

535.71

CERAMIC WORKS

389.30

10

FACING WORKS

161.20

11

PAINTING WORKS

135.83

12

MISCALENIOUS WORKS

361.00

TOTAL

996.76

1,420.00

9,207.20

4.4. (12.) COMMAND BUILDING

POS. DESCRIPTION OF WORKS


A
B
1
1.1

UNIT
C

QTY
D

m3

2,100.00

Unit
Price
EUR
E

Total
Price
EUR
D*E

EARTH WORKS
Excavation works for foundation slab and
basement with bottom finishing and
lateral dismissing of axcavated materials
away from work site. III and IV class of
soil.Trench depth of 0.00 - 2.00 m.
Account per m3.

1.2

12.50

Acquiring, transportation and thumping


for gravel buffer layer up to designed
dencity according to structural analysis
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 63

26,250.00

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m3.
underneath foundation slab
m3

47.20

14.00

660.80

m3

9.30

14.00

130.20

m3

1,073.50

3.00

3,220.50

m3

1,026.50

5.00

5,132.50

underneath pavement
1.3

Filling of healthy soil to the layers of 20


cm with compaction to full density and
possible wetting if required by the
supervisor. The calculation is given for
filling and transportation of the soil from
landfill construction site.
Account per m3.

1.4

Removal of excess excavated material,


within the complex terrain was leveled at
the plant, out of a particular landfill site,
with loading and unloading soil from
vehicles, and rough soil planning in the
landfill, up to 5 km away.
Account per m3.

EARTH WORKS
2

CONCRETE
WORKS

TOTAL
AND

35,394.00

REINFORCED

Installation is only permitted mechanical made concrete, characteristics and quality


required in the static calculation.
Provides for the use of smooth formwork except as specifically stated otherwise in the
positions of quantities.
Deviations from the projected plane dimensions and elevation must not exceed +5 mm.
All bad derived places or parts of the structure (deviations from the required dimensions,
segregation, inadequate stamp concrete, etc.) will be removed and re-done or repaired if
possible, as determined by the designer and construction supervisor of the Investor, at the
expense of the contractor.
The unit price includes the purchase of materials, preparation and installation, all labor and
tools, transportation, moving or stationary scaffolding, formwork, masonry arches
templates and production .
Plain concrete
2.1

Contrete works for double layerd buffer


sized d=6+4 cm designed with plain
concrete grade 20.
Account per m2.
m2

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

251.00

10.00

PAGE 64

2,510.00

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
2.2

Acquiring of materials and concrete


sidewalks with concrete MB20 thickness
d= 10 cm above the processing area.
The upper surface of the pavement at
the slope of the building. For each 2.00
m sidewalks do expansion Joints 2 cm
wide and fill them with hot bitumen.
Dividers to separate the sidewalk width
of 2 cm along the entire building and fill it
with hot bitumen.
Account per m2.

2.3

m2

62.00

6.00

372.00

172.00

40.00

6,880.00

m3

105.00

120.00

12,600.00

m3

68.00

150.00

10,200.00

m3

45.00

150.00

6,750.00

m3

8.25

170.00

1,402.50

m3

4.20

170.00

714.00

m3

44.00

180.00

7,920.00

m3

10.20

180.00

1,836.00

Acquiring of materials and installation of


roof gas concrete slab of self-supporting
elements of the thickness d = 20 cm. In
all of the project.
Account per m2.
Reinforced concrete

2.4

Acquirin of materials and istallation of


foundation slab and basement with
concrete MB 30.
Account per m3 .
foundation slab
basement walls

2.5

Acquiring of materials and installation of


floor ceiling with concrete MB 30.
Slab thickness d=15cm
Account per m3 .

2.6

Concrete works for vertical beams using


smooth forms with concrete MB 30.
Account per m3 .
section 30/40 cm
square section 30/30 cm

2.7

Acquiring of materials and installation of


horizontal and roof beams with concrete
MB30.
Account per m3 .

2.8

Acquiring of materials and installation of


horizontal and vertical beams with
concrete MB30.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 65

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m3 .
2.9

Acquirin of materials and installation of


stair and landing with concrete MB30.
Account per m3 .
m3

CONCRETE AND REINFORCED WORKS


3

4.30

200.00

TOTAL

860.00
52,044.50

REINFORCED WORKS
The unit price includes the purchase of materials, transport, placing and binding
reinforcement kit.

3.1
Supply, stretching, cutting, cleaning,
bending, placing and tying reinforcing
steel - reinforcing the formwork
foundation slab and basement walls
(100kg/m)
173,00x100=
floor ceiling (125kg/m)
45,00*125=
posts (150kg/m)
12,45x150=

kg

17300.00

0.80

13,840.00

kg

5625.00

0.80

4,500.00

kg

1867.50

0.80

1,494.00

kg

8800.00

0.80

7,040.00

kg

1530.00

0.80

1,224.00

kg

387.00

0.80

309.60

roof beams (200kg/m)


44,00x200=
vert. and hori. beams (150kg/m)
10,20*150=
stairs (90kg/m)
4,30*90=
REINFORCED WORKS
4

TOTAL

28,407.60

MASONRY WORKS
Masonry may be used only bricks and blocks of brick machine made, the proper format,
straight edges and surfaces, well-baked, no cracks.
Building made exactly according to plans and static calculations, clean, horizontal lines,
with no fragments smaller than 1/4 brick.
Connections must be correct, and the edges of the walls of the straight and vertical podvisak.
The unit price includes the purchase of materials, mortar preparation, installation, all labor
and tools, transportation, moving and stationary scaffolding, masonry arches templates
and production

4.1

Masonry exterior walls, gas concrete


blocks of thickness d = 20 cm with
cement mortar, 1:3 scale gas or glue for
concrete, according to the
manufacturer's instructions. The price
includes the extra scaffolding.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 66

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m
thickness of wall d=20 cm
m

257.00

12.00

3,084.00

224.00

12.00

2,688.00

150.00

9.00

1,350.00

m2

416.20

18.00

7,491.60

m2

162.50

18.00

2,925.00

m2

495.10

18.00

8,911.80

m2

495.10

7.50

3,713.25

4.2
Interior masonry walls, gas concrete
blocks of thickness d = 20cm d = 10cm
with cement mortar, 1:3 scale gas or glue
for concrete, according to the
manufacturer's instructions. The price
includes the extra scaffolding
Account per m
thickness of wall d=20 cm
thickness of wall d=10 cm
4.3
Making full cladding silicate bricks 12 cm
thick, the first class in the extended
mortar proportions 1:1:6. To use the
entire brick masonry and a half straight
cut-off edges. Couplings carried out
using a square or circular iron rod
sections corresponding to the coupling.
Bond has to be correct. Constructive
relationship with the wall anchors to
perform, with 5 pieces per m. When
masonry taken to avoid leakage of
mortar. Joints treated with cement mortar
1:2 scale, as instructed by the designer.
The price includes the grouting.
Account per m
4.4
Protection of basement wall insulation on
the outside wall of solid brick masonry on
the edge 7cm. Walls to work in the
compo proportions 1:2:6.
Account per m
4.5

4.6

Protection of basement wall insulation on


the outside wall of brick 12cm. Walls to
work in the compo proportions 1:2:6.
Account per m
Acquiring of of material and cement
screed 1:3 scale as the substrate for
floors. The upper surface smooth and
prepared to take the final floor covering.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 67

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m
4.7

Acquiring of materials and internal and


external plastering walls and ceilings
prounim mortar 1:2:6 in two layers with
fine parget.
Account per m
m2

MASONRY WORKS
5
5.1

5.2

6.1

6.00

TOTAL

12,000.00
42,163.65

CARPENTRY WORKS
Acquiring of materials and roof wood
construction 50/100 mm, as the surface
of the roofing sheet. Strips placed at a
distance of 70 cm.
Account per m
m2

231.25

10.00

2,312.50

m2

231.25

10.00

2,312.50

Acquiring of materials and roof wood


construction 30/50 mm, as the surface of
the roofing sheet. Strips placed at a
distance of 80 cm.
Account per m

CARPENTRY WORKS
6

2,000.00

TOTAL

4,625.00

UNSULATING WORKS
All Insulating work must be performed meticulously and accurately according to the
requirements of the project, estimate of works and details.
The used materials must comply with applicable regulations and stardandima, provided
with certificates accredited institution, proven in use, and how permanent facility or
designed so that their possible replacement.
Any errors in the structure must be adequately remedied or repaired prior to application of
insulation materials.
The unit price includes the purchase of materials, transport and production
Acquiring of of material and the
horizontal and vertical waterproofing of
the foundation slab and basement walls.
Work through the insulation completely
dry and clean concrete surfaces and wall
surfaces.
Account per m

6.2

m2

482.10

13.00

6,267.30

m2

231.25

11.00

2,543.75

Acquiring of materials and zrada hydro


and thermal insulation in the roof of the
hard mineral wool d = 5 cm in the
sandwich of PVC film d = 0.2 mm.
Account per m

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 68

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
6.3
Acquiring of of material and thermal
insulation of faade walls with insulating
material of thickness d = 4 cm insulation
is placed and fixed with glue and dowels
for wall cladding, in the following layers:
TP mineral wool d = 4 cm, breathable
waterproof sheeting.
Account per m
m2
UNSULATING WORKS
7

416.20
TOTAL

10.00

4,162.00
12,973.05

METAL WORKS

All positions are made from the adopted typical profile, all in accordance with the scheme,
details and workshop drawings. Door frames are installed on the system of dry mounting,
via steel bevel anchored at the wall. Throughout the volume of openings to perform sealing
pur foam. According to the size of the wing hinge to determine the number and strength
(for a minimum of three door pieces per lap). Throughout the extent of the wing is a double
gasket profile (minimum three-fold). The schemes are podprozorna lumber and aluminum
coating comprehensive profiles (to do with the wall). Sealing glass and sashes to provide
custom-fit rubber bands. All fields covered in locksmith work raditiu all the schemes and
details. Measures taken on the spot. Opening to view the grounds. Workshop
documentation gives the contractor on the basis of their technological solutions, and the
authorization for the program of the workshop documentation signed by the designer, or
supervisor.
7.1
Acquiring of materials, fabrication and
installation of facade metal works, made
of aluminum profiles with required
stiffeners and thermal barrier. The finish
is aluminum color coating in choice of
the designer. Metal works is glazed
thermal glass d = 4 +12 +4 mm.
Positions equipped with appropriate
fittings, all in accordance with the
manner of opening, and the choice of the
designer.
Account per piece
Double glazed entrance door.
dim. 200/335 + 60 cm
Double glazed entrance doo
dim. 200/220 + 70 cm
Double wing window
dim. 200/175 cm
Double wing window
dim. 170/175 cm
Multin wing window
dim. 200/230+60 cm
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

piece

800.00

800.00

piece

550.00

550.00

piece

280.00

2,520.00

piece

220.00

440.00

piece

300.00

300.00

PAGE 69

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Single wing window
dim. 125/70 cm
Single wing window
dim. 80/60 cm

piece

120.00

960.00

piece

90.00

360.00

Acquiring of materials, fabrication and


installation of exterior doors and
windows, made in the construction of
aluminum profiles with required stiffeners
and thermal barrier. The finish is
aluminum color coating in choice of the
designer. Positions equipped with
appropriate fittings, all in accordance
with the manner of opening, and the
choice of the designer.
Account per piece
Quadruple extirior door
dim. 390/395 cm

piece

1,500.00

3,000.00

Acquiring of materials, fabrication and


installation of interior doors, made in the
construction of aluminum profiles with
required stiffeners. The finish is
aluminum color coating in choice of the
designer. Skylights glazed with plain
glass is d = 6 mm. Positions equipped
with appropriate fittings, all in
accordance with the manner of opening,
and the choice of the designer.
Calculation per unit built, glazed and
finally processed position ..
Multi-part glass partition with a door.
dim. 200(360)/335 + 60 cm

piece

1,100.00

1,100.00

dim. 100/210 cm

piece

220.00

1,320.00

Single with solid filled door lined with


sheet metal.
dim. 90/210 cm

piece

200.00

800.00

Single with solid filled door lined with


sheet metal.
dim. 80/210 + 60 cm

piece

220.00

880.00

16.85

40.00

674.00

7.2

7.3

Single with solid filled door lined with


sheet metal.

7.4
Acquiring of materials, fabrication and
installation of stair railings, a set of
mutually welded steel seamless pipe
50 and 30. Guardrail fence is cooked
oak dim. 5x3cm. Fence height is 110 cm.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 70

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

7.5

Metal grid used as doormats is


complitely built from flat steel with frame.
dim. 200/60 cm
METAL WORKS
8

piece

130.00

TOTAL

130.00
13,834.00

TIN WORKS

All tin works will be carried out of plastic, aluminum sheet with the appropriate tourniquet,
merger passes. Sheet thickness less than 0.60mm for a tourniquet 1-2 mm type.
Connections for the substructure shall be suitable nails (for wood) and the appropriate
screws and anchors (for concrete).
All visible surfaces, boards, gutters, standing and lying hinge must be perfectly straight,
true and equally distant from the surface of walls, slabs and the like.
All plumbing works are taught entirely free of mortar and other impurities.
The unit price includes the purchase of materials, fabrication and installation.
8.1
Acquiring of materials and TR plasticized
aluminium sheet d = 0.7 mm. An integral
part of the mounting position of all fittings
to cover the ridge, bay, lying toward the
end of the roof eaves flashings around
penetrations through the roof and others.
Roof cover is placed over boarding with
roofing paper (which is counted
separately).
Account per m
m2

245.00

22.50

5,512.50

m1

37.00

16.00

592.00

m1

31.20

14.00

436.80

8.2
Acquiring of of material and aluminum
gutters hanging plasticized sheet d = 0.6
mm, complete with fittings for
attachment. Lamination in the tone of the
designer of choice.
Hanging gutter square section 10/10 mm
Account per m1.
8.3
Acquiring of materials, fabrication and
installation of vertical drains gutters
coated aluminum sheet thickness d = 0.6
mm., Complete with fittings for
attachment. Lamination in the tone of the
designer of choice. Gutter square section
10/10 mm
Account per m1.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 71

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
8.4

Plasticized flashing window sills,


aluminum sheet thickness d = 0.60 mm,
width 35 cm developed.
Account per m1.
m1

TIN WORKS
9

36.60
TOTAL

15.00

549.00
7,090.30

CERAMIC WORKS

For all of the pottery works may be used only tiles of class, project the required dimensions
and quality, glazed or unglazed, equipped with the necessary certificates.
When tiling avoid cutting board and, if necessary, cut pieces shall not be narrower than 5
cm, and the cut edges sanded. Vertical and horizontal joints must be absolutely coincide.
Derived, oploane surface must be flat and smooth, without vitopernih tiles.
The unit price includes the purchase of materials, transport, all tools, scaffolding needed.
9.1

9.2

Lining the walls, ceramic glazed tiles


(flysch) in cement mortar 1:3 at the
height of 2.10 m.
Account per m
m2

76.80

15.00

1,152.00

m2

78.60

30.00

2,358.00

m2

113.10

20.00

2,262.00

m2

281.40

25.00

7,035.00

m2

42.80

35.00

1,498.00

Lining the walls with acid resistant


ceramic tiles at the height of 2.10 m.
Account per m

9.3

Flooring with the development of the


socle in cement mortar 1:3. Height Sokle
the longer side plate (20cm)
Sintered ceramic glazed tiles broadcast
Account per m
Glazed slip resistant tiles
Clinker floor tiles.
Acid resistant floor tiles. Fugue putty with
acid epoxy.

CERAMIC WORKS
10

10.1

10.2

TOTAL

14,305.00

FLOORING WORKS
The used material for the flooring works must be first class.
The unit price includes the purchase of materials, all the necessary tools and development.
Procurement
of
materials
and
manufacturing vinfleks floor.
Account per m2.
m2
82.85
15.00
1,242.75
Procurement of materials and production
of double antistatic floor.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

m2

21.20

25.00
PAGE 72

530.00

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
Account per m2.
FLOORING WORKS
11

11.1

TOTAL

1,772.75

PAINTING WORKS
The used material for painters' works must be first class, and the works carried out only
with a skilled work force.
Painting works include proper preparation of surfaces depending on the substrate and the
type of paint that is applied.
Applied colors must be the same tone and completely cover the surface, absolutely and
uniformly related to the substrate.
The unit price includes the purchase of materials necessary scaffolding, all the necessary
tools and development.
Painting the interior and ceiling surfaces,
dispersion paint resistant to moisture.
Account per m2.

11.2

m2

1,500.00

3.00

4,500.00

m2

510.10

3.00

1,530.30

Painting the interior surface of the


ceiling, acrylic paint.
Account per m2.

PAINTING WORKS
13
13.1

6,030.30

MISCALENIOUS WORKS
Procurement of materials and installation
of lower ceilings, sound absorbing
plaster cardboard plates d = 12.5 mm,
corresponding to the metal framing,
which is fixed over the grid and the
corresponding profile and attach to the
ceiling over suspenders, with a lowering
of the projected level. Ceiling move away
from the wall, and placed at the junction
of L lajsnu profile.

The calculation of per square meter


includes the purchase, delivery and
installation of panels and grid, leaving
openings for lighting, filling joints with a
mixture of coupling, the final installation
of extensive moldings.
Ceiling made of gypsum cardboard
panels waterproof d = 12.5 mm in
sanitary block the entrance
antechamber.
13.2

TOTAL

164.10

15.00

2,461.50

29.55

18.00

531.90

m1

1.00

10.00

10.00

Acquiring and placing of PVC -pipes


F100 mm for conducting electrical
insulation through wall footings.
Account per m1.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 73

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
13.3

13.4
13.5

Procurement of materials, fabrication and


installation of external scraper for shoes.
Account per piece
Acquiring of telescopic ladder.
Account per piece

piece

2.00

10.00

20.00

piece

1.00

80.00

80.00

495.10

1.00

495.10

Final cleaning to laundry room complete


exterior and interior metalwork, glass and
others. just before the technical
acceptance.
Account per m.

MISCALENIOUS WORKS

TOTAL

3,598.50

4.5. SUMMARY FOR (12.) COMMAND BUILDING


SUMMARY FOR - COMMAND BUILDING (07.)

EUR

EARTH WORKS

35,394.00

CONCRETE AND REINFORCED WORKS

52,044.50

REINFORCED WORKS

28,407.60

MASONRY WORKS

42,163.65

CARPENTRY WORKS

4,625.00

INSULATING WORKS

12,973.05

METAL WORKS

13,834.00

TIN WORKS

CERAMIC WORKS

7,090.30
14,305.00

10

FLOORING WORKS

1,772.75

11

PAINTING WORKS

6,030.30

13

MISCALENIOUS WORKS

3,598.50

TOTAL

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

222,238.65

PAGE 74

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

4.6. (05.) SEPARATING CHAMBER AND (06.) PRIMARY TREATMENT

POS. DESCRIPTION OF WORKS

UNIT

QTY

Unit
Price
EUR

Total
Price
EUR

05.SEPARATING CHAMBER AND


06. PRIMARY TREATMENT
I Earth works

Excavation spoil materials in a wide.


Excavated material is removed outside the working
zone.
Account per m3.

m3

343.5

12.0

4,122.0

Acquiring of, transport, filling and compaction


gravel beneath the slab object.
Account per m3.

m3

12.5

14.0

175.0

with compacting.
Account per m3.

m3

279.0

2.5

697.5

Loading and removal of excess material from


excavations at
permanent disposal site designated by the supervisory
authority.
Account per m3.

m3

124.0

2.0

248.0

Acquiring of materials, transport, filling and compaction


gravel beneath the pavement
Account per m3.

m3

1.4

14.0

18.9

Backfill material selected from excavation


around the walls of the building in layers of 20-30 cm,

I Earth works

Total

5,261.4

II Concrete and reinforced works

Plain concrete

Preparation of buffer layer thickness d = 10 cm beneath


the slab and pavement of
plain concrete MB 15.
Account per m2.
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

m2

128.0
PAGE 75

6.0

768.0

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

UNIT

QTY

Unit
Price
EUR

m3

4.6

170.0

773.5

foundation slabs
exterior walls
concrete tickness up to 30cm
walls (curtain)
concrete tickness up to 30cm
posts

m3

43.0

120.0

5,160.0

m3

36.3

150.0

5,445.0

m3
m3

26.3

150.0

3,945.0

channels

m3

2.8

170.0

476.0

POS. DESCRIPTION OF WORKS

Total
Price
EUR

reinforced concrete
2

Concreting reinforced concrete


MB 30
Account per m3.
upper slab

concreting WTP concrete


MB 30 (WTP8)
Account per m3.

II Concrete and reinforced works

Total

16,567.5

III Reinforcing works


1

Acquiring of materials, transport, unloading, correct,


cleaning, cutting, bending and placing
rebars to the static calculation
Account per kg.
RA 400/500 - 2

kg

III Reinforcing works

10,840.0

0.8

Total

8,672.0
8,672.0

IV Insulating works
1

Production of waterproofing foundation walls of


objects with one cold and two hot
coats of bituminous emulsions
Account per m2.

m2

125.0

7.0

875.0

Making of insulation of the slab


Account per m2.

m2

114.0

6.0

684.0

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 76

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

UNIT

QTY

Unit
Price
EUR

Account per m2.

m2

19.0

15.0

285.0

Making the protection of concrete surfaces WTP


penetrator
Account per m2.

m2

339.0

9.0

3,051.0

POS. DESCRIPTION OF WORKS


Making the protection of the upper surface (ground
elevation) concrete epoxy coatings
3

IV Insulating works

Total

Total
Price
EUR

4,895.0

V Metal works

Fabrication and installation of steel fixed railings


galvanized seamless pipes.
Account per m'

m'

7.8

50.0

390.0

Production and installation of floor


"ROST" construction
Account per m2.

m2

71.6

50.0

3,580.0

V Metal works

Total

3,970.0

VI Miscalenious works
1

Supply and installation of cast iron


climbers DIN 1212
Account per piece

piece

12.0

15.0

180.0

lump
sum

1.0

150.0

150.0

Cleaning and washing of structure


after finishing works.
Account per lump sum

VI Miscalenious works

Total

4.7. SUMMARY FOR (05.) SEPARATING CHAMBER AND (06.) PRIMARY TREATMENT

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 77

330.0

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
SUMMARY

05.S.C. & 06.PRIM. TREATMANT

I Earth works
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Metal works
VI Miscalenious works

5,261.4
16,567.5
8,672.0
4,895.0
3,970.0
330.0

TOTAL

39,695.9

4.8. (07.) EQUALIZATION TANK

POS. DESCRIPTION OF WORKS

UNIT

QTY

Unit
Price
EUR

Total
Price
EUR

07.EQUALIZATION BASIN
I Phase-1 of quantities for building
I Earth works

Excavation spoil materials in a wide.


Excavated material is removed outside the working
zone.
Account per m3.

m3

384.0

12.0

4,608.0

Acquiring of, transport, filling and compaction


gravel beneath the slab object.
Account per m3.

m3

7.8

14.0

109.2

Backfill material selected from excavation


around the walls of the building in layers of 30 cm,
with compacting.
Account per m3.

m3

112.0

2.5

280.0

Acquiring of materials, transport, filling and


compaction
gravel beneath the pavement
Account per m3.

m3

1.5

14.0

21.0

Loading and removal of excess material from


excavations at
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 78

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

POS. DESCRIPTION OF WORKS


permanent disposal site designated
supervisory authority.
Account per m3.

by

UNIT

QTY

Unit
Price
EUR

m3

271.0

2.0

Total
Price
EUR

the

I Earth works

Total

542.0
5,560.2

II Concrete and reinforced works

Plain concrete

Preparation of buffer layer thickness d = 10 cm


beneath the slab and pavement of
plain concrete MB 15.
Account per m2.

m2

71.5

6.0

foundation slab

m3

21.5

120.0

2,580.0

horiyontal slabs
walls
radial walls

0.6

170.0

102.0

m
m3

54.0

150.0

8,100.0

channels
dropping layer

m3
m3

1.2
16.0

150.0
100.0

180.0
1,600.0

429.0

reinforced concrete
2

concreting WTP concrete


MB 30 (WTP8)
Account per m3.

II Concrete and reinforced works

Total

12,991.0

III Reinforcing works

Acquiring of materials, transport,


correct,
cleaning, cutting, bending and placing
rebars to the static calculation
Account per kg.
RA 400/500 - 2
III Reinforcing works

unloading,

kg

9,330.0

0.8

Total

7,464.0

IV Insulating works
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

7,464.0

PAGE 79

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

UNIT

QTY

Unit
Price
EUR

m2

129.0

9.0

1,161.0

Production of waterproofing foundation walls of


objects with one cold and two hot
coats of bituminous emulsions
Account per m2.

m2

169.0

7.0

1,183.0

Making of insulation of the slab


Account per m2.

m2

56.6

6.0

339.6

POS. DESCRIPTION OF WORKS

Making the protection


penetrators
Account per m2.

of

concrete

Total
Price
EUR

surface

IV Insulating works

Total

2,683.6

V Metal works

Fabrication and installation of ribbed sheet metal


cover
Account per m2.

m2

V Metal works

1.0

50.0

Total

50.0
50.0

VI Miscalenious works
1

Supply and installation of cast iron


climbers DIN 1212
Account per piece

piece

15.0

15.0

225.0

lump
sum

1.0

100.0

100.0

Cleaning and washing of structure after finishing


works.
Account per lump sum
VI Miscalenious works

Total

325.0

4.9. SUMMARY FOR (07.) EQUALIZATION TANK

SUMMARY
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

07.EQUALIZATION BASIN
PAGE 80

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
I Earth works
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Metal works
VI Miscalenious works
TOTAL

5,560.2
12,991.0
7,464.0
2,683.6
50.0
325.0

5,885.2

4.10. (08.) SBR BASIN

POS. DESCRIPTION OF WORKS

UNIT

QTY

Unit
Price
EUR

Total
Price
EUR

08.SBR BASIN
I Phase (1 par = 2 basins)
I Earth works

Excavation spoil materials in a wide.


Excavated material is removed outside the
working zone.
Account per m3.

m3

3,302.0

12.0

39,624.0

Acquiring of, transport, filling and


compaction
gravel beneath the slab object.
Account per m3.

m3

564.0

14.0

7,896.0

Backfill material selected from excavation


around the walls of the building in layers of
30 cm,
with compacting.
Account per m3.

m3

498.5

2.5

1,246.3

Loading and removal of excess material


from excavations at
permanent disposal site designated by the
supervisory authority.
Account per m3.

m3

2,803.5

2.0

5,607.0

I Earth works

Total

54,373.3

II Concrete and reinforced works


IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 81

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

UNIT

QTY

Unit
Price
EUR

m2

659.5

6.0

3,957.0

m3

13.0

120.0

1,560.0

foundation slab
walls
cantilever channels

m3
m3
m3

330.0
795.0
2.3

120.0
150.0
170.0

39,600.0
119,250.0
391.0

cantilever trail

m3

0.6

170.0

102.0

POS. DESCRIPTION OF WORKS

Total
Price
EUR

Plain concrete

Preparation of buffer layer thickness d = 10


cm beneath the slab and pavement of
plain concrete MB 15.
Account per m2.
reinforced concrete

Concreting reinforced concrete


20 MB, associated manholes - 2 pcs.
Account per m3.
concreting WTP concrete
MB 30 (WTP8)
Account per m3.

II Concrete and reinforced works

Total

164,860.0

III Reinforcing works

Acquiring of materials, transport, unloading,


correct,
cleaning, cutting, bending and placing
rebars to the static calculation
Account per kg.
RA 400/500 - 2

kg

III Reinforcing works

115,000.0

0.8

Total

92,000.0
92,000.0

IV Insulating works

Making the protection of concrete surface


penetrators
Account per m2.

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

m2

1,072.0

9.0

9,648.0

PAGE 82

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

POS. DESCRIPTION OF WORKS


Production of waterproofing foundation
walls of
2
objects with one cold and two hot
coats of bituminous emulsions
Account per m2.
3

Making of insulation of the slab


Account per m2.

UNIT

QTY

Unit
Price
EUR

m2

308.0

7.0

2,156.0

m2

550.0

6.0

3,300.0

IV Insulating works

Total

Total
Price
EUR

15,104.0

V Metal works
1

Manufacture and installation fences


Account per m2.

m'

68.0

50.0

3,400.0

Manufacture and installation coating plates


and rost
Account per m2.

m2

2.0

50.0

100.0

V Metal works

Total

3,500.0

VI Miscalenious works
1

Supply and installation of cast iron


climbers DIN 1212
Account per piece

piece

32.0

15.0

480.0

lump
sum

1.0

100.0

100.0

Cleaning and washing of structure after


finishing works.
Account per lump sum
VI Miscalenious works

Total

580.0

4.11. SUMMARY FOR (08.) SBR BASIN

SUMMARY
I Earth works
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

08.SBR BASIN

54,373.3
PAGE 83

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Metal works
VI Miscalenious works
TOTAL

164,860.0
92,000.0
15,104.0
3,500.0
580.0

330,417.3

4.12. (08.) COLLECTING BASIN

POS. DESCRIPTION OF WORKS

UNIT

QTY

Unit
Price
EUR

Total
Price
EUR

09.COLLECTING BASIN

I Earth works

Excavation spoil materials in a wide.


Excavated material is removed outside the
working zone.
Account per m3.

m3

1,110.0

12.0

13,320.0

Acquiring of, transport, filling and


compaction
gravel beneath the slab object.
Account per m3.

m3

144.0

14.0

2,016.0

Backfill material selected from excavation


around the walls of the building in layers of
30 cm,
with compacting.
Account per m3.

m3

518.5

2.5

1,296.3

Acquiring of materials, transport, filling and


compaction
gravel beneath the pavement
Account per m3.

m2

12.0

14.0

168.0

Loading and removal of excess material


from excavations at
permanent disposal site designated by the
supervisory authority.
Account per m3.

m3

591.5

2.0

1,183.0

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 84

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

POS. DESCRIPTION OF WORKS

UNIT

I Earth works

QTY

Unit
Price
EUR

Total

Total
Price
EUR
17,983.3

II Concrete and reinforced works

Plain concrete

Preparation of buffer layer thickness d = 10


cm beneath the slab and pavement of
plain concrete MB 15.
Account per m2.

m2

156.0

6.0

foundation slab

m3

61.6

120.0

7,392.0

horizontal slabs
exterior walls

m
m3

22.1
52.0

170.0
150.0

3,757.0
7,800.0

interior walls
coronas

m3
m3

15.9
4.8

150.0
160.0

2,377.5
768.0

posts
beams

m3
m3

0.6

170.0

102.0

936.0

reinforced concrete
2

concreting WTP concrete


MB 30 (WTP8)
Account per m3.

II Concrete and reinforced works

Total

23,132.5

III Reinforcing works

Acquiring of materials, transport, unloading,


correct,
cleaning, cutting, bending and placing
rebars to the static calculation
Account per kg.
RA 400/500 - 2
III Reinforcing works

kg

15,700.0
Total

0.8

12,560.0
12,560.0

IV Insulating works

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 85

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

UNIT

QTY

Unit
Price
EUR

m2

390.5

9.0

3,514.5

Production of waterproofing foundation


walls of
objects with one cold and two hot
coats of bituminous emulsions
Account per m2.

m2

211.0

7.0

1,477.0

Making of insulation of the slab


Account per m2.

m2

123.5

6.0

741.0

POS. DESCRIPTION OF WORKS


Making the protection of concrete surface
penetrators
1
Account per m2.

IV Insulating works

Total

Total
Price
EUR

5,732.5

V Metal works

Manufacture and installation of ribbed sheet


metal covers
Account per m2.

m2

V Metal works

5.0

50.0

Total

250.0
250.0

VI Miscalenious works

Supply and installation of cast iron


climbers
Account per piece
Cleaning and washing of structure after
finishing works.
Account per lump sum

piece

15.0

15.0

225.0

lump
sum

1.0

100.0

100.0

VI Miscalenious works

Total

325.0

4.13. SUMMARY FOR (08.) COLLECTING BASIN

SUMMARY
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

09.COLLECTING BASIN
PAGE 86

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

I Earth works
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Metal works
VI Miscalenious works
TOTAL

17,983.3
23,132.5
12,560.0
5,732.5
250.0
325.0

59,983.3

4.14. (10.) THICKENER

POS. DESCRIPTION OF WORKS

UNIT

QTY

Unit
Price
EUR

Total
Price
EUR

10.THICKENER
I Earth works
1

Excavation spoil materials in a wide.


Excavated material is removed outside the
working zone.
Account per m3.
m3

270.5

12.0

3,246.0

m3

6.5

14.0

90.3

Backfill material selected from excavation


around the walls of the building in layers of
30 cm,
with compacting.
Account per m3.

m3

92.5

2.5

231.3

Loading and removal of excess material


from excavations at
permanent disposal site designated by the
supervisory authority.
Account per m3.

m3

171.5

2.0

343.0

Acquiring of materials, transport, filling and


compaction
gravel beneath the pavement
Account per m3.

m3

2.0
Total

14.0

28.0
3,938.6

Acquiring of, transport, filling and


compaction
gravel beneath the slab object.
Account per m3.

I Earth works
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 87

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

POS. DESCRIPTION OF WORKS

UNIT

QTY

Unit
Price
EUR

Total
Price
EUR

m2

36.5

6.0

m3

13.9

120.0

1,668.0

29.5

150.0

4,425.0

II Concrete and reinforced works

Plain concrete

Preparation of buffer layer thickness d = 10


cm beneath the slab and pavement of
plain concrete MB 15.
Account per m2.

219.0

reinforced concrete
concreting WTP concrete
MB 30 (WTP8)
Account per m3.
foundation slab
walls, channels, bridge

II Concrete and reinforced works

Total

6,312.0

III Reinforcing works

Acquiring of materials, transport, unloading,


correct,
cleaning, cutting, bending and placing
rebars to the static calculation
Account per kg.
RA 400/500 - 2

kg

III Reinforcing works

4,340.0

0.8

Total

3,255.0
3,255.0

IV Insulating works

Making the protection of concrete surface


penetrators
Account per m2.
Production of horizontal and
hydroinsulation of
objects with one cold and two hot
coats of bituminous emulsions
Account per m2.

m2

116.0

9.0

1,044.0

m2

124.0

7.0

868.0

34.0
Total

6.0

204.0
2,116.0

vertical

foundation walls
foundation slab
IV Insulating works
IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

PAGE 88

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

UNIT

QTY

Unit
Price
EUR

Manufacture and installation of the fence


with a ladder of steel pipes.
Account per piece
Cleaning and washing of structure after
finishing works.

piece

1.0

630.0

630.0

Account per lump sum

lump
sum

1.0

100.0

100.0

POS. DESCRIPTION OF WORKS

Total
Price
EUR

V Miscalenious works

V Miscalenious works

Total

730.0

4.15. SUMMARY FOR (10.) THICKENER

SUMMARY

10.THICKENER

I Earth works
II Concrete and reinforced works
III Reinforcing works
IV Insulating works
V Miscalenious works
TOTAL

3,938.6
6,312.0
3,255.0
2,116.0
730.0

16,351.6

4.16. TOTAL SUMMARY

TOTAL SUMMARY
STRUCTURE
A.

PRELIMINARY WORKS WITH FENCE AND GATE AND ROADS

C.

03.GUARD HOUSE

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

EUR
431,056.00
9,207.20

PAGE 89

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN
C.

12.COMMAND BUILDING

222,238.65

D.

05.SEPARATING CHAMBER AND 06.PRIMARY TREATMENT

D.

07.EQUALIZATION BASIN

D.

08.SBR BASIN

D.

09.COLLECTING BASIN

59,983.25

D.

10.THICKENER

16,351.55

39,695.90
5,885.20
330,417.25

TOTAL

IOV10-17 IK CONSULTING ENGINEERS APRIL 2012

1,114,835.00

PAGE 90

PRELIMINARY DESIGN FOR WWTP CETINJE & SEWERAGE NETWORK WITH FACILITIES
MUNICIPALITY OF CETINJE / MONTENEGRO
BOOK 5 WASTE WATER TREATMENT PLANT
VOLUME 5.3 ARCHITECTURAL DESIGN

5. DRAWINGS
Number
1017- IP - A-A0001

Name
Geodetic plan with marked borders and vertices of the plot and cadastral
plan, R=1:1000

1017- IP - A-A0002 WWTP General layout, R=1:500


1017- IP - A-A0003 WWTP Urban layout, R=1:500
1017- IP - A-A0101 01. Fence Fence scheme plan view and front view, R=1:20
1017- IP - A-A0201

02. Sliding gate with electric drive and pedestrian gate Gate scheme
plan view, sections and details, R=1:20

1017- IP - A-A0301 03. Guardhouse Layouts, sections and views, R=1:100


1017- IP - A-A1201 12. Command building Basement layout, R=1:100
1017- IP - A-A1202 12. Command building Ground floor layout, R=1:100
1017- IP - A-A1203 12. Command building First floor layout, R=1:100
1017- IP - A-A1204 12. Command building Roof layout, R=1:100
1017- IP - A-A1205 12. Command building Section 1-1, R=1:100
1017- IP - A-A1206 12. Command building Section 2-2, R=1:100
1017- IP - A-A1207 12. Command building Section 3-3, R=1:100
1017- IP - A-A1208 12. Command building North and West facade, R=1:100
1017- IP - A-A1209 12. Command building South and East facade, R=1:100
1017- IP - A-A0501

05. Separating chamber, 06. Huber-unit(1+1), 07. Equalization tank


(1+1) Plan views of underground and above ground levels, R=1:100

1017- IP - A-A0502

05. Separating chamber, 06. Huber-unit(1+1), 07. Equalization tank


(1+1) Sections I-I, II-II i III-III, R=1:100

1017- IP - A-A0801 08. SBR basins Plan view of underground level, R=1:100
1017- IP - A-A0802 08. SBR basins Plan view of above ground level, R=1:100
1017- IP - A-A0803 08. SBR basins Sections 1-1 i 2-2, R=1:100
1017- IP - A-A0901

09. Collecting basin Plan views of underground and above ground level
and sections, R=1:100

1017- IP - A-A1001 10. Thickener Plan views and sections I-I i II-II, R=1:100