Research and application of horizontal well


plugging water technology
LIANG Xiaofang
ZHANG Honggang
Oil Production Plant 3 of PetroChina Changqing Oilfield Company
Yinchuan Ningxia 750006
China
Abstract:With the large-scale application of horizontal wells in the oil three factory, devel
opment contradiction appears gradually, as the natural fractures, fracture and heterogeneity
factors, easy to cause the partial layer water injection advance, flooding horizontal well sec
tion section, due to horizontal wells dense local wells, horizontal wells and directional wells
staggered distribution, well, not rules is not perfect, resulting in horizontal well regional oilwater relationship is complex, it is difficult to judge the impact of water flooded layer, single
well productivity. Dynamic performance for high volume, high water cut, oil production rate
is low. To improve the production of the horizontal well, the ascension of the whole oil three
factory development result of the horizontal well, the horizontal well water shutoff technology
experiment, achieved good results.
Key Words:horizontal well
multi-stage intelligentwater plugging

70 % 27

201312-10
1968-

525871084@qq.com

47.4 %

47

12

121

67 %

2 3

11

,
,

4
2

/mm /mm /mm /mm /mm

13

114

127
131

118.6124.26

500

60

131

5
132

1
1

>10m3/d 3550 cm


20


30

10

33

2014

48

Y445 Y441

6 7
1321

21

2013 6

1
2
3

5 3
22

2012 10

622 0 t 75.6 t

1322

7
3

/m3 /t /% /mgL-1 /m

12 330.0 m 22 288.0 m

13.71

2 013

81.1

22 134

1 484

2012.9.14-2012.9.28

32 220.0 m 42 163.0 m
52 114.0 m

11

12.57

0.06

99

9 459

855

2012.8.14-2012.8.28

15

15.37

1.26

90.3

30 701

1 566

2012.9.9-2012.9.25

11.82

1.53

84.8

33 768

1 346

2012.8.14-2012.8.28

12 410.04 m 22 246.11 m
32 129.63 m
12 369.68 m 22 260.08 m
32 127.92 m
12 410.04 m 22 246.11 m
32 129.63 m
12 540.0 m
22 480.0 m

20

15.37

1.26

90.3

30 701

1 566

2012.9.9-2012.9.25

3430.0 m
42 370.0 m
5
2 310.0 m
62 210.0 m
72 140.0 m

/m3 /t /% /mgL-1 /m3

5.5

18.61

49

100

71 309

/t

9.63


/t

/t

0.70

1.05

/% /mgL
-1

0.70

91.5

59 619

15.23 m3 1.21 t 90.6 % 2

70 000 mg/L

2004
2078 0.22 mm
2146 4 6

1 970 m

18.61 m3 9.63 m3 0 t 0.7 t


100 % 91.5 %
4

23
231

2 3
1

11

11

7 0 000 mg/L 2013

/m3

30 000 mg/L

10

0.2 %+5 %

200

10 %+

0.01 %

100

0.3 %HPAM

10

3
100 %
1
2 40 %

3
3 01-41

3 3

320

3 5

01-41
5

11

/m

/t

12.57

0.06

99

9 459

12 410.04 m

8.98

4.28

41.4

31 499

22 246.11 m

5.65

2.87

29.1

37 146

10 2

32 129.63 m

6.96

100

24 958

7.59

100

232

/% /mgL
-1

11

3
1

1 3

01-41

1
2 3

23
3 8
2


53
820 h

53

MPa

510

1

qgv -104m3/d
h-m
Kh -

10-3m2T-g -

D
2004
9.
2 .M.
2004
3 .
J.
2001
225
441443.

mPas
Zg -Sv - 4 -

r ev
r wv -m
m
p e -MPa
p wf -MPap s -

J.
2009
322
1820.
5 .J.

2004
256
650652.

MPa
0.101MPaT s - 6 Lee A LGonzalez M HEakin B E. The Viscosity of Natural

20
q AOF -104m3/d
L-
104m3mPas/MPa2dqAOFi -104m3/dpi MPa
qAOFm -104m3/dpm -

GasesJ.Trans. AIME 237


1996
9971000.
7
M
2007.

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
45
strings-expanding the CasesR.SPE 46 0301998.

J.
2012
4011
62-65.

14 Turner R GHubbard M G
Dukler A E. Analysis and pre 19 . 2
diction of minimum flow rate for the continuous re-moval of

J.2008156
86-

liquids from gas wellsR.SPE 219819697582.

88.

15 .50.8mm 20 .
J.2010
193
44-45.

J
2011
304
77-80.

16 .M. 21 .J.

19865-20.

200937
31-33.

17 . 22 .J.
J.2008182
85-88.

2011
3
85-87.

18 .

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
49

1
87-89.
J2006203
2 J
33-35.
2011304

3
J
2002
164
43-45.
4
J2003
256
81-82.

You might also like