Name of Work
1.1.2
Estimate Rs
: 460.50
Lakhs
TS No. :
1.1.3
WE/RE Rs.
Lakhs
Authority:
1.1.4
103.00
Lakhs
1.1.4
51.25
Lakhs
1.2.1
1.2.2
C R Agt. No
: 156/2009-10
1.2.3
: Rs. 39 09 1893/-
1.2.4
DHS:
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
2.02.2010
TP:
DFC:
HYDERABAD
TS Memo.No. 102 /
2008-09, Dated:
22.11.2008 GO Ms No.
36 T(R&B) Dt.
28.2.2008
-
derabad.
2.40% Excess
1.08.2011
Sl. No.
1
2
Description of items
Specification
No. MoRT&H
Stretches
Proddatur Court
Building
309&310
-do-
-do-
402
-do-
612
-do-
402
-do-
-do-
a) Footings
-do-
b) Pedestals
-do-
-do-
d) Plinth Beams
-do-
-do-
-do-
-do-
126
-do-
126
-do-
10
402
-do-
11
-do-
12
13
14
-do-
-do-
403
-do-
15
906
-do-
16
-do-
17
-do-
18
-do-
19
703
-do-
20
703
-do-
21
-do-
22
-do-
23
-do-
24
703
-do-
25
-do-
26
703
-do-
27
-do-
28
911
-do-
29
912
-do-
30
31
-do-
32
-do-
33
34
1328
-do-
710
-do-
-do-
35
-do-
36
-do-
37
-do-
38
-do-
39
-do-
40
-do-
41
1212
-do-
2.1
2.2
ks
Stage of Work
Under Progress
Under Progress
Work is in Progress
Work is in Progress
completed
Work is in Progress
completed
completed
Work is in Progress
completed
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
To be taken up
5.0
SUMMARY OF Q C TESTS
Description of
work
Type of test
Frequency for
each test
Method
Gradation
1 test for 15
cum
AIV
FIV
Water absorption
Strength of
concrete
IS: 516-1959
1 for 1-5
2for 6-15
3 for 16-30
4 for 31-50
+1 test for each
50 cum
IS: 1199-1959
Mix design
1 per source
Gradation
1 test for 15
cum
Bulkage
10
Fineness modulus
11
Clay content
IS: 2116 -
Course
aggregate
5
Concrete
Sand
No. of Tes
Total
quantity
Executed in Required as
per MORTH
cum
The field staff have not furnished the extract of QC tests conducted and Q C test records during the inspecti
control tests have to be conducted as per the table 900.3,900.4 and 900.6 of MORTH specifications.
Hence quality cannot be assured and further there are chances to occur damages as such they are requeste
the performance of the work at closer intervals and take necessary steps for rectification of such type d
occurs duly notifying to the contractor timely
As per clause 1.11 of IRC SP - 11 " Quality Control for construction of roads and runways ", Out of total tests,
70% to be carried out by AEE/AE, 20% by DEE & 10% by EE.
5.2 End test Results conducted by Quality control officers during this inspection
SI.No
1
Name of Test
No of Test done
Gradation
Observed
Annexure-I
Tests on Sand
3 Steel
Annexure-II
Annexure-III
No. of Tests
Done
Short
fall
Basement depth
C17 - C37
0.55
0.55
4 nos of 20 mm dia
4 nos of 20 mm dia
4 nos of 16 mm dia
4 nos of 16 mm dia
4 nos of 20 mm dia
4 nos of 20 mm dia
C70
0.23 x 0.45
0.23 x 0.45
C123
0.23 x 0.45
0.23 x 0.45
135 mm
150 mm
0.015
135 mm
150 mm
0.015
140 mm
150 mm
0.010
140 mm
150 mm
0.010
Description
As per Execution
Specified as per
drawings
C-69 - C-82
100.540
C-69 - C-70
100.560
C-70 - C-83
100.550
C-82 - C-83
100.555
C1-C2
100.560
c1- c30
100.545
c-30 - c31
100.550
c31-c2
100.530
c121-c122
100.545
c121-c128
100.555
c144- 145
100.545
c145-123
100.550
C70
Reinforcement Details
C 122
C123
Plinth beam depth
Spacing Stirrups of
8mm dia
C17 - C37
Not furnished.
Top levels of the Plinth Beam over the entire building is same except with minor variation.
Differences
Dy.Exe.Engineer(R&B)
Q C Sub Division, Kadapa
.C Staf
pection
ment details are verified and are
Remark
s
-
Differences
13.5
court building
B.S
F.S
1.780
H.I
101.780
1.240
1.220
1.230
1.225
1.220
1.235
1.230
1.250
1.235
1.225
1.235
1.230
C-69 - C-82
C-69 - C-70
C-70 - C-83
C-82 - C-83
C1-C2
c1- c30
c-30 - c31
c31-c2
c121-c122
c121-c128
c144- 145
c145-123
RL
100.000 TBM
100.540
100.560
100.550
100.555
100.560
100.545
100.550
100.530
100.545
100.555
100.545
100.550
REMARKS
#REF!
The following tests on materials are conducted and are tabulated below:7.0 Coarse Aggregates (Annexure -I )
Gradation Test for 40 mm metal(single size)
Weight
Sieve Size in
retained in
mm
g
Wt
11092
Cummulative
wt Retained
% Wt
retained
% Wt
passing
Specified
0.00
100.00
100
63
NIL
40
1086
1086
9.79
90.21
85-100
20
9856
10942
98.65
1.35
0-20
10
150
11092
100.00
0.00
0-5
Remarks
Wt of Aggregate passing
through 2.36 mm
A.I.V
W2/W1 *
100
Remarks
307
75
24.43
< 30
Wt
Cummulative
wt Retained
% Wt
retained
% Wt
passing
15884
Specified
40
NIL
0.00
100.00
100
20
1525
1525
9.60
90.40
85-100
10
14287
15812
99.55
0.45
0-20
4.75
72
15884
100.00
0.00
0-5
Remarks
Wt of Aggregate passing
through 2.36 mm
A.I.V
W2/W1 *
100
Remarks
315
80
25.40
< 30
338
72
21.3
Re
ma
rks
>3
0
1830.00
Cum.wt.
retained
%
retained
10mm
0.00
0.00
0.00
100.00
100
4.75mm
52.00
52.00
2.84
97.16
90-100
2.36mm
173.00
225.00
12.30
87.70
75-100
1.15mm
399.00
624.00
34.10
65.90
55-90
600 mic
512.00
1136.00
62.08
37.92
35-59
300mic
498.00
1634.00
89.29
10.71
8-30
150mic
126.00
1760.00
96.17
3.83
0-10
Specified
ZONE-II
Remarks
Fineness
The gradation
modulus =
of sand falls in
296.78/100
Zone II
= 2.97 %
= 2.97 %
Pan
70.00
1830.00
296.78
Zone II
marks
The gradation
of sand falls in
Zone II
Zone II
0.394
8 mm
0.395
0.395
0.395
8.19
0.889
0.888
16.02
1.564
1.578
0.0139
20.15
0.280
54784.00
2.462
2.466
0.0040
25.34
0.101
54784.00
3.856
3.854
0.396
0.886
12 mm
0.890
0.892
1.539
16mm
1.577
1.576
2.462
20mm
2.460
2.464
3.857
25mm
3.853
3.859
Total
Say
Recovery
amount
15327.35
5552.91
20880.26
20881.00
General Remarks :
The Date of handing over site is 2.02.2010 and the date fixed for completion as per agreement is 1.8.2011 . The field of
informed that E.O.T is applied 30.08.2012 , but the approval from the competent is awaited. The value of work done as report
officers is 103 Lakhs works out to 26%.The Progress of work is very slow. The agreements stipulates making payment
milestones specified. The Executive Engineer is requested to verify the progress of work in accordance with mile stones bo
and Financial specified in the agreement and take appropriate measures as per agreement condition.
The reinforcement for the RCC columns inculding balance plinth beam are corroded.These steel items are to be thorough
and made rust free before going for concrete.
Cracks are developed in the basement wall at the columns C121 - C122, C121 - C28 & C143- C123. The same are to be rec
The field officers should ensure the designed flexural strength for all concrete members before making payment.
As on date of inspection the CC cubes are not available at site for testing the compressive strength of concrete.
It is recommended to asses and accept the in situ strength of concrete of columns by Non - distructive methods
13311:1992(part I & Part II) and as per clause 402.9.2 of APDSS.
It is observed that near the overlaps the steel is being bend for the column rods. The same is to be avoided.
8
9
The field officers have not produced steel bills to the extent of work done. As per clause 1009.3 of MoRTH specifications, the
The field officers have not produced steel test certificates from authorised original manufacturers during insepction for verifica
10
The field staff have not furnished the Log of cement on the day of inspection and they are requested to furnish the extrac
cement for verification.
11
The field officers are advised to arrange the samples of the each item of the building components like water supply,sanita
joinery & fixtures, flooring items etc. for display by the compitent authority for approval for usage in the work.
12
The field officers have not furnished test results of water analysis during inspection. The field officers should ensure that the
for concrete mix and curing purposes should not be less than PH 6.
13
The Executive Engineer is requested to effect the recovery of Rs. 20 881 /- from contractor's bills towards less unit weight in
intimate the recovry particulars such as MB No. and CB Voucher No. to this ofice in the compliance report.
Note :
The Q C R furnished above are not basis for making payment on the work as it does not purport to be covering all the aspects of the work and field E
requested to check up the work and see that the work is executed to specified standards and satisfy themselves before making payment.
The field officers are requested to check the recovery calculations as per agreement conditions before effecting the recovery.
The recovery proposed is as per the E-in - C(R&B) (Admn & Roads) circular Memo No. 12582/vigl/1/2005-1 dated. 17.10.2006. The Executive Enginee
to keeping view regarding recovery to be effected.
The Q C R furnished above are not valid for any evidence in the court of law.
The test results given in the Q C R are valid for the samples extracted at the specified locations and are tested in the Q C laboratory only.
be covering all the aspects of the work and field Engineers are