DETAILED ESTIMATE
Name of the work: Approach road from R&B road to Maseedupadu of Gopa
GRANT:- CRR(SCP)
DISTRICT
WEST GODAVARI
CIRCLE
ELURU
DIVISION
ELURU
SUB-DIVISION
ELURU
MANDAL
DENDULURU
A PRADESH
DEPARTMENT
Maseedupadu of Gopannapalem GP
akhs
SPECIFICATION REPORT
Name of the work: Approach road from R&B road to Maseedupadu of Gopannapalem GP
Estimate Amount Rs. 39.50 lakhs
The work "Approach road from R&B road to Maseedupadu of Gopannapalem GP",
Est.Cost.Rs.39.50 lakhs was administratively sanctioned under CRR(SCP) grant for the year 2014-15 vide
G.O Rt.No 310 of PR&RD(Prog.I) Dept.Dt 30.3.2015
The road connects Maseedupadu habitation to Eluru-Jangareddigudem R&B Road.
(Key Map enclosed).The surrounding area is full of horticultural fields and houses.Traffic
survey is conducted on the road and overloaded vehicles are also observed.Hence,pavement design was carried
out(Copy enclosed).As per the pavement design,200mm thick GSB,WBM Gr-II & WBM Gr-III layers are needed
along with B.T.
The existing GSB layer is sufficient and WBM Gr-II &Gr-III are proposed in the estimate.
C.C paved dip is proposed at 0/4
1.Picking old metal layer from 0/0 to 0/180
2.WBM Gr II&III layers from 0/0 to 0/900
3.Prime coat from 0/0 to 0/900
4.OGPC and seal coat from 0/0 to 0/900
Further lump sum provisions are made in the estimate for the following items:1)Provision for VAT @ 5.00%
2)QC charges @ 0.5%
The estimate is prepared as per the current SSR,i.e.2014-2015 rates and as per
the A.P Revised Standard data work will be carried out as per APDSS after entrustment
Dy.Executive Engineer
PRI,Eluru
Asst.Executive Engineer
PRI,Eluru
s. 39.50 lakhs
n the estimate.
:
Approach road from R&B road to Maseedupadu of Gopannapalem G
:CRR(SCSP)
Sri.P.V.S.Durga Prasad,Dy.Exe.Engineer,PR,Eluru
Sri.D.V.Srinivasa Rao,Asst.Exe.Engineer,PR,Eluru
INSPECTION NOTE
Approach road from R&B road to Maseedupadu of Gopannapalem GP was inspected on
Total length of the road is 0.90 Km.The reach from 0/0 to 0/180 is badly damaged BT Surface.Remaining reach
from 0/180 to 0/9 Km is OTG metal partially damaged.
The following instructions are issued to the field staff:1.The crust thickness may be verified and pavement design may be carried out after
conducting traffic survey.Pavement layers may be proposed accordingly.Embankment widening is also to be taken
up with carted earth
2.C.C paved dip may be proposed at 0/4 Km
RINTENDING ENGINEER,PR,ELURU
rakash Naidu,BE
Prasad,Dy.Exe.Engineer,PR,Eluru
Rao,Asst.Exe.Engineer,PR,Eluru
TION NOTE
EXECUTIVE ENGINEER
PANCHAYAT RAJ,ELURU
SEINORAGE CHARGES
Name of the work: Approach road from R&B road to Maseedupadu of Gopannapalem GP
Description of item
2
Material
3
Carting earth
Earth
0.00
0.00
GSB
Gravel
0.00
0.792
0.00
Sand
0.00
0.408
0.00
Quantity
4
Per cum/sqm
5
Total
6
Gravel
253.13
0.05
12.66
Picking metalled
surface
Grade II layer
Metal
1.45
0.00
Metal
253.13
1.45
367.04
BT OGPC
Metal
3375.00
0.027
91.13
BT Seal coat
Sand
3375.00
0.006
20.25
Gravel
1658.25
0.792
1313.33
Sand
1658.25
0.408
676.57
Earth work
Earth
24.30
24.30
10
Sand filling
Sand
4.05
1.05
4.25
11
M10 Concrete
Metal
4.05
0.9
3.65
Sand
4.05
0.45
1.82
Metal
9.18
0.9
8.26
Sand
9.18
0.45
4.13
Metal
0.00
0.9
0.00
Sand
0.00
0.45
0.00
Metal
19.13
0.9
17.22
Sand
19.13
0.45
8.61
12
13
14
M15 Concrete
Super structure
CC Road
apalem GP
s. 39.50 lakhs
Rate per Cum
7
Amount
8
22.00
0.00
22.00
0.00
40.00
0.00
22.00
278.44
50.00
0.00
50.00
18351.93
50.00
4556.25
50.00
1012.50
22.00
28893.35
40.00
27062.64
22.00
534.60
40.00
170.10
50.00
182.25
40.00
72.90
50.00
413.10
40.00
165.24
50.00
0.00
40.00
0.00
50.00
860.85
40.00
344.34
82898.49
Name of the work: Approach road from R&B road to Maseedupadu of Gopannapal
No
Length (m)
Width (m)
Construction of Embankment with approved materials obtained from borrow pits with all lifts, transporting to site,
spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 100
as per Technical Specification Clause 301.5 MORD / 305 MORTH
From 0/0 to 0/900
900.00
1.50
900.00
3.75
Picking old metalled surface to a depth of 40 to 100mm and spreading metal including watering with an initial lead of 2
hectometers and rolling with power rollers,watering and spreading gravel for blindage and power roller rolling including hir
charges of power roller(8 to 10T)barricading and diversion of traffic and wetting the new consolidation for a fortnight for
compacted thickness of 50mm(SSR item No.160)
From 0/0 to 0/180
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper gra
and camber, applying and brooming, stone screenings to fill -up the interstices of coarse aggregate, watering and
compacting to the required density grading 2 as per Technical Specification Clause 405 MORD /404 MORTH. For
compacted thickness of 75mm.
180.00
3.75
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper gra
and camber, applying and brooming, stone screenings to fill -up the interstices of coarse aggregate, watering and
compacting to the required density grading 3 as per Technical Specification Clause 405 MORD /404 MORTH. For
compacted thickness of 75mm.
From 0/0 to 0/900
900.00
3.75
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleanin
of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specificatio
Clause 502 MORD (for use on Water Bound Macadam)
Over WBM layer
From 0/0 to 0/900
900.00
3.75
900.00
3.75
900.00
3.75
Providing, laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using
Type B as per Technical Specification Clause 510 MORD. (using Three wheel 80-100 kN static roller)
From 0/0 to 0/900
Providing, laying and rolling of Open-Graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm
aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing cours
on a previously prepared base, including mixing in HMP 30/40 t capacity plant, laying and rolling with a three wheel 80-1
kN static roller capacity, finished to required level and grades to be followed by seal coat of either type A or Type B or Typ
as per Technical Specification Clause 508 MORD.
Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg p
sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Cla
503 MORD
From 0/0 to 0/900
900.00
3.75
Construction of granular shoulder by providing well graded material / Close graded material, spreading in uniform layers
with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smoo
wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 4
MORD / MORTH
From 0/0 to 0/900
900.00
1.00
10 Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including settingout
construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to lead of 50m,
dressing of sides and bottom and back filling in trenches with excavated suitable material as per clause 300(1) of MORD.
For toe walls A/R
45.00
0.60
11 Filling in foundation trenches as per drawing and technical specification clause 305.3.9 MORD and 304 MORTH for sand
filling
For toe walls A/R
45.00
0.60
12 Providing concreate for plain/reinforced concreate in open foundations using 40mm normal size graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted by vibration including curingg for 14 days complete
per drawing and technical specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for bed
concrete
For toe walls A/R
45.00
0.60
13 Providing concreate for plain/reinforced concreate in open foundation complete as per drawing and technical specification
clause 802, 803, 1202 & 1203 for body walls
For toe walls A/R
45.00
(0.45+0.23)/2
14 Filling with stone dust below the C.C Pavement for levelling including all labour charges ete complete
For dip
15.00
7.50
15 Construction of Un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base w
M30 Grade concrete using 43 grade of any other type as per clause 1501.2.2 coarse and fine aggregates confirming to IS
383, maximum size of coarse aggregate not exceeding 25mm micron thick polythene film and the form work, spreading th
concrete with shovels, rakes, compacted using vibrators and finished in continuous operation including provision of
contraction and expansion, construction joints ,admixtures as approved, curing of concrete slabs for a period of 14 days
using curing compound (where specified) and water finishing to lines and grade etc complete
For dip
15.00
7.50
ACT ESTIMATE
to Maseedupadu of Gopannapalem GP
Estimate Amount Rs. 39.50 lakhs
Thickness
(m)
6
Quantity
Unit
Rate
Amount
10
cum
168.91
228029
cum
2952.19
747288
sqm
45.51
30722
cum
3264.67
826386
0.500
1350.00
1350.00
0.075
253.13
253.13
-----
675.00
675.00
0.075
253.13
253.13
-----
3375.00
3375.00
sqm
29.40
99225
sqm
10.91
36821
sqm
162.06
546953
sqm
48.83
164801
cum
968.34
261452
cum
148.84
3617
3375.00
3375.00
-----
3375.00
3375.00
3375.00
3375.00
0.150
270.00
270.00
24.30
24.30
4.05
4.05
cum
1747.70
7078
cum
4930.84
19970
9.18
cum
5655.01
51913
5.63
5.63
cum
1571.39
8847
cum
6840.48
130858
4.05
4.05
9.18
s ete complete
0.050
0.170
19.13
19.13
LS
158198
LS
15820
82898
529124
Total
3950000
Design of flexib
a)Traffic survey details:-
The area surrounding the road is filled with horticultural fields.Hence,there is no nee
non-harvesting season traffics to arrive at AADT.Hence,commercial vehicle traffic particulars are taken
S.No Date of
survey
No.of
Commercial
vehicles
HCVs
observed(C
Overloaded
Vs)
by 20%
Unladen HCVs
Unladen
HCVs
4.5.15
41
5.35
2.58
5.5.15
44
5.35
2.58
6.5.15
43
5.35
2.58
Hence,average of the traffic count of above 3 days is taken as AADT.Now assuming 6% traffic growth and
Hence average annual daily traffic (AADT) =
N = To x4811xL =
202062
Hence,as per clause 3.5 of IRC SP:72 2007,the traffic commes under T 5 category.As per the pavem
crust is as given below:1.Modified/Improved sub grade with CBR not less than 10----150mm
2.Granular sub base with CBR not less than 20----175mm
3.WBM Base course with CBR not less than 100----75mm
4.Bitumen treated WBM with CBR not less than 100----75mm
0/0 to 0/900
WBM
200mm
0mm
The existing crust thickness is not sufficient for the projected traffic inten
Hence,it is proposed to provide 150mm thock GSB,WBM Gr II&WBM Gr
s (HCVs)
Unladen HCVs
VDF for
normally
loaded
HCVs
Equivalent
Standard Axle MCVs
loads(ESALs) Overloaded
by 20%
Laden MCVs
VDF for
Normally
overloaded loaded
MCVs
MCV's
VDF for
normally
loaded
MCVs
Unladen MCVs
Unladen
VDF for
MCVs
normally
loaded
MCVs
0.31
38.62
0.65
0.34
0.02
0.31
38.12
0.65
0.34
0.02
0.31
38.93
0.65
0.34
0.02
ssuming 6% traffic growth and a design period of 10 years,the no.of cumulative ESAL applications
42
ategory.As per the pavement design catologes in Fig.4 of IRC SP:72-2007,the composition of the
BT
Remarks
Equivalent
Standard
Axle
loads(ESAL
s)
Total
ESALs(To)
3.7
42.32
3.37
41.49
3.7
42.63
126.44
xecutive Engineer,
LEAD STATEMENT
Name of the work: Approach road from R&B road to Maseedupadu of Gopannapalem GP
Sl. No.
Description of Material
Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
2
Coarse Sand for concrete
Coarse Sand for filling
Coarse Sand for mortor
Gravel
40mm HBG M/c Metal-SS5
20mm HBG M/c Metal-SS5
10mm HBG M/c Metal-SS5
Steel
Cement
Bitumen VG-30 grade bulk
Emulsion SS-I grade -- Packed
Emulsion RS-I grade -- Packed
Stone dust of size less than 2.36mm -- (IRC&MORTH)
3
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 MT
1.00 MT
1.00 MT
1.00 MT
1.00 MT
1.00 Cum
14
15
16
17
18
19
20
21
22
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1.00 Cum
1. Certified that the above leads are correct to the best of my knowledge
2. Certified that the work spot lies within 12Km from the corporation limits
LEAD STATEMENT
napalem GP
Estimate Amount Rs. 39.50 lakhs
Lead in KM
4
Vadapalli
Vadapalli
Vadapalli
Vegiwada
I.Pangidi
I.Pangidi
I.Pangidi
5
73.00
73.00
73.00
14.00
76.00
76.00
76.00
Visakhapatnam
Visakhapatnam
Visakhapatnam
I.Pangidi
303.00
303.00
303.00
76.00
I.Pangidi
I.Pangidi
I.Pangidi
I.Pangidi
I.Pangidi
I.Pangidi
I.Pangidi
I.Pangidi
I.Pangidi
76.00
76.00
76.00
76.00
76.00
76.00
76.00
76.00
76.00
Conveyance
Charges
6
746.14
746.14
746.14
173.25
773.77
773.77
773.77
909.00
1060.50
1060.50
773.77
773.77
773.77
773.77
773.77
773.77
773.77
773.77
773.77
773.77
8
0.00
0.00
0.00
0.00
70.00
70.00
70.00
Machine
Crushing
Charges
9
0.00
0.00
0.00
0.00
155.00
259.00
173.00
36688.08
27673.36
28828.80
340.00
0.00
0.00
0.00
70.00
0.00
0.00
0.00
85.00
10
1356.14
1206.14
1418.14
276.25
1618.77
2138.77
1708.77
43000.00
6200.00
37597.08
28733.86
29889.30
1268.77
308.00
504.00
656.00
780.00
984.00
944.00
588.00
456.00
419.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
77.00
126.00
164.00
195.00
246.00
236.00
147.00
0.00
0.00
1228.77
1473.77
1663.77
1818.77
2073.77
2023.77
1578.77
1299.77
1262.77
Initial Cost
7
610.00
460.00
672.00
103.00
620.00
1036.00
692.00
43000.00
6200.00
Blasting
Charges
Total Amount
DATA SHEET
Name of the work: Approach road from R&B road to Maseedupadu of Gopannapalem GP
Index-Code
S. No.
1
RBR-SBBS-1
RBR-BASC-1
RBR-BASC-2
RBR-BASC-14
RBR-BASC-17
CD WORK ITEMS:RBR-FNDN-1
10
RBR-FNDN-2
11
RBR-FNDN-4
12
RBR-FNDN-4
13
RBR-FNDN-2
14
RBR-CCPV-5
15
DATA SHEET
Estimate Amount R
Description
2
Unit
3
Qualitty
4
Rate Rs.
5
Unit = cum
Taking output = 100 cum
a) Labour
Mate
Mazdoor (Unskilled)
Add MA@25%
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour
Tipper 5.5 cum with 10 t capacity
Dozer D-80 for spreading @ 200 cum per hour
Motor grader for grading @ 200 cum per hour
Water tanker 6 kl capacity
Three wheel 80-100 kN Static Roller @ 80 cum per hour
c) Material
Water
c&d) Overheads & Contractors Profit@ 13.615%
Cost for 100 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/100
Granular Sub-base with Well Graded Material / Close Graded
Material (Table 400.1)
By Mix in Place Method
Construction of granular sub-base by providing well graded
material / Close graded material, spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method
with rotavator at OMC, and compacting with smooth wheel roller
80-100 kN / Vibratory Roller to achieve the desired density,
complete as per Technical Specification Clause 401 MORD /
MORTH
day
day
1.04
295
hour
hour
hour
hour
hour
1.67
4.50
0.50
0.50
2.00
2848.50
922.00
2575.60
3216.00
624.00
hour
1.25
1146.70
kl
12
day
day
day
2.40
8.00
295.00
295.00
hour
6.00
3216.00
hour
hour
hour
30.00
12.00
3.00
1146.70
422.00
624.00
cum
cum
255.00
129.00
276.25
1206.14
12.08
250.00
295.00
295.00
36.00
24.00
1146.70
624.00
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screenings to fill -up the interstices
of coarse aggregate, watering and compacting to the required
density grading 2 as per Technical Specification Clause 405
MORD /404 MORTH. For compacted thickness of 75mm.
By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Add MA@25%
b) Machinery
Three wheel 80-100 kN Static Roller @ 10 cum per hour
day
day
day
hour
hour
Water tanker 6 kl capacity
c) Material (Refer Tables 400.7,8,9 and 10 MORD/ 400.6,7,8 &9
MOTTH)
Aggregate
cum
435.60
1440.57
cum
86.40
1371.27
cum
kl
28.80
144.00
1268.77
0.00
12.08
250.00
295.00
295.00
36.00
24.00
1146.70
624.00
435.60
1667.87
cum
86.40
1371.27
cum
kl
28.80
144.00
1268.77
0.00
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 material
Water
c&d) Overheads & Contractors Profit@ 13.615%
Cost for 300 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screenings to fill -up the interstices
of coarse aggregate, watering and compacting to the required
density grading 3 as per Technical Specification Clause 405
MORD /404 MORTH. For compacted thickness of 75mm.
By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Add MA@25%
b) Machinery
day
day
day
hour
hour
Water tanker 6 kl capacity
c) Material (Refer Tables 400.7,8,9 and 10 MORD/ 400.6,7,8 &9
MOTTH)
Aggregate
Grading 3 53 mm to 22.4 mmm @ 0.91 cum per 10 sqm for
compacted thickness of 75mm
cum
Stone Screening
Type B 11.2mm for Grading 3 @ 0.18 cum/10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 material
Water
c&d) Overheads & Contractors Profit@ 13.615%
Cost for 300 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Prime Coat
Low porosity
Providing and applying primer coat with bitumen emulsion (SS-1)
on prepared surface of granular base including cleaning of road
surface and spraying primer at the rate of 0.70-1.0 kg/sqm using
mechanical means as per Technical Specification Clause 502
MORD (for use on Wet Mix Macadam & WBM)
Unit = cum
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Add MA@25%
b) Machinery
Hydraulic brom @ 1250 sqm per hour
Air compressor 210 cfm
day
day
1.04
295.00
hour
hour
1.40
1.40
357.00
507.50
hour
hour
Water tanker 6 kl capacity 1 trip per hour
c) Material (Refer Tables 400.7,8,9 and 10 MORD/ 400.6,7,8 &9
MOTTH)
t
Bitumen emulsion (SS-1) @ 0.85 kg per sqm
kl
Water
c&d) Overheads & Contractors Profit@ 13.615%
1.00
0.50
860.00
624.00
1.48
3.00
28733.86
0.00
1.04
295.00
hour
hour
1.40
1.40
357.00
507.50
hour
c) Material (Refer Tables 400.7,8,9 and 10 MORD/ 400.6,7,8 &9
MOTTH)
t
Bitumen emulsion (RS-1) @ 0.275 kg per sqm
c&d) Overheads & Contractors Profit@ 13.615%
1.00
860.00
0.48
29889.30
Unit = cum
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Add MA@25%
b) Machinery
Hydraulic brom @ 1250 sqm per hour
Air compressor 210 cfm
Bitumen emulsion pressure distributor @ 1750 sqm/hour
day
day
Bituminous
By Manual Means
Case - II : Type B (510 - MORD)
Bitumen (S-65)
day
day
day
hour
hour
hour
hour
hour
hour
t
cum
10.00
3.52
295.00
295.00
6.00
6.00
6.00
3.64
6.00
16.00
19120.00
1320.00
1646.00
889.40
2249.00
1146.70
5.84
37597.08
108.00
1652.11
Unit = cum
Taking output = 1250 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
Add MA@25%
b) Machinery
Mix all 6/10 t capacity
Three wheel 80-100 kN Static roller
Bitumen boiler oil fired 1000 litre capaciy fitted with spray set
c) Material
Bitumen VG-30 @ 6.80 kg per 10 sqm
Crushed sand or grit as passing 2.36 mm sieve and retained on
180 micron sieve applied @ 0.06 cum per 10 sqm
day
day
day
15.00
2.85
295.00
295.00
hour
hour
2.50
2.50
649.00
1146.70
hour
2.50
209.00
0.85
37597.08
cum
7.50
1356.14
Unit = Sqm
a)Labour
Labour charges for 50mm thickness(SSR Item No.161b)
Add MA@25%
b) Material
Gravel
c&d) Overheads & Contractors Profit@ 13.615%
Rate per cum = a+b+c+d
Excavation of structures:
Earth work in excavation for structures as per drawing and
technical specifications clause 305.1 including settingout
construction of shoring and bracing, removal of stumps and other
deleterious material and disposal up to lead of 50m, dressing of
sides and bottom and back filling in trenches with excavated
suitable material as per clause 300(1) of MORD.
Ordinary Soil
Up to 3m depth
sqm
1.00
21.00
cum
0.05
276.25
Unit = cum
taking output=10cum
a) Labour
Mate
Mazdoor (Unskilled)
Add MA@25%
c&d) Overheads & Contractors Profit@ 13.615%
Cost for 10cum=a+b+c
Rate per cum = (a+b+c)/10
day
day
day
day
3.64
295.00
0.31
295.00
cum
1.050
1356.14
T
cum
cum
0.220
0.45
0.9
6200.00
1356.14
1618.77
0.1
1.39
385.00
295.00
0.40
453.00
day
day
day
Hour
T
cum
cum
cum
cum
day
day
day
0.275
0.48
0.48
0.24
0.08
6200.00
1356.14
1618.77
2138.77
1708.77
0.1
1.39
Hour
0.40
385.00
295.00
453.00
0.10
Filling with stone dust below the C.C Pavement for levelling
including all labour charges ete complete
Stone dust filling
Unit = cum
a) Labour
Mate
Mazdoor (Unskilled)
Add MA @ 25%
b) Material
Stone dust
c&d) Overheads & Contractors Profit@ 13.615%
Rate per cum = a+b+c+d
day
day
cum
0.31
295.00
1.000
1268.77
Unit = cum
Taking output = 75 cum (172.5 T)
a) Labour
Mate
Mason (1st class)
Mason (2nd class)
Mazdoor (Un-Skilled)
Mazdoor (Skilled)
Surveior
Mazdoor (Semi-Skilled)
Add MA@25%
b) Machinery
Concrete mixer 0.28/0.4 cum capacity (6 mixers) with weight
batcher and suitable capacity calibrated water tank
Needle vibrator
Screed vibrator
Plate vibrator
Water Tanker 6kl capacity
Air Compressor (1 hour initial + 1 hour final)
c) Material
Crushed stone coarse aggergates, grading will be as per clause
1501.2.4.1 (Table 1500.1) of specifications @ 0.90 cum / cum of
concrete
20mm
10mm
Sand as per IS:383 & conforming to clause 1500.2.4.2 @ 0.4 cum
of concrete
Cement @ 350 kg / cum of concrete
Polythene sheet 125 micron
Basic rate for 75 cum
Form work @ 3 % on (a+b+c)
c&d) Overheads & Contractors Profit@ 13.615%
Rate per 75 cum
Rate per 1 cum
day
day
day
day
day
day
day
5.00
5.00
150.00
6.00
2.00
6.00
385.00
345.00
295.00
295.00
345.00
295.00
hour
hour
hour
hour
hour
hour
36.00
9.00
9.00
9.00
5.00
2.00
453.00
165.70
48.00
48.00
624.00
507.50
t
cum
cum
44.55
22.95
2138.77
1708.77
cum
T
sqm
33.75
26.25
412.50
1356.14
6200.00
18.00
ve Engineer,
Amount Rs.
6
306.80
76.70
4757.00
4149.00
1287.80
1608.00
1248.00
1433.38
2024.10
16890.78
168.91
Remarks
7
708.00
2360.00
767.00
19296.00
34401.00
5064.00
1872.00
70442.63
155592.11
39551.95
290502.74
968.34
3563.60
73750.00
19328.40
41281.20
14976.00
627512.29
118477.73
36540.63
0.00
127358.77
1062788.62
2952.19
3563.60
73750.00
19328.40
41281.20
14976.00
726524.17
118477.73
36540.63
0.00
140839.24
1175280.97
3264.67
306.80
76.70
499.80
710.50
860.00
312.00
42526.11
0.00
6166.49
51458.40
29.40
306.80
76.70
499.80
710.50
860.00
14346.86
2287.41
19088.07
10.91
2950.00
1038.40
997.10
114720.00
7920.00
9876.00
3237.42
13494.00
18347.20
219566.95
178427.88
77683.78
648258.73
162.06
4425.00
840.75
1316.44
1622.50
2866.75
522.50
31957.52
10171.05
7314.32
61036.83
48.83
21.00
5.25
13.81
5.45
45.51
1073.80
268.45
146.20
1488.45
148.84
91.45
22.86
1423.95
209.43
1747.70
1364.00
610.26
1456.89
38.50
410.05
112.14
181.20
166.92
590.89
4930.84
1705.00
650.95
777.01
513.31
136.70
38.50
410.05
112.14
181.20
452.49
677.67
5655.01
91.45
22.86
1268.77
188.31
1571.39
1925.00
1725.00
44250.00
1770.00
690.00
1770.00
13032.50
16308.00
1491.30
432.00
432.00
3120.00
1015.00
95282.29
39216.32
45769.74
162750.00
7425.00
438404.15
13152.12
61479.39
513035.66
6840.48
utive Engineer,
pannapalem GP
cutive Engineer,