1. PROPOSED POSITION
: Mechanical Engineer
2. NAME
: ASMADI
3. DATE OF BIRTH
: September 8, 1957
4. NATIONALLY
: Indonesia
5. EDUCATION
6. OTHERS TRAINING
:
Indonesia - Mother tongue
English
- Excellent
OF PROFICIENCY
8. MEMBER SHIP OF
Engineer PROFESSIONAL
9. EMPLOYMENT RECORD
From Nov, 1999 up to 2009
Employer.
Position held and Description of
Duties.
:
: Dinas Pekerjaan Umum (PU)
Detailed design of the hydro mechanical
Works Reviewed the contractor's.
Construction schedule, equipment
schedule
for mechanical works.
Supervised and evaluated of the
contractor's construction works and
prepared methodology of heavy
equipment
operation in connection with
installation of
the sluice gate.
Calculation the bill and quantities of the
Hydro mechanical equipment.
111
THIS PROJECT.
THE
TASK ASSIGNED.
1.
To review
the contractor's
Construction
program
for
mechanical
works
including
review design and assembling
at the factory.
2.
3.
4.
: PJT
: Pt. Catur
112
: 6
Units
-
Tower crane.
: 2 Units
: 2
Units
-
Stop log
: 8 Units
: 4
Units
His duty covered :
(1) Supervised and quality control of
the
contractor's construction works for
steel
conduit or penstock construction.
Prepared
methodology of
(2)
heavy
Project
Employer
PU
Client
Kalini P
Sept, 02-2012 up to Oct, 04-2012
month
Welding Engineer.
113
: Pt.
the
contractor's construction works for
steel
(2)
Asahan
90MW
PLTA
Project : 2 x
Employer
PT. Bajradaya
43
months
Mechanical Engineer.
Responsible for review design and
quality
control (QA/QC) of the mechanical works :
114
: 2
2 Units
6.2
2 Units
6 Sets
1 Unit
: 1 Unit
Valve
:
: 1 Unit
equipment schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection with
installation of the gates, Turbine etc.
(4) Calculated the bill and quantities of
the
Dam hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the team leader
Ponre-Ponre
South Sulawesi
Dam Project
Employer
PU
Client
Pt. Metttana
60
Months
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
- Maintenance Gate. : 2.2x2.2m = 1
unit
- Intake
Gate and Hoist : 2.2x2.2m = 1 unit
- Intake gate for siphon pipe 3 x3m = 2
Units
- Siphon
115
Steel Pipe
: 1.60 m x220 m
- Trash Rack
: 4x4.5 m = 1 Unit
- Flushing gates and Hoist 1.5x1.5m = 2
Units
His duty covered :
(1) Reviewed the contractor's
contraction
schedule, Design preparation,
equipment
schedule for Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection with
installation of the gates, siphon pipe.
(4)
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the team leader
Pelaparado Dam NTB Project
Employer
PU
Client
Pt. Mettana
30
months
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
116
methodology
of
heavy
equipment operation in connection with
installation of the gates, penstock, etc.
(4)
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Benanain Weir NTT Project
Employer
PU
Client
Pt. Mettana
April 2002 up to Dec 2004
months
20
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
- Intake Gate,
117
of
heavy
equipment operation in connection
with
installation of the gates, Electrical,
etc.
(4) Calculated the bill and quantities of
the
Dam hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the team leader
Tilong Dam NTT Project
Employer
PU
Client
Mettana
Feb 2000 up to April 2002
months
Mechanical Engineer.
118
: Pt.
26
of
heavy
equipment operation in connection
with
installation of the gates, penstock,
etc.
(4) Calculated the bill and quantities of
the
Dam hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the team leader
Batu Bulan Dam NTB Project
Employer
PU
Client
Pt. Mettana
119
25
months
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
- Intake Gate and Hoist. : 2.0x2.0m = 1
Unit
- Flushing
Gate and Hoist : 1.5x1.5m = 1 Unit
- Trash Rack
2.0x3.5m = 1 Unit
- Jet Flow Gate : 0.7m
- Bonneted Slide gate : 2.0x2.0m = 1
Unit
- Monorail Hoist : 1 Unit
- Turbin (Micro Hydro) Lonyok 50
KW
- All Electrical
His duty covered :
(1) Reviewed the contractor's
contraction
schedule, Design preparation,
equipment
schedule for Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the gates, Electrical,
etc.
(4) Calculated the bill and quantities of
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the team leader
Telaga Tunjung Dam Project (Design)
1110
Employer
PU
Client
Pt. Binakarya
months
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
- Steel Conduit
- Trash Rack
- Bonneted slide gate
- Stop log
His duty covered :
(1)
contraction
schedule,
equipment schedule,
for
Mechanical works.
(2)
Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the steel conduit.
(3)
the
hydro mechanical equipment.
Sangiran Dam Project
Employer
PU
Client
Pt. Binakarya
February 1999 up to May 1999
months
Mechanical Engineer.
1111
: 1.5x1.5m = 2 Units
of
heavy
equipment operation in connection with
installation of the steel conduit.
(4)
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Flood
(Design)
Semarang Project
Employer
PU
Client
Asia Pasific
October 1998 up to Jan. 1999
months
Mechanical Engineer.
1112
methodology
of
heavy
equipment operation in connection with
installation of the Slide gates.
(3)
the
hydro mechanical equipment.
Nawangan Dam Project :
Employer
PU
Client
P. Karya
: Pt.
months
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
- Intake Gate : 8.0x6.0m = 3 Units
- Sluice Gates : 0.7x0.7m = 3 Units
His duty covered :
(1) Reviewed the contractor's
contraction
schedule,
equipment schedule,
for
Mechanical works.
1113
of
heavy
equipment operation in connection with
installation of the gates.
(4)
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Flood Way Dam Project East
Java
Employer
PU
Client
Pt. P. karya
months
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
- Spillway Gates : (15 m x 7.5m). = 5
Units
- Stop
Log
: (15m x 1.75m) = 5 sets
- Monorail Hoist : 1 Unit
His duty covered :
(1) Reviewed the contractor's
contraction
schedule,
equipment schedule,
for
Mechanical works.
1114
of
heavy
equipment operation in connection with
installation of the gates.
(4) Calculated the bill and quantities of
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the team leader
Bili-Bili Multi Purpose Dam
Project South Sulawesi
Employer
PU/PLN
Client
Pt. Binakarya
12
months
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
- Spillway Gates
Units.
Guard Gate
- Steel Penstock
- Trash Rack
- - Slide Gate
- Bulk Head Gate
- Turbins and Accs
: 12.0x 8m = 2
: 2.5x2.5m = 1 Unit
: 3.7m x 300m
: 9.5mx 15m
: 1.2x1.2m = 1 Unit
: 4.5x4.5m = 1Unit
: 20 MW
1115
schedule,
equipment schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection with
installation of the gates.
(4)
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
Darma Dam Project
Employer
PU
Client
Pt. Binakarya
10
months
Mechanical Engineer.
Responsible for review design and
quality
control of the mechanical works :
- Intake Gate
: 3.0x3.0 m = 1
Unit.
- Guard
Gate
: 0.9m
= 1 Unit
:
- Trash Rack : 3.5x3.5m = 1 Unit
His duty covered :
(1) Reviewed the contractor's
contraction
1116
schedule,
equipment schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection with
installation of the gates.
(4)
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress report
and submitted to the team leader
PU
Client
Pt. Indahkarya
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
- Intake Gate
: 3.0x2.5m =
3 Units.
Under Sluice Gate : 3.0x1.5m = 3
Units
- Trash
Rack
: 1 Unit
His duty covered :
1117
equipment schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection with
installation of the Sluice gate.
(4)
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the team leader
Pertamina
Cilacap
Plant Project at
design and
quality
control of the mechanical works :
- Pressure Vessel
: 15 Bar
- Fuel Tank
: 10000 m3
- Heat Exchanger. : 1500 m2
His duty covered :
(1) Responsible
for review
design
and
Recommendation of the mechanical
works
for tank wall & valves equipment.
1118
methodology
of
heavy
equipment operation in connection with
installation of the intake gate
installation.
(5)
the
Dam hydro mechanical equipment.
Sidorejo Nyrtec Project
Central Java
Employer
PU
Client
Pt. Indahkarya
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
-
equipment schedule,
for
Mechanical works.
1119
of
heavy
equipment operation in connection
with
installation of the AVIO, and AVIS
gate.
(4) Calculated the bill and quantities of
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team leader
Dumpil Dam Project
Central
Java
Employer
PU
Client
Pt. Indahkarya
12
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
- Fixed Wheel Gate (10 mx7.5 m) : 5
Units
- Sluice
Gate and Hoist (2.5mx3.0m) : 1 Unit
- Stop log
(10 mx 1.6m) : 5 Units
- Gantry Crane Hoist
: 1 Sets
His duty covered :
(1) Reviewed the contractor's
contraction
1120
schedule,
equipment schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection with
installation of the intake gate.
(4)
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team leader
Riam Kanan Weir Project
Central Java
Employer
PU
Client
Yodyakarya
: Pt.
11
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
- Intake Gate and Hoist : 2.5x2.5m = 4
Units
- Upper
Gate and Hoist : 2.5x3.5m = 4 Units
- Lower Gate and Hoist : 2.5x1.5m = 4
Units
- Trash Rack
: 2.0x 5 m = 1
Unit
1121
= 3x3m =
equipment schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the intake gate.
(4) Calculated the bill and quantities of
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team leader
Sedadi Weir Project
Central
Java
Employer
PU
Client
Pt. Indahkarya
15
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
1122
- Intake Gate
: 2.25x2.25m = 3 units
- Sluice Gate
: 2.25x1.5m = 3
units
- Trash Rack
= 1 Unit
- Stop log
: 2.25x1.2m = 2 sets
- Monorail Hoist : 1 Unit
His duty covered :
(1) Reviewed the contractor's
contraction
schedule,
equipment schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection with
installation of the intake gate.
(4) Calculated the bill and quantities of the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team leader
Sugar Plant Project
Client
Pt. Brt Ind.
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
- Cook Pan.
- Over Head Crane
: 20 Tons
- Fuel Tank
: 20000 m3 l
1123
- Juice Heater
His duty covered :
(1) Responsible
for review
design
and
Recommendation of the mechanical
works
for tank wall & valves equipment.
(2) Evaluation of quantity and quality of
steel
materials for the tank wall and
valves
equipment.
(3) Determined the leaked test procedure
for
quality control and their results of
the
valves installation.
(4) Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the intake gate
installation.
(5) Calculated the bill and quantities of
the
hydro mechanical equipment.
Pertamina
Cilacap
Plant Project at
Client
Pt. Brt Ind.
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
- Pressure Vessel
: 50 Bar
- Fuel Tank
: 15000 m3
1124
for review
design
and
Recommendation of the mechanical
works
for tank wall & valves equipment.
(2) Evaluation of quantity and quality of
steel
materials for the tank wall and
valves
equipment.
(3) Determined the leaked test procedure
for
quality control and their results of
the
valves installation.
(4) Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the intake gate
installation.
(5) Calculated the bill and quantities of
the
hydro mechanical equipment.
Wadas
Employer
PU
Client
Pt. Brt Ind.
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
1125
equipment
schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the Draft Tube gate.
(4) Calculated the bill and quantities of
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team leader
Talang
Dam Project
Employer
PU
Client
Pt. P. karya
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
- Hoisting Equipment 40 tons.
- Steel Slide Gate : 8x8.0m = 4 Units
- Trash Rack
1126
equipment
schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the Steel Slide Gate.
(4) Calculated the bill and quantities of
the
hydro mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team leader.
PLTU
Employer
PLN
Client
Brt Ind.
: Pt.
16
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
- Steam drum and water drum.
- Steel structure and Colum.
- Piping
1127
- Trash Screen
His duty covered :
(1) Reviewed the contractor's
contraction
schedule,
equipment
schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology of
heavy
equipment operation in connection
with
installation of the Steel structure,
steam/water drum.
(4) Calculated the bill and quantities of
the
mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team leader.
PLTU
T. Perak Project : 2x 50 MW
Employer
PLN
Client
Pt. Brt Ind.
15
months
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
1128
equipment
schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the Steel structure,
colum, Piping etc.
(4) Calculated the bill and quantities of
the
mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team
LNG
Project
(ABB)
Employer
Pt. Bontang
Client
Pt. Brt Ind.
Feb. 1982 up to Jan. 1984
months
1129
23
Mechanical Engineer.
Responsible for review
design and
quality
control of the mechanical works :
-
equipment
schedule,
for
Mechanical works.
(2) Supervised and quality control of
the
contractor's construction works for
steel
construction.
(3) Prepared
methodology
of
heavy
equipment operation in connection
with
installation of the Vessel, HE etc.
(4) Calculated the bill and quantities of
the
mechanical equipment.
(5)
Supervised
works progress
monitoring,
Daily, weekly & monthly progress
report
and submitted to the Co-team leader.
1130
1131