Burrard Bridge Upgrade and North Intersection Project

Cross Section 1 - Centre of Burrard Bridge

One-way southbound protected bike lane

Existing

Barrier

Sidewalk

One-way northbound protected bike lane


Barrier

Two southbound travel lanes


Three northbound travel lanes

Bu

rn

ab
y

St

One-way southbound protected bike lane

Proposed

Sidewalk

Barrier

One-way northbound protected bike lane

Two southbound travel lanes

Barrier

Sidewalk
reinstated

110
1P
ac

ifi
c

St

111

1P
ac

ifi
c

St

Two northbound travel lanes

13

80

rlo
w

24

25

Th
u

12

90

St

rra

rd

09

13

86

13
90

Ha

rw
oo

Th
u

rlo
w

St

One-way southbound protected bike lane

Development Site

St

St

Proposed

Dr
ak
e

Th
u

New sidewalk on
widened section

One-way northbound protected bike lane

Two southbound travel lanes


Four northbound travel lanes

Barrier

New sidewalk on
widened section

Barrier

(Existing as Section 1)

St

St

110
6

10
6

Pa
c

ifi
c

Pa
c

St

ifi
c

St

rlo
w

Cross Section 2 - Northern end of Burrard Bridge

Bu

10

Bridge widening

Ha

18

rw
oo

St

ifi
c

Cross Section 3 - Burrard north of Pacific

St

10
20

10
41
Pa
c

ifi
c

Th
u

10
4

Pa
c

19

Bu

rra

ifi
c

St

rd

One-way southbound protected bike lane

Sidewalk

Pa
c

Three northbound travel lanes

St
c

17

10
19

Pa
c

ifi

St

10
23

Pa
c

ifi

rra

St
c
ifi
Pa
c
10
27

rd

ifi
Pa
c
10
31

St

St

10
39

ifi

Cr
os
sse
ct
io
n

Sidewalk

Two southbound travel lanes

Landscaped planters

St

17

Pa
c
80
10

Existing

St

Bu

rlo
w

St

St

Bridge widening

Proposed

14

Sidewalk

One-way southbound protected bike lane

New one-way northbound protected bike lane

Sidewalk

Three northbound travel lanes

10

40

Pa
c

ifi

03
10

cS
t

Cr
os
sse
ct
io
n

Pa
c

ifi

St

Two southbound travel lanes

15

4
8

Key Features

Cross Section 4 - Pacific west of Burrard

Existing

Landscaped back
boulevard

One westbound travel lane

One-way eastbound protected bike lane


Barrier

Sidewalk

Landscaped back boulevard


Sidewalk

Two eastbound travel lanes

Improve safety for all road users

St
rn
Ho

10

ifi
Pa
c
90

Increase number of trees


2

11

Proposed

12

17

Respect heritage value of the bridge

cS
t

Bu

n
io
ct
se
sos
Cr

Maintain motor vehicle travel times

ifi

St

Transportation Movements
Existing/Retained

Improve walking, biking connections

Pa
c

Cr
os
sse
ct
io
n

rd
rra

21

by

St

Restore walking on the east side of


the bridge

Landscaped back
boulevard
Sidewalk

New one-way westbound protected bike lane

One-way eastbound protected


bike lane
Two right-turn lanes
onto bridge

One eastbound travel lane


One westbound
travel lane

Sidewalk

Proposed

Motor vehicles

13

82

New tree

Ho

rn

by

St

Bikes
Pedestrians

21

20
St

16

Cross Section 5 - Pacific west of Hornby

80
1P
ac
ifi

22

Existing

23

Sidewalk

Barrier

Two westbound travel lanes

Sidewalk

Two eastbound travel lanes

17

Ho

St

14

88

One-way eastbound protected bike lane

rn

St

Ho
we

by

11

13

n
io
ct
se
sos
Cr

One-way eastbound protected bike lane

Proposed

New tree

New one-way westbound protected bike lane

Two eastbound travel lanes

Two westbound travel lanes

New tree

Sidewalk

1
Sidewalk

New left-turn lane


onto Hornby

24

Development Site

What are we proposing?

Why?

Retain all existing turning movements at Burrard and Pacific

To maintain vehicular access

Widen approx. 100m of Burrard Bridge as it approaches


the Burrard-Pacific intersection to allow 2 southbound
motor vehicle lanes and 4 northbound at the intersection

To maintain motor vehicle travel times


To create space to restore walking on both sides of the bridge

Remove slip lanes

To improve safety and comfort for all road users by creating a


protected intersection that minimizes conflicts
To provide improved walking and cycling crossings

Add dual right-turn lanes to Burrard and Pacific

To maintain motor vehicle flow

Improve existing bike connections

To improve safety for all road users


To provide a safe, convenient and comfortable cycling route for people
of all ages and abilities

6
7

Shift sidewalks to outside of brazier towers

Rehabilitate stairways and upgrade lighting

To provide width for additional right-turn lane at the intersection


To retain heritage elements on the bridge
To improve accessibility and comfort for people walking

For more information, visit vancouver.ca/burrardbridgenorth


June 2015

What are we proposing?

Why?

Plant over 60 new trees throughout the project area and


retain large Cypress tree

To preserve and enhance green space


To increase tree canopy cover

Relocate bus stop on Burrard south of Burnaby to north


of Burnaby

To accommodate new street design

10 Remove City-owned building at 900 Pacific

To provide space for intersection improvements.


(most of block was purchased between 1930 and 1990 for potential bridge
changes)

11

Close two lane ends on the south side of Pacific to motor


vehicles and bikes while maintaining walking access

12 Add new dedicated left-turn lane from eastbound Pacific


to Hornby

13 Add new dedicated right-turn lane from eastbound Pacific


to Howe

14 Retain all travel lanes and most parking on Burrard north


of Pacific

To accommodate new road alignment

What are we proposing?

Why?

Why?

15 Retain northbound bus stop on Burrard

To maintain access to transit

22

Shift sidewalk on south side of Pacific between Hornby and


Howe slightly south

16 Reduce Hornby south of Pacific to one lane at the

To reduce conflicts between road users


To increase storage space at the intersection for pedestrians
and cyclists

To provide space for the protected bike lane without removing


existing trees
To provide a more comfortable walking experience

23

Add new painted westbound bike lane on north side of


Pacific between Hornby and Howe

To improve safety for all road users. (the City will seek additional street

To improve safety for all road users


To provide a safe, convenient and comfortable cycling route
for people of all ages and abilities

24 Coordinate project with future road improvements to be


delivered by adjacent development

To ensure overall design functions well and to avoid redundant


construction

25

To prevent shortcutting through the neighbourhood

intersection. Retain all turn movements

17

Add new protected bike lanes

18 Relocate on-street parking on Thurlow from east side to

To provide space for the uphill bike lane


To maintain access for local residents and businesses

To reduce turning and weaving conflicts


To allow future protected intersection

19 Shift sidewalk on the north side of Pacific between Burrard

To provide space for the protected bike lane


To provide a more comfortable walking experience

To allow a signalized right-turn phase


To reduce conflicts between all road users

20 Add new treed median on Pacific between Howe and Hornby

To provide additional green space and tree canopy

west side of street

To maintain traffic flow


To maintain access for local residents and businesses (10 of 12 parking
spots retained)

What are we proposing?

and Thurlow slightly north. Retaining walls likely required

21

Realign Pacific between Burrard and Howe towards the south

To provide space for all road users and a more consistent road
alignment

Restrict entry into lane from Burrard

width to accommodate a protected bike lane in the future)