l.
(3.5x4=14)
material
78600 N/m3,
4 mm2,
: )xlQtt N/m2-The
pull at
i/.
3'J0
'.
56" 30',
ECE3O3tKIrl-26229
[Turn Over
l7.
(a)
{6x2=12)
Reading at
30
45'
2.235,2.795,3.355 1.75
20
30'
0.945,7.490,2.035 2.25
(b)
BM
(c)
of these methods ?
advantages and disadvantages
(6x2=12\
3. Attemptanytwopartsofthefollowing:
used in
(a) What are the different shapes of transition curves
highways and railways
transition curve'
O)
oflong chord'
ECE303/KIH-26229
(c)
4.
(a)
(6x2=12)
is
A traverse survey was conducted and the data obtained
given in following table. Find the magnitude and direction
of the closing
eror if
anY.
2510 18'
(b)
A may be assumed to
haveauniformelevationoflZim.Determinetheheight
ofthe signal at B if the line of sight is required to pass 3 z
above the ground.
(c)
ECE3O3/KIII-26229
1900