Professional Documents
Culture Documents
ALTERNATIVE ENERGY
EXPO CENTER, KARACHI
ALTERNATIVE
ENERGY STATUS IN
PAKISTAN
PROF DR NASIM A. KHAN
SENIOR EXECUTIVE DIRECTOR
OSMANI & COMPANY (PVT) LTD
14 MARCH 2013
DR. NASIM@OSMANI.COM,
DRNASIMAKHAN@GMAIL.COM
SERC
RESEARCH RESULTS
PRIVATE SECTOR
ALMOST NON EXISTENT
POPULATION
PATTERN
ENERGY
GENERATION
PATTERN
HYDROPOWER
JAMMU&
KASHMIR
ENERGY
GENERATION
PATTERN
HYDROPOWER
JAMMU&
KASHMIR
OIL
KHOST
SHARIG
SOR-RANGE
THERMAL
SUI
LAKHRA
THERMAL
THAR
COAL
JAMMU&
KASHMIR
APRIL
GUPIS
GILGIT
CHITRAL
1.5
3.3
MAY
0.9
1 M/S
6 M/S
2 M/S
7 M/S
3 M/S
8 M/S
4 M/S
9 M/S
2.5
BUNJI
3.0
2.3
CHILAS ASTOR
2.6
SKARDU
3.8
DROSH 3.0
DIR
PESHAWAR
1.7
1.9
PARACHINAR
3.0
1.3
MUZAFFARABAD
BALAKOT
0.9 KAKUL
1.9
ISLAMABAD
1.2 JHELUM
0.9
5 M/S
D. I. KHAN
2.4
10 M/S
WIND SPEED
COLOUR CODE
KOTLI
3.9
1.8
ZHOB
3.3
3.4
3.5
KALAT
JACOBABAD
3.0
MAY
KHUZDAR
PANJGUR
3.3
STUDY REPORT BY
PAKISTAN COUNCIL FOR APPROPRIATE TECHNOLOGY
NAWABSHAH
4.2
PADIDAN
JIWANI
1.9
KHANPUR
SUKKUR
2.1
3.5
5.0
3.2
BAHAWALNAGAR
2.1
BAHAWALPUR
2.0
DALBANDIN
NOKUNDI
2.7
MULTAN
BARKHAN
SIBI
2.1
5.1
2.5
LAHORE
1.6
FAISALABAD
LORALAI
QUETTA
SIALKOT
2.3
HYDERABAD
10.8
ORMARA
KARACHI
5.9
4.5
8.3
BADIN
GUPIS
GILGIT
2 .5
CHITRAL
1.5
BUNJI
4.6
3.1
DROSH
3 .3
2 .5
CHILAS ASTOR
DIR
2 .9
SKARDU
1.0
3.6
JUNE
1 M/S
6 M/S
2 M/S
7 M/S
3 M/S
8 M/S
4 M/S
9 M/S
PESHAWAR
1.9
PARACHINAR
3 .4
1.9
1.3
MUZAFFARABAD
BALAKOT
1.1 KAKUL
1.7
ISLAMABAD
1.4 JHELUM
0.9
5 M/S
D. I. KHAN
2 .5
10 M/S
WIND SPEED
COLOUR CODE
KOTLI
3.3
2 .2
ZHOB
4.3
FAISALABAD
4.1
MULTAN
2 .5
2 .2
DALBANDIN
KALAT
JIWANI
2.5
JACOBABAD
3.4
KHANPUR
JUNE
SUKKUR
2.9
KHUZDAR
STUDY REPORT BY
PAKISTAN COUNCIL FOR APPROPRIATE TECHNOLOGY
NAWABSHAH
6.1
9.7
ORMARA
3.8
BAHAWALNAGAR
2.5
BAHAWALPUR
PADIDAN
5.1
BARKHAN
SIBI
2 .2
3.1
PANJGUR
3.6
4.0
3 .3
QUETTA
NOKUNDI
LAHORE
2 .3
LORALAI
7.8
SIALKOT
KARACHI
5.9
3.0
5.2
HYDERABAD
8.1
BADIN
9.0
CHOR
WIND TURBINES ON
COASTLINE OF KARACHI
DEVELOPED BY
OCEAN SERVICES, NICE LINK TRUST, SOLAR PRODUCTS INCORPORATED PAKISTAN, WIND
BARON
Project experience
Technical Advisor
Hybrid Power System
Community Managed
Client
Location
Date
Project experience
Technical Advisor
Client
Location
Date
2003
Facilities
7.5 kW wind turbine, 0.5 kW
solar panels, a 10 kW diesel
generator, and 60 x 2v long-life
acid batteries.
Services
Hybrid System Installation
Resource assessment
Wind, Solar
and Diesel
System design
Site installation
14
METERS/SECOND
12
10
8
HYDERABAD
GHARO
KATIBANDAR
2
0
JAN
FEB
MAR
APR
MAY
JUN
JUL
MONTH
AUG
SEP
OCT
NOV
DEC
MONTH:
GUPIS
GILGIT
3.6
CHITRAL
4.6
DROSH
3 .3
JUNE
1.5
BUNJI
3.1
2 .5
CHILAS ASTOR
2 .9
SKARDU
DIR
2 .5
1.0
1.3
PESHAWAR
1.7
1.9
PARACHINAR
MUZAFFARABAD
BALAKOT
1.1 KAKUL
1 M/S
6 M/S
2 M/S
7 M/S
3 M/S
8 M/S
1.4 JHELUM
4 M/S
9 M/S
KOTLI
3 .4
1.9
ISLAMABAD
0.9
5 M/S
D. I. KHAN
10 M/S
WIND SPEED
COLOUR CODE
3.3
2 .5
2 .2
4.3
2 .3
LORALAI
FAISALABAD
4.0
3 .3
QUETTA
MULTAN
2 .5
BARKHAN
SIBI
2 .2
KALAT
2.5
JACOBABAD
KHANPUR
3.4
3.1
3.8
BAHAWALNAGAR
2.5
BAHAWALPUR
2 .2
DALBANDIN
NOKUNDI
LAHORE
ZHOB
4.1
7.8
SIALKOT
JUNE
SUKKUR
2.9
PANJGUR
KHUZDAR
3.6
STUDY REPORT BY
PAKISTAN COUNCIL FOR APPROPRIATE TECHNOLOGY
NAWABSHAH
6.1
PADIDAN 3.0
5.1
JIWANI
9.7
ORMARA
KARACHI
5.9
5.2
HYDERABAD
8.1
BADIN
9.0
CHOR
GHARO AREA
AEDB DATA
60m Wind
Measuring
Mast- NPE
JHIMPIR
AEDB DATA
LAND IN JHIMPIR, THATTA DISTRICT, SINDH
AEDB DATA
70
60
50
40
30
20
10
0
2001
2002
2003
2004
2005
2006
INSTALLED/YR
2007
2008
CUMULATIVE MASTS
2009
2010
2011
2012
13.9399
17.3672
14.1359
14.1164
13.6202
14.6098
13.2483
14.5236
14.532
15.9135
14.8618
Date Announced
6 Dec, 2008
13 Dec, 2011
10 Aug, 2010
15 Dec, 2011
15 Dec, 2011
15 Feb, 2012
16 Mar, 2012
16 Mar, 2012
26 April, 2012
8 May, 2012
8 May, 2012
15 May, 2012
29 June, 2012
24 May, 2012
3 Jan, 2012
AEDB
GOVT OF SINDH
NEPRA
NTDC
HESCO
KESC
INVETSTORS
INVESTORS
FINANCIAL CONSULTANTS;
BRIDGE FACTOR
ME CONSULT
RER
OSMANI
WIND ROSE
IPEC
EXISTING SOLAR
ENERGY SCENARIO IN
PAKISTAN
MWH
SOLAR POTENTIAL IS
30,000 TIMES
ANNUAL ENERGY GENERATED IN PAKISTAN
GOMA
NARAM ADM
GYONG
OLDING
ADIL
PAIJU
IHEC
GHAYARI
DUMBA BAO
SKARDU
HAMZI GHUND
GILGIT
BURZIL
LEH
NULLAH
GULTARI
SHAKMA
NEKRUN
BUNYAL
KEL
QUETTA
SHARDA
AWARAN
RANAK
DHAR
GHARO
KARACHI
MARA
POST
URAN
KEL
TARIQ
CAMP
SOLAR LIGHTS AT
GOMA HOSPITAL
SOLAR LIGHTS AT
GOMA WORKSHOP
SOLAR CAR
DESIGNED BY STUDENTS AT
SOLAR SYSTEMS LAB
CAN BE IMPROVED FOR AUTO RICKSHAWS
STIRLING ENGINE
DEVELOPED IN PAKISTAN
STIRLING ENGINE
DEVELOPED IN PAKISTAN
SINDH
3000
HOMES
Overview of village
Bharomal (Sindh)
DHA CITY
KARACHI
PAKISTAN ENGINEERING
COUNCIL
ISLAMABAD
SOLAR PV CELL
MANUFACTURERS
AKHTER SOLAR
SARA SOLAR
AROUND 9 MW OF SOLAR PV CELLS
HAVE BEEN MANUFACTURED AND
INSTALLED IN PAKISTAN
Around $ 100 MILLIONS MARKET
BIO-ENERGY
BIO-DIESEL POLICY APPROVED AND
AVAILABLE
THOUSANDS OF ACRES OF
JATROPHA, PONGAMIA PLANTED
BIO GAS PLANTS [5000 INSTALLED,
1000 BEING INSTALLED IN PUNJAB]
UNDP-GEF
Two-year project for Sustainable
Development of Utility Scale Wind
Power Production approved by GoP
Project funding amounts to US $ 3.1
Million
Aims to elaborate on the existing wind
policy
Country-wide wind resource
assessment also part of the project
CONCLUSION
10
8
6
4
ENERGY SOURCE
SOLAR
CSP
HYDRO
NUCLEAR
WASTE
OIL
BIOMASS
COAL
SOLAR
PV
GAS
WIND
12
NUCLEAR
50
YRS
NIL
MILLIONS
OF YRS
WOOD
COAL
THOUSANDS OF YRS
150 YEARS
NIL
WOOD
(MILLIONS OF YEARS)
NUCLEAR
50 YRS
NIL
MILLIONS
OF YRS
WOOD
COAL
THOUSANDS OF YRS
150 YEARS
INNOVATIVE STRATEGIES
A QUESTION IS, WHEN WOULD AN
AVERAGE PAKISTANI USE ENERGY
EQUAL TO ENGLAND OF 1970 ?
IN REALITY
IN PAKISTAN,
SOLAR ENERGY AND WIND
ARE THE ACTUAL SOURCES
REST ALL ARE
ALTERNATE SOURCES OF ENERGY