Air Conditioning
Sky Light - floor glass
Double Hight Chitrapat Size
( 1: 2)
M S Staircase at Jinalay (Wood Work)
Viewing galary opening door / Railing (Manish)
External staircase flooring / Finishing / Railing
Drainage covers
Pergola Finishing
(POP)
Staircase and head room for terrace
(Manish)
Ladder for Shikkar
(Manish)
Glass facade for miniature
(Manish)
Miniature of Songadh
Lightning arrester for Shikkar
Fire pump cable to be provided
Car hoist
D B on each floor
Main Junction in basement
Meter Room
Stack Parking
Strom water drain
Reliance cable Work
Compound wall Design
Building Window Work (Mirchandanai)
Sky light work (Top Floor) - Keyur
Shone Tiles - Terrace

Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Ceiling details for lower level and lift lobby


Electric details for lower and double height ceiling
Flooring details
Wall Finishing details
Final positions for chitrapat , witings ( 6 / 8)
Acoustick details - for Lower Level
Staircase lighting /Railing /Wall finishing
Lift lobby ceiling with electric and light fittings.
Flooring inlay design at swadhyay lift lobby.
Sashtras (left 100 + Right side 100)
Thamni (left 50 + right 50 )
Extra Sashtras
Flooring, Lift Lobby, Lift Cladding
Inlay on Lift lobby + outside stairs area
Jinvani + Acharya Photo (Back side of Pratimaji )
Wall finishing
Arrangement for pooja samagri

Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design

13 NOV 14 (indexed)

WIP
Manish
WIP
After OC
later
later
WIP

WIP

13-Nov
13-Nov

One week

Ready
Ready 2 Maniram + 4 Sunil ?

Ready
Ready

SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
JINALAY FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
SONGADH DARSHAN
SONGADH DARSHAN
SONGADH DARSHAN
SONGADH DARSHAN
SONGADH DARSHAN
SONGADH DARSHAN
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS

SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL
JINALAY FLOOR
JINALAY FLOOR
JINALAY FLOOR
JINALAY FLOOR
JINALAY FLOOR

18
19
20
21
22
23
24
25
26
27
28

Covering of pergola (outside-back side)


Ceiling of Dome
Ceiling of Shamran
Bell, Bhandar, Naman, Mirror - Right Side
Poojan Pustak
Poojan Utensils + Extra Items...
Lift Lobby Ceiling, Electrical and Flooring
Compound wall pictures
External paving details
Sky light ventilator enclosing details
3 windows on "C" section

Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design

29
30
31
32
33
34
35

Car hoist front elevation


Main gate + wicket gate
Ceiling details
Flooring
External plumbing work
Toilets
Covering of slab at swadhaya hall and ground level

Design
Design
Design
Design
Design
Design
Design

A C - Placement & Design


Notice Board
Table / Chairs, Patla for Pooja
Parmagamsar on Colomn

Design + Of
Design+ Of
Design+ Of
Design+Of

Colomn - Shrut Skandh & Teenlok


Audio Video Consol on left side
OC
Lift certificate
Garden NOC
Purchasing internal / external lights
Kalash for samaran & shikkar
2 Noitce Board + 1 daily activity board
Display Outside - (like Portugees Church)
Chitrapats 12+16
10 Bol for above lift + 9" Patti in design
All lift lobby flooring with Inlay + Electrcials + Ciling
Audio / Video
Audio Video Consol
Pravachan Detail Board - on colomn

Office
Office
Office
Office
Office
Office
Office
Office
Office
Office
Office
Office
Ofiice
Ofiice
Ofiice

1
2
3
4

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

13 NOV 14 (indexed)

2 weeks Manish+Islam
Vinit ?

Ready
Recived + pend
to collect samples
with florring
Done ?
1 - 2 week
later
samples - Ready

Hemantbhai

Visit on 15-11
Nov. End

External Done

Size finalized + W I P
20-11-2014 (Mitesh)
Done
Nov. End
Nov. End

JINALAY FLOOR
JINALAY FLOOR
JINALAY FLOOR
JINALAY FLOOR
JINALAY FLOOR
JINALAY FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
GROUND FLOOR
SONGADH DARSHAN
SONGADH DARSHAN
COMMON POINTS
COMMON POINTS
COMMON POINTS

SONGADH DARSHAN
JINALAY FLOOR
JINALAY FLOOR
SWADHAYAY HALL

JINALAY FLOOR
JINALAY FLOOR
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
COMMON POINTS
SWADHAYAY HALL
SWADHAYAY HALL
SWADHAYAY HALL

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

SWADHAYAY HALL
Air Conditioning
Sky Light - floor glass
Double Hight Chitrapat Size
( 1: 2)
Ceiling details for lower level and lift lobby
Electric details for lower and double height ceiling
Flooring details
Wall Finishing details
Final positions for chitrapat , witings ( 6 / 8)
Acoustick details - for Lower Level
Staircase lighting /Railing /Wall finishing
Lift lobby ceiling with electric and light fittings.
Flooring inlay design at swadhyay lift lobby.
Sashtras (left 100 + Right side 100)
Thamni (left 50 + right 50 )
Extra Sashtras
Parmagamsar on Colomn
Audio / Video
Audio Video Consol
Pravachan Detail Board - on colomn

Contractor
Contractor
Contractor
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design+Of
Ofiice
Ofiice
Ofiice

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

JINALAY FLOOR
M S Staircase at Jinalay (Wood Work)
Flooring, Lift Lobby, Lift Cladding
Inlay on Lift lobby + outside stairs area
Jinvani + Acharya Photo (Back side of Pratimaji )
Wall finishing
Arrangement for pooja samagri
Covering of pergola (outside-back side)
Ceiling of Dome
Ceiling of Shamran
Bell, Bhandar, Naman, Mirror - Right Side
Poojan Pustak
Poojan Utensils + Extra Items...
Notice Board
Table / Chairs, Patla for Pooja
Colomn - Shrut Skandh & Teenlok
Audio Video Consol on left side

Contractor
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design
Design+ Of
Design+ Of
Office
Office

GROUND FLOOR
Viewing galary opening door / Railing (Manish)
External staircase flooring / Finishing / Railing
Drainage covers
Lift Lobby Ceiling, Electrical and Flooring
Compound wall pictures
External paving details
Sky light ventilator enclosing details

Contractor
Contractor
Contractor
Design
Design
Design
Design

1
2
3
4
5
6
7

13 NOV 14 (floorwise)

8
9
10

3 windows on "C" section


Car hoist front elevation
Main gate + wicket gate

Design
Design
Design

1
2
3
4
5
6
7
8

SONGADH DARSHAN
Pergola Finishing
Staircase and head room for terrace
Ladder for Shikkar
Glass facade for miniature
Miniature of Songadh
Lightning arrester for Shikkar
Ceiling details
Flooring

A C - Placement & Design

Design + Of

COMMON POINTS
Fire pump cable to be provided
Car hoist
D B on each floor
Main Junction in basement
Meter Room
Stack Parking
Strom water drain
Reliance cable Work
Compound wall Design
Building Window Work (Mirchandanai)
Sky light work (Top Floor) - Keyur
Shone Tiles - Terrace
External plumbing work
Toilets
Covering of slab at swadhaya hall and ground level
Lift certificate
OC
Garden NOC
Purchasing internal / external lights
Kalash for samaran & shikkar
2 Noitce Board + 1 daily activity board
Display Outside - (like Portugees Church)
Chitrapats 12+16
10 Bol for above lift + 9" Patti in design
All lift lobby flooring with Inlay + Electrcials + Ciling

Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Design
Design
Design
Office
Office
Office
Office
Office
Office
Office
Office
Office
Office

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

(POP)
(Manish)
(Manish)
(Manish)

13 NOV 14 (floorwise)

Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Design
Design

WIP
Manish
WIP
13-Nov
13-Nov

One week

Ready
Ready 2 Maniram + 4 Sunil ?

Hemantbhai
Done
Nov. End
Nov. End

After OC
Ready
Ready

2 weeks Manish+Islam
Vinit ?

Visit on 15-11
Nov. End

later
later
Ready
Recived + pend
to collect samples
with florring
13 NOV 14 (floorwise)

Done ?
1 - 2 week
later

WIP

samples - Ready

External Done

Size finalized + W I P
20-11-2014 (Mitesh)

13 NOV 14 (floorwise)