Professional Documents
Culture Documents
Chapter 7
Continuous Probability Distributions
1.
2.
3.
a.
b.
a = 6 b = 10
8, found by (6 + 10)/2
c.
1.1547 found by
d.
e.
f.
[1/(10 6)](10 6) = 1
0.75, found by [1/(10 6)](10 7)
0.5, found by [1/(10 6)](9 7)
a.
b.
a=2 b=5
3.5, found by (2 + 5)/2
c.
0.8660 found by
d.
e.
f.
[1/(5 2)](5 2) = 1
0.8, found by [1/(5 2)](5 2.6)
0.2667, found by [1/(5 2)](3.7 2.9)
(5 2) 2
12
a.
b.
4.
(10 6) 2
12
c.
d.
a.
b.
981.50 found by
c.
d.
(3800 400) 2
12
7-1
5.
a.
b.
a = 0.5, b = 3.0
Mean is 1.75, found by (0.5 + 3.0)/2
Standard deviation is 0.72, found by
6.
(3.0 0.5) 2
12
c.
d.
e.
a.
b.
c.
d.
7.
The actual shape of a normal distribution depends on its mean and standard deviation. Thus,
there is a normal distribution, and an accompanying normal curve, for a mean of 7 and a
standard deviation of 2. There is a another normal curve for a mean of $25,000 and a standard
deviation of $1742, and so on.
8.
It is bell shaped and symmetrical about its mean. It is asymptotic. There is a family of normal
curves. The mean, median, and the mode are equal.
9.
a.
b.
c.
10.
a.
b.
c.
about 68 percent
about 95 percent
over 99 percent
11.
12.
13.
50,000 60,000
50,000 35,000
2.00 Z Rachel
1.875
5000
8000
Adjusting for their industries, Rob is well below average and Rachel well above.
Z Rob
75 90
100 90
0.68
Z2
0.45
22
22
The first is slightly less expensive than average and the second is slightly more.
25 20
1.25
a.
1.25 found by z
4.0
b.
0.3944, found in Appendix B.1
18 20
0.5
c.
0.3085, found by z
2.5
Find 0.1915 in Appendix B.1 for z = 0.5 then 0.5000 0.1915 = 0.3085
Z1
7-2
14.
a.
b.
c.
15.
14.3 12.2
0.84
2.5
0.2995, found in Appendix B.1
10 12.2
0.88
0.1894, found by z
2.5
Find 0.3106 in Appendix B.1 for z = 0.88, then 0.5000 0.3106 = 0.1894
z = 0.84, found by z
$24 $20.50
1.00
$3.50
a.
0.3413, found by z
b.
c.
0.3336, found by z
$19.00 $20.50
0.43
$3.50
Find 0.1664 in Appendix B.1, for a z = 0.43, then 0.5000 0.1664 = 0.3336
16.
a.
b.
c.
17.
a.
0.8276, first find z = 1.5, found by ((44 50)/4) and z = 1.25 = (55 50)/4). The
area between 1.5 and 0 is 0.4332 and the area between 0 and 1.25 is 0.3944, both
from Appendix B.1. Then adding the two area we find that 0.4332 + 0.3944 = 0.8276.
0.1056, found by 0.5000 0.3944, where z = 1.25
0.2029, recall that the area for z = 1.25 is 0.3944, and the area for z = 0.5, found by
((52 50)/4) is 0.1915. Then subtract 0.3944 0.1915 and find 0.2029.
b.
c.
18.
a.
b.
c.
19.
a.
b.
c.
20
a
b.
c.
0.4017, first find z = 0.36, found by ((75 80)/14) and z = 0.71(((90 80)/14). The
area between 0.36 and 0 is 0.1406 and the area between 0 and 0.71 is 0.2611, both
from Appendix B.1. then adding the two area we find 0.1406 + 0.2611 = 0.4017.
0.3594, found by 0.5000 0.1406, where z = 0.36
0.2022 found by z = (55 80)/14 = 1.79, for which the area is 0.4633. The z-value
for 70 is 0.71 and the corresponding area is 0.2661. So 0.4633 0.2611 = 0.2022
0.3264, found by 0.5000 0.1736, where z = 0.45, found by ((3000 2708)/650).
0.2152; the z-value for $3500 is 1.22, found by ((3500 2708)/650, and the
corresponding area is 0.3888, which leads to 0.3888 0.1736 = 0.2152.
0.5143; the z-value for $2500 is 0.32, found by ((2500 2708)/650, and the
corresponding area is 0.1255, which leads to 0.1255 + 0.3888 = 0.5143.
0.2620; the z-value for 30 is 0.2, found by ((30 29)/5, with a corresponding area of
0.0793, and the z-value for 34 is 1.0, found by (34 29)/5, with a corresponding area
of 0.3483, which leads to 0.3413 0.0793 = 0.2620.
0.8849, found by 0.3849 + 0.5000.
The z-value for 23 is 1.2, found by (23 29)/5.
0.0139, found by 0.5000 0.4861.
The z-value for 40 is 2.2, found by (40 29)/5.
7-3
21.
a.
b.
c.
22.
a.
b.
c.
23.
X = 56.60, found by adding 0.5000(the area left of the mean) and then finding a z value that
forces 45% of the data to fall inside the curve. Solving for X: 1.65 = (X 50)/4 = 56.60.
24.
X 80
14
X 80.00 11.76 68.24
0.84
25.
26.
27.
a.
b.
28.
29.
30.
31.
a.
b.
c.
32.
a.
b.
c.
d.
=n =50(0.25) = 12.5
2 = n (1 ) = 12.5(1 0.25) = 9.375
9.375 3.0619
0.2578, found by (14.5 12.5)/3.0619 = 0.65, the area is 0.2422, then 0.5000
0.2422 = 0.2578
0.2578, found by (10.5 12.5)/3.0619 = 0.65. The area is 0.2422. Then 0.5000
0.2422 = 0.2578.
=(40)(0.55) = 22
2 =9.9
= 3.15
0.2148, found by (24.5 22)/3.15 = 0.79. The area is 0.2852. Then 0.5000 0.2852
= 0.2148
0.0197, found by (15.5 22)/3.15 = 2.06. The area is 0.4803. Then 0.5000
0.4803 = 0.0197
z = (14.5 22.0)/3.15 = 2.38 and (25.5 22.0)/3.15 = 1.1, so 0.8578, found by
0.4913 + 0.3665 = 0.8578
7-4
33.
a.
b.
c.
34.
a.
b.
c.
d.
35.
a.
b.
c.
36.
37.
38.
2.39
105 10.24695
10.24695
The area under the curve for 2.39 is 0.4916. Then 0.5000 0.4916 = 0.0084
139.5 150
1.02
0.8461, found by z
10.24695
The area between 139.5 and 150 is 0.3461. Adding 0.3461 + 0.5000 = 0.8461
a.
b.
c.
d.
a.
b.
0.02598 found by
c.
d.
e.
a.
b.
1.212 found by
c.
d.
2 1
197
3 3
(12.05 11.96) 2
12
(4.2 0) 2
12
7-5
39.
40.
41.
a.
7 found by (4 + 10) / 2
b.
1.732 found by
c.
d.
a.
b.
1 = [1 / (3.5 - 0)](3.5 0)
1.75 found by (0 + 3.5) / 2
c.
1.01 found by
d.
e.
a.
b.
c.
d.
0.4 for net sales, found by (170 180)/25 and 2.92 for employees, found by
(1850 1500)/120
Net sales are 0.4 standard deviations below the mean. Employees is 2.92 standard
deviations above the mean.
65.54% of the aluminum fabricators have greater net sales compared with Clarion,
by 0.1554 + 0.5000. Only 0.18% have more employees than Clarion, found
0.4982
29 32
34 32
1.5
1.0
0.3413
2
2
0.7745, found by 0.4332 + 0.3413
0.0495, found by 0.5000 0.4505
35.3, found by 32 + 1.65(2)
a.
0.5000, because z
b.
c.
found
by 0.5000
42.
a.
(10 4) 2
12
(3.5 0) 2
12
b.
c.
d.
e.
30 490
5.11
90
0.2514, found by 0.5000 0.2486
0.6374, found by 0.2486 + 0.3888
0.3450, found by 0.3888 0.0438
5 4.2
1.33
0.4082, because z
0.6
0.0918, found by 0.5000 0.4082
0.0905, found by 0.4987 0.4082
0.6280, found by 0.4987 + 0.1293
5.25, found by 4.2 + 1.75(0.6)
45.
a.
b.
c.
d.
46.
a.
b.
c.
d.
43.
b.
c.
d.
44.
a.
7-6
7-7
47.
a.
b.
c.
48.
a.
b.
c.
49.
50.
a.
b.
c.
d.
51.
a.
b.
c.
52.
a.
b.
c.
d.
53.
a.
b.
c.
d.
7-8
54.
a.
b.
c.
55.
56.
664.5 640
2.17
11.31
57.
a.
b.
c.
58.
a.
b.
c.
59.
a.
b.
60.
49 43.9
0.84
0.5000 0.2000 = 0.3000, so z = 0.84
=6.07
There is about a 50 percent difference between the two standard deviations. The distribution
is not normal.
61.
a.
b.
c.
62.
a.
z = (45.00 42.000)/2.25 = 1.33, p(z > 1.33) = 0.5000 0.4082 = 0.0918. It is over
$45 about 22 days, found by 240(0.0918).
z = (38.00 42.00)/2.25 = 1.78 and z = (40.00 42.00)/2.25 = 0.89. So 0.4625
0.3133 = 0.1492 or 14.92 percent of the days.
$44.34, found by 42.00 + (1.04)(2.25)
b.
c.
63.
470
0.25
500
1.28
7-9
64.
65.
=150(0.15) = 22.5
z = (29.5 22.5)/4.37 = 1.60
66.
a.
b.
67.
a.
b.
68.
a.
accurate.
b.
150(0.15)(0.85) 4.37
P(z > 1.60) = 0.5000 0.4452 = 0.0548
7-10