SUBIC-CLARK-TARLAC
EXPRESSWAY
SLOPE PROTECTION WORKS AT GUMAIN
TECHNICAL SPECIFICATIONS
JANUARY 2O14
SUBIC-CLARK-TARLAC EXPRESSWAY
Slope Protection Works at Gumain Bridge (Pier 5 and 6)
BIDDING DOCUMENTS
TECHNICAL SPECIFICATIONS
INTRODUCTION
The Technical Specifications describe in detail the work to be executed, the character and
quality of materials and workmanship and the specific responsibilities of the Contractor that
are not covered by the Conditions of Contract. The Technical Specification shall be read in
conjunction with the plans and other contract documents.
Pertinent notes appearing in the Contract Plans or Drawings shall also be considered as part
and parcel of the technical specifications. Such notes shall take precedence over the DPWH
Standard Specifications and the Supplemental Specifications.
The Supplemental Specifications shall consist of modifications and additions to the DPWH
Standard Specifications (Volume II), to adapt the latter to actual conditions and/or
requirements relative to this project. Some of these modifications and additions may actually
be of general application but in the absence of a supplemental specifications adopted by
DPWH, subsequent to the publication of the DPWH Standard Specifications, 2004 Edition,
Volume II @ Highways, Bridges and Airports these Supplemental Specifications have been
included in the Technical Specifications of this project.
The Supplemental Specifications for this project shall consist of modifications and additional
to the DPWH Standard Specifications as follows:
(1)
Modifications in the specification of standard work items under Part A to Part H of the
DPWH Standard Specifications. These modifications are carried out without
changing the "number" and "name" of each of such standard work items.
(2)
The Special Provisions for this project shall consist of specifications for work Items
distinguished by placing the symbol "SPL" before its designated Arabic Number.
Subic-CIark-Tarlac Expressway
Slope Protection Works at Gumain Bridge (Pier 5 and 6)
Bidding Dociimen
Specificatioi
EARTHWORK
PART C
EARTHWORK
Subic-Clark-Tarlac Expressway
Slope Protection Works-Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specifications
EARTHWORK
PART C
EARTHWORK
ITEM 100
100.1
Description
Construction Requirements
100.2.1
General
Method of Measurements
Delete the text of Section 100.3 and replace with the following:
Measurement will be by Area Method. The work to be paid for shall be based on the
total area cleared and grubbed which is calculated in hectares within the limits defined
on the drawings or as directed by the Engineer including adjustment that may be made
to satisfy cer
tain site requirements.
100.4
Basis of Payment
Add the following paragraph after the first paragraph and amend the second
paragraph of Section 100.4 to read as follows:
Pay Items 100, Clearing and Grubbing shall be paid in hectares and shall include the
cost of removing all trees.
Descr
iption
Unit of Measurement
100
Hectare
Subic-Clark-Tarlac Expressway
Slope Protection Worh-Gumam Bridge (Pier 5 and 6)
Bidding Documents
Specifications
EARTHWORK
ITEM 103
STRUCTURE EXCAVATION
103.1
Description
103.2
Construction Requirements
103.2.2
Excavation
Where, in the opinion of the Engineer, any invert has become soft or unsuitable to
receive the concrete bed due to the Contractor's method of working, the Contractor shall
at his own expense remove and replace the material with non-structural concrete or
other approved material as instructed by the Engineer. Where concrete is specified, the
mix shall consist of ordinary Por
tland cement and aggregate, both complying with the
Specif
ications Item 405. The weight of cement mixed with 0.3m3 of aggregate shall not
be less than 50 kg. The quantity of water shall not exceed that required to produce a
smooth cement paste, which coat evenly the whole of the aggregate.
The Engineer's approval is required before placing concrete in all excavations for
structures made through water bear
ing strata that require dewatering.
103.2.6
Subic-Clark-Tarlac Expressway
Slope Protection Works-Gumain Br
idge (Pier 5 and 6)
Bidding Documents
Specifications
EARTHWORK
Add the following paragraph to Sub-Section 103.2.6
Foundation fill and backfill for structures other than pipe culver
t shall be granular subbase materials meeting the requirements of Item 200 and complying with the grading of
Table 200.1
Delete the text of Sub-Section 103.3.4 and substitute the following:
Shoring, cribbing, and related protective works if required in the construction shall not be
measured and paid for separately and shall be considered subsidiary to the item for
which they are constructed and utilized.
103.3.5
Basis of Payment
Delete the second sentence of Sub-Section 103.3.5 including items (1), (2), (3) and
(4) and substitute the following:
The payment for structure excavation and bridge excavation shall be deemed to include
the cost of backfilling, shoring, cribbing, protective works, removing and disposing
unsuitable mater
ials off site and removal and hauling of excess suitable materials to
stockpiles as directed by the Engineer. The payment shall be the full compensation for
the work item including the cost of labor, equipment, tools and incidentals necessary to
complete the work prescr
ibed in this item.
No measurement for separate payment to the Contractor shall be made for back-fill
being the relevant compensation included by the Contractor in his rates in the Bill of
Quantities in the pay items for excavation for structures and bridges.
Replace the second paragraph of Sub-Section 103.3.5 with the following:
Payment will be made under:
Pay Item Number
Description
Unit of Measurement
103
Structure Excavation
Cubic Metre
Suhic-Clark-Tarlac Expressway
Slope Protection Works-Gumain Bridge (Pier 5 and 6)'
Bidding Documents
Specifications
EARTHWORK
ITEM 104
EMBANKMENT
104.2
Material Requirements
Construction Requirements
104.3.1
General
Method of Construction
Method of Measurement
Add the following paragraph after the last paragraph of Sub-Section 104.4:
Any material coming from roadway, structure, drainage or ditch excavations which are
suitable for use but are replaced by the Contractor with borrow materials without prior
approval by the Engineer, shall not be measured for payment.
Subic-Clark-Tarlac Expressway
Slope Protection Worh-Gunutln Bridge (Pier 5 and 6)
Bidding Documents
Specifications
EARTHWORK
surveyed and repor
ted to the Engineer for checking and approval to the execution of the
embankment operation.
104.5
Basis of Payment
Descr
iption
Unit of Measurement
104
Cubic Metre
Subic-Clark-Tarlac Expressway
Slope Protection Works-Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specifications
I
I
PART G
I
I
I
I
Subic-Clark-Tarlac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)
Bidding Documer
Specif
icatio
ITEM 404
REINFORCING STEEL
Rebar fabrication and installation shall be done by a competent steel man to ensure good
workmanship. There should be a proper supervision for the "cutting and bending" of
reinforcing bars, frequent checking of bar schedule and clearances, f
rom the beginning until
the re-bars are installed.
404.3.8
The Contractor shall submit to the Engineer for approval, the shop Drawings Indicating the
bending, cutting, splicing and installation of all reinforcing bars.
404.4
Method of Measurement
Subic-Clark-TarlacExpressway'
SlopeProtectionatGumainBridge(Pier5and6)
Size
Size
Unit Weight
(mm)
(mm)
(kg/m)
6
6
10
10
12
12
16
16
20
20
25
25
28
28
32
32
36
36
0.222
0.616
0.888
1.579
2.466
3,854
4.833
6.313
7.991
Bidding Documents
Specifications
3/8
%
G_
Basis of Payment
Description
Unit of Measurement
404
Kilogram
ITEM 405
STRUCTURAL CONCRETE
405.1
Description
405.1.2
Class A1
Lean Concrete-
405.2
Materials Requirements
Sieve Designation
Alternate
Standard
(mm)
63
50
U.S. Std
3-75
1 V?
25
19
CL A S S
A1
LEAN
254"
2
1
100
20-55
9.5
No. 4
95-100
100
90-100
12.5
4.75
0-10
405.2.6
Admixtures
405.3
PRODUCTION REQUIREMENTS
Subia-Clark-Tadac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)
100
25-60
40-70
_
0-10
0-15
Bidding Documents
Spe cif
icat ions
Classes of
Concrete
Minimum
Cement
Content
Maximum
Water/
Cement
Ratio
Consistency
Range in
Slump
Designated
Size ofCoarse
Aggregate
Minimum
Compressive
Strength of
150x300 mm
Concrete
Cylinder
Specimen @
28 days
50 - 100
25-4.75
21
(2-4)
(T'- No. 4)
(3000)
50- 100
19 - 4.75
21
(2-4)
(1/2* - No. 4)
(3000)
mm (inch)
360
(9 bags)
0.49
(9.0 bags)
Lean
N/mm2(psi)
Kg/kg
360
A1
Square
Opening Std.
Kg(bag**)
320
(8 bags)
0.49
0.54
50- 100
(2-4)
37.5-4.75
(1 %" - No. 4)
17
(2500)
Based on 40 kg/bag
After the last Subsection under this Section, add the following Sub-section:
405.3.2
1.
General
Precaution shall be taken as needed to protect concrete from damage due to weather or
other environmental conditions during placing and curing operations. Concrete that has
been damaged by weather conditions shall be either repaired to an acceptable condition or
removed and replaced.
2.
Rain Protection
Under conditions of rain, the placing of concrete shall not commence or shall be stopped
unless adequate protection is provided to prevent damage to the surface mortar or
damaging flow or washing of the concrete surface.
Sublc-CIark-Tarlac Expressway
Slope Protection a! Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specifications
When the ambient temperature is above 32 C (90 F), the forms, reinforcing steel, steel
beam flanges, and other sur
faces which will come in contact with the mix shall be cooled to
below 32 C (90 F), by means of a water spray or other approved methods.
The temperature of the Concrete at the time of placement shall be maintained within the
specified temperature range by any combination of the following:
Shading the materials areas or the production equipment.
Cooling the aggregates by sprinkling with water which conforms to the
requirements.
Method of Measurement
Description
Unit of Measurement
405
Cubic Meter
405(1)
Cubic Meter
405(2)
Cubic Meter
Subic-Clark-Tarlac Expre
Slope Protection at Gutna
e (Pier 5 and 6)
Bidding Boatmen.
Specificatior
G_
and gratings, and pairs of metal frames and covers will be measured as acceptably
completed. The number of lined ditches and catch basins adjusted as directed will be
measured as acceptably completed.
502.5
Basis of Payment
Description
Unit f Measurement
502(2)
Llnear Meter
502(3)
each
Sublc-CIark-Tarlac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specif
ications
505.1
Description
G_
Material Requirements
Stones
Stones for riprap shall be hard, durable, bank or river stones, resistant to weather action and
free from seams or other defects. The stones for grouted riprap Class "A" shall be round
natural stones of sizes ranging from 200 mm @ 300 mm in diameter as shown on the
Drawings. Adobe stones and lime rocks shall not be used for riprap works.
505.2.2
Polyester non-woven plastic cloth, sewed like a bag and filled with 20 mm gravel will be
used as filter material at each weep-hole as shown on the Drawings.
505.2.3
Mortar
Construction Requirements
Excavation
The grouted riprap shall be founded at the toe of Cribwall as shown on the Drawings or as
ordered by the Engineer.
505.3.2
Placing
The stones shall be laid by hand or individually by machines. They shall be laid with dose,
broken joints and shall be firmly bedded into the slope and against the adjoining stones.
Each stone shall be laid with adjacent stones. The grouted r
iprap shall thoroughly be
rammed into place as construction progresses and the finished sur
face shall present an
even, tight sur
face. Interstices between stones shall be filled with small broken fragments
firmly rammed into place. The spaces between the stones shall then be filled with cement
mor
tar as specified in Sub-section 504.2.3. Sufficient mor
tar shall be used to completely fill
all voids, except that the face sur
face of the stones shall be left exposed.
Subic-CUirk-Tarlac Expressway
Slope Protection at Cumatn Bridge (Pier 5 and 6)
Bidding Documents
Specifications
G_
Grouting
Grout shall be place from bottom to top of the surface swept with a stiff broom. After
grouting is completed the surface shall be cured as specified in Item 405, Structural
Concrete for a period of at least three days. Hardened grout left during the previous days'
operation shall be cleaned thoroughly from earth or dust and other unnecessary materials
with water and broom before another layer of stone and grout is added.
505.4
Method of Measurement
Basis of Payment
Descr
iption
Unit of Measurement
505(1)
Cubic Metre
Subic-Clark-Tarlac Expressway
Shoe Protection at Gvmain Bridge (Pier5 and 6)
Bidding Docui
Speciftcc
G_
STONE MASONRY
Stone
The first and second paragraph shall be modified with the following:
Stones shall be clean, hard and durable and shall be subject to the approval of the
Engineer. Unless otherwise specified on the Drawings or directed by the Engineer, stones
for masonry shall be Class A as described in Item 504, Riprap and Grouted Riprap. Stones
more or less will have roughly similar blunted ends.
506.2.2
Mortar
Construction Requirements
Excavation
The bed for stone masonry shall be excavated to the required depths of Cribwall foundation
as shown on the Drawings.
Placing
The stones shall be laid by hand or individually by machines. They shall be laid with close,
broken joints and shall be firmly bedded inside the beam opening of Cribwall. Each stone
shall be laid with adjacent stones. The st
one masonry shall thoroughly be rammed into
place as construction progresses and the finished surface shall present an even, tight
surface. Interstices between stones shall be filled with small broken fragments firmly
rammed into place. The spaces between the stones shall then be filled with cement mor
tar
as specified in Sub-section 505.2.2. Sufficient mor
tar shall be used to completely fill all
voids, except that the face surface of the stones shall be left exposed.
506.3.3
Grouting
Grout shall be place from bottom to top of the surface swept with a stiff broom. After
grouting is completed the sur
face shall be cured as specified in Item 405, Structural
Concrete for a period of at least three days. Hardened grout left during the previous days'
operation shall be cleaned thoroughly from ear
th or dust and other unnecessary materials
with water and broom before another layer of stone and grout is added.
Subic-Clark-Tarlac Expressivay
Slope Protection at Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specification,:
G_
Method of Measurement
Basis of Payment
Description
Unit of Measurement
506
Stone Masonry
Cubic Meter
ITEM 507
RUBBLE MASONRY
This item shall consist ofthe construction of rubble concrete around footing base of Gumain Bridge Pier No.
5 in accordance with this specification and in conformity with the lines, grades, slopes and dimensions
shown in the Plans or established bythe Engineer.
507.2Mat
er
ial Requirements
507.2.1St
one
The stone shall be cleaned, hard, and durable and shall be subject to the Engineer's approval. Adobe stone
shall not be used unless otherwise specified. Stones to be used shall be more than 0.015 cubic metre in
volume and not less than 75 percent of the total volume of rock embankment and shall consist of stones
0.03 cubic metre in volume as described in Item 506.2. Stones obtained f
rom excavation performed under
this contract may be used.
507.2.2Concret
e Class "B"
Concrete shall be Class "B in accordance with Item 405, Structural Concrete.
507.3Construction Requirements
507.3.1 Preparation of Foundat
ion Bed
The foundation bed shall be excavated to the lines and grades as shown in the plans as directed by the
Engineer, and shall be thoroughly compacted in accordance with Item 104.3.3.
Subic-Clark-Tarlac Expressnvqy
Slope Protection at Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specifications
G_
507.4Method of Measurement
The quantity to be paid for shall be the number of cubic meters of rubble concrete complete in place and
accepted. In computing the quantity of payment the dimension used shall be those shown on the plans or
ordered in writing by the Engineer. No reduction shall be made forweepholes.
507.5Basis of Payment
The quantity of rubble concrete determined as provided in the preceding section 507.4, Method of
Measurement, shall be paid for at the contract unit pr
ice per cubic meterfor rubble concrete, which price and
payment shall be full compensation for the preparation of the bed, furnishing, necessary excavations,
falsework, and for all labor, equipment, tools and incidental necessaryto complete the Item.
Paymentwillbemadeunder
PayItemNumber
Description
UnitofMeasurement
507
RubbleConcrete
CubicMeter
Subic-Clark-Tarlac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specifications
G_
Material Requirements
511.1.1
General
511.1.2
Wire
Wire
BodyWire
Selvedge orperimeterwire
Tying and connecting wire
511.4
2.7
3.4
2.3
Method of Measurement
Basis of Payment
Description
Unit of Measurement
511(1)
Gabions
Cubic Meter
511(3)
Square Meter
Subic-Clark-Tarlac Expressway
Slope Protection at Gumain Bridge. (Pier 5 and 6)
Bidding Documents
Specif
ications
Description
This item shall consist of furnishing and placing of materials to prevent seepage or the entry
of river water during construction works at the bridge's pier in accordance with this
Specification and the Drawings.
Prior to the construction of the temporary cofferdam, the Contractor shall submit a shopdrawing showing its dimensions based on actual ground condition together with his
proposed methodology and sequence of operation to the Engineer for the laser's full
satisfaction and approval.
SPL-A.2
Material Requirements
This item shall consist of grouted rockfill materials, should be impervious enough to resist
the seepage of water from the river, and constructed in accordance with this Specifications
and to the lines, grades and dimensions as shown on the Plans. Rockfill materials to be
used shall conform to Item 505. Mortar for the grouted rockfill shall be Class "A".
SPL-A.3
Construction Requirements
The materials for the cofferdam shall be placed in close conformity with the lines, grades,
and dimensions as shown on the drawings or as directed by the Engineer. It should be so
constructed to withstand the strong impact and scouring action of the river in times of
looding while the construction works at the bridge's pier is ongoing.
f
The stones shall be laid by hand, or individually by machine. The spaces between the
stones shall be filled with cement mortar sufficiently to completely fill all the voids.
SPL-A.4
Method of Measurement
The quantity to be measured and paid for shall be the number of cubic meter of materials in
place, completed and accepted by the Engineer and shall constitute such materials as
specified in Item SPL-A.2
SPL-A.5
Basis of Payment
Description
Unit of Measurement
SPL-A
Temporary Cofferdam
Cubic Meter
Subic-Clark-Tarlac Expresnvay
Slope Protection at Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specifications
G_
Description
Realignment of river channel shall consist of excavation, removal and trimming of all classes
of materials in the channel prism including placing or stockpiling of excavated suitable
materials and disposal of unsuitable or surplus materials to designated disposal areas in
accordance with these Specifications and Drawings or as directed by the Engineer.
Prior to re-channeling works, the Contractor shall submit a shop-drawing showing its
dimensions (length, width, height) based on actual ground condition together with his
proposed methodology and sequence of operation to the Engineer for the latter's full
satisfaction and approval.
SPL-B.2
Construction Requirements
Excavation for river re-channeling shall be done in close conformity with the lines, grades,
and dimensions as shown on the drawings or as directed by the Engineer.
Excavated materials from river re-channeling works shall be stockpiled at the designated
area by the Engineer.
SPL-B.3
Method of Measurement
River channel excavations will be measured by volume in cubic meter of material excavated
from the channel prism to the neat lines and grades as shown on the Plans and as
established by the Engineer.
Hauling of excavated mater
ials either for stockpiling or disposal including trimming of side
slopes in channel pr
ism and channel bed shall be considered subsidiary works under this
item.
Basis of Payment
Description
Unit of Measurement
SPL-B
River Re-channeling
Cubic Meter
Subic-Clark-Tarhc Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specifications
3JB3gS?=5^wr@ S 9!y;
Subic-Clark-Tarlac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)
Bidding Documents
Specifications