ases Conversion Development Authority

SUBIC-CLARK-TARLAC

EXPRESSWAY
SLOPE PROTECTION WORKS AT GUMAIN

BRIDGE (PIER 5 AND 6)

TECHNICAL SPECIFICATIONS

JANUARY 2O14

SUBIC-CLARK-TARLAC EXPRESSWAY
Slope Protection Works at Gumain Bridge (Pier 5 and 6)

BIDDING DOCUMENTS

TECHNICAL SPECIFICATIONS
INTRODUCTION
The Technical Specifications describe in detail the work to be executed, the character and
quality of materials and workmanship and the specific responsibilities of the Contractor that
are not covered by the Conditions of Contract. The Technical Specification shall be read in
conjunction with the plans and other contract documents.
Pertinent notes appearing in the Contract Plans or Drawings shall also be considered as part
and parcel of the technical specifications. Such notes shall take precedence over the DPWH
Standard Specifications and the Supplemental Specifications.
The Supplemental Specifications shall consist of modifications and additions to the DPWH
Standard Specifications (Volume II), to adapt the latter to actual conditions and/or
requirements relative to this project. Some of these modifications and additions may actually
be of general application but in the absence of a supplemental specifications adopted by
DPWH, subsequent to the publication of the DPWH Standard Specifications, 2004 Edition,
Volume II @ Highways, Bridges and Airports these Supplemental Specifications have been
included in the Technical Specifications of this project.
The Supplemental Specifications for this project shall consist of modifications and additional
to the DPWH Standard Specifications as follows:
(1)

Modifications in the specification of standard work items under Part A to Part H of the
DPWH Standard Specifications. These modifications are carried out without
changing the "number" and "name" of each of such standard work items.

(2)

Specifications for additional items of work, respectively Par


t A to Par
t H of the DPWH
Standard Specifications.

The Special Provisions for this project shall consist of specifications for work Items
distinguished by placing the symbol "SPL" before its designated Arabic Number.

Subic-CIark-Tarlac Expressway
Slope Protection Works at Gumain Bridge (Pier 5 and 6)

Bidding Dociimen
Specificatioi

EARTHWORK

PART C

EARTHWORK

Subic-Clark-Tarlac Expressway
Slope Protection Works-Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specifications

EARTHWORK
PART C

EARTHWORK

ITEM 100

CLEARING AND GRUBBING

100.1

Description

Section 100.1 is revised to read as follows:


This Item shall consist of the removal, hauling, and stockpiling of all mater
ials including
trees, stumps, roots, vegetations, logs, wastes, debris and protruding objects except
those that are designated to remain in accordance with other items of these
Specifications and where directed by the Engineer. The holes resulting from grubbing
operations, where directed by the Engineer, shall be filled with approved materials which
shall be placed and compacted to the same dry density as that of the adjoining soil.
100.2

Construction Requirements

100.2.1

General

Atthe end of Sub-Section 100.2.1, add the following paragraphs:


Clearing shall be extended to one (1) meter beyond the toe of the fill slopes, or rounding
cut slopes or outside edge of drainage facilities, unless otherwise shown on the
Drawings or directed by the Engineer, with the exception of trees under the jur
isdiction
of the Forest Management Bureau and/or such tree and brush designated for
preservation. Trees, shrubs or bushes designated to remain in place shall be carefully
trimmed as directed by the Engineer and shall be protected from scarr
ing, debarking and
other injuries during construction operations.
Any unauthorized interference and damage to pr
ivate property shall be made good or
restored by the Contractor to the satisfaction of the Engineer and the Owner.
100.3

Method of Measurements

Delete the text of Section 100.3 and replace with the following:
Measurement will be by Area Method. The work to be paid for shall be based on the
total area cleared and grubbed which is calculated in hectares within the limits defined
on the drawings or as directed by the Engineer including adjustment that may be made
to satisfy cer
tain site requirements.
100.4

Basis of Payment

Add the following paragraph after the first paragraph and amend the second
paragraph of Section 100.4 to read as follows:
Pay Items 100, Clearing and Grubbing shall be paid in hectares and shall include the
cost of removing all trees.

Amend the second paragraph of Section 100.4 to read as follows:


Payment will be made under:
Pay Item Number

Descr
iption

Unit of Measurement

100

Clearing and Grubbing

Hectare

Subic-Clark-Tarlac Expressway
Slope Protection Worh-Gumam Bridge (Pier 5 and 6)

Bidding Documents
Specifications

EARTHWORK

ITEM 103

STRUCTURE EXCAVATION

103.1

Description

Add the following paragraphs to Section 103.1:


Structure excavation shall include the furnishing and placing of approved foundation fill
materials to replace unsuitable materials encountered below the foundation elevations of
the structures.

103.2

Construction Requirements

103.2.2

Excavation

Add the following paragraphs to Sub-Section 103.2.2:


Any excavation carried beyond the limits and dimensions as shown or described on the
Drawings or Specifications shall be backfilled with acceptable materials.
The sides of pits, trenches and other excavations shall, where required, be adequately
timbered and supported at the satisfaction of the Engineer, and all such excavations
shall be sufficient size to enable the concrete to be laid accurately and proper refilling
and compaction to be carr
ied out.
Should excavations be effected to a greater depth or width than is necessary then the
Contractor shall at his own expense backfill the excess excavation with approved
materials, compacted to the density of the adjacent ground, to the correct levels and
dimensions to the approval of the Engineer.
When instructed by the Engineer, the Contractor shall carefully set aside the various
materials encountered so that they may be replaced in their original position.
Trenches shall be kept clean and free from water during excavation, concreting, and
backfilling, and the Contractor shall dig diversion channels, erect cofferdams or
otherwise de-water the trench.

Where, in the opinion of the Engineer, any invert has become soft or unsuitable to
receive the concrete bed due to the Contractor's method of working, the Contractor shall
at his own expense remove and replace the material with non-structural concrete or
other approved material as instructed by the Engineer. Where concrete is specified, the
mix shall consist of ordinary Por
tland cement and aggregate, both complying with the
Specif
ications Item 405. The weight of cement mixed with 0.3m3 of aggregate shall not
be less than 50 kg. The quantity of water shall not exceed that required to produce a
smooth cement paste, which coat evenly the whole of the aggregate.
The Engineer's approval is required before placing concrete in all excavations for
structures made through water bear
ing strata that require dewatering.
103.2.6

Backfill and Embankment for Structures Other than Pipe Culver


t

Subic-Clark-Tarlac Expressway
Slope Protection Works-Gumain Br
idge (Pier 5 and 6)

Bidding Documents
Specifications

EARTHWORK
Add the following paragraph to Sub-Section 103.2.6
Foundation fill and backfill for structures other than pipe culver
t shall be granular subbase materials meeting the requirements of Item 200 and complying with the grading of
Table 200.1
Delete the text of Sub-Section 103.3.4 and substitute the following:
Shoring, cribbing, and related protective works if required in the construction shall not be
measured and paid for separately and shall be considered subsidiary to the item for
which they are constructed and utilized.
103.3.5

Basis of Payment

Delete the second sentence of Sub-Section 103.3.5 including items (1), (2), (3) and
(4) and substitute the following:
The payment for structure excavation and bridge excavation shall be deemed to include
the cost of backfilling, shoring, cribbing, protective works, removing and disposing
unsuitable mater
ials off site and removal and hauling of excess suitable materials to
stockpiles as directed by the Engineer. The payment shall be the full compensation for
the work item including the cost of labor, equipment, tools and incidentals necessary to
complete the work prescr
ibed in this item.
No measurement for separate payment to the Contractor shall be made for back-fill
being the relevant compensation included by the Contractor in his rates in the Bill of
Quantities in the pay items for excavation for structures and bridges.
Replace the second paragraph of Sub-Section 103.3.5 with the following:
Payment will be made under:
Pay Item Number

Description

Unit of Measurement

103

Structure Excavation

Cubic Metre

Suhic-Clark-Tarlac Expressway
Slope Protection Works-Gumain Bridge (Pier 5 and 6)'

Bidding Documents
Specifications

EARTHWORK
ITEM 104

EMBANKMENT

104.2

Material Requirements

Add the following item at the end of the Sub-Section 104.2:


Selected Granular Embankment
The mater
ials to be used for embankment at the back of Cribwall shall be selected
granular embankment-river run gravely sand or gravel or other clean granular materials
as shown and specified on the drawing or as directed and approved by the Engineer.
104.3

Construction Requirements

104.3.1

General

Add the following paragraph at the end of Sub-Section 104.3.1


Prior to the construction of embankment, the Contractor shall submit for review and
approval the methodology he intends to apply for the formation of embankment
satisfying all requirements in conformity with the lines, grades and dimensions shown in
the plans. The methodology shall show the systematic procedure of constructing the
embankment in conjunction with the procedure proposed for the slope protection as
shown in the drawings.
The approval of the proposed methodology however does not relieve the Contractor of
the responsibilities for any unsatisfactory or defective works as results of such
methodology. The Engineer at his discretion may reject or require remedial measures to
the defective works. The cost of replacing or remedying defective works shall be borne
by the Contractor.
104.3.2

Method of Construction

Embankment/Backfilling activities shall be phasing parallel with the sequence of


CRIBWALL construction. Each layer of embankment/backfill shall not be more than
500mm thick and shall be properly compacted with compaction equipment in
accordance with this Specifications. The process is repeated until the whole height of the
retaining wall is filled.
104.4

Method of Measurement

Add the following paragraph after the last paragraph of Sub-Section 104.4:
Any material coming from roadway, structure, drainage or ditch excavations which are
suitable for use but are replaced by the Contractor with borrow materials without prior
approval by the Engineer, shall not be measured for payment.

Measurement of quantities for embankment shall be made by the volume of


embankment materials placed and compacted to the lines, grades, and dimensions
shown on the drawings or directed by the Engineer and shall be taken only in the
presence of the Engineer. The Engineer shall be notified at least 24 hours before taking
such measurement. The volume of embankment mater
ials shall be computed by end
area method and determined from the excavation section of the embankment
established on the original ground line after stripping. The or
iginal ground line shall be

Subic-Clark-Tarlac Expressway
Slope Protection Worh-Gunutln Bridge (Pier 5 and 6)

Bidding Documents
Specifications

EARTHWORK
surveyed and repor
ted to the Engineer for checking and approval to the execution of the
embankment operation.
104.5

Basis of Payment

Modify the text of Section 104.5 to read as follows:


The accepted quantities, measured as prescribed in Section 104.4, shall be paid for at
the Contract unit price for the Pay Items listed below that is included in the Bill of
Quantities. The payment for accepted quantities for embankment with fill materials from
roadway and borrow excavation shall be deemed to include the cost of excavation,
hauling, blending, drying and wet
ting if necessary, placing, spreading and compaction
of fill mater
ials. The payment for accepted quantities for embankment construction with
fill materials from dredging and realignment of r
iver channel and structure excavation
shall be deemed to include the cost of hauling from stockpiles, blending, drying and
wet
ting if necessary, placing, and spreading and compaction of fill materials. The
payment shall be full compensation for the furnishing, placing and compacting of all
materials, including all labor, equipment, tools and incidentals necessary to complete the
work prescr
ibed in this Item.
The unit pr
ice shall also include the costs for procurement and furnishing of required
materials if not coming from approved excavation. No separate payment shall be made
for the tentative removal of embankment, counterweight f
ill, placing and removal of
surcharge and preload and secondary excavation and backfilling for structures to be
constructed on the embankment, cost of which shall be deemed included in the unit
price of the embankment.
Payment will be made under:
Pay Item Number

Descr
iption

Unit of Measurement

104

Embankment (Selected Fill or Granular


River Run)

Cubic Metre

Subic-Clark-Tarlac Expressway
Slope Protection Works-Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specifications

DRAINAGE AND SLOPE PROTECTION STRUCTURES

I
I

PART G

DRAINAGE AND SLOPE


PROTECTION STRUCTURES

I
I
I

I
Subic-Clark-Tarlac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)

Bidding Documer
Specif
icatio

DRAINAGE AND SLOPE PROTECTION STRUCTURES


PART G

DRAINAGE AND SLOPE PROTECTION STRUCTURES

ITEM 404

REINFORCING STEEL

404.3 Construction Requirements


At the end of Sub-Section 404.3.1 insert the following:
The Contractor shall, before materials are ordered, furnish the Engineer for approval plans
of the reinforcement arrangement of each affected structure showing clearly any revised
spacing or diameters of bars required to ensure that the design strength of the structure is
maintained. For the purposes of this Sub-section, design strength shall be define as the
product of yield strength of reinforcing bar and the area of reinforcing bar provided in the
section. Any expense incident to the revisions of materials furnished in accordance with
such plans shall be borne by the Contractor.
Supplement this Section with following:
404.3.7

Rebar Fabrication and Installation

Rebar fabrication and installation shall be done by a competent steel man to ensure good
workmanship. There should be a proper supervision for the "cutting and bending" of
reinforcing bars, frequent checking of bar schedule and clearances, f
rom the beginning until
the re-bars are installed.
404.3.8

Bar Bending, Splicing and Placing

The Contractor shall submit to the Engineer for approval, the shop Drawings Indicating the
bending, cutting, splicing and installation of all reinforcing bars.
404.4

Method of Measurement

Supplement this Section with the following:


The quantity to be paid for shall be the calculated theoretical number of kilograms of
reinforcing steel bars, mesh or mats as determined from the net length of the steel as
shown on the drawings, incorporated in concrete and accepted. Reinforcing steel bars shall
not be measured and paid separately where structures are paid in unit, as they are deemed
to be included in the unit pay items of the structures.
The weight of plain or deformed bars or bar-mat information to AASHTO Specifications will
be computed from the theoretical weight of plain round bars of the same nominal size as
shown on the following table:
Bar
Bar
Designation
Designation
#2
#2
#3
#3
#4
#4
#5
#5
#6
#6
#8
#8
#9
#9
#10
#10
#11
#11

Subic-Clark-TarlacExpressway'
SlopeProtectionatGumainBridge(Pier5and6)

Size
Size

Unit Weight

(mm)
(mm)

(kg/m)

6
6
10
10
12
12
16
16
20
20
25
25
28
28
32
32
36
36

0.222
0.616
0.888
1.579
2.466
3,854
4.833
6.313
7.991

Bidding Documents
Specifications

3/8
%

DRAINAGE AND SLOPE PROTECTION STRUCTURES


404.5

G_

Basis of Payment

Payment will be made under:


Pay Item Number

Description

Unit of Measurement

404

Reinforcing Steel (Grade 40)

Kilogram

ITEM 405

STRUCTURAL CONCRETE

405.1

Description

405.1.2

Classes and Uses of Concrete

The whole text under this Sub-section is amended as follows:


Two (2) classes of concrete are provided for in this item, namely A, A1 and lean. Each class
shall be used in that par
t of the structure as described herein below and called for on the
Plans.

The classes of concrete are as follows:


Class A

For reinforced concrete Cribwall and as indicated on the Plans.

Class A1

For Slab on Fill and where shown on Plans.

Lean Concrete-

405.2

For thin layers underneath footings and where shown on Plans or as


directed by the Engineer.

Materials Requirements

405.2.3 Coarse Aggregates


Modify Table 405.1 as follows:
Mass PercentPassing

Sieve Designation
Alternate
Standard

(mm)
63
50

U.S. Std

3-75

1 V?

25
19

CL A S S
A1

LEAN

254"

2
1

100

20-55

9.5
No. 4

95-100

100
90-100

12.5
4.75

0-10

405.2.6

Admixtures

405.3

PRODUCTION REQUIREMENTS

Subia-Clark-Tadac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)

100

25-60

40-70

_
0-10

0-15

Bidding Documents
Spe cif
icat ions

DRAINAGE AND SLOPE PROTECTION STRUCTURES


405.3.1

Proportioning and Strength of Structural Concrete

Modify Table 405.2 as follows:


Table 405.2 a

Classes of
Concrete

Composition and Strength of Concrete for use in Structures


(Locally Manufactured Cement)

Minimum
Cement
Content

Maximum
Water/
Cement
Ratio

Consistency
Range in
Slump

Designated
Size ofCoarse
Aggregate

Minimum
Compressive
Strength of
150x300 mm
Concrete
Cylinder

Specimen @
28 days

50 - 100

25-4.75

21

(2-4)

(T'- No. 4)

(3000)

50- 100

19 - 4.75

21

(2-4)

(1/2* - No. 4)

(3000)

mm (inch)

360
(9 bags)

0.49

(9.0 bags)

Lean

N/mm2(psi)

Kg/kg

360

A1

Square
Opening Std.

Kg(bag**)

320
(8 bags)

0.49

0.54

50- 100

(2-4)

37.5-4.75

(1 %" - No. 4)

17

(2500)

Based on 40 kg/bag
After the last Subsection under this Section, add the following Sub-section:
405.3.2

Protection of Concrete from Environmental Conditions

1.

General

Precaution shall be taken as needed to protect concrete from damage due to weather or
other environmental conditions during placing and curing operations. Concrete that has
been damaged by weather conditions shall be either repaired to an acceptable condition or
removed and replaced.
2.

Rain Protection

Under conditions of rain, the placing of concrete shall not commence or shall be stopped
unless adequate protection is provided to prevent damage to the surface mortar or
damaging flow or washing of the concrete surface.
Sublc-CIark-Tarlac Expressway
Slope Protection a! Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specifications

DRAINAGE AND SLOPE PROTECTION STRUCTURES


3.

Hot Weather Protection

When the ambient temperature is above 32 C (90 F), the forms, reinforcing steel, steel
beam flanges, and other sur
faces which will come in contact with the mix shall be cooled to
below 32 C (90 F), by means of a water spray or other approved methods.
The temperature of the Concrete at the time of placement shall be maintained within the
specified temperature range by any combination of the following:
Shading the materials areas or the production equipment.
Cooling the aggregates by sprinkling with water which conforms to the
requirements.

Cooling the aggregates or water by refr


igeration or replacing a por
tion or all the
mix water with ice that is flakes or crushed to the extent that the ice will
completely melt dur
ing mixing of the concrete.
Liquid nitrogen injection
405.4

Method of Measurement

The whole text under this section is amended to read as follows:


The quantity of structural concrete, reinforcing steel, formworks and falseworks required for
cast-in-place concrete construction or other Contract Pay Items shall be measured for
payment in the manner prescr
ibed in the several items involved.
No separate measured shall be made for formwork for Class A Concrete.
405.5 Basis of Payment
The whole text under this section is amended to read as follows:
The accepted quantities measured as prescribed in Section 405.4, Method of Measurement,
shall be paid for at the contract unit price for each of the several pay items listed below that
are included in the Bill of Quantities. The price and payment shall be full compensation for
furnishing, preparing, fabricating, placing, curing and for all labor, equipment, tools and
incidentals necessary to complete the Item.
Payment for Class A concrete shall be deemed to include the cost of formwork.

Payment will be made under:


Pay Item Number

Description

Unit of Measurement

405

Concrete Concrete Class A - Cribwall


(fc=21.0 Mpa)

Cubic Meter

405(1)

Concrete Concrete Class A1 - Slab on Fill


(fc=28.0 Mpa)

Cubic Meter

405(2)

Lean Concrete (fc=15 Mpa)

Cubic Meter

Subic-Clark-Tarlac Expre
Slope Protection at Gutna

e (Pier 5 and 6)

Bidding Boatmen.
Specificatior

DRAINAGE AND SLOPE PROTECTION STRUCTURES

G_

ITEM 502 MANHOLES, INLETS AND CATCH BASINS


Modify this section to read as follows:
5021 Descr
iption
This item shall consist ofthe construction, reconstruction or adjustment of lined ditch and catch basins in
accordance with this Specification and in reasonably close conformity with the lines and grades shown on
the Plans or as established by the Engineer.
502.2
Material Requirement
Modify this section to read as follows:
Unless otherwise indicated on the Plans, Concrete for these structures shall be Concrete
Class "A" and shall be in accordance with item 405, Structural Concrete.
502.3
Construction Requirements
Concrete construction shall conform to the requirements for Item 405-Structural Concrete.
Metal frames shall be set in full mor
tar bed. When grade adjustment or existing structures
is specified, the frames, covers and gratings shall be removed and the walls reconstructed
as required. The cleaned frames shall be reset at the required elevation. Upon completion,
each structure shall be cleaned of any accumulation of silt, debr
is, or foreign mat
ter of any
kind and shall be kept clear of such accumulation until final acceptance of the work.
Excavation and backfill shall be done in accordance with Item 103, Structure Excavation.
502.4
Method of Measurement
Modify this section to read as follows:
Lined ditches and catch basins, both new and reconstructed as applicable, will be measured
by the unit. Any additional concrete, reinforcing steel required for author
ized increases in
heights of structures paid of under this Item and in excess of the standard height shown on
the Plans will be measured and paid for under Item 405, Structural Concrete and Item 404,
Reinforcing Steel, as applicable. Structures noted on the Plans as "junction boxes" will be
measured for payment as manholes. The number of concrete covers, pairs of metal frames

and gratings, and pairs of metal frames and covers will be measured as acceptably
completed. The number of lined ditches and catch basins adjusted as directed will be
measured as acceptably completed.
502.5

Basis of Payment

The accepted quantities, determined as provided in Section 502.4, Method of Measurement


of the Pay Items in the Bill of Quantities will be paid for at the contract unit prices, which
shall constitute full compensation for furnishing and placing all mater
ials and for all labor,
equipment, tools and incidentals necessary to complete the Item. Excavation and backfill will
be measured and paid for as provided in in item 103 Structure Excavation.
Modify this section to read as follows:
Payment will be made under:
Pay Item No.

Description

Unit f Measurement

502(2)

Lined Ditch Inlet (U-Ditch)

Llnear Meter

502(3)

Catch Basin (1.4x1.5m)

each

Sublc-CIark-Tarlac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specif
ications

DRAINAGE AND SLOPE PROTECTION STRUCTURES


ITEM 505

RIPRAP AND GROUTED RIPRAP

505.1

Description

G_

Modify this Section to read as follows:


This Item shall consist of furnishing and placing of riprap with grout in accordance with this
Specification and to the lines, grades and dimensions shown on the Drawings. The work
also include construction of weep holes.
505.2

Material Requirements

Modify this Section to read as follows:


505.2.1

Stones

Stones for riprap shall be hard, durable, bank or river stones, resistant to weather action and
free from seams or other defects. The stones for grouted riprap Class "A" shall be round
natural stones of sizes ranging from 200 mm @ 300 mm in diameter as shown on the
Drawings. Adobe stones and lime rocks shall not be used for riprap works.
505.2.2

Filter Material at Weep-hole

Polyester non-woven plastic cloth, sewed like a bag and filled with 20 mm gravel will be
used as filter material at each weep-hole as shown on the Drawings.
505.2.3

Mortar

Mortar for grouted riprap shall be one (1) par


t cement to three (3) par
ts sand by volume and
enough water to obtain the required consistency and shall conform to the requirements of
Item 405, Structural Concrete.
505.3

Construction Requirements

Modify this Section to read as follows:


505.3.1

Excavation

The bed for grouted r


iprap shall be excavated to the required depths of Cr
ibwall foundation
as shown on the Drawings.

The grouted riprap shall be founded at the toe of Cribwall as shown on the Drawings or as
ordered by the Engineer.
505.3.2

Placing

The stones shall be laid by hand or individually by machines. They shall be laid with dose,
broken joints and shall be firmly bedded into the slope and against the adjoining stones.
Each stone shall be laid with adjacent stones. The grouted r
iprap shall thoroughly be
rammed into place as construction progresses and the finished sur
face shall present an
even, tight sur
face. Interstices between stones shall be filled with small broken fragments
firmly rammed into place. The spaces between the stones shall then be filled with cement
mor
tar as specified in Sub-section 504.2.3. Sufficient mor
tar shall be used to completely fill
all voids, except that the face sur
face of the stones shall be left exposed.

Subic-CUirk-Tarlac Expressway
Slope Protection at Cumatn Bridge (Pier 5 and 6)

Bidding Documents
Specifications

DRAINAGE AND SLOPE PROTECTION STRUCTURES


505.3.3

G_

Grouting

Grout shall be place from bottom to top of the surface swept with a stiff broom. After
grouting is completed the surface shall be cured as specified in Item 405, Structural
Concrete for a period of at least three days. Hardened grout left during the previous days'
operation shall be cleaned thoroughly from earth or dust and other unnecessary materials
with water and broom before another layer of stone and grout is added.
505.4

Method of Measurement

Modify this Section to read as follows:


Riprap and grouted riprap shall be measured by the cubic metre in place, completed and
accepted by the Engineer in accordance with the Drawings. Only accepted work will be
measured for payment and the computation of the quantity thereof will be based on the
volume within the limiting dimensions designated on the Drawings.
505.5

Basis of Payment

This Section is entirely deleted and substituted with the following:


The quantities measured as provided under Sub-section 504.4, Method of Measurement
shall be paid for at the Contract unit price as listed in the Bill of Quantities, which pr
ice and
payment shall be full compensation preparation of the bed, for furnishing and placing all
materials including all labor, equipment, tools and incidentals necessary to complete the
work item.

Payment will be made under:

Pay Item Number

Descr
iption

Unit of Measurement

505(1)

Grouted Riprap, Class A

Cubic Metre

Subic-Clark-Tarlac Expressway
Shoe Protection at Gvmain Bridge (Pier5 and 6)

Bidding Docui
Speciftcc

DRAINAGE AND SLOPE PROTECTION STRUCTURES


ITEM 506

G_

STONE MASONRY

506.2 Material Requirements


506.2.1

Stone

The first and second paragraph shall be modified with the following:
Stones shall be clean, hard and durable and shall be subject to the approval of the
Engineer. Unless otherwise specified on the Drawings or directed by the Engineer, stones
for masonry shall be Class A as described in Item 504, Riprap and Grouted Riprap. Stones
more or less will have roughly similar blunted ends.
506.2.2

Mortar

Add at the end of this Sub-section with the following:


The binder for stone masonry shall be mortar Class A and composed of one (1) part
Portland cement and two (2) parts of sand by volume and shall conform to the requirements
of materials under Item 405, Structural Concrete. Mortar that is not used within 90 minutes
after water has been added shall be discarded. Retampering of mortar will not be permitted.
506.3

Construction Requirements

Modify this Section to read as follows:


506.3.1

Excavation

The bed for stone masonry shall be excavated to the required depths of Cribwall foundation
as shown on the Drawings.

The stone masonry shall be founded at the toe of Cr


ibwall as shown on the Drawings or as
ordered by the Engineer.
506.3.2

Placing

The stones shall be laid by hand or individually by machines. They shall be laid with close,
broken joints and shall be firmly bedded inside the beam opening of Cribwall. Each stone
shall be laid with adjacent stones. The st
one masonry shall thoroughly be rammed into
place as construction progresses and the finished surface shall present an even, tight
surface. Interstices between stones shall be filled with small broken fragments firmly
rammed into place. The spaces between the stones shall then be filled with cement mor
tar
as specified in Sub-section 505.2.2. Sufficient mor
tar shall be used to completely fill all
voids, except that the face surface of the stones shall be left exposed.
506.3.3

Grouting

Grout shall be place from bottom to top of the surface swept with a stiff broom. After
grouting is completed the sur
face shall be cured as specified in Item 405, Structural
Concrete for a period of at least three days. Hardened grout left during the previous days'
operation shall be cleaned thoroughly from ear
th or dust and other unnecessary materials
with water and broom before another layer of stone and grout is added.

Subic-Clark-Tarlac Expressivay
Slope Protection at Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specification,:

DRAINAGE AND SLOPE PROTECTION STRUCTURES


506.4

G_

Method of Measurement

Modify this Section to read as follows:


Stone Masonry shall be measured by the cubic meter in place, completed and accepted by
the Engineer in accordance with the Drawings. Only accepted work will be measured for
payment and the computation of the quantity thereof will be based on the volume within the
limiting dimensions designated on the Drawings.
506.5

Basis of Payment

This Section is entirely deleted and substituted with the following:


The quantities measured as provided under Sub-section 505.4, Method of Measurement
shall be paid for at the Contract unit price as listed in the Bill of Quantities, which pr
ice and
payment shall be full compensation for preparation of the bed, for furnishing and placing all
mater
ials including all labor, equipment, tools and incidentals necessary to complete the
work item.

Payment will be made under:

Pay Item Number

Description

Unit of Measurement

506

Stone Masonry

Cubic Meter

ITEM 507

RUBBLE MASONRY

This item shall consist ofthe construction of rubble concrete around footing base of Gumain Bridge Pier No.
5 in accordance with this specification and in conformity with the lines, grades, slopes and dimensions
shown in the Plans or established bythe Engineer.
507.2Mat
er
ial Requirements
507.2.1St
one
The stone shall be cleaned, hard, and durable and shall be subject to the Engineer's approval. Adobe stone
shall not be used unless otherwise specified. Stones to be used shall be more than 0.015 cubic metre in
volume and not less than 75 percent of the total volume of rock embankment and shall consist of stones
0.03 cubic metre in volume as described in Item 506.2. Stones obtained f
rom excavation performed under
this contract may be used.
507.2.2Concret
e Class "B"

Concrete shall be Class "B in accordance with Item 405, Structural Concrete.
507.3Construction Requirements
507.3.1 Preparation of Foundat
ion Bed
The foundation bed shall be excavated to the lines and grades as shown in the plans as directed by the
Engineer, and shall be thoroughly compacted in accordance with Item 104.3.3.

Subic-Clark-Tarlac Expressnvqy
Slope Protection at Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specifications

DRAINAGE AND SLOPE PROTECTION STRUCTURES

G_

507.3.2Falsework and Formwork Construct


ion
Falsework/formwork shall be constructed so as to withstand the stresses imposed. Formwork used shall tie
constructed with suf
icient strength, rigidity and shape as to leave the finished works true to the dimensions
f
shown on the Plans and with the surface finished as specified. The inside surface of the forms shall be
cleaned of all dirt, water and foreign materials. Forms shall be thoroughly coated with form oil prior to use.
The form oil shall be commercial quality form oil or other approved coating which will permit the ready
release offorms and will not discolorthe concrete.
507.3.3Placing
One layer of concrete Class "B* shall be placed at the prepared bed prior to placing of stones. Clearance
between stones shall not be less than 2-1/2inches or the maximum size of concrete aggregate for Class
"B". Concrete Ct
ass "B" shall be placed after each layer of stone and shall be thoroughly consolidated by
means of a vibrator inserted in each layer of concrete. In no case shall the vibrator be operated longer than
10 seconds in any location. After removal of forms, any cavities, voids and honeycomb spots shall be filled
up with mortar composed of one par
t cement and two parts sand. All debris and refuse resulting from work
shall be removed andthe site left in a neat and presentable condition.
507.3.4Weephot
es
it shall conform to the requirements of Item 505, Riprap and Grouted Riprap under Subsection 505.3.4,
Weepholes.

507.4Method of Measurement
The quantity to be paid for shall be the number of cubic meters of rubble concrete complete in place and
accepted. In computing the quantity of payment the dimension used shall be those shown on the plans or
ordered in writing by the Engineer. No reduction shall be made forweepholes.
507.5Basis of Payment
The quantity of rubble concrete determined as provided in the preceding section 507.4, Method of
Measurement, shall be paid for at the contract unit pr
ice per cubic meterfor rubble concrete, which price and
payment shall be full compensation for the preparation of the bed, furnishing, necessary excavations,
falsework, and for all labor, equipment, tools and incidental necessaryto complete the Item.
Paymentwillbemadeunder
PayItemNumber

Description

UnitofMeasurement

507

RubbleConcrete

CubicMeter

Subic-Clark-Tarlac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specifications

DRAINAGE AND SLOPE PROTECTION STRUCTURES

G_

ITEM 511 GABIONS


511.1 Description
Modify this Section to read as follows:
"This works shall consist of constructing wire-mesh gabions, furnished, place and filled in
with rocks in accordance with the Specifications and at the locations and in conformity with
the lines and grades shown on the plans or as ordered by the Engineer"
511.1

Material Requirements

511.1.1

General

511.1.2

Wire

Supplement this Subsection with the following:


Unless otherwise specified on the plans, the minimum size of wire for gabions shall be as
follows:
Diameter(mm)
Gabions

Wire
BodyWire
Selvedge orperimeterwire
Tying and connecting wire

511.4

2.7
3.4
2.3

Method of Measurement

Modify this Section to read as follows:


"The quantities to be measured shall be the number of cubic meter of gabions, placed,
completed and accepted.
511.5

Basis of Payment

Modify this Section to read as follows:


Quantities determined as provided under Section 511.4 Method of Measurement shall be
paid for at the appropriate contract unit price per unit of measurement of the pay items
shown in the Bill of Quantities, which pr
ice and payment shall constitute full compensation
for all necessary excavation, subgrade preparation, for furnishing, placing of wire baskets
and fill mater
ials and for all labor equipment, accessor
ies, tools and incidentals necessary to
complete the item.
Payment will be made under:
Pay Item Number

Description

Unit of Measurement

511(1)

Gabions

Cubic Meter

511(3)

Geotexiiles (Filter Cloth)

Square Meter

Subic-Clark-Tarlac Expressway
Slope Protection at Gumain Bridge. (Pier 5 and 6)

Bidding Documents
Specif
ications

DRAINAGE AND SLOPE PROTECTION STRUCTURES

Add the following work item to Part G ofDPWH Standard Specifications

ITEM SPL-A TEMPORARY COFFERDAM DURING CONSTRUCTION


SPL-A.1

Description

This item shall consist of furnishing and placing of materials to prevent seepage or the entry
of river water during construction works at the bridge's pier in accordance with this
Specification and the Drawings.
Prior to the construction of the temporary cofferdam, the Contractor shall submit a shopdrawing showing its dimensions based on actual ground condition together with his
proposed methodology and sequence of operation to the Engineer for the laser's full
satisfaction and approval.
SPL-A.2

Material Requirements

This item shall consist of grouted rockfill materials, should be impervious enough to resist
the seepage of water from the river, and constructed in accordance with this Specifications
and to the lines, grades and dimensions as shown on the Plans. Rockfill materials to be
used shall conform to Item 505. Mortar for the grouted rockfill shall be Class "A".
SPL-A.3

Construction Requirements

The materials for the cofferdam shall be placed in close conformity with the lines, grades,
and dimensions as shown on the drawings or as directed by the Engineer. It should be so
constructed to withstand the strong impact and scouring action of the river in times of
looding while the construction works at the bridge's pier is ongoing.
f
The stones shall be laid by hand, or individually by machine. The spaces between the
stones shall be filled with cement mortar sufficiently to completely fill all the voids.
SPL-A.4

Method of Measurement

The quantity to be measured and paid for shall be the number of cubic meter of materials in
place, completed and accepted by the Engineer and shall constitute such materials as
specified in Item SPL-A.2
SPL-A.5

Basis of Payment

Payment will be made under:


Pay Item Number

Description

Unit of Measurement

SPL-A

Temporary Cofferdam

Cubic Meter

Subic-Clark-Tarlac Expresnvay
Slope Protection at Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specifications

DRAINAGE AND SLOPE PROTECTION STRUCTURES

G_

Add the following work item to Part G ofDPWH Standard Specifications

ITEM SPL-B RIVER RE-CHANNELING DURING CONSTRUCTION


SPL-B.1

Description

Realignment of river channel shall consist of excavation, removal and trimming of all classes
of materials in the channel prism including placing or stockpiling of excavated suitable
materials and disposal of unsuitable or surplus materials to designated disposal areas in
accordance with these Specifications and Drawings or as directed by the Engineer.
Prior to re-channeling works, the Contractor shall submit a shop-drawing showing its
dimensions (length, width, height) based on actual ground condition together with his
proposed methodology and sequence of operation to the Engineer for the latter's full
satisfaction and approval.
SPL-B.2

Construction Requirements

Excavation for river re-channeling shall be done in close conformity with the lines, grades,
and dimensions as shown on the drawings or as directed by the Engineer.
Excavated materials from river re-channeling works shall be stockpiled at the designated
area by the Engineer.
SPL-B.3

Method of Measurement

River channel excavations will be measured by volume in cubic meter of material excavated
from the channel prism to the neat lines and grades as shown on the Plans and as
established by the Engineer.
Hauling of excavated mater
ials either for stockpiling or disposal including trimming of side
slopes in channel pr
ism and channel bed shall be considered subsidiary works under this
item.

Provision and maintenance of access roads, det


our roads, temporary bridges and drainages
and crane ways to construction site shall not be measured and paid for separately and shall
be deemed to be included in the related pay Items prescribed in these specifications.
SPL-B.5

Basis of Payment

Payment will be made under:


Pay Item Number

Description

Unit of Measurement

SPL-B

River Re-channeling

Cubic Meter

Subic-Clark-Tarhc Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specifications

3JB3gS?=5^wr@ S 9!y;

DRAINAGE AND SLOPE PROTECTION STRUCTURES

Subic-Clark-Tarlac Expressway
Slope Protection at Gumain Bridge (Pier 5 and 6)

Bidding Documents
Specifications