DESIGN OF CIRCULAR WATER TANK

(Rigid joint)

Nameof work:1

Tank capacity

400

K ltr

Depth of water

4.00

mtr

4000

mm

Free board

0.20

200

mm

Conrete

cbc

20
7

fy

415

400000 ltr

unit weight 25000 N/m3


m 13.3

N/mm2

Tensile stress

115

N/mm2

mm

Effective Cover

40

mm

12

mm

120

mm c/c

upto 25% height

12

mm

170

mm c/c

upto 50% height

12

mm

200

mm c/c

upto 75% height

12

mm

220

mm c/c

upto 100% height

12

mm

440

mm c/c

mm

200

mm c/c

Steel

Nominal Cover

35

Reinforcement
Vertivcal
Hoops Ring

Floor

(both direction)

170

11600
12 mm Ring
440 mm c/c

170

100%
1.00 m

12 mmBars
240 mm c/c
12 mm Ring
220 mm c/c

75%
1.00 m

4000
12 mm Ring
200 mm c/c

50%
0.60 m

12 mm Bars
120 mm c/c
12 mm Ring
170 mm c/c

1.40 m

8 mm Ring
200 mm c/c
8 mm Ring
200 mm c/c
170
75

pk_nandwana@yahoo.co.in

DESIGN OF CIRCULAR WATER TANK (Rigid joint)


Nameof work:Tank capacity
Depth of water
Free board
Conrete
Steel

0
400 K ltr
4.00 m
0.20 m
M
fy
cbc

Nominal cover

20
415 N/mm2
7 N/mm2
35 mm

400000 mm
4000 mm
200
mm

Tensile stess =
m =
Effective cover =

### Design Constants:- For HYSD Bars

st

cbc
k=

115
7
m*c

m*c+st
j=1-k/3
1
R=1/2xc x j x k
0.5

Cocrete M =

N/mm2

m 13.3
13.3
13.3 x

0.447

0.851

0.447

0.851

x 0.447 =

1.332

115

Effective depth of tank =

If D is the inside diameter of tank, we have =

### Dimention of tank:-

from which D

20

wt. of concrete = 25000 N/mm2

N/mm2
=

115 N/mm2
13.3
40 mm

400

3.80

xD
4

11.57

Provide a diameter of

m
=

11.60

3.80

say

4.00

- 0.20 =

3.80

400000

1000

1000

1000

cm

170

11.60

### Determination of bending moment and hoop tension:= 3H+5 =


3
x 4.00 +
5
H2
= 4.00
x
4.00
=
8
h
= H/3 = 4.00
DT
11.60
x
0.17
The height above base, upto which cantilever action will be there is given by
H/3 or
D
Maximum ring tension at this level, per meter height = w (H-h)
where w
2
11.60
pressure at h/3 = 9800 x ( 4.00 - 1.333 )x
= 151573
N
2
Maximum prerssure at bottom =
wH
= 9800 x 4.00 = 39200
N
1
1.333
x ### x 1.333 x
maximum cantilever B.M. =
Mf =
2
3
Thickness of wall from empirical formula

17

= 1.333

1 m which ever is heigher

9800

N/m2

= 11615 N-m/m

### Design of setion for cantilever action:if d is the effective thickness of tank wall,
Mf
11615
x
1000
D=
=
= 93.00 mm
1000 R
x
1000
1.33
=
93 +
35 =
128 =
say
130 mm
Total thickness =d +cover
However, provide a minimum thickness equal to the greater of following;
170
30
x 4.00 +
50 =
170 Hence provide T=
(I) 150mm (II) 30H+ 50 =
=
135
mm
Providing
35 mm cover to the center of reinforcement,
availble d
Mf
11615
x 1000
Ast =
Area of steel for cantilever bending is given by=
= 879
st . J .d =
115 x 0.851 x 135
3.14xdia2
3.14 x 12 x 12
using ### mm bars
A
=
=
= 113
4 x100
4
x
100
Spacing of hoop Bars = 1000 x
113 / 879 =
129
say
= 120 mm
12 mm bar, @ 120 mm c/c upto height of 1.40 m from base
Hence Provided

Above this height, curtail half bars and continue the other half upto top. Let us test this for devlopment length
pk_nandwana@yahoo.co.in

12
115
x
st
=
431
mm say
0.43
m
4
0.8
=
4. tbd
x
1.40 m height above the base. These vertical bars are to be
Hence half bars may be curtailed at
25 mm
provided inner face . Keep a clear cover of =
Ld

### Design of section for hoops action;


151573 N
at 1.33 m above the base
Maximum hoops tension
2

area of ring, Ash =


151573
/
=
1318
115
mm
Let us provide rings atboth faseHence of area of ring in each face=
659
mm2
3.14xdia2
3.14 x 12 x 12
using ### mm bars
A
=
=
= 113
4 x100
4
x
100
Spacing of hoop Bars = 1000 x
113 / 659 =
172
say
= 170 mm
Hence Provided ### mm bar, @ 170 mm c/c upto height of
1.40 m from base
and above this, the spacing may be increased
1000 x 113
Actual , Ast
=
2
x
=
1330 mm2
170
151573
=
ct
0.813
<
1.2
170 +(
13.3 1 )x 1330 =
1000
x
Hoop tension at
9800 x
2.00 x
11.60 /
2.00 =
113680
2.00 m below top =
2

area of ring, Ash =


113680
/
989
115 =
mm
Let us provide rings atboth faseHence of area of ring in each face=
495
mm2
2
3.14xdia
3.14 x 12 x 12
using ### mm bars
A
=
=
= 113
4 x100
4
x
100
Spacing of hoop Bars = 1000 x
113 / 495 =
228
say
= 220 mm
Hence Provided ### mm bar, @ 220 mm c/c upto height of
2.00 m from base
0.3
At the top, minimum Ash
=
x 1000 x 170 = 510 /
2
= 255
mm2
100
Spacing of hoop Bars
=
1000 x
113 / 255 =
443
say
= 440 mm c/c
### Distribution reinforcement:Percentage area of distribution reinforcement is

0.30

0.10

170
450

100
100

0.280

0.280
x
1000 x
170 = 476
area of steel in each face = 238
100
However , no additional reinforcement will be provided at inner face since the vertical steel for cantilever action
will serve this purpose. Hence provided Ast=
238 mm2 in vertical direction at the outer face.
3.14xdia2
3.14 x
8
x 8
using 8 mm bars
A
=
=
= 50
4 x100
4
x
100
Spacing of hoop Bars = 1000 x
50 / 238 =
211
say
= 200 mm
Hence Provided these 8 mm bar, @200 mm c/c

Ash

### Provision for haunches:It is customary to provide150 mmx150mm haunchesat the junction of wall and base.
A haunches reinforcement of 8 mm @
200 mm c/c may be provided.
### Design of tank floor.:Since the tank floor is resting on ground throughout , provide a minimum thickness of 150
0.30
Minimum Ast
=
x
150 x 1000
=
450
mm2 in each direction
100
Provide half the reinfocement near each face, Ast
=
225 mm2
2
3.14xdia
3.14 x
8
x 8
using 8 mm bars
A
=
=
= 50
4 x100
4
x
100
Spacing of hoop Bars = 1000 x
50
/ 225 =
223
say
= 200 mm
However provide 8 mm bars @ 200 mm c/c in both direction , at top and bottom of floor slab.

The floor slab will rest on


### Detail of reinforcement :pk_nandwana@yahoo.co.in

75 mm thick layer of lean concrete covered with a layer of tar felt.


The detail shown in drawing.

mm
m

hich ever is heigher

mm
mm2
mm2

m from base

vlopment length

ical bars are to be

ove the base

mm2

N/mm2

mm2

mm2

r cantilever action

mm2

wall and base.

mm
direction

mm2

DESIGN OF CIRCULAR WATER TANK (Rigid joint)


Nameof work:- 0

170

11600
100%
12 mm Ring
440 mm c/c

1.00 m

12 mmBars
240 mm c/c

75%

12 mm Ring
220 mm c/c

170

1.00 m

50%
12 mm Ring
200 mm c/c

0.60 m

12 mm Bars
120 mm c/c
12 mm Ring
170 mm c/c

4000

1.40 m

8 mm Ring
200 mm c/c
8 mm Ring
200 mm c/c
150
75

pk_nandwana@yahoo.co.in

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

cbc N/mm2
m cbc

8.5

10

11.5

13

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

Grade of
concrete

kc

0.329

0.329

0.329

0.329

0.329

0.329

M 15

(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)

Grade of concrete
bd (N / mm2

jc

0.89

0.89

0.89

0.89

0.89

0.89

M 20

Rc

0.732

1.025

1.244

1.464

1.684

1.903

M 25

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

M 30

kc

0.289

0.289

0.289

0.289

0.289

0.289

M 35

jc

0.904

0.904

0.904

0.904

0.904

0.904

M 40

Rc

0.653

0.914

1.11

1.306

1.502

1.698

M 45

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

M 50

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table v in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44

Permissible shear stress in concrete


M-20
M-25
M-30
0.18
0.19
0.2
0.22
0.23
0.23
0.30
0.31
0.31
0.35
0.36
0.37
0.39
0.40
0.41
0.42
0.44
0.45
0.45
0.46
0.48
0.47
0.49
0.50
0.49
0.51
0.53
0.51
0.53
0.55
0.51
0.55
0.57
0.51
0.56
0.58
0.51
0.57
0.6

tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62

M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63

Maximum shear stress c.max in concrete (IS : 456-2000)


Grade of concrete

c.max

M-15
1.6

M-20
1.8

M-25
1.9

M-30
2.2

M-35
2.3

M-40
2.5

Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Shear stress tc
100As
bd
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59

M-20
0.18
0.18
0.18
0.19
0.19
0.19
0.2
0.2
0.2
0.21
0.21
0.21
0.22
0.22
0.22
0.23
0.23
0.24
0.24
0.24
0.25
0.25
0.25
0.26
0.26
0.26
0.27
0.27
0.27
0.28
0.28
0.28
0.29
0.29
0.29
0.30
0.30
0.30
0.30
0.30
0.31
0.31
0.31
0.31
0.31

Reiforcement %
100As
M-20
bd
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25

0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10

0.32
0.32
0.32
0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4

1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61

0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12

0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49

2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

3.15

0.51

Permissible Bond stress Table bd in concrete (IS : 456-2000)


M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

M-50
1.4

Development Length in tension


Plain M.S. Bars

H.Y.S.D. Bars

kd = Ld

bd (N / mm2)

kd = Ld

0.6

58

0.96

60

0.8

44

1.28

45

0.9

39

1.44

40

35

1.6

36

1.1

32

1.76

33

1.2

29

1.92

30

1.3

27

2.08

28

1.4

25

2.24

26

2.0

Modification factore

bd (N / mm2)

Permissible stress in concrete (IS : 456-2000)


Permission stress in compression (N/mm2) Permissible stress in bond (Average) for
plain bars in tention (N/mm2)
Bending cbc
Direct (cc)
(N/mm2)
(N/mm2)
in kg/m2
Kg/m2 (N/mm2)
Kg/m2
--3.0
300
2.5
250
5.0
500
4.0
400
0.6
60
7.0
700
5.0
500
0.8
80
8.5
850
6.0
600
0.9
90
10.0
1000
8.0
800
1.0
100
11.5
1150
9.0
900
1.1
110
13.0
1300
10.0
1000
1.2
120
14.5
1450
11.0
1100
1.3
130
16.0
12.0
1.4
1600
1200
140

1.4
1.2
0.8
0.4

0.0

0.4
0.8
Percentage of tension reinforcement

1.2

1.6

2.4

2.8

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

cbc N/mm2
m cbc

8.5

10

11.5

13

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

Grade of
concrete

kc

0.329

0.329

0.329

0.329

0.329

0.329

M 15

(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)

Grade of concrete
bd (N / mm2)

jc

0.89

0.89

0.89

0.89

0.89

0.89

M 20

Rc

0.732

1.025

1.244

1.464

1.684

1.903

M 25

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

M 30

kc

0.289

0.289

0.289

0.289

0.289

0.289

M 35

jc

0.904

0.904

0.904

0.904

0.904

0.904

M 40

Rc

0.653

0.914

1.11

1.306

1.502

1.698

M 45

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

M 50

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table v in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44

Permissible shear stress in concrete


M-20
M-25
M-30
0.18
0.19
0.2
0.22
0.23
0.23
0.30
0.31
0.31
0.35
0.36
0.37
0.39
0.40
0.41
0.42
0.44
0.45
0.45
0.46
0.48
0.47
0.49
0.50
0.49
0.51
0.53
0.51
0.53
0.55
0.51
0.55
0.57
0.51
0.56
0.58
0.51
0.57
0.6

tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62

M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63

Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Maximum shear stress c.max in concrete (IS : 456-2000)


Grade of concrete

c.max

Shear stress tc

M-15
1.6

M-20
1.8

Reiforcement %

M-25
1.9

M-30
2.2

M-35
2.3

Permissi
M-40
2.5

Grade of concrete

ct.max

100As
bd
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66

M-20

M-20

0.18
0.18
0.18
0.19
0.19
0.19
0.2
0.2
0.2
0.21
0.21
0.21
0.22
0.22
0.22
0.23
0.23
0.24
0.24
0.24
0.25
0.25
0.25
0.26
0.26
0.26
0.27
0.27
0.27
0.28
0.28
0.28
0.29
0.29
0.29
0.30
0.30
0.30
0.30
0.30
0.31
0.31
0.31
0.31
0.31
0.32
0.32
0.32
0.32
0.32
0.33
0.33

0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.46
0.47
0.48
0.49
0.50
0.51

100As
bd
0.15
0.18
0.21
0.24
0.27
0.3
0.32
0.35
0.38
0.41
0.44
0.47
0.5
0.55
0.6
0.65
0.7
0.75
0.82
0.88
0.94
1.00
1.08
1.16
1.25
1.33
1.41
1.50
1.63
1.64
1.75
1.88
2.00
2.13
2.25

0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20

0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41

1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74

0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46

1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51

2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table bd in concrete (IS : 456-2000)


M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

Development Length in tension


Plain M.S. Bars

H.Y.S.D. Bars

bd (N / mm2)

kd = Ld

bd (N / mm2)

kd = Ld

0.6

58

0.96

60

0.8

44

1.28

45

0.9

39

1.44

40

35

1.6

36

1.1

32

1.76

33

1.2

29

1.92

30

1.3

27

2.08

28

1.4

25

2.24

26

Permissible stress in concrete (IS : 456-2000)


Permission stress in compression (N/mm2) Permissible stress in bond (Average) for
plain bars in tention (N/mm2)
Bending cbc
Direct (cc)
(N/mm2)
(N/mm2)
in kg/m2
Kg/m2 (N/mm2)
Kg/m2
--3.0
300
2.5
250
5.0
500
4.0
400
0.6
60
7.0
700
5.0
500
0.8
80
8.5
850
6.0
600
0.9
90
10.0
1000
8.0
800
1.0
100
11.5
1150
9.0
900
1.1
110
13.0
1300
10.0
1000
1.2
120
14.5
1450
11.0
1100
1.3
130
16.0
12.0
1.4
1600
1200
140

Permissible direct tensile stress in concrete (IS : 456-2000)


Grade of concrete

ct.max

M-10
1.2

M-15
2.0

M-20
2.8

M-25
3.2

M-30
3.6

M-35
4.0

M-40
4.4

M-50
1.4

You might also like