You are on page 1of 130

Appendix - L

Water Treatment Plant


For Multivillage Scheme - Adavisomanal & 30 Villages,Taluka -Muddebihal, District- Bijapur
The work Involves Construction of 3600 Cum per Day Capacity Water Tretment Plant
.The following items of Work,are proposed.
a) Cascade type gravity aerator
b) Presettling tank.
c) Raw water balancing Tank.
d)Slow sand Fillter .
e)Pure water storage tank.
f)Pure water pumping system
1

Population Forecast

a)

As per Population forecast for the year 2021 for the Entire Project Villages

b)

Water demand considering Basic LPCD

= 51379
= 55

= 2825845

Lit/Day

With 10% Losses For Distribution

= 3108430

Lit/Day

ii

With 5% Losses For Transmition (Pure water only)

= 3263860

Lit/Day

iii

With 5% Losses in Water Treatment plant

= 3427053

Lit/Day

iv

With 5% Losses in Raw water Transmission

= 3598406

Lit/Day

(As this quantity of Water Likely to be lost in transit only)

= 3427050

Lit/Day

But to be on safer side and to give additional cushion let us adopt Quantity to be treated

= 3598400

Lit/Day

= 3600000

Lit/Day

MLD

Hence total water to be Treated if 5% of losses in raw water Transmission considered.

Say

3.60

= 3600.00 Cum/Day
Criteria and parameters for consideration for planning and designing based on guidelines given in Manual on
Water supply and Treatment published by CPHEEO, Govt of india , Ministry of Urban Develepment New DelhiMay 1999 and other hand books on public health engineering.
A
I
II

Cascade type Gravity aerator


The aim of aeration in respect of surface source water
To Remove odour caused by carbon dioxide , hydrogen sulphide and taste caused by volatile substances
specially for deep water of impounded reservoir i.e. Dam
To add oxygen to give freshness
Parameters

Height of Aeration Structure

1.2 to 3.0

But NEERI Nagpur found on experiment that 1 to 1.5mtr fall is advisible.


II

Nos of steps or trays

III

Area of areater

4 to 6
0.015 to 0.045 sqm/cum/hrs

IV Carbon dioxide removal

25 to 50%

20 to 35%

Hydrogen sulphide removal

Detailed Scheme Report

Niketan Consultants

Appendix - L

Recommended for Adoption Design

Height aeration cascade

No of steps

Area of aerator

1.5 m
5 No
0.015 Sqm

Plain - settling Tank (Sedimentation Tank)


This treatment is to bring the turbidity of water upto 10 NTU

Parameter for design


I

Detention period

= 3 to 4 hours

II

No of units

= 2 or more

III

Depth of tank (average)

IV Velocity of flow

3 m(2 to 5 m)

0.4 m/sec
(0.2 to 0.5 m/Sec)

Surface loading (horizontal flow)

36 Cum/Sqm/Day

VI Extra capacity for sludge

VII Weir loading (average)

= 100 to 300 Cum/m/Day

VIII Floor Slope

= 1 in 12

(for mechanical plants)

25%

IX Length to width ratio

= 2 or more

= 1.2 :1 to 2:1

Slope for sludge removal

XI Velocity of Water in outlet conduit

= Not more than 0.4m/sec

Since we are planning to provide slow sand filters operating 24 hrs, Raw water storage is required
between pre-settling Tank and slow sand filter as pumping hours adopted is 20hrs for raw water pumping.
Hence raw water storage tank also work as secondary sedimentation Tank to some extent. Considering this
aspect following parameters adopted for sedimentation Tank design.
I

Detention time

= 3

hrs

II

No of units

= 2

no

II

Depth of Tank
a) Water Depth

= 3.6

b) Free board

= 0.3

IV Volocity of flow

= 0.4

m/sec

= 36

Cum/Sqm/Day

VI Extra capacity for sludge (depth)

= 0.5

VII Floor slope

= 1 in 12

VIII Length to width ratio

= 2

IX Slope for sludge removal

= 1.2 to 1

Velocity of Water in outlet conduit

= 0.4

Raw water storage Tank

Surface loading

m/Sec

As already brought above, raw water pumping is done for 20hrs with 10hrs of each shift with 2hrs break in
Detailed Scheme Report

Niketan Consultants

Appendix - L

between. Hence minimum 2hrs holding capcity is required. However considering any mechanical delay in
starting 2nd pump, It is recommended to provide 3hrs storage requirement of filtration quantity per hour.

Detailed Scheme Report

Niketan Consultants

Appendix - L

Slow sand filter


Total water Demand - 3600 Cum/ Day
As per report of research project carried out by NEERI Nagapur on slow sand filter, they could bring down
the turbidity of 30 NTU to 1 NTU at the rate of filtration ranging from 0.1 to 0.3m/hr giving very good result. In
this regard a xerox copy of the extract of the report enclosed.
Similarly slow sand filter have been Considered very economical in maintenance with capacity ranging up to
2 MGD(9000Cum/Day or 9.0 MLD).In Columbia (xerox copy of extract of report
attached)
As per CPHEEO Manual on water supply, filter beds up to area of 2000 Sqm can be adopted.
Considering these aspects in view adoption of slow sand filter has been considered in this
case.
As per CHPEEO-manual and other manual design cirterias are as under

Sl no

Water quality parameters

purification effect of slow sand filter (parameters)

Design period

10-15 year(10 year as per CPHEEO)

Period of operation

24 hrs/day

Rate of filtration

0.1 to 0.2 m/hrs as per NEERI up to 0.30 m/hrs

Initial height of filter bed

Filter bed area

10 to 200sqm per filter , as per CPHEEO


manual.

No of filter beds

650-1200 sqm--5 units

1 m as per CPHEEO (but could be


between 0.8 to 1.0 m)

1200-2000 sqm--6 units


7

Specification of filter media


a) sand
i) effective size

0.2 to 0.3 mm

ii) uniformity
co-efficient

3 to 5

b)gravel bed

30 cm

c)Under drainage

20 cm

d)free board
21 cm
e)Effluent weir level above sand
bed
20-30 mm
f)internal depth of filter bed
(variable)

Usually
free board - 30cm
water depth - 1.3m
Filter media - 0.9m
Gravel support - 0.30m
brick drains - 0.2m
Total

Detailed Scheme Report

3.0m
Niketan Consultants

Appendix - L

Detailed Scheme Report

Niketan Consultants

Appendix - L

Now Recommended for adoption in design


I

Depth of supernatant water

II

Period of Operation

III

Rate of filtration

= 0.15 m/h

24 hrs

As raw water storage tank acts as a Secondary sedementation tank, rate of filtration has been adopted
more than minimum of 0.1m/hr
IV Free board

= 0.20 m

1 m

5 Nos

Depth of filter sand

VI No of filter beds

3600
24

1000 sqm

0.15

(Between 650 to 1200Sqm)


VII Gravel

0.3 m

VIII Under drains

0.2 m

IX Water level above sand bed(minimum)

= 20-30 mm

Pure Water Storage Tank


Since it has been planned to pump pure water for 20 hours with shift, 10 hours pumping & 2 hours rest.
Minimum storage capacity required is 2 hours storage for filtered water considering rate of filteration
However considering other breackdown etc. 3 hours storage capacity recommended

Detailed Scheme Report

Niketan Consultants

Appendix - L

Hydraulic design of WTP components


Considering recommended parameters for adoption in design

Cascade (Gravity) Type aerator


Raw water pumping rate
considering total Demand 3600 cum/D & 20 hours of pumping
Area of aerator required at the rate of

3600

=
0.045 sqm/Cum/hr

20

= 0.045 x
=

Rise of each step of cascade if 5 steps adopted

8.1
150

3
1.5m
2
0.45

D1

0.45 m(as asumed)

3.141 X

D-22

3.14 X

D-12

4
3.141 X

4
D-22

3.141 x

3.141 X

= D-2

3.26 m

0.452

4
D-22

0.257

(8.1

8.1 Sqm

8.1

8.1

###
3.141

=
Width of each step =

3.26228 m
3 - 0.45
10

0.26 m

Say

30 Cm

Design of collecting weir

Assume velacity of

0.3 m/Sec

Quantity of Water to be carried =


Detailed Scheme Report

180

0.05

180 Cum/hr

Sqm

If dia of inlet pipe is 450mm, then BB steps area D2 dia of bottom step D1
dia of inlet pipe

180 Cum/hr

Cum/Sec
Niketan Consultants

30 Cm

Appendix - L

=
Area of weir required to collect & convey

Assume width of channel as

Depth of of channel

Cosidering Fall of depth of 30 Cm and channel width


of 75cm
=

0.05

0.17

Sqm

0.23

60 x

60

0.05
0.3

Cum/Sec

0.75 m
0.17
0.75
0.22 m

ie

0.17

0.23

0.75
Total depth of channel at bottom
However let us adopt Considering
overloading requirement

Width

Depth

Width of each step

0.3

0.75
0.60

3.26

0.23 =

0.530 m

m
m

0.45 =

0.28

10
Outer dia of cascade if 12 cm thick wall adpoted for channel at the periphery.
Outer dia of cascade

Provide outer Dia of

###

0.75 +

3.26 +

###

0.12

Slope of channel leading to pre-settling tank.


Adopt cross section of 75 cm wide X 60 cm height(With free board of 30 Cm)
slope of channel should be such that it produces the flow 0.3 m / Sec
for open channel V

Where, Velocity of flow =


R

=
=

=
Detailed Scheme Report

1
0.013
0.3

X R2/3

X S1/2

m/Sec

Hydraulic radius
area of channel (effective)
Wetted perimeter
0.166
(0.75 +

0.166

0.28 +

0.28)

0.166

m
Niketan Consultants

Appendix - L

Detailed Scheme Report

0.166

Niketan Consultants

Appendix - L

=
S

Slope of gradient
V2 X .0132
R4/3
0.32

0.0132

0.12674/3

If pipe provided ,let velocity V = 0.50 mt/Sec

Dia of pipe =

0.05

0.5
=

0.356

4
3.142

Sa37.5 Cm Dia

Sedimentation tank
Total demand

3600 Cum/Day

With 20 hrs pumping =

180 Cum/Day

Detention provide =

Hrs

Capacity Sedimentation Tank =

3X

180

= 540 Cum

If two units provided


capacity of each unit

with average water depth in tank as

540
2
3.6

= 270

Cum

270
3.6

= 75 Sqm

Each unit is Further sub divided as under i.e. 3 Compartments of 4.5 X 6.25 x = 84.375 Sqm
Total area provided = 84.375 X 2 = 168.75 Sqm
6.25m

Unit 1
4.5m
6.25m

Unit 2

Detailed Scheme Report

Niketan Consultants

Appendix - L

Check for Surface


loading =

3600

168.75

21.3333 Cum/Sqm/Day

<

36 Cum/Sqm/Day

Inlet And out let Weir


Inlet weir (Influent channel with bottom openings )
keeping velocity of water in channel

0.3 m/sec

and keeping width of channel a

0.75 m

For discharge of 180 Cum/hr i.

0.05 Cum/sec

Depth of channel

0.05

0.22 cm

0.3 x 0.75
With free board of 20 cm
The cross section of Influent channel =
Sloop of channel

0.75x

0.42 m

V2 X 0.0132

Were V = 0.3 m/sec

R4/3

R=

0.75 X 0.22
(0.75 X 0.2 X 2)

= 0.15

Provide same for effluent channel

Raw water storage tank


Total quantity of water to be filtere

3600 Cum/Day

Slow sand filter works for 24 hrs

3600
24

I,e 3 hrs Storage requirement


I

= 150

= 150
X3

Cum
### Cum

If 3.6 mt Depth of tank with 0.30mt free board And circular tank adopted

Dia of tank =

450

3.6

12.61

4
3.142

Say Provide 12.75 m Dia

Detailed Scheme Report

Niketan Consultants

Appendix - L

Design of Slow sand filter


Quantum of water to be treated =

3600 Cum

Filter works for 24 hrs


Hence , Quantity of water to be filtered per hour =

3600
24

= 150

Cum/hr

As we have provided raw water Storage tank after sedimentation tank , the former acts as
Secondary sedimentation tank also.
Hence rate of filtration adopted 0.15 m instead lower of 0.1 m per hr (it is should be between
0.10 to 0.30 m/hr as per CPHEEO And 0.1to 0.20 m/hr as per NEERI experiment )

Surface area of filter bed required =

150
0.15

1000

Sqm

No of beds to be provided as per CPHEEO manual for surface area between 650 to 1200 Sqm =
Area of each filter unit =

1000
5

= 200

Sqm

Let filter bed be as under with over all depth of fil

2.7 mt

0.30mt Free board

1.0mt supernatant water


3.04 mt

1.25mt Initial loading of filter Sand

0.30 mt Gravel

0.20 mt Under drain

0.415 mt Central drain

If circular tank adopted Dia of each tank =

200 x 4
3.142

Detailed Scheme Report

Niketan Consultants

Appendix - L

= 15.96 mt
Say 16 mt

Detailed Scheme Report

Niketan Consultants

Appendix - L

16 mt Dia

Pure water tank


Considering losses of water in raw water rising main and WTP (I,e 5 % Cumulative at
each stage )
balance of pure water to be stored is 3263860 liter per day I,e 3264 Cum/Day . If WTP
losses are ignored for assessment then 3427 Cum/Day
Let us consider pure filtered water coming from effluent .

3427 Cum/day

As filter wash for 24 hrs


Per hour rate of pure water discharge =

3427
24

142.8

Cum/hr

We have planned pure water pumping also 20 hrs with each shift of 10 hrs and rest
period of 2 hrs.
Minimum storage required is
for 2 hrs =

2X

142.792 = 286 Cum

But considering any mechanical break down and delay in restarting of pumps
Let us provide 3 hours capacity storage =

3 X 142.8

= 428

Cum

Say 430 Cum


Considering 3 mt Deep circular pure water tank
Dia of tank =

Detailed Scheme Report

430 X4

13.51l mt
Niketan Consultants

Appendix - L

3.142 X 3

13.51l mt

Let us adopt 14 m Dia circular Tank.

Detailed Scheme Report

Niketan Consultants

Appendix - M

Rough structural Design of Cascade ariatour


Areator column

Column 25X25

Water in let-pipe as 450mm dia


Column 25X25

20 cm thick hallow
450mm Dia
Column 25X25

20 cm thick circular hallow column to


accommodate pipe

BB Wt
W-1
=

3.142

D-12

W-2

3.142

X
4

0.75

=(

0.441844

0.111

Cum

X
4

D-22

= 3.142

=
=(
=

3.142

0.866

X
4
-

0.2386

1.05

3.142

=(
=

Detailed Scheme Report

3.142

1.432
0.4084

3.142X

0.30

X D2

0.3

0.0707 )

0.3

0.3

0.3

3.142X

0.3
0.30

4
0.3

Cum
W-3

X D2
4

0.0707 )

3.142

X
4
-

1.35

0.0707 )

3.142

3.142X

0.30
4

X
4

D-32

3.142

X D2
4

0.3

0.3

Cum

Niketan Consultants

0.3

Appendix - M

W-4

= 3.142

= 3.142

0.111

3.142X

0.30

0.3

0.6

0.3

3.142

X D2

2.05

0.0707 )

0.2386

3.142X

0.6
0.30

0.6

0.4084

0.621

1.938

Cum

3.317
6634

0.3

Cum

3.317

Load of BB =
Weidht of BB =

1.938

Cum

X
4

3.301

0.0707 )

D-52

3.142

=(

Total BB

X
4

X D2
4

1.65

0.6205

3.142

X
4

2.139

D-42

3.142

=(

W-5

X
4

Kg

Coming on RC Slab=
=

2000
3.142

6634

0.7

Kg
-

4
6634

-(

0.385

6634

1134.0

3.142

X 0.3
4

0.07
=

)X

1.8

X
X

1.8 X

2000

2000

5500.0

Average circular hoop = considering Beam rod.


Beam Dia =

0.7

3.141 x D

Per meter Load on slab

+
3.141

0.65
2
x
=

=
1.025
5500.0
3.22

1.025
=

3.21953 m
=

1708

Kg/m

21 cm
Water load = Commen average 0.15cm
1.52

Linear (0.30
=
=

Detailed Scheme Report

1.5 x
1500

5 x

1000)

1000

Niketan Consultants

Appendix - M

Moment due to flow water load & Bricks won has


1708
Taking moment about B=
RA

RA

0.32

1500
1.52

3208

3208
0.32

3208 =

675.368 Kg

1.52
Maximum BM at -0.32 for RB

675.37

1.52

1026.56

Load due to water both at cendes & Middle


=

Assume thickness of slab =

w l2
12

x 1.52
12
=

25

Kgm

20 cm

Self weightt of slab =

0.2

2500

wl2
12

Moment due to self wt =


Total moment =

300

Kgm

1026.56

500 Kg/Sqm
500

25.00

X
12

1.52

96.27

X
X

100 X
100

96.27 Kgm

1147.83 Kgm

As per IS- 3370


Thickness of slab

Provide
Steel
Ast to steel

1147.83
17

21 cm thick slab

Ast

(M-20 concrete)

=
0.87

M
(D-Conrete)

21X
0.1 X
35

Adopt 12mm steel

Detailed Scheme Report

11 =

1.13
4.32

100
0.259

X
100
0.8

100

0.059

1147.83 X
1X
(21

X t

=
Minimum steel :-

20.13

0.80

26.1574

cm

5.88
=

100
5)

Cm2
4.32

Sqm

Niketan Consultants

1500

Appendix - M

Provide 12mm at 20 cm c/c radically


Distribution bars circular
0.12 %
2100 X
0.12
100

=
=

8mm
2.52

0.5 X
100
2.52

19.8413

Cm2
Say 18 cm c/c

Column
Total load coming on structur
Water load

3.142

X3.7
4

12.57

=
BB load

5943

Dead load of slab

3.142

X
4

3)

Kg

3.142

X 0.3 X

1000

Kg

3.142

12.57

5549

Kg

2)

3.142X

1.7

1.7

3.142X
4

0.21

0.21

2500

0.21

2500

2500

Total load
BB

5943

Kg

.
Wall load over fall

1500

Kg

Slab base

5406

Kg

Water load in chanal

2283

Kg

End wall load


Total

=
=

2826
17958

Kg
Kg

Let us assume centre hollow column shaft


Take 50
% of load
And outer column -

Detailed Scheme Report

50

% of load

Niketan Consultants

Appendix - M

Load on column

17958
2

Load on shaft column

8979

Kg

8979

Since, to balance the slab - 4 column on peripher provided


=

Load on each column


Provide column size

23 X

8979
4

23 X

0.3
100

Minimum 4 bars of

23

2245

23 Which can take load provide nominal reinforce of steel as per IS-450
that is .3 column
0.8

1.27

12 X

60X

Cm2

12 mm

Stirruf of 6 mm at 20 cm c/c.
Design of Edge wall
(M-20 concrete)

Provide 8 mm bar

0.8

X
1.2

100

0.21 X
100

0.8

1.21

Cm2

60 cm /c

Provide 8mm vertical bar at 30 cm c/c


And 6mm distribution bar at 20 cm c/c
Ring beam

Total load on ring beam

Length of ring beam

3.142

3.1425

8979

Kg

3.142

4 =

12.57

Since, 4 column provided


Hence say
Span

12.57
4

3.1425

Load on that per mtr

Assume beam of

25 X

Dead load of beam

\ Total load =
BM =

wl2
12

714.32

8979
12.57

714.32 Kg/Rm

25 cm
0.25

871.00

0.25

156.25
X
12

=
Say =

3.1425

2500

156.25 Kg

870.57 Kg
871.00 Kg/Rm
=

716.78

KgM

(If normal design adopt)


As IS

3370

X
100X 6
16 X
25
=

Detailed Scheme Report

716.78

X
16 X

32.79 cm
Niketan Consultants

100X
25

Appendix - M

Provide beam of =
Rein force =

25 X

33

Ast =

M
0.87

0.20

33

100
5 ) X 1200

100
5 ) X

2.45

cm2

2.45

1.96

1200
0.8

25 X
Provide

716.78
X
0.87
X ( 33
-

Minimum steel

33 X

0.2
100

12 mm bar

0.8

30

1.32

Cm2

2 bar at top
3 bar at bottom

With stirruf of 8 mm at 20 cm c\c


Design of centre hallow column
3.142

70

4
=

3849

=
Total head

3.142X

675

3174
=

8979

kg

3.142
Area of concrete

0.70

4
=

0.3849

=
Compresive stress

0.3149
8979

0.3149 X

100

3.142X

100

0.30
4

0.07

m2
=

2.85

Kg / Cm2

which is quite less than


Provide - M-15 Concrete for shoft with minimum % of steel as per IS - 456
Height of the column - assume above ground 4 m and below ground 1.5 m
Provide nominal ring beam of 25 x 25 cm (M - 15 Concrete) with Reinforce of 12 mm x 2
bar at bottom and 10 mm x 2 bar on top with 6mm stirrup at 20 cm c/c
Foundation - As load is very nominal on each column considering 10 Ton/ Sqmt SBC
Provide column footing of 1m x 1m with 10 mm bar both way at 15 cm c/c
and footing slab thickness of 20 cm
On base slab - M - 10
10 cm thick
Similarly for shoft
Height of shoft above ground - 4 m (assume)
Below ground - 1.5 m
Detailed Scheme Report

Niketan Consultants

Appendix - M

Full circular raft slab of radius 2.3


m
With thickness of slab 20 cm
With nominal reinforce of 10 mm at 15cm both ways. Over sub base slab (M - 10)
10 cm thick
Design of Presettling Tank
A

7.5

Capacity

7.5

486 Cum >

Height

3.6

Sludge

0.3

Free board

0.3

4.5
D

4.5

3.6
480

F
Hence,

4.5
G

7.5

Let us design one bay of


Let us design wall AD

7.5 x

4.5

(Bottom & Verticle height)

7.5

Bottom restrained on all side & sit


But - Top - Free

4.5
L
B

Reffer Table - 3 For b/a

=
x/a

7.5
4.5

4.5

b/a

4.5
3.9

= 1.667 < 2

= 1.154

IS - 3370 - part IV for design of liquid container

1.0
Y=0

Y = b/2

Mx

My

Mn

My

+ 0.009

- 0.016

1/4

+ 0.002

+ 0.011

- 0.005

- 0.023

1/2

+ 0.009

+ 0.013

- 0.006

- 0.029

3/4

+ 0.008

- 0.008

- 0.004

- 0.020

( - ) 0.035

- 0.007

Detailed Scheme Report

Niketan Consultants

x 4
Cum

Appendix - M

For b/a

Detailed Scheme Report

1.25

Niketan Consultants

Appendix - M

Y=0

x/a

Y = b/2

Mx

My

Mn

My

+ 0.015

- 0.029

1/4

+ 0.005

+ 0.015

- 0.007

- 0.034

1/2

+ 0.014

+ 0.015

- 0.007

- 0.037

3/4

+ 0.006

- 0.007

- 0.005

- 0.024

( - ) 0.047

- 0.009

By meter polation between

b/a = 1

& b/a = 1.25

Let us find out co-efficients for b/a = 1.154

For b/a

1.154
Y=0

x/a

Y = b/2

Mx

My

Mn

My

+ 0.0120

- 0.024

1/4

+ 0.0038

+ 0.0134

- 0.0062

- 0.0297

1/2

+ 0.0120

+ 0.0142

- 0.0066

- 0.0339

3/4

+ 0.0068

- 0.003

- 0.00461

- 0.0224

( - ) 0.0423

- 0.0082

Horizontal moment = My wa3


Verticle moment = Mx wa3
w =
wa3

1000
=

kg / cum
1000

a =
x

3.9 3

3.9 m
=

59319

kgm

Let evaluate moment - with application of respective


Co - efficient for b/a = 1.154

x/a

Y=0

Y = b/2

0
1/4
1/2

Mx
0
+ 225.41
+ 711.82

My
+ 747.41
+ 794.07
+ 842.32

Mn
0
- 367.77
- 391.50

My
- 1423.66
- 1761.77
- 2010.91

3/4
1

+ 403.36
- 2509.19

- 177.95
- 486.41

- 273.46
0

- 1328.74
0

Detailed Scheme Report

Niketan Consultants

Appendix - M

- 2509.19

- 486.41

Wall thickness required at base of slab as per IS - 3370

Maximum moment

2509.19

For vertical moment t

C =
b
t

wall thickness

M X
C
X

6
b

M
17

X 6
X b

Tension for bending as per IS-3370 Table C=17


100

cm

wall thickness

Design per
=

100

cm width

2509.19
17

X
X

100
100

X6

=
Say

Wall thickness required at top for


horizontal moment
t

wall thickness

Detailed Scheme Report

cm

30 cm

Maximum moment
1423.66
Kg
2010.91
17

X
X

100
100

X6

= 26.6408 cm
Say

Let us provide thickness of

29.759

27 cm

27 cm

Niketan Consultants

KgM

Appendix - M

Requirment of Reinforcement
Ast

M
0.87

St

M
d
St

For water containe provide cover of

=
=
=

Moment
effestive depth
Tensile strength of steel as per IS-3370 Table for tor
stc,.

5 cm

Therefore steel required for various moment


Ast

x/a

0.87

M X 100
30 5) X

1500

X
100
32625

Y=0

Y = b/2

+ 2.29

- 4.36

1/4

+0.69

+ 2.436

- 1.127

- 5.40

1/2

+ 2.18

+ 2.58

- 1.20

- 6.16

3/4

+ 1.236

+ 0.545

- 0.838

- 4.07

- 7.69

- 1.49

Reinforcement-Vertical
x/a

Innerface

Externalface

1/4

-1.127

+ 0.69

1/2

-1.2

+ 2.18

3/4

-0.838

+ 1.236

- 7.69

Reinforcement- Horizontal
Ast required
x/a
Innerface
Externalface
0

- 4.36

+ 2.29

1/4

- 5.4

+ 2.436

1/2

- 6.16

+ 2.58

3/4

- 4.07

+ 0.545

Detailed Scheme Report

Reinforcement
Dia&space
12 mm at
mmc/c
12 mm at
mmc/c
12 mm at
mmc/c
12 mm at
mmc/c
12 mm at
mmc/c

for
300
300
300
150
150

Dia &Space
12mmat300 mmc/c
12mmat300 mmc/c
12mmat300 mmc/c
12mmat300 mmc/c
12mmat300 mmc/c

Ast provide
Inner space
Outer space
12 mm at 200
10mmat300 mmc/c
mmc/c
12 mm at 200
10mmat300 mmc/c
mmc/c
12 mm at 150
10mmat300 mmc/c
mmc/c
12 mm at 150
10mmat300 mmc/c
mmc/c
12 mm at 150
10mmat300 mmc/c
mmc/c

Niketan Consultants

Appendix - M

Minimum % of steel

30 X

100

100

0.2400

0.3
0.3

(0.3

0.000

7.2

0.35

0.2)

0.8

0.185

0.300 X

0.2400

0.8
0.8
%

Sqcm

Since thickness is more than 25 cm , Half renforcement is provioded on both facess


Minimum renforcement on each faces =
If 12 mm box are =

1131
7.69

2.964

Sqcm

14.7

Hence free bord 30 cm has been also accounted and external face also has been remainded with renforcement of 2.96
Sqcm it is safe to adopted 12 mm at 14 cm C/C .
design of wall AB
Height =

7.5

mt

b
a

7.5
3.9

From table 3

IS

x/a

Length =

3.9 mt

1.923

3370 - part IV
Y=0

Y = b/2

Mx

My

Mx

My

+0.025

- 0.05

1/4

+0.012

+0.022

- 0.01

- 0.052

1/2

+0.016

+0.016

- 0.009

- 0.046

3/4

-0.002

-0.005

- 0.005

- 0.027

-0.074

-0.015

Mx

My

Mx

My

+0.027

- 0.06

1/4

+0.013

+0.023

- 0.012

- 0.059

1/2

+0.015

+0.016

- 0.06

- 0.049

3/4

-0.008

-0.003

- 0.005

- 0.027

-0.086

-0.017

x/a

Detailed Scheme Report

Y=0

Y = b/2

Niketan Consultants

Appendix - M

Y=0

x/a

Y = b/2

Mx

My

Mx

My

+0.0264

- 0.0569

1/4

+0.0127

+0.02269

- 0.01138

- 0.0568

1/2

+0.0153

+0.016

- 0.00969

- 0.048

3/4

-0.0061

-0.0036

- 0.005

- 0.027

-0.0823

-0.016384

Horizantal momemnt = My wa3


Vertical moment = Mx wa3
Moment by applying Co efficent for b/a = 1.923
wa3

=
=

100

3.93

5931.9

Kg

Moment in kg /m

x/a

Y=0

Y = b/2

Mx

My

Mx

My

+1566.62

- 3375.25

1/4

+753.35

+1345.94

- 675.05

- 3369.32

1/2

+907.58

+949.1

- 574.8

- 2847.31

3/4

-361.84

-213.54

- 296.59

- 1601.61

-4881.95

-971.88

wall thickness as per IS 3370


at base for vertical moment

4881.95
=

X
17

100

X6
= 41.5095 cm

100

Say 42 cm

wall thickness as per IS


= 3375.25 at top for horizantal
moment

3375.25
=

X
17

100
100

X6
= 34.5147 cm

Say

35 cm

The wall thickness will be 42 cm at bottom and 35 cm on top with vertical face on water side and batter other side

Detailed Scheme Report

Niketan Consultants

Appendix - M

take average thickness as (

42 +

35 )

38.5

Requriement of steel renforcement


Ast

As

M
0.87

0.87

X
(39

100
5) X

1500

X
(35

100
5) X

1500

X 100
44370

X 100
39150

For vertical moment

For Horizontal moment

Y=0

x/a

Y = b/2

+ 4.0

- 8.62

1/4

+ 1.7232

+ 3.43

- 1.544

- 8.60

1/2

+ 2.076

+ 2.42

- 1.314

- 7.27

3/4

- 0.827

- 0.545

- 0.678

- 4.09

- 11.16

- 2.48

=
Minimum Reinforcement % of steel
=

Average thickness

0.3
0.3

(0.3

0.000

Detailed Scheme Report

0.2)

0.8

0.285

0.300 X

0.240

0.8
0.8
%

38.5
=
=

Ast Minimum

0.35

0.240
100

39X

100

38.5
28.5
9.360

cm

10

cm2

Niketan Consultants

Appendix - M

Vertical Reinforcement
x/a

Innerface

Ast required
Externalface

1/4

- 1.544

+ 1.722

1/2

- 1.314

+ 2.036

3/4

- 0.827

- 11.16

Minimum steel if provided on both face

Ast provide
Inner space
Outer space
12 mm at 300
10mmat250 mmc/c
mmc/c
12 mm at 300
10mmat250 mmc/c
mmc/c
12 mm at 300
10mmat250 mmc/c
mmc/c
12 mm at 100
10mmat250 mmc/c
mmc/c
12 mm at 100
10mmat250 mmc/c
mmc/c
6.74
= 3.37 cm2
2

Horizontal Reinforcement
x/a

Innerface

Ast required
Externalface

- 8.620

+ 4

1/4

- 8.60

+ 3.43

1/2

- 7.27

+ 2.42

3/4

- 4.09

- 2.48

Minimum Reinforcement 3.37

Detailed Scheme Report

Ast provide
Inner space
Outer space
12 mm at 125
10mmat150 mmc/c
mmc/c
12 mm at 125
10mmat150 mmc/c
mmc/c
12 mm at 125
10mmat250 mmc/c
mmc/c
12 mm at 250
10mmat250 mmc/c
mmc/c
12 mm at 250
10mmat250 mmc/c
mmc/c

cm2

Niketan Consultants

Appendix - M

Design of settling tank


If dimension tank modified with 3 Components
6.5

4.5

Capacity of settling tank =

3 X 180

No of units

=
=

540 Cum
2 no

Capacity of each unit

540
2

270

Cum

With average depth of water of 3.25 M


and 0.35 sludge depth

270
= 83 sqm
3.25

surface area of each tank


Each tank is subdivided into 3 compartments of
4.5 X 6.25 M
Total area of tank provided

4.5 X 6.25 X 3 =

=
=

84.375 X 2 = 168.75
More than 166 sqm

Check for surface loading = 3600


= 21.33
< 36
168.8
Each sub tank is designed as per Is 3370- part IV Table 3
For design , it is assumed that the top is free and base and side of wall fixed
Design of walls AE,BF, CG, DH,EI,FJ,GK,KL, will be similar ,
as dimension are same Hence let us design wall AE
b/2
b/2
y

fixed

fixed

Cum/Sqm/Day

84.375 Sqm
Sqm

Hence ok

x
fixed
a = Height of wall
b = Width of wall
w
Density
=
of water

= 3.6m
= 4.5m
= 1000kg/Cum

Horizontal moment = My X wa3


Vertical moment = Mx X wa3
wa3

1000

3.63

46656 kg

b
4.5
=
= 1.25
2
3.6
From table 3 IS 3370 part IV Mx&My Co efficient for b/2=1.25
Detailed Scheme Report

Niketan Consultants

Appendix - M

x/a

y=0

y=b/2

Mx

My

Mx

My

+ 0.015

- 0.029

1/4

+ 0.005

+ 0.015

- 0.007

- 0.034

1/2

+ 0.014

+ 0.015

- 0.007

- 0.037

3/4

+ 0.006

+ 0.007

- 0.005

- 0.024

- 0.047

- 0.009

Horizontal moment = My = wa3,Vertical moment Mx = wa3


x/a

y=0

y=b/2

Mx

My

Mx

My

+ 699.84

- 1353.02

1/4

+ 233.28

+ 699.84

- 326.59

- 1586.3

1/2

+ 653.18

+ 699.84

- 326.59

- 1726.27

3/4

+ 279.93

+ 326.59

- 233.28

- 1119.74

- 2192.83

- 419.9

2192.83

Maximum vertical moment = (-) 2192.83 kgm


Maximum Horizontal moment =(-)1726.27 kgm

Thickness of wall at base for vertical moment

17

x 100 X 6
X 100
Say 28 sqcm

Thickness of wall at top for horizontal moment

1726.27
17

27.81 Sqcm

Provide 30 cm

x 100 X 6
X 100

24.68

Sqcm

Say 25 sqcm
For uniformity , considering thickness difference 5cm
Let us provide uniform thickness of wall of 30 cm
steel reinforcement for vertical moment =
Vertical moment
0.87 x d x 1500
steel reinforcement for Horizontal moment =

Detailed Scheme Report

Horizontal moment =
0.87 x d x 1500

Vertical moment
0.87 X (30-5) X 1500
Horizontal moment
0.87 X (30-5) X 1500

Niketan Consultants

Appendix - M

Vertical moment=

Vertical moment
32625

Horizontal moment =
x/a

sqcm

Horizontal moment
32625

sqcm

y=0

y=b/2

+ 2.145

- 4.147

1/4

+ 0.715

+ 2.145

-1

- 4.862

1/2

+2

+ 2.145

-1

- 5.29

3/4

+ 0.858

-1

- 0.75

- 3.49

- 6.72

- 1.287

Reinforcement required and provioded(Vertical reinforcement)


x/a

Ast required
inner face
External face

Ast provided
Inner face

External face

12 mm At 300 C/C

10 mm at 300 C/C

1/4

-1

+ 0.715

12 mm At 300 C/C

10 mm at 300 C/C

1/2

-1

+2

12 mm At 150 C/C

10 mm at 300 C/C

3/4

- 0.715

+ 0.858

12 mm at 150 C/C

10 mm at 300 C/C

- 6.72

-0

12 mm at 150 C/C

10 mm at 300 C/C

Minimum steel for 30cm thick wall as


per IS 3370 in % =

0.3
=

(0.3 - 0.2)
0.35

X 0.20

X 0.8

0.194 %

Minimum steel required = 0.194


100
If provided on each face of wall =

x 30 x
5.82
2

100

5.82 Sqm

2.91 sqm

Reinforcement required and provioded(Horizantal reinforcement)


x/a

Ast required
inner face
External face

Ast provided
Inner face

External face

- 4.14

+ 2.145

12 mm At 200 C/C

10 mm at 300 C/C

1/4

- 4.862

+ 2.145

12 mm At 200 C/C

10 mm at 300 C/C

1/2

- 5.29

+ 2.145

12mm At 200 C/C

10 mm at 300 C/C

3/4

- 3.34

+1

12 mm at 300 C/C

10 mm at 300 C/C

Detailed Scheme Report

Niketan Consultants

Appendix - M

3/4

- 3.34

+1

12 mm at 300 C/C

10 mm at 300 C/C

- 1.287

-0

12 mm at 300 C/C

10 mm at 300 C/C

Detailed Scheme Report

Niketan Consultants

Appendix - M

Design of Wall

AB,BC,CD,EF,FG,GH,IJ,JK,KL, &

(In respect of walls Ef,FG , GH reinforcement for both the feces provided as per inner face requirement)
b =6.25m
b
6.25
=
= 1.73
a=3.6m
a
3.6
w=1000kg/cum
Horizontal moment = My X wa3 = My X 46656 kgm
Mx & My Co efficients to be obtained from
Co-efficient from table 3 IS 3370 - IV

x/a

y=0

y=b/2

Mx

My

Mx

My

+ 0.025

- 0.05

1/4

+ 0.012

+ 0.022

- 0.01

- 0.052

1/2

+ 0.016

+ 0.016

- 0.009

- 0.046

3/4

+ 0.002

- 0.005

- 0.005

- 0.027

- 0.074

- 0.015

Mx

My

Mx

My

+ 1166.4

- 2332.8

1/4

+ 559.87

+ 1026.43

- 466.56

- 2426.11

1/2

+ 746.49

+ 746.49

- 419.9

- 2146.17

3/4

- 93.312

- 233.28

- 233.28

- 1259.71

- 3452.54

- 699.84

Moment in kg
x/a

y=0

y=b/2

Thickness of wall required for maximum vertical


moment

3452.54
17

x 100 X 6
X 100

=
say

Thickness required for maximum horizontal


moment

2426.1
17

x 100 X 6
X 100

34.9
35 cm

29.26

Sqcm

Say 30 sqcm
Provide uniform thickness of wall of 35 cm for full height
Reinforcement requirement
moment X 100
Ast =
0.87 (36 - 5) 1500
Detailed Scheme Report

Niketan Consultants

Appendix - M

Minimum steel =

0.3

moment X 100
40455

sqcm

(0.3 - 0.2)
0.35

X 0.25

=
35

Minimum steel required =

X 0.8

0.183%
X

100 X 0.18
= 6.41
100

Sqcm

if provided on both face = 3.206 sqm


Reinforcement required
x/a

y=0

y=b/2

+ 2097

- 5.96

1/4

+ 1.43

+ 2.62

- 1.19

- 6.196

1/2

+ 1.9

+ 1.9

- 1.07

- 5.48

3/4

- 0.23

- 0.595

- 0.595

- 3.217

- 80818

- 1.787

Vertical reinforcement
x/a

Ast required
inner face
External face

Ast provided
Inner face

External face

12 mm At 240 C/C

10 mm at 250 C/C

1/4

- 1.19

+ 1.43

12 mm At 240 C/C

10 mm at 250 C/C

1/2

- 1.07

+ 1.9

12 mm At 120 C/C

10 mm at 250 C/C

3/4

- 0.595

12 mm at 120 C/C

10 mm at 250 C/C

- 8.818

12 mm at 120 C/C

10 mm at 250 C/C

For Horizontal Moment


Ast required
x/a
inner face
External face

Ast provided
Inner face

External face

- 5.96

+ 2.97

10 mm At 130 C/C

10 mm at 250 C/C

1/4

- 6.196

+ 2.62

10 mm At 130 C/C

10 mm at 250 C/C

1/2

- 5.48

+ 1.9

10 mm At 130 C/C

10 mm at 250 C/C

3/4

- 3.217

10 mm At 260 C/C

10 mm at 250 C/C

- 1.787

10 mm At 260 C/C

10 mm at 250 C/C

Detailed Scheme Report

Niketan Consultants

Appendix - M

Detailed Scheme Report

Niketan Consultants

Appendix - M

Base Slab Design


Case :- 1
(2 component of 4.5x7.5)
Short wall = length 4.5m ,height 3.9

0.3m
0.3m free board

W1 3.6
W3
0.65
wh
W2

0.3 M

1.95

= 3.6 +
= 3.9
Assume Base width
=

0.3
0.5 x

= 0.5 x 3.9
Assume thickness of base slab as 30cm

= 1.95 m

(Width of base slab between 0.5 to 0.6H. Without slab &base)


Width of toe b/3 or b/6
= 1.95
= 0.654
3
Assume thickness of slab is 30 cm
Check stability against overturning
Take moment at -"A"
Sl.no
1

Force Kg
w1 =

0.3

3.9 x

2500

Lever arm in m
=

2925
=

w2 =

w3 = 1.15 x

0.3

x 1.95 x
3.6

2500
1000

Detailed Scheme Report

+2340

Kg m

###

Kg m

1462.5

0.8
0.975

3600

1.45

+5220

-2192.83

Moment at base due to water pressure

SW

Moment on Kg m

7957.5

SM =

Kg m
m

+6793

Niketan Consultants

Appendix - M

6793
7987.5
=

b
2

= 0.85045

b/6= 1.95
6

X =

1.95
2

0.325

0.850

>

0.125

0.975

- 0.85 =

0.125

Hence safe

Maximum pressure at toe

7987.5
1.95

1+

6 X 0.125
1.95

= 5671.59

Kg/Sqm

Maximum pressure at heel

7987.5
1.95

1-

6 X 0.125
1.95

= 2520.77

Kg/Sqm

Minimum BM at toe =

5671.59

Maximum BM at heel =

2520.77

Thickness of base slab as per =


IS 3370

0.65 )2
2

1
2

)2

1230
X 6 X
17 X 100

1198.12

Kg m

1260

Kg m

100

21

Cm

But provide 30cm thickness Hence safe


1198 x
0.87 (23 -

Ast for toe =

100
5)

1500

3.67

Sqcm

Provide 12 mm at 25 cm C/C at Both way

Minimum steel =

0.3

(0.3 0.2)
X 0.20
0.35
=

Minimum steel required =

30

X 0.8

0.194%

X 100 X 0.194
=
100

5.8

Sqcm

This to be provided on both faces i.e. bottom & top minimum each face=5.8/2 = 2.9 sqcm
i.e. 10 mm at 25 C/C both ways

Detailed Scheme Report

Niketan Consultants

Appendix - M

1260 X
0.87 (30 -

Ast for heel =

100
5)

1500

= 3.860

Sqcm

Provide 12mm at 25 cm C/C both ways bottom & base slab and 10mm 25 cm C/C both ways at top of base slab
Design of base slab for Long wall i.e. 6.25 m
0.35m
0.3m free board

Height of wall = 3.9 m


Width of base slab = 0.5H to 0.6H
= 0.50 X 3.9

W1

3.6
= 1.95
W3

0.65

Height of water = 3.6 m


W2

0.3 M

length of toe = b/3 = 1.95/3 = 0.65 m


Assume thickness of base slab = 30 cm

1.95

Check for stability when water is full & no soil out side
Sl.no
1

Force Kg
w1 =

0.35

3.9 x

Lever arm in m

2500

3412.5
=

w2 =

w3 = 0.95 x

0.3

x 1.95 x
3.6

2500
1000

b
2

b/6= 1.95
6
Maximum pressure at toe =

Detailed Scheme Report

8295
1.95

Kg m

###

Kg m

1462.5

3420

1.475

+5044.5

Kg m

-2452.4

SM=

+5833.3

= 7811.36

Kg/Sqm

8295

5833.3
8295

X =

+2815.3
0.8
0.975

Moment at base due to water pressure

SW

Moment on Kg m

0.703231 M

1.95
2
0.325

0.703

>

0.2718

1+

0.272

Hence safe

6 X 0.2718
1.95

Niketan Consultants

Appendix - M

8295
1.95

Maximum pressure at heel =

Minimum BM at toe =

7811.36

Maximum BM at heel =

677.63

Thickness of base slab as per IS =


3370

1-

6 X 0.2718
1.95

= 677.63

Kg/Sqm

0.65 )2
2

1650.14

Kg m

0.95 )2
2

305.78

Kg m

1650.14 X 6 X
17 X 100

100

24.13 Cm

But provide 30cm thickness Hence safe


Ast for toe =

1650
x
0.87 (30 -

5)

100

Ast for heel =

678
x
0.87 (30 -

5)

1500
100
1500

= 5.05

Sqcm

= 2.07

Sqcm

Minimum steel 30 cm thick base slab = 5.80 sqcm


on both faces = 2.90 sqcm
.' .
For toe at bottom 12 mm at 20 cm C/C both ways
at top 10 mm at 25 cm C/C
For heel at bottom & top 10mm at 25 cm C/C
For central portion of slab
Provide 20 cm thick slab and minimum reinforcement of 2.5 sqcm both way
i.e. 10 mm at 25 cm C/C on both face & both ways.
Design for in let channel and out let channel
Raw water channel from aerator to settling tank
Q = 180 cum/hr = 0.05 Cum / sec
V = 0.30 mt/sec
0.05
= 0.166 Sqm
0.3
Provide channel size of 75 cm (wide)
and depth of channel = 0.166
= 0.22
Cm
0.75
Considering 20 cm free board
Total depth of channel = 22+20 = 42 cm
Provide channel size 0.75 m X 0.42 m (with free board of 0.2mt)
assume = Area =

42 CM

10
CM

0.75m

20 CM FREE BOARD
20
cm

10 CM

0.22m
10 CM

0.87

Depth of water in the channel = 22 cm


Detailed Scheme Report

Niketan Consultants

Appendix - M

Assume thickness of cantilever slab = 15 cm


Assume thickness of side wall = 12 cm
Dead load of slab = 0.15 X 0.97 X 2500
=
Per running m
Dead load of vertical wall = 0.12 X 0.42 X 2500
= 126 kg
BM at support point = 363.75 X
=

363.8 kg

0.97
+ 126
2
363.32 Kgm

Thickness of wall =

X (0.97-0.06)

363.32
X 6 X
17 X 100

Steel reinforcement =
=

0.87

100

11.32 Cm

363.32 X 100
(12 5) 1500

3.09

sqcm

Minimum reinforcement = 0.3 X 12 = 3.6 Sqcm


Provide 10 mm tor at 20 cm C/C
Distribution 8mm tar at 20 cm C/C
Vertical wall minimum reinforcement = 10 X 100 X 0.3
100

3.0 sqcm

Provide 10 mm at 25 cm C/C
Distribution 8mm at 20 cm C/C
Similarly for channel on inner face
Let 7.5 cm dia orifices at 17.5 cm C/C in vertical wall on inner side provided at height of 10 cm from floor level
in such way that top level of pipe matches with full storage level of settling tank
At in of 2 cantilever wall over vertical wall of settling tank provided a beam of 20cm X 30cm
with 6 bars of 12 mm dia and 8mm stirrups at 20cn C/C

Detailed Scheme Report

Niketan Consultants

Appendix - M

Design of Raw Water Tank


Capacity of tank = 450 cum
A) With 3.6m Tank height ,Dia of Tank =12.75m
With 0.3m Free board
Dia =12.75m,
Water depth =3.6m
Free board =0.3m

0.3M

Free board

3.6M
12.75M
Circular Tank

Material proposed
M-20 grade concrete and Tor steel Fe-415 N/Sqm
Thickness of side wall
1) Minimum =15 cm
2) 3cm per M depth + 5cm
= 3
x
Adopt -20 cm thick wall

3.9

5=

16.7cm

The tank wall is free at top and fixed at base as base slab and side wall are cast
integral to each other.To give good bond between side wall and base slab , a haunch
of 30 cm height and width also proposed.
t
D=12.75M
3.9M

H
t=20cm
H=3.9mtr
W=1000kg
D=12.75mtr

wH
Base
circular wall
For

3.92
H2
=
Dt
12.75x.20

Ring Tension
=

5.96

Say6.0

Refer IS - 3370 - Para IV Tab Table - 9


Case I
Critical condition When Tank is full & no soil out side
P = wh =
1000x3.9
= 3900kg./sqm
Maximum hoop tension = Co efficient x wH x D
2
For,
H2

= 5.96
Dt
Maximum Hoop Tension occurs at 0.6H as per table 9
Co efficient = +0.514 (For0.6)

Detailed Scheme Report

Niketan Consultants

Appendix - M

Maximum Hoop tension

0.514 x 1000 x 3.9 x 12.75


2
12779.325 kg.

T =
Ast = T

12779.325

sst

8.519cm2

1500

Ast Min =

0.3 -

0.30 -

0.2

X 0.1

0.35

Minimum steel required =

20 X

100

2.172

8.519
2

Now Hoop tension at both


=
faces of wall

Spacing of bars on both faces using 12


mm tor steel bar

0.2171
100

.
if provided on both faces

0.8

0.2171 %

4.342

cm2

cm2

4.260 cm2

1.131

X
4.259

100

26.56 cm

Provide 12mm bar at 25cm c/c in (Ast provide 9.04sqcm)the form of horizontal rings up to 3.1m from
top of wall
Hoop tension at 0.2H that is 0.78 from bottom
=
=

0.234

1000

5818

kg/Sqcm

3.9 X 12.75
2

from table - 9

Ast =

5818
1500

3.88

cm2

And bottom 0.8m provide 8mm at 20cm c/c on both the faces.
Minimum Ast provided
=
5 cm2
> 4.34
cm2
Check for tensile stress on concrete
Equivalent - area

100

2000 +

Tensile stress in concrete

20

(13 -1) X

108.48
=

9.04
2108.48

12779
2108.48

cm2

6.06 Kg/cm2

<

12 Kg/cm2

Hence safe
Design for BM
Refer Table 10 of IS - 3370 Page IV
H2
for
= 5.96
Say 6
Dt
Maximum (-) Ve BM Occurs at 1.0H & Co-efficient
Detailed Scheme Report

(-) 0.0187
Niketan Consultants

Appendix - M

Moment

= Co-efficient x w x h3

Detailed Scheme Report

Kgm

Niketan Consultants

Appendix - M

0.0187

0.0187

1000

59319

Maximum (+)Ve BM
Occur at 0.7H & Co-efficient = +
Moment

0.0051

3.9

1109.27

Kgm

0.0051
59319

302.53 Kgm

Thickness of wall required for (-)Ve BM

1109.27 X
17 X

19.79

100 X
100

cm

Provide 20cm Hence safe


Ast for (-) BM

Ast for (+)Ve BM

0.87
=

1109.27
X
100
(20 5) X 1500

0.87

= 5.666769 cm2

302.53
X 100
(20 - 5) X 1500

Minimum steel to be provided

4.344

1.545 cm2

cm2

Vertical bar inner face, 10mm tor at 12.5cm c/c


Up to 2m height - from bottom and later curtail alternate bar.
Provide 8mm tor at 30cm c/c on outer face of wall as vertical reinforcement.
Check for Shear
Shear force at base when the tank is full and no soil outside =

1000
=

Shear Stress

=
100

% of steel provide =

3900
0.87
0.785 X
12.5

X
100

15

3.9

3900

Kg/m

0.419

2.9885 Kg/cm2
1
15

6.28
15

Permissible shear stress as per IS - 456 - for M-20


for 0.25%
2.2 Kg/cm2

for 0.50%
for 0.418%

=
=

Detailed Scheme Report

3.0
2.2
2.2

+
+

Kg/cm2
(3

-2.2)
0.25
0.5376

X
=

0.168
2.7376

<

2.9885

Hence not safe

Niketan Consultants

Appendix - M

Hence provide haunch of 50cm

50 cm at bottom
(50+20=70)

Shear stress

=
100X

3900
0.87X

65

0.6897

Kg/cm

Hence Safe

If we re assess shear force at 3.4m for top.


Shear stress

=
100X

3400
0.87X

15

2.61 <

2.7376

Hence Safe

Check for hoop compression on wall


When there is soil pressure from out side and no water inside
Assume, soil - slope (Angle of repose as 20O)
and density of soil as 2000 Kg/cm2

Hoop compression (P)

=
=
=
Hoop compression

Hoop Stress in concrete

Soil X h X

2000
2000
3822

P X Def =
=

1-Sin
1+Sin

X 3.9 X

f
f

1-Sin 20O
1+Sin 20O

X 3.9
Kg/Sqm

0.49

3822

X(

12.75

50259.3
=
100 X
20

25.13

0.2 X 2.0) =
<

Kg/cm2

50

50259.3 Kg

Kg/cm2

Hence safe
Concrete alone takes the hoop compression
However ring reinforcement provided for hoop tension ,meets minimum steel requirement.
Design of Base slab
Criteria
Top width =
Bottom width =
of baseslab

20cm Minimum
between 0.5 to 0.6H

Toe projection
Now
Assume
b

Toe =

H=

H
6
b

Detailed Scheme Report

3.9

0.5 H

H
6

1.95

b
3

=
=

3.9
6

or

3.9 X 0.5
1.95
=

0.65

0.65

Niketan Consultants

Appendix - M

3
Assume thickness of base slab as

Detailed Scheme Report

0.65

30 cm

Niketan Consultants

Appendix - M

Taking moment at point - "A"


Sl
No

Lever arm in
Moment in Kg m
mtr

Force (Kg)

1 W-1

0.20 X

3.9

2500 =

1950

0.65

1267.5

2 W-2

0.30 X

1.95

2500 =

1462.5

0.975

1425.93

3 W-3

1.10 X

3.6

1000 =

3960

1.4

5544
###

Moment due to water


Pressure at base

--

Sw =
X

e =

b
2

7372.5

7128.17
7372.5

S M

Kg

1.95
2

(-) 1109.26
=

(+)

7128.17

0.97

0.97

0.005

b
6

<

0.325

Hence safe
Pressure at toe =

7372.5
1.95

7372.5
1.95

7372.5
1.95

7372.5
1.95

3780.8

=
Pressure at heel =

Net pressure at heel = (

1.015385

0.99

3742.99
=

3437.48 Kg/cm2
6 X
0.005
1.95

0.015
3742.99
3600

Kg/cm2

up ward

BM at toe =

3437.48

X
2

0.65

BM at heel =

142.99

1.1
2

Detailed Scheme Report

=
-

142.99

6 X
0.005
1.95

726.17 Kgm

86.51 Kgm

Niketan Consultants

Appendix - M

726.17

Thickness of base at toe =


=
Provide =

30 cm

>

Ast require for Toe =

16

726.17
X
X(
30 0.3

= 0.102857
= 30 X

100

Hence safe

Ast minimum required =

Area of steel

6 X
100

cm

16

0.87

X
17 X

100

100
5 )X
(0.3

1500

0.2)
0.35

2.226 Cm2

0.2

X 0.8

%
0.1029
100

3.087

Cm2

Ast on each face =


2.916 Cm2
Provide 10 mm at 20 cm c/c on both faces of slab.
Distribute steel - 8mm at 20cm c/c
For central portion of base slab provide nominal thickness of 20cm. With minimum steel on both faces that is
bottom and top.
Ast Min =

0.3
6.000

(0.3

0.35

0.2) X

0.1

0.8X

20

Cm2

Reinforcement on each face =


2.176 Cm2
Provide 8mm at 20cm c/c both way in 2 layer (Top and Bottom)
Ast pressure =
5 Cm2
agwsh
4.352

Cm2

Horizontal ring bar above 0.78m


from bottom 12mm @25 c mc/c
10 mm bar@ 12.5 cm upto 2 M height
later on alternative bar c urtailment

vertical 8mm bar


@30cm c/c

Horizontal ring bar


8mm @ 20 cm c/c

Horizontal ring bar up to 0.78m


from bottom 8 mm @20 c mc/c
12 mm Dovel bar for haunch
@25 cm c/c

Ha unch

Top & bottom(ring bar of base slab)


10 mm @ 20 cm c/c

Reinforc ement central portion


8 mm @ 20 cm c/c both ways
@ Top & bottom

Distribution bars 8mm @ 20 cm c/c

Detailed Scheme Report

Niketan Consultants

Appendix - M

Detailed Scheme Report

Niketan Consultants

Appendix - M

Design of slow sand filter

Design of wall (Circular tank)


Dia =
16 mt
Thick ness of circular wall should not be less than the following.
I) 15 Cm
ii) 30 mm per mt height + 50 mm =
141.5 mm
For 3 m Deep tank wall
Provide thickness of wall =
20 Cm
The wall is fixed at base and free at top
.' .
H2
(3.04) 2
=
= 2.888
Dt
16 X 0.2
Critical condition ,when tank is full of Water and no soil out side
Refer IS -3370,Part IV-1967 , table no 9
for

H2
Say 3.0
= 2.89
Dt
Maximum hoop tension occurs at 0.50H from top
Minimum hoop tension (T) = Co efficient X Wh X R
= 0.362

1000

3.04

16
2

= 8803.84 kg
Area of steel required for hoop tension

Ast on each face =

Detailed Scheme Report

5.8692
=
2

2.9346

8803.84
1500

5.8692

Sqcm

Sqcm

Niketan Consultants

Appendix - M

Ast minimum required


For tor steel =

=
I,e On each face =

0.3

(0.3 0.2)
0.35

4.34

0.1

0.8

20

Sqcm

2.172

Sqcm

provide 10 mm at 25 Cm C/C on both the faces(Circular rings)


Ast provide =
7
Sqcm >
5.869 Sqcm
Check for tensile stress in Concrete
Equivalent area of concrete =
100 X 20
+( 13 - 1
=

2000

2084

Sqcm

Tensile stress in concrete =

8803.8
2084

)X 7

84

= 4.224

Kg/Sqcm <

12 kg/sqcm

Hence safe
Design for BM
(Refer table 10 of IS - 3370-part IV - 1967)
Maximum BM occurs at base
BM =

Co efficient X W X H3 Kgm

H = 3.04 M

W = 1000 Kg/Cum

= Co efficient X 1000 X 3.043


Co efficient x
H3
Dt

Co efficient for
Maximum (-)BM =

28094

2.888

0.0333

Say 3.0

is 0.333

28094

= 935.5302 Kgm
Maximum (+)BM at 0.60H
=

Detailed Scheme Report

0.0097

28094

= 272.512 Kg/m

Ast for - BM =

935.54 X
0.87 (20 -

100
= 4.77
5) 1500

Sqcm

Ast for + BM =

272.51 X
0.87 (20 -

100
= 1.39
5) 1500

Sqcm

Niketan Consultants

Appendix - M

Provide 10mm tor at 15 cm C/C on inner face of wall on vertical bar for (-) ve BM and 8mm Tar at 15 Cm
C/C on outer face of wall on Vertical bar for (+)ve BM

Detailed Scheme Report

Niketan Consultants

Appendix - M

Check for shear at base


refer table 11 of IS 3370 part IV
Shear at beam for

H2
Dt

= 2

Coefficient

= +

0.299

H2
Dt

= 3

Coefficient

= +

0.262

H2
Dt

= 3

Coefficient

0.262

=
Shear force at base

X
=

-0.002 X

Shear stress =

2722
100 X (20 - 5)

( 0.299 1

0.3 )

X 0.88

-0.002
Kg

WH2

1000

3.042

2722

1.814

Kg

Kg/sqcm

<

2.7

Kg/sqcm

Hence safe
% of Steel provided

= 5.83 +
3.33
20 X 100

Permissible shear stress for M -20

2.70

Concrete with 0.458 % of steel

0.46%

Kg/sqcm
Hence safe

Check for hoop compression on Wall


Critical load condition
When tank is empty & outside saturated soil
Intensity of earth pressure = p
density of Saturated soil =
Angle of repose =

2000 Cum

2000 X 2.85

1 - sin 20o

20o

height of soil out side Assume =

Hoop compression =

p X

2.85m
D
2

= 2793 x

16
2

2793

= 22344

kg/sqm
kg

Compressive stress developed due to the hoop Compression of 1 M height and 20 cm thick wall
=

100

22344
X 20

11.45

Kg/sqcm

<

50

Kg/sqcm

Hence safe

Detailed Scheme Report

Niketan Consultants

Appendix - M

Design of base slab


Assume
Thickness of base slab thickness as 30 cm Critical condition ,no soil out side and in side water up to FSL
and slow sand filter media.
Water Depth = 2.74 m
Filter media = 1.74 m
0.2m
Total depth = 3.04 m
0.3m free board
Density of saturated filter media = 2000 kg/Cum

W1 2.74 m
W3 1.74M

Effective media

0.3m
W2

0.3 M

1.5M
Width of base slab = 0.50 to 0.6H
Say
= 0.50 X 3.04 = 1.5 M
Toe = H/6 or B/3
Toe width = 1.5/3 = 0.50
But provided toe width = 0.3 M
Taking moment about point 'A'
Sl
No
1 W-1

0.20 X 3.04 X 2500 =

1520

0.65

912

2 W-2

0.30 X

1125

0.75

843.75

3 W-3

2.74 X

2740

2740

W-4
4

Lever arm Moment in Kg


in mtr
m

Force (Kg)

1.5 X 2500 =
1

X 1000 =

1.74 X 2000-1000
Moment due to water
Pressure at base

Sw =

7125

1740

1740

--

(-) 935.53

S M =

Kg

5300.22

e = b/2 - x = 1.5/2 - 0.743 = 0.75 - 0.743 = 0.007


e = b/2 = 1.5/6 = 0.25 > 0.007
Maximum pressure at toe

=
=

Maximum pressure at heel


Detailed Scheme Report

7125
1.5
4883

Hence safe

6 x 0.007
1.5

6 x 0.007
1.5

kg/Sqcm

7125
1.5

Niketan Consultants

Appendix - M

=
BM at toe =

BM at heel =

4617

Kg/sqcm

4883

X
2

0.32

4617

X
2

12

= 219.73 kgm

= 2308.5 kgm

The thickness of base slab required as per IS-3370

2308.5 X 100 X 6
17 X 100

= 28.54
But provide 30 cm Hence OK
Ast at toe =

219.73
X
100
0.87 (30 - 5) 1500

= 0.66

Sqcm

Ast at heel =

2308.50 X
100
0.87 (30 - 5) 1500

= 7.07

Sqcm

Minimum steel as per IS 3370 = 5.832 Sqcm


On each face i.e. top bottom = 2.916 Sqcm
Provide 12mm at 15 cm C/C at bottom of slab along the length
Provide 10mm at 30 cm C/C at bottom of slab across the length
Provide 10mm at 20 cm C/C at top of slab along the length
Provide 8mm at 20 cm C/C at top of slab across the length
Central portion provide 20cm thick slab with minimum reinforce of 0.1944 %.
I,e 10mm at 30 cm C/C at both faces with 10mm at 30 cm C/C at both face on distribution bars
Design of inlet chamber

standard sand density =


Angle of repose = 15o
Sand pressure p =
=
b
1.2
=
a
1.74

2000

2000 X

y=0

1 - sin 15o
1 + sin 15o

0.68

b
=
2

0.6

y=b/2

Mx

My

Mx

My

+ 0.004

-0.007

1/4

'+ 0.001

'+ 0.008

- 0.002

-0.01

1/2

'+ 0.005

'+ 0.010

-0.003

-0.017

3/4

'+ 0.007

'+ 0.007

-0.003

-0.013

Detailed Scheme Report

1.74

2047 kg/sqm

From table 3 of IS - 3370


Part IV-1667
Moment coefficient for
x/0

kg/Cum

Niketan Consultants

Appendix - M

3/4

'+ 0.007

'+ 0.007

-0.003

-0.013

'- 0.024

'- 0.005

Detailed Scheme Report

Niketan Consultants

Appendix - M

I.e Maximum vertical moment =

0.24 X W X h2
= 0.24 X
2047
=
149 Kg m

Maximum Horizantal moment =

(-)

0.017 X

1.742

2047 X

1.742

100 X
X 100

105.35 kg m

149
Thickness of wall required in Cm =
=

7.25

x
17
Cm

Provide thickness of wall as 15 cm


Ast required =

149
X
100
0.87 (15 - 5) 1500

Ast at toe =

= 1.14

Sqcm

Ast minimum =
3.40 sqcm
Provide 8mm at 15 cm vertical bar and 8mm at 20 cm horizontal bar
Ast provided =
6.60 sqcm > 3.40 sqcm
Design of out let chamber
b
a

1.5
3.65

= 0.41

Manual co efficient as per IS - 3370 table-3 part IV


wh = 1000 X 3. 605 = 3605
x/a

y=0

y=b/2

Mx

My

Mx

My

+ 0.001

-0.002

1/4

0.001

0.005

- 0.001

-0.004

1/2

+ 0.002

0.006

-0.002

-0.009

3/4

+ 0.004

0.006

-0.001

-0.007

- 0.015

-0.003

minimum vertical moment =

0.15 X

3605

X h2

= 0.15 X

3605

X (3.605)2

= 702 kg m

702
Thickness of wall required in Cm =

Detailed Scheme Report

x
17

100 X
X 100

= 15.7

Niketan Consultants

Appendix - M

provide thickness of wall =16 Cm

Detailed Scheme Report

Niketan Consultants

Appendix - M

702
X
0.87 (16 -

Ast for vertical moment =

3.4

100
= 4.89
5) 1500

Sqcm

Sqcm

Provide 10 mm tar at 15 cm C/C inner side and 30 Cm C/C on outer side


Ast provided = 804 Sqcm > 5.40 Sqcm
Ast for horizontal moment =
421.65 X
100
= 2.937 sqcm
0.87 X 11 X 1500
Provide 8 mm at 15 cm C/C on inner side
8 mm at 30 cm C/C on outer side

Detailed Scheme Report

Niketan Consultants

Appendix - M

Design of Pure water SUMP


Storage Capacity
=
430 Cum
Circular tank With Average Water depth of
.' .

Surface area of tank =

Dia of tank

430
3

143.33

as planed

143.33

Sqm

3.142
Provide

14

13.51

m tank

0.30mt Free board

14.00 m
3.0mt

Design of top dome


Thickness of the dome normally varies between 10 Cm to 15Cm .
For our design let us adopt 15 Cm thick dome,
Loads
Self weight of dome =
0.15
X
2500
Live load

375

Kg/Sqm

150
525

Kg/Sqm
Kg/Sqm

Total
1
1
to
4
6
Radius of dome can be calculated by equation

Rise of dome =

D
2

r (2R-r) =
2.3333

2R =

2.333

Of span

r
R
D
=

=
=
=

14
6

2.33333

Rise
Radius of dome
Dia of tank
14

22

+
2.33

11.7

2.33

mt

SAY 11.70 mt

Detailed Scheme Report

Niketan Consultants

Appendix - M

Sin f

D/2
=
R

7
11.70

=
f

0.598
36o

38'

<

50o

Hence dome is under compression


Use M20 Grade Concrete,Steel-Fe 415

s cbc
s st

Permissible stress in concrete .

Hoop stress at any angle given by

Maximum hoop stress occurs when


Maximum hoop stress =

525

=
=
=

WR

20475
2.0475

Kg/Sqcm

1500

Kg/Sqcm

(Cos f2
t(1

+ Cos f
+ Cos f)

1)

+
1

<

12

0o
11.7
0.15

or

70

1
+

kg/Sqm
kg/Sqcm

kg/Sqcm

(Even if thickness of dome slab is taken as 10 cm then stress work out 2.36kg/Sqcm )
Maximum meridional stress occurs at 36o 38'

=
=

525

12

WR

1-

0.15

Cos

(1-

Cos

f)

Sin

36o38'

0.8

(Sin 36o38')2

525

X 12
0.15
= 23728.81

( 0.598 )

kg/Sqm

= 2.3728

kg/Sqcm

<

12

kg/Sqcm

Hence safe
If thickness of dome slab taken as 10 cm then Stress work out to 2.71 Kg/Sqcm < 12 kg/Sqcm)
Hence to make it more safe 15 cm thick dome slab has been adopted.
0.3
0.2
0.3
X
0.05
(
)
0.35

Minimum % of Steel =

Ast

0.23

=
X

0.23%
100
100

15

3.45

X 0.8

Sqcm

Hence minimum Reinforcement of 0.23% of gross sectional area is provided


Provide 10mm Dia at 20cm c/c(Ast provided 3.925 Sqcm) in each principal direction.
Design of Ring beam
Meridional thrust per M length

23728.81

15
100

3559.32

kg/M

the ring beam to resist the horizontal component of meridional thurst at the end of the dome.
The ring beam is subjected to hoop tension.
Detailed Scheme Report

Niketan Consultants

Appendix - M

Horizontal Component of meridional thrust

Detailed Scheme Report

Cos f

Niketan Consultants

Appendix - M

=
=
Hoop tension

D
2

=
=

Provide beam size(assumed)

3559.32 X Cos 36o80'


2941.6471694 Kg/M
14
2941.6471694
X
2
20591.530186
Kg

45
X
35
Cm
20591.530186
=
=
13.074
1575
For beam minimum reinforcement as per IS_456-1978 page no 71 - Class 25.5.1.1

Ast required

Minimum reinforcement for beam

=
As
bd

As
=

0.85
fy

As
b
d

=
=
=

Minimum area of reinforcement


Breadth of beam
Effective depth

fy

Characteristic strength of Reinforcement in N/Sqmm

This should not be greater than maximum Reinforcement

Minimum reinforcement

As

0.04
0.85

Ac =

=
45

bd

0.85

3.226

X 45 X
415

15.71
35

Tensile stress in concrete =

Sqcm

1884.96
Sqcm

2199.12

>

13.074

(13 - 1)

Sqcm

X 15.71 =
20591.53
1763.5

1763.52

Kg/Sqm

11.68kg/sqcm

<

12 kg/Sqm

Hence safe
Minimum Shear reinforcement
As per IS-456-1975 Class 25.5.1.6
Minimum shear reinforcement

Asv
bsv

Asv

0.4
fy

= Total cross sectional area of stirrups legs effective in shear

sv
b

= stirrup spacing along the length of the member


=
Breadth of beam

fy

Detailed Scheme Report

35

314.16
Ast =

Area provided

bd
X
fy

providing 20 mm dia Tor 5No

Sqcm

Characteristic strength of the stirrup reinforcement in N/ Sqmm which shall not be taken greater than 415
N/Sqmm

Niketan Consultants

Appendix - M

Sv

Asv X
0.4 x

fy
b

If we adopt 8mm Two legged stirrup .

Then spacing Sv

X
0.4

0.5
X

X
45

415

23.06

Cm C/C

Hence provide 8mm Stirrup at 225 mm C/C

Design of Circular wall


Material to be M 20Grade concrete
Tor steel Fe 415 N/Sqmm
Thickness of wall shall not be less than
(I) 15Cm(minimum)
(ii) 3Cm per M depth + 5Cm =14Cm
Adopt 20Cm thick wall
As the roof dome is designed on Membrane theory , the tank is assumed free at top and fixed at base
H2
Dt

32
14

0.2

3.21

Refer IS 3370 part IV table 9


Case 1
Critical condition when tank Is full, No soil out side
P = wh
=

Maximum hoop tension for

Detailed Scheme Report

1000
H2
Dt

3000

3.21

Kg/Sqm
=

Coefficient

WXH

D
2

Niketan Consultants

Appendix - M

.
Maximum hoop stress accures at 0.5H

Detailed Scheme Report

Niketan Consultants

Appendix - M

By inter pollution

H2
Dt

3.0

Coefficient 0.362

H2
Dt

Coefficient 0.429

Coefficient for hoop tension =


For

H2
=
Dt

(0.429 -

0.362)

0.210

0.000

3.21

Maximum hoop tension

Ast =

0.362 +

s st

0.000

kg

Ast minimum

provided on both face

10

1500

Ast Minimum %

Spacing of 10 mm dia bar

0.00

20 X
=

0.00
2

0.7854

100 X

=
X
25

14
2

Sqcm

( 0.3 0.35

0.3 -

1000 X

0.2 )

0.000000
100

0.1

X 0.8 =

0.00 Sqcm

0.000000

on both face 2.17 Sqcm

0.00 Sqcm
100

###

3.14 Sqcm

Provide 10mm dia bar at 25 cm C/C on both faces in the form of horizontal ring up to 2 M from Top (Steel provided
6.28 sqcm)and provide 8mm Dia tar at 20 cm C/C both faces up to 1m Height from bottom(Ast provided 5 sqcm)
The minimum Ast provided from both portion =
2
X5
X 0.5
= ### >

0.00

Check for tensile Stress in Concrete


Equivalent Area

100 X

Tensile stress in concrete

Detailed Scheme Report

20
=

+ (13

-1 )

6.28

0
2075.36

0.00

2075.36 Sqcm

Kg/Sqcm

<

12 Kg/Sqcm

Niketan Consultants

Sqm

Appendix - M

Design for Bending Moment


Refer table -10
Maximum
-Ve BM
for

H2
Dt

Co efficient X W X H3

= 3.21

(0.0333 -

0.0268 +

0.0268)

0.210

0.00000

0.210

0.00000

From Table 3.0


=
Maximum +Ve BM

0 X

1000 X

0.0

33

KgM

Occurs at 0.6 H
=

Co efficient X W X H3

(0.0097 -

0.0077 +

0.00000

Thickness of Wall required for (-) BM


Required as per IS 3370-Part iv

0.0077)

1000

33

Kg/M
0 X
100 X
17 X 1500

0.00

Cm

Provide thickness of wall 20 cm > 0.00 Cm


Ast for (-) Ve BM

Ast for +Ve BM


Minimum % of Steel

0.0
0.87

X
(20 -

100
5 ) X 1500

0.00 Sqcm

261.9
X
0.87
(20 -

100
5 ) X 1500

1.34 Sqcm

0.00

Sqcm
& on each face

Sqcm

Provide 10mm Tor steel at 15cm c/c on inner face as vertical reinforcement from base and curtail alternate
bar above 1.5m and provide 8mm tor at 30 cm c/c on
=
outerface wall as vertical bars.
Ast provide

6.91

>

Sqcm

4.34

Sqcm

Check for Shear


Shear force at base when tank is full and no soil out side
P

Shear stress

=
0.87

% of Steel provided
Detailed Scheme Report

3000
100 X( 20 -

5)
6.91
15

1000 X 3.0 =

=
x 100
x 100

3000

Sqcm

2.299 Kg/Sqcm

0.46 %
Niketan Consultants

Appendix - M

Detailed Scheme Report

Niketan Consultants

Appendix - M

Permissible shear stress for


As per IS 456

0.46%

of steel
###

2.2 +
=

2.2 )
0.25

X 0.21

2.00

>

Kg/Sqcm

2.299

Kg/Sqcm

Hence Safe

when no water inside and soil is outside


the earth pressure from out side cause hoop compression
P=

Assume =
Angle of repose =

2000

rst =

1- sin
1+sin

rst X h

Saturated density of soil =

2000

Kg/Cum

20o
X

Hoop compression

1- sin 20o

( 1+sin 20o

= P

X (

2941.88 X (

=
Compression stress developed
due to hoop compression

)=

6000 x

1 1 +

0.342
0.342

2941.88 kg/Sqm

D + 2t)

2941.88 x
=

14 +

2x

14.4

42363
100 X 20

0.2 )
42363.072
=

21.18

kg
Kg/Sqcm

<

50

Kg/Sqcm

Hence concrete alone takes the hoop compression


Minimum % of steel already provided
Hence safe
Design of base slab

Hence safe

Detailed Scheme Report

Niketan Consultants

Appendix - M

Detailed Scheme Report

Niketan Consultants

Appendix - M

Check stability

(Considering water inside and no soil outside)

Assume thickness of slab as


30
& Length Toe =
50
cm
& Length heel =
75
cm
Moment at base of wall due to water
pressure

cm

0.0

Kgmt

Taking moment about point "A"

Sl
No
1 W-1

0.20(

3.3 -

0.35 ) x

W-2

0.75(

3x

W-3

0.30(

1.45 x

W-4
=

Particulars of force in kg
2500

Lever arm in mt

Moment in
Kg/M
885

1475

0.6

1000

2250

1.075

2419

2500

1087.5

0.725

788.4

(Vertical Thurst from spherical dome)


spherical area
Circumference

3.142
5

in kg

X thickness X 2500

204.96
X 14.20

X 0.15X

2500

1722.7

0.6

Moment at base due to Water pressure

W =
X =

b
2

b
6

1.45
6

Kgm

0.7843

0.2417

Maximum pressure at toe

1.45
2

>
=

-0.28

(1+

6425.5
1.45

(1+

-704.59 Kg/Sqm

1 =

-0.28

Hence safe

6535.2
1.45

Maximum pressure at heel

Detailed Scheme Report

-0.00

M = + 5125.81

6535.2 kg
5125.81
6535.2

1033.62

6425.5
1.45

(1-

6425.5
1.45

6X

-0.280
)
1.45

-1.159l )

6X

-0.280
1.45

2.159

9567.35 kg/mt

Niketan Consultants

Appendix - M

Maximum BM at toe

-704.59

(0.5)2

2
Maximum BM at heel

9567.35

(0.75)2
2

2690.8171875
17

X
X

100
100

-88.0738 Kg/mt

2690.82

Kg/mt

Thickness of base slab required

30.8172

But provided 30 cm Hence Safe

Ast required at Toe =

-88.07375
X
x (30 - 5 ) x

100
1500

-0.27

Sqcm

2690.8171875
X
0.87
x (30 - 5 ) x

100
1500

8.25

Sqcm

( 0.3 - 0.2 )
0.35

0.2

100 =

0.00

0.87
Ast required at heel =

X6

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

30

0.8

0.000

Sqcm

Provide 10 mm tor at 20Cm C/C both top & Bottom


Ast provided

7.85 Sqcm > 5.82 Sqcm Hence safe


For Central portion of slab provide nominal thickness of 20 cm with minimum % of steel required

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

( 0.3 - 0.2 )
0.35
X

20

0.1

100=

0.00

Sqcm

>

0.8

0.000

Sqcm

Provide 8 mm tor steel bothway in two layers at top & bottom at 20 cm C/C
Ast provided =

Detailed Scheme Report

0.5

4.34 Sqcm

Hence safe

Niketan Consultants

Jal Nirmal Project

Design of Pure water SUMP at Sarawad


Storage Capacity
=
400 Cum
Circular tank With Average Water depth of
.' .

Surface area of tank =

Dia of tank

400
3

133.33

as planed

133.33

Sqm

3.142

13.03

Provide 13.1 m tank

0.30mt Free board

13.10 m
3.0mt

Design of top dome


Thickness of the dome normally varies between 10 Cm to 15Cm .
For our design let us adopt 15 Cm thick dome,
Loads
Self weight of dome =
0.15
X
2500
Live load

375

Kg/Sqm

150
525

Kg/Sqm
Kg/Sqm

Total
1
1
to
4
6
Radius of dome can be calculated by equation

Rise of dome =

D
2

r (2R-r) =
2.183

Of span

2.183

r
R
D
=

13.1
6

2.183

=
Rise
=
Radius of dome
=
Dia of tank
13.1 2
22

2R = 6.6

+
2.18

2.18

10.9

mt

SAY 10.90 mt
Sin f

D/2
=
R

6.55
10.90
f

0.601

36o 56'

<

50o

Hence dome is under compression


Use M20 Grade Concrete,Steel-Fe 415

s cbc
s st

Permissible stress in concrete .

Hoop stress at any angle given by

70

Kg/Sqcm

1500

WR

(Cos f2

Kg/Sqcm

t(1
Maximum hoop stress occurs when

Maximum hoop stress =

Detailed Scheme Report

525

0
10.9
0.15

19075

kg/Sqm

or

1.9075

kg/Sqcm

+
+

Cos f
Cos f)

1)

+
1

<

12

1
+

kg/Sqcm

Niketan Consultants

Jal Nirmal Project

(Even if thickness of dome slab is taken as 10 cm then stress work out 2.73 kg/Sqcm )
Maximum meridional stress occurs at 36o 38'

525

=
=

12

WR

1-

0.15

Cos

(1-

Cos

f)

Sin2

36o 56'

(Sin 36 56')
o

525

X 12
0.15
= 22868.15

( 0.601 )

0.8

kg/Sqm

= 2.287

<

kg/Sqcm

12

kg/Sqcm

Hence safe
If thickness of dome slab taken as 10 cm then Stress work out to 2.71 Kg/Sqcm < 12 kg/Sqcm)
Hence to make it more safe 15 cm thick dome slab has been adopted.
0.3
0.2
0.3
X
0.05
)
0.35

Minimum % of Steel =

Ast

0.23

=
X

100
100

0.23 %
X
15

3.45

X 0.8

Sqcm

Hence minimum Reinforcement of 0.23% of gross sectional area is provided


Provide 10mm Dia at 20cm c/c(Ast provided 3.925 Sqcm) in each principal direction.
Design of Ring beam
Meridional thrust per M length

22868.15

15
100

3430.22

kg/M

the ring beam to resist the horizontal component of meridional thurst at the end of the dome.
The ring beam is subjected to hoop tension.
Horizontal Component of meridional thrust

Hoop tension

=
=
=

D
2

=
=

Provide beam size(assumed)


Ast required

Cos f
3430.22 X Cos 36o80'
2829.1444699 Kg/M
13.1
2829.1444699
X
2
18530.896278
Kg
T

45
X
35
Cm
18530.896278
=
11.766
1575
For beam minimum reinforcement as per IS_456-1978 page no 71 - Class 25.5.1.1
=

Minimum reinforcement for beam

=
As
bd

As
=

0.85
fy

As
b
d

=
=
=

Minimum area of reinforcement


Breadth of beam
Effective depth

fy

Characteristic strength of Reinforcement in N/Sqmm

This should not be greater than maximum Reinforcement

Minimum reinforcement

As

0.04
0.85

Ac =

=
45

Tensile stress in concrete =

bd

0.85

3.226

X 45 X
415

35

Sqcm

314.16
Ast =

Area provided

bd
X
fy

providing 20 mm dia Tor 4No

Sqcm

12.57
35

1570.80
Sqcm

2199.12

>

(13 - 1)

11.766

Sqcm

X 12.57 =
18530.90
1725.8

1725.84
10.74kg/sqcm

Kg/Sqm

<

12 kg/Sqm

Hence safe

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Minimum Shear reinforcement


As per IS-456-1975 Class 25.5.1.6
Minimum shear reinforcement

Asv

0.4
fy

bsv

Asv

Sv

= Total cross sectional area of stirrups legs effective in shear

sv
b

= stirrup spacing along the length of the member


=
Breadth of beam

fy

Asv X
0.4 x

fy
b

Characteristic strength of the stirrup reinforcement in N/ Sqmm which shall not be taken greater than 415
N/Sqmm

Then spacing Sv

If we adopt 8mm Two legged stirrup .


=

X
0.4

0.5
X

X
45

415

23.06

Cm C/C

Hence provide 8mm Stirrup at 225 mm C/C

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Design of Circular wall


Material to be M 20Grade concrete
Tor steel Fe 415 N/Sqmm
Thickness of wall shall not be less than
(I) 15Cm(minimum)
(ii) 3Cm per M depth + 5Cm =14Cm
Adopt 20Cm thick wall
As the roof dome is designed on Membrane theory , the tank is assumed free at top and fixed at base
H2
Dt

32
13.10 x

0.2

3.44

Refer IS 3370 part IV table 9


Case 1
Critical condition when tank Is full, No soil out side
P = wh
=

1000
H2
Dt

Maximum hoop tension for

3000

3.44

Kg/Sqm
=

Coefficient

WXH

D
2
.

Maximum hoop stress accures at 0.5H


By inter pollution

H2
Dt

3.0

Coefficient 0.362

H2
Dt

Coefficient 0.429

Coefficient for hoop tension =


For

H2
=
Dt

(0.429 -

0.362)
1

0.440

s st

Ast minimum

Spacing of 10 mm dia bar

10

0.000

kg

1500

provided on both face

Ast Minimum %

0.00

20 X
=

0.00
2

0.785

100

=
X
25

13.1
2

Sqcm

( 0.3 0.35

0.3 -

1000 X

0.2 )

0.000000
100

0.1

X 0.8 =

0.00 Sqcm

0.000000

on both face 2.17 Sqcm

0.00 Sqcm
100

3.14 Sqcm

6.28 Sqcm

Provide 10mm dia bar at 25 cm C/C on both faces in the form of horizontal ring up to 2 M from Top (Steel provided
6.28 sqcm)and provide 8mm Dia tar at 20 cm C/C both faces up to 1m Height from bottom(Ast provided 5 sqcm)
The minimum Ast provided from both portion =
2
X5
X 0.5
=
### >

Detailed Scheme Report

0.000

3.44

Maximum hoop tension

Ast =

0.362 +

0.00

Sqm

Niketan Consultants

Jal Nirmal Project

Check for tensile Stress in Concrete


Equivalent Area

100 X

20

Tensile stress in concrete

Design for Bending Moment


Refer table -10
Maximum
-Ve BM
for

H
Dt

+ (13

-1 )

6.28

0
2075.36

0.00

2075.36 Sqcm

Kg/Sqcm <

12 Kg/Sqcm

Co efficient X W X H3

= 3.44

(0.0333 -

0.0268 +

0.0268)

0.440

0.00000

0.440

0.00000

From Table 3.0


=
Maximum +Ve BM

0 X

1000 X

0.0

33

KgM

Occurs at 0.6 H
=

Co efficient X W X H3

(0.0097 -

0.0077 +

0.0077)

0.00000

1000

33

Kg/M

Thickness of Wall required for (-) BM


Required as per IS 3370-Part iv

0 X
100 X
17 X 1500

Provide thickness of wall 20 cm > 0.00


Ast for (-) Ve BM

0.0
0.87

Ast for +Ve BM


Minimum % of Steel

0.00

Cm

X
(20 -

100
5 ) X 1500

0.00 Sqcm

261.9
X
0.87
(20 -

100
5 ) X 1500

1.34 Sqcm

0.00

Sqcm

& on each face

Cm

Sqcm

Provide 10mm Tor steel at 15cm c/c on inner face as vertical reinforcement from base and curtail alternate
bar above 1.5m and provide 8mm tor at 30 cm c/c on
=
outerface wall as vertical bars.
Ast provide

6.91

>

Sqcm

4.34

Sqcm

3.0 =

3000

Check for Shear


Shear force at base when tank is full and no soil out side
P

Shear stress

=
0.87

3000
100 X( 20 -

% of Steel provided

0.46%
2.2 +
=

5)
6.91
15

Permissible shear stress for


As per IS 456

1000 X

2.299 Kg/Sqcm

x 100
x 100

of steel
###

Sqcm

2.2 )
0.25

X0

0.46 %

2.00

Kg/Sqcm

2.299

>

Kg/Sqcm

Hence Safe

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

when no water inside and soil is outside


the earth pressure from out side cause hoop compression
1- sin
1+sin
Saturated density of soil =

Assume =
Angle of repose =

2000

rst X h

P=

rst =

)
2000

Kg/Cum

20o
X

Hoop compression

1- sin 20o

( 1+sin 20o

= P

X (

2941.88 X (

=
Compression stress developed
due to hoop compression

)=

6000 x

1 1 +

0.342
0.342

2941.88 kg/Sqm

D + 2t)

2941.88 x
=

13 +

2x

13.4

39421
100 X
20

0.2 )
39421.192
=

19.71

kg
Kg/Sqcm

<

50

Kg/Sqcm

Hence concrete alone takes the hoop compression


Minimum % of steel already provided
Hence safe
Design of base slab

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Check stability

(Considering water inside and no soil outside)

Assume thickness of slab as


30
& Length Toe =
50
cm
& Length heel =
75
cm
Moment at base of wall due to water
pressure

cm

0.0

Kgmt

Taking moment about point "A"

Sl
No
1 W-1

0.20(

3.3 -

0.35 ) x

W-2

0.75(

3x

W-3

0.30(

1.45 x

W-4
=

Particulars of force in kg
2500

Lever arm in mt

Moment in
Kg/M
885

1475

0.6

1000

2250

1.075

2419

2500

1087.5

0.725

788.4

(Vertical Thurst from spherical dome)


spherical area
Circumference

3.142
5

in kg

X thickness X 2500

179.44
X 13.30

X 0.15X

2500

1610.2

0.6

Moment at base due to Water pressure

W =
X =

b
2

b
6

1.45
6

-0.00

M = + 5058.31

6422.7 kg
5058.31
6422.7

966.12

0.7876

0.2417

Maximum pressure at toe

1.45
2

>
=

-0.28

1 =

-0.28

Hence safe

6422.7
1.45

(1+

6425.5
1.45

(1+

-704.59 Kg/Sqm

Maximum pressure at heel

Maximum BM at toe

6425.5
1.45

(1-

6425.5
1.45

9567.35 kg/mt

-704.59

6X

-0.280
)
1.45

-1.159l )

6X

-0.280
1.45

Detailed Scheme Report

9567.35

2.159

(0.5)2

2
Maximum BM at heel

Kgm

(0.75)2
2

-88.0738 Kg/mt

2690.82

Kg/mt

Niketan Consultants

Jal Nirmal Project

Thickness of base slab required


2690.8171875
17

100
100

X6

But provided 30 cm Hence Safe

30.8172

Ast required at Toe =

-88.07375
X
x (30 - 5 ) x

100
1500

-0.27

Sqcm

2690.8171875
X
0.87
x (30 - 5 ) x

100
1500

8.25

Sqcm

( 0.3 - 0.2 )
0.35

0.2

100 =

0.00

0.87
Ast required at heel =

X
X

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

30

0.8

0.000

Sqcm

Provide 10 mm tor at 20Cm C/C both top & Bottom


Ast provided

7.85 Sqcm > 5.82 Sqcm Hence safe


For Central portion of slab provide nominal thickness of 20 cm with minimum % of steel required

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

( 0.3 - 0.2 )
0.35
X

20

0.1

100=

0.00

Sqcm

>

0.8

0.000

Sqcm

Provide 8 mm tor steel bothway in two layers at top & bottom at 20 cm C/C
Ast provided =

Detailed Scheme Report

0.5

0.00

Sqcm

Hence safe

Niketan Consultants

Jal Nirmal Project

Design of Pure water SUMP at Kumate


Storage Capacity
=
200 Cum
Circular tank With Average Water depth of
.' .

Surface area of tank =

Dia of tank

200
3

as planed

66.67

66.67

Sqm

3.142
Provide

9.5

9.21

m tank

0.30mt Free board

9.50 m
3.0mt

Design of top dome


Thickness of the dome normally varies between 10 Cm to 15Cm .
For our design let us adopt 15 Cm thick dome,
Loads
Self weight of dome =
0.15
X
2500
Live load

375

Kg/Sqm

150
525

Kg/Sqm
Kg/Sqm

Total
1
1
to
4
6
Radius of dome can be calculated by equation

Rise of dome =

D
2

r (2R-r) =
1.5833

2R =

Of span

1.583

r
R
D
=

9.5
6

1.58333

=
Rise
=
Radius of dome
=
Dia of tank
9.5 2
22

+
1.58

1.58

7.9

mt

SAY 7.90 mt
Sin f

D/2
=
R

4.75
7.90
f

0.601

36o 56'

<

50o

70

1500

Hence dome is under compression


Use M20 Grade Concrete,Steel-Fe 415
Permissible stress in concrete .

Detailed Scheme Report

s cbc
s st

Kg/Sqcm
Kg/Sqcm

Niketan Consultants

Jal Nirmal Project

Hoop stress at any angle given by

Maximum hoop stress occurs when


s=

525

WR

7.9
0.15

= 13825

kg/Sqm

or 1.3825

kg/Sqcm

(Cos f2

t(1

+
+

Cos
Cos

+
1

1
+

<

12

kg/Sqcm

1)

f
f)

(Even if thickness of dome slab is taken as 10 cm then stress work out 2.73 kg/Sqcm )
Maximum meridional stress occurs at 36o 38'

525

=
=

12

WR

1-

0.15

Cos

(1-

Cos

f)

Sin2

36o 56'

(Sin 36 56')
o

525

X 12
0.15
= 22868.15

( 0.601 )

0.8

kg/Sqm

= 2.287

<

kg/Sqcm

12

kg/Sqcm

Hence safe
If thickness of dome slab taken as 10 cm then Stress work out to 2.71 Kg/Sqcm < 12 kg/Sqcm)
Hence to make it more safe 15 cm thick dome slab has been adopted.
0.3
0.2
0.3
X
0.05
(
)
0.35

Minimum % of Steel =

Ast

0.23

=
X

100
100

0.23 %
X
15

3.45

X 0.8

Sqcm

Hence minimum Reinforcement of 0.23% of gross sectional area is provided


Provide 10mm Dia at 20cm c/c(Ast provided 3.925 Sqcm) in each principal direction.

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Design of Ring beam


Meridional thrust per M length

22868.15

15
100

3430.22

kg/M

the ring beam to resist the horizontal component of meridional thurst at the end of the dome.
The ring beam is subjected to hoop tension.
Horizontal Component of meridional thrust

Hoop tension

=
=
=

D
2

=
=

Provide beam size(assumed)


Ast required

35
X
30
Cm
13438.436232
=
=
12.799
1050
For beam minimum reinforcement as per IS_456-1978 page no 71 - Class 25.5.1.1

Ch
Minimum reinforcement for beam
=
As
ara
As
cte
=
bd
rist
ic
As = str
Minimum area of reinforcement
b
= en
Breadth of beam
d
= gth
Effective depth
of
fy = Rei
nfo
This should not be greater than maximum
=
rce Reinforcement
inforcement
As
=
me
nt
in
=
N/
Sq
m
=
m
providing 20 mm dia Tor 5No
314.16
Ast =
1570.80
Area provided
Ac =

Cos f
3430.22 X Cos 36o80'
2829.1444699 Kg/M
9.5
2829.1444699
X
2
13438.436232
Kg
T

=
35

Tensile stress in concrete =

15.71
30

Sqcm

>

(13 - 1)

12.799

0.85
fy

0.04
0.85

bd
X

bd

0.85

X
415

35

2.151

Sqcm

fy
X

30

Sqcm

X 15.71 =
13438.44
1238.5

Sqcm

1238.52

Kg/Sqm

10.85kg/sqcm

<

12 kg/Sqm

Hence safe

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Minimum Shear reinforcement


As per IS-456-1975 Class 25.5.1.6
Minimum shear reinforcement

Asv

0.4
fy

bsv

Asv

Sv

= Total cross sectional area of stirrups legs effective in shear

sv
b

= stirrup spacing along the length of the member


=
Breadth of beam

fy

Asv X
0.4 x

fy
b

Characteristic strength of the stirrup reinforcement in N/ Sqmm which shall not be taken
greater than 415 N/Sqmm

Then spacing Sv

If we adopt 8mm Two legged stirrup .


=

X
0.4

0.5
X

X
35

415

29.64

Cm C/C

Hence provide 8mm Stirrup at 250 mm C/C

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Design of Circular wall


Material to be M 20Grade concrete
Tor steel Fe 415 N/Sqmm
Thickness of wall shall not be less than
(I) 15Cm(minimum)
(ii) 3Cm per M depth + 5Cm =14Cm
Adopt 20Cm thick wall
As the roof dome is designed on Membrane theory , the tank is assumed free at top and fixed at base
H2
Dt

32

9.50 x

0.2

4.74

Refer IS 3370 part IV table 9


Case 1
Critical condition when tank Is full, No soil out side
P = wh
=

1000
H2
Dt

Maximum hoop tension for

3000

4.74

Kg/Sqm
=

Coefficient

WXH

D
2
.

Maximum hoop stress accures at 0.5H


By inter pollution

H2
Dt

4.0

Coefficient 0.362

H2
Dt

Coefficient 0.429

Coefficient for hoop tension =


For

H2
=
Dt

s st

Ast minimum

Spacing of 10 mm dia bar

10

0.000

kg

1500

provided on both face

Ast Minimum %

Detailed Scheme Report

(0.477 -

0)

0.740

0.000

4.74

Maximum hoop tension

Ast =

0.429 +

0.00

20 X

100 X

0.00
2

0.7854

9.5
2

Sqcm

( 0.3 0.35

0.3 -

1000 X

0.2 )

0.000000
100

0.1

X 0.8 =

0.00 Sqcm

0.000000

on both face 2.17 Sqcm

0.00 Sqcm
100

3.14 Sqcm

###

Niketan Consultants

Jal Nirmal Project

25

3.14 Sqcm

Provide 10mm dia bar at 25 cm C/C on both faces in the form of horizontal ring up to 2 M from Top (Steel provided
6.28 sqcm)and provide 8mm Dia tar at 20 cm C/C both faces up to 1m Height from bottom(Ast provided 5 sqcm)
The minimum Ast provided from both portion =
2
X5
X 0.5
= ### >

0.00

Sqm

Check for tensile Stress in Concrete


Equivalent Area

100 X

Tensile stress in concrete

20
=

+ (13

-1 )

6.28

0
2075.36

0.00

2075.36 Sqcm

Kg/Sqcm <

12 Kg/Sqcm

Design for Bending Moment


Refer table -10 or Refer table 5. And 6 of book design of reinforced concrete structures ,page no .528.
Maximum
-Ve BM
=
Co efficient X W X H3
for

H2
Dt

= 4.74

(0.0268 -

0.0222 +

0)

=
Maximum +Ve BM

0 X

1000 X

0.0

0.740

0.00000

0.740

0.0000

33

KgM

Occurs at 0.6 H
=

Co efficient X W X H3

(0.0077 -

0.0059 +

0.00000

Thickness of Wall required for (-) BM


Required as per IS 3370-Part iv

0)

1000

33

Kg/M
0 X
100 X
17 X 1500

0.00

Cm

Provide thickness of wall 20 cm > 0.00 Cm


Ast for (-) Ve BM

Ast for +Ve BM


Minimum % of Steel

0.0
0.87

X
(20 -

100
5 ) X 1500

0.00 Sqcm

261.9
X
0.87
(20 -

100
5 ) X 1500

1.34 Sqcm

0.00

Sqcm

& on each face

Sqcm

Provide 10mm Tor steel at 15cm c/c on inner face as vertical reinforcement from base and curtail alternate
bar above 1.5m and provide 8mm tor at 30 cm c/c on
=
outerface wall as vertical bars.
Ast provide

Detailed Scheme Report

6.91

Sqcm

>

4.34

Sqcm

Niketan Consultants

Jal Nirmal Project

Check for Shear


Shear force at base when tank is full and no soil out side
P

Shear stress

3000
100 X( 20 -

0.87

% of Steel provided

5)
6.91
15

Permissible shear stress for


As per IS 456

1000 X 3.0 =

0.46%
=

Sqcm

2.299 Kg/Sqcm

x 100
x 100

of steel
( 2.9 - 2.2 )
0.25

2.2 +

3000

X1

0.46 %

5.60

>

Kg/Sqcm

2.299

Kg/Sqcm

Hence Safe

when no water inside and soil is outside


the earth pressure from out side cause hoop compression
1- sin
1+sin
Saturated density of soil =

Assume =
Angle of repose =

rst X h

P=

rst =

)
2000

Kg/Cum

20o

2000

Hoop compression

1- sin 20o

( 1+sin 20o

= P

X (

2941.88 X (

=
Compression stress developed
due to hoop compression

)=

6000 x

1 1 +

0.342
0.342

2941.88 kg/Sqm

D + 2t)

2941.88 x
=

10 +

2x

10.4

30596
100 X 20

0.2 )
30595.552
=

15.30

kg
Kg/Sqcm

<

50

Kg/Sqcm

Hence concrete alone takes the hoop compression


Minimum % of steel already provided
Hence safe

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Design of base slab

Check stability

(Considering water inside and no soil outside)

Assume thickness of slab as


30
& Length Toe =
50
cm
& Length heel =
75
cm
Moment at base of wall due to water
pressure

cm

0.0

Kgmt

Taking moment about point "A"

Sl
No
1 W-1

0.20(

3.3 -

0.35 ) x

W-2

0.75(

3x

W-3

0.30(

1.45 x

W-4
=

Particulars of force in kg
2500

Lever arm in mt

Moment in
Kg/M
885

1475

0.6

1000

2250

1.075

2419

2500

1087.5

0.725

788.4

(Vertical Thurst from spherical dome)


spherical area
Circumference

3.142
5

in kg

X thickness X 2500

78.59
X
9.70

X 0.15X

2500

Moment at base due to Water pressure

W =

Detailed Scheme Report

5779.5 kg

967.0

0.6

580.2

M = + 4672.39

-0.00
Kgm

Niketan Consultants

Jal Nirmal Project

X =

4672.39
5779.5

b
2

b
6

1.45
6

0.8084

0.2417

Maximum pressure at toe

1.45
2

>

-0.28

1 =

-0.28

Hence safe

5779.5
1.45

(1+

6425.5
1.45

(1+

-704.59 Kg/Sqm

Maximum pressure at heel

Maximum BM at toe

6425.5
1.45

(1-

6425.5
1.45

9567.35 kg/mt

-704.59

6X

-0.280
)
1.45

-1.159l )

6X

-0.280
1.45

2.159

(0.5)2

2
Maximum BM at heel

9567.35

(0.75)2
2

2690.8171875
17

X
X

100
100

-88.0738 Kg/mt

2690.82

Kg/mt

Thickness of base slab required

30.8172

But provided 30 cm Hence Safe

Ast required at Toe =

-88.07375
X
x (30 - 5 ) x

100
1500

-0.27

Sqcm

2690.8171875
X
0.87
x (30 - 5 ) x

100
1500

8.25

Sqcm

( 0.3 - 0.2 )
0.35

0.2

100 =

0.00

0.87
Ast required at heel =

X6

Minimum Ast required =

Minimum Ast required =

0.3 -

0.000
100

30

0.8

0.000

Sqcm

Provide 10 mm tor at 20Cm C/C both top & Bottom


Ast provided

Detailed Scheme Report

7.85 Sqcm > 5.82 Sqcm Hence safe

Niketan Consultants

Jal Nirmal Project

For Central portion of slab provide nominal thickness of 20 cm with minimum % of steel required

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

( 0.3 - 0.2 )
0.35
X

20

0.1

100=

0.00

Sqcm

>

0.8

0.000

Sqcm

Provide 8 mm tor steel bothway in two layers at top & bottom at 20 cm C/C
Ast provided =

Detailed Scheme Report

0.5

4.34 Sqcm

Hence safe

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

Design of Pure water Intermittent Sump in the Rising Main at Kudagi LT


Storage Capacity
=
150 Cum
Circular tank With Average Water depth of
.' .

Surface area of tank =

Dia of tank

150
2.7

as planed

55.56

55.56

Sqm

3.142
Provide

8.5

8.41

m tank

0.30mt Free board

8.50 m
2.70 m

Design of top dome


Thickness of the dome normally varies between 10 Cm to 15Cm .
For our design let us adopt 15 Cm thick dome,
Loads
Self weight of dome =
0.15
X
2500
Live load

375

Kg/Sqm

150
525

Kg/Sqm
Kg/Sqm

Total
1
1
to
4
6
Radius of dome can be calculated by equation

Rise of dome =

D
2

r (2R-r) =
1.4167

2R =

1.417

Of span

r
R
D
=

8.5
6

1.41667

=
Rise
=
Radius of dome
=
Dia of tank
8.5 2
22

1.42

+
1.42

7.1

mt

SAY 7.10 mt
Sin f

D/2
=
R

4.25
7.10
f

Detailed Scheme Report

0.599

36o 47'

<

50o

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

Hence dome is under compression


Use M20 Grade Concrete,Steel-Fe 415

s cbc
s st

Permissible stress in concrete .

Hoop stress at any angle given by

Maximum hoop stress occurs when


s=

525

70

1500

WR

7.1
0.15

= 12425

kg/Sqm

or 1.2425

kg/Sqcm

Kg/Sqcm
Kg/Sqcm

(Cos f2

t(1

+
+

Cos
Cos

+
1

1
+

<

12

kg/Sqcm

(1-

Cos

f)

Sin

1)

f
f)

(Even if thickness of dome slab is taken as 10 cm then stress work out 2.73 kg/Sqcm )
Maximum meridional stress occurs at 36o 38'

525

=
=

12

WR

1-

0.15

Cos

36o 47'

(Sin 36o39')2

525

X 12
0.15
= 23021.12

( 0.599 )

0.8

kg/Sqm

= 2.302

<

kg/Sqcm

12

kg/Sqcm

Hence safe
If thickness of dome slab taken as 10 cm then Stress work out to 2.71 Kg/Sqcm < 12 kg/Sqcm)
Hence to make it more safe 15 cm thick dome slab has been adopted.
0.3
0.2
0.3
X
0.05
(
)
0.35

Minimum % of Steel =

Ast

0.23

=
X

100
100

0.23 %
X
15

3.45

X 0.8

Sqcm

Hence minimum Reinforcement of 0.23% of gross sectional area is provided


Provide 10mm Dia at 20cm c/c(Ast provided 3.925 Sqcm) in each principal direction.

Detailed Scheme Report

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

Design of Ring beam


Meridional thrust per M length

23021.12

15
100

3453.17

kg/M

the ring beam to resist the horizontal component of meridional thurst at the end of the dome.
The ring beam is subjected to hoop tension.
Horizontal Component of meridional thrust

Hoop tension

=
=
=

D
2

=
=

Provide beam size(assumed)


Ast required

35
X
30
Cm
12120.883407
=
=
11.544
1050
For beam minimum reinforcement as per IS_456-1978 page no 71 - Class 25.5.1.1

Ch
Minimum reinforcement for beam
=
As
ara
As
cte
=
bd
rist
ic
As = str
Minimum area of reinforcement
b
= en
Breadth of beam
d
= gth
Effective depth
of
fy = Rei
nfo
This should not be greater than maximum
=
rce Reinforcement
inforcement
As
=
me
nt
in
=
N/
Sq
m
=
m
providing 20 mm dia Tor 4No
314.16
Ast =
1570.80
Area provided
Ac =

Cos f
3453.17 X Cos 36o80'
2851.9725665 Kg/M
8.5
2851.9725665
X
2
12120.883407
Kg
T

=
35

Tensile stress in concrete =

12.57
30

Sqcm

>

(13 - 1)

11.544

0.85
fy

0.04
0.85

bd
X

bd

0.85

X
415

35

2.151

Sqcm

fy
X

30

Sqcm

X 12.57 =
12120.88
1200.8

Sqcm

1200.84

Kg/Sqm

10.09kg/sqcm

<

12 kg/Sqm

Hence safe

Detailed Scheme Report

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

Minimum Shear reinforcement


As per IS-456-1975 Class 25.5.1.6
Minimum shear reinforcement

Asv

0.4
fy

bsv

Asv

Sv

= Total cross sectional area of stirrups legs effective in shear

sv
b

= stirrup spacing along the length of the member


=
Breadth of beam

fy

Asv X
0.4 x

fy
b

Characteristic strength of the stirrup reinforcement in N/ Sqmm which shall not be taken
greater than 415 N/Sqmm

Then spacing Sv

If we adopt 8mm Two legged stirrup .


=

X
0.4

0.5
X

X
35

415

29.64

Cm C/C

Hence provide 8mm Stirrup at 250 mm C/C

Detailed Scheme Report

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

Design of Circular wall


Material to be M 20Grade concrete
Tor steel Fe 415 N/Sqmm
Thickness of wall shall not be less than
(I) 15Cm(minimum)
(ii) 3Cm per M depth + 5Cm =14Cm
Adopt 20Cm thick wall
As the roof dome is designed on Membrane theory , the tank is assumed free at top and fixed at base
H2
Dt

32

8.50 x

0.2

5.29

Refer IS 3370 part IV table 9


Case 1
Critical condition when tank Is full, No soil out side
P = wh
=

1000
H2
Dt

Maximum hoop tension for

3000

5.29

Kg/Sqm
=

Coefficient

WXH

D
2
.

Maximum hoop stress accures at 0.5H


By inter pollution

H2
Dt

5.0

Coefficient 0.477

H2
Dt

Coefficient 0.504

Coefficient for hoop tension =


For

H2
=
Dt

s st

Ast minimum

Spacing of 10 mm dia bar

10

0.710

9052.5

kg

1500

provided on both face

9052.5

Ast Minimum %

Detailed Scheme Report

(0.477 -

1)

0.290

0.710

5.29

Maximum hoop tension

Ast =

0.504 +

6.04

20 X

100 X

6.04
2

0.7854

8.5
2

Sqcm

( 0.3 0.35

0.3 -

1000 X

0.2 )

0.000000
100

0.1

X 0.8 =

0.00 Sqcm

0.000000

on both face 2.17 Sqcm

3.02 Sqcm
100

3.14 Sqcm

###

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

25

3.14 Sqcm

Provide 10mm dia bar at 25 cm C/C on both faces in the form of horizontal ring up to 2 M from Top (Steel provided
6.28 sqcm)and provide 8mm Dia tar at 20 cm C/C both faces up to 1m Height from bottom(Ast provided 5 sqcm)
The minimum Ast provided from both portion =
2
X5
X 0.5
= ### >

0.00

Sqm

Check for tensile Stress in Concrete


Equivalent Area

100 X

Tensile stress in concrete

20
=

+ (13

-1 )

6.28

9052.5
2075.36

4.36

2075.36 Sqcm

Kg/Sqcm <

12 Kg/Sqcm

Design for Bending Moment


Refer table -10 or Refer table 5. And 6 of book design of reinforced concrete structures ,page no .528.
Maximum
-Ve BM
=
Co efficient X W X H3
for

H2
Dt

= 5.29

(0.0222 -

0.0187 +

0)

=
Maximum +Ve BM

0 X

1000 X

0.0

0.290

0.00000

0.290

0.0000

33

KgM

Occurs at 0.6 H
=

Co efficient X W X H3

(0.0046 -

0.0028 +

0.00000

Thickness of Wall required for (-) BM


Required as per IS 3370-Part iv

0)

1000

33

Kg/M
0 X
100 X
17 X 1500

0.00

Cm

Provide thickness of wall 20 cm > 0.00 Cm


Ast for (-) Ve BM

Ast for +Ve BM


Minimum % of Steel

0.0
0.87

X
(20 -

100
5 ) X 1500

0.00 Sqcm

261.9
X
0.87
(20 -

100
5 ) X 1500

1.34 Sqcm

0.00

Sqcm

& on each face

Sqcm

Provide 10mm Tor steel at 15cm c/c on inner face as vertical reinforcement from base and curtail alternate
bar above 1.5m and provide 8mm tor at 30 cm c/c on
=
outerface wall as vertical bars.
Ast provide

Detailed Scheme Report

6.91

Sqcm

>

4.34

Sqcm

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

Check for Shear


Shear force at base when tank is full and no soil out side
P

Shear stress

3000
100 X( 20 -

0.87

% of Steel provided

5)
6.91
15

Permissible shear stress for


As per IS 456

1000 X 3.0 =

0.46%
=

Sqcm

2.299 Kg/Sqcm

x 100
x 100

of steel
( 2.9 - 2.2 )
0.25

2.2 +

3000

X1

0.46 %

5.60

>

Kg/Sqcm

2.299

Kg/Sqcm

Hence Safe

when no water inside and soil is outside


the earth pressure from out side cause hoop compression
1- sin
1+sin
Saturated density of soil =

Assume =
Angle of repose =

rst X h

P=

rst =

)
2000

Kg/Cum

20o

2000

Hoop compression

1- sin 20o

( 1+sin 20o

= P

X (

2941.88 X (

=
Compression stress developed
due to hoop compression

)=

6000 x

1 1 +

0.342
0.342

2941.88 kg/Sqm

D + 2t)

2941.88 x
=

9 +

2x

9.4

27654
100 X 20

0.2 )
27653.672
=

13.83

kg
Kg/Sqcm

<

50

Kg/Sqcm

Hence concrete alone takes the hoop compression


Minimum % of steel already provided
Hence safe

Detailed Scheme Report

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

Design of base slab

Check stability

(Considering water inside and no soil outside)

Assume thickness of slab as


30
& Length Toe =
50
cm
& Length heel =
75
cm
Moment at base of wall due to water
pressure

cm

0.0

Kgmt

Taking moment about point "A"

Sl
No
1 W-1

0.20(

3.0 -

0.35 ) x

W-2

0.75(

3x

W-3

0.30(

1.45 x

W-4
=

Particulars of force in kg
2500

Lever arm in mt

Moment in
Kg/M
795

1325

0.6

1000

2250

1.075

2419

2500

1087.5

0.725

788.4

(Vertical Thurst from spherical dome)


spherical area
Circumference

3.142
5

in kg

X thickness X 2500

63.20
X
8.70

X 0.15X

2500

Moment at base due to Water pressure

W =

Detailed Scheme Report

5529.5 kg

867.0

0.6

520.2

M = + 4522.39

-0.00
Kgm

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

X =

4522.39
5529.5

b
2

b
6

1.45
6

0.8179

0.2417

Maximum pressure at toe

1.45
2

>

-0.28

1 =

-0.28

Hence safe

5529.5
1.45

(1+

6425.5
1.45

(1+

-704.59 Kg/Sqm

Maximum pressure at heel

Maximum BM at toe

6425.5
1.45

(1-

6425.5
1.45

9567.35 kg/mt

-704.59

6X

-0.280
)
1.45

-1.159l )

6X

-0.280
1.45

2.159

(0.5)2

2
Maximum BM at heel

9567.35

(0.75)2
2

2690.8171875
17

X
X

100
100

-88.0738 Kg/mt

2690.82

Kg/mt

Thickness of base slab required

30.8172

But provided 30 cm Hence Safe

Ast required at Toe =

-88.07375
X
x (30 - 5 ) x

100
1500

-0.27

Sqcm

2690.8171875
X
0.87
x (30 - 5 ) x

100
1500

8.25

Sqcm

( 0.3 - 0.2 )
0.35

0.2

100 =

0.00

0.87
Ast required at heel =

X6

Minimum Ast required =

Minimum Ast required =

0.3 -

0.000
100

30

0.8

0.000

Sqcm

Provide 10 mm tor at 20Cm C/C both top & Bottom


Ast provided

Detailed Scheme Report

7.85 Sqcm > 5.82 Sqcm Hence safe

Niketan Consultants

Managuali and 35 Villages

Jal Nirmal Project

For Central portion of slab provide nominal thickness of 20 cm with minimum % of steel required

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

( 0.3 - 0.2 )
0.35
X

20

0.1

100=

0.00

Sqcm

>

0.8

0.000

Sqcm

Provide 8 mm tor steel bothway in two layers at top & bottom at 20 cm C/C
Ast provided =

Detailed Scheme Report

0.5

4.34 Sqcm

Hence safe

Niketan Consultants

Jal Nirmal Project

Design of Pure water SUMP at KUMATE


Storage Capacity
=
100 Cum
Circular tank With Average Water depth of
.' .

Surface area of tank =

Dia of tank

100
3

as planed

33.33

33.33

Sqm

3.142

6.51

Provide 6.75 m tank

0.30mt Free board

6.75 m
3.0mt

Design of top dome


Thickness of the dome normally varies between 10 Cm to 15Cm .
For our design let us adopt 15 Cm thick dome,
Loads
Self weight of dome =
0.15
X
2500
Live load

375

Kg/Sqm

150
525

Kg/Sqm
Kg/Sqm

Total
1
1
to
4
6
Radius of dome can be calculated by equation

Rise of dome =

D
2

r (2R-r) =
1.125

Of span

1.125

r
R
D
=

6.75
6

1.125

=
Rise
=
Radius of dome
=
Dia of tank
6.75 2
22

2R = 3.4

+
1.13

1.13

5.6

mt

SAY 5.60 mt
Sin f

D/2
=
R

3.375
5.60
f

0.603

36o 3'

<

50o

70

1500

Hence dome is under compression


Use M20 Grade Concrete,Steel-Fe 415
Permissible stress in concrete .

Hoop stress at any angle given by

s cbc
s st
=

WR

Kg/Sqcm
Kg/Sqcm

(Cos f2
t(1

Detailed Scheme Report

+
+

Cos
Cos

f
f)

1)

Niketan Consultants

Jal Nirmal Project

Maximum hoop stress occurs when


s=

525

5.6
0.15

9800

kg/Sqm

or

0.98

kg/Sqcm

+
1

1
+

<

12

kg/Sqcm

(Even if thickness of dome slab is taken as 10 cm then stress work out 2.73 kg/Sqcm )
Maximum meridional stress occurs at 36o 38'

=
=

525

12

WR

1-

0.15

Cos

(1-

Cos

f)

Sin2

36o 3'

0.79

(Sin 36o3')2

525

X 12
0.15
= 23852.54

( 0.603 )

kg/Sqm

= 2.385

<

kg/Sqcm

12

kg/Sqcm

Hence safe
If thickness of dome slab taken as 10 cm then Stress work out to 2.71 Kg/Sqcm < 12 kg/Sqcm)
Hence to make it more safe 15 cm thick dome slab has been adopted.
0.3
0.2
0.3
X
0.05
(
)
0.35

Minimum % of Steel =

Ast

0.23

=
X

100
100

0.23 %
X
15

3.45

X 0.8

Sqcm

Hence minimum Reinforcement of 0.23% of gross sectional area is provided


Provide 10mm Dia at 20cm c/c(Ast provided 3.925 Sqcm) in each principal direction.
Design of Ring beam
Meridional thrust per M length

23852.54

15
100

3577.88

kg/M

the ring beam to resist the horizontal component of meridional thurst at the end of the dome.
The ring beam is subjected to hoop tension.
Horizontal Component of meridional thrust

Hoop tension

D
2

=
=
=
=
=

Provide beam size(assumed)


Ast required

Cos f
3577.88 X Cos 36o80'
2946.8778417 Kg/M
6.75
2946.8778417
X
2
9945.7127156
Kg
T

30
X
25
Cm
9945.7127156
=
=
13.261
750
For beam minimum reinforcement as per IS_456-1978 page no 71 - Class 25.5.1.1

Ch
Minimum reinforcement for beam
=
As
ara
As
cte
=
bd
rist
ic
As = str
Minimum area of reinforcement
b
= en
Breadth of beam
d
= gth
Effective depth
of
fy = Rei
nfo
rce
me
nt
in
N/
Sq
Detailed Scheme Report
m
m

Sqcm

0.85
fy

Niketan Consultants

Jal Nirmal Project

This should not be greater than maximum Reinforcement


inforcement

=
=

As

0.04
0.85

bd
X

bd
30

fy

providing 20 mm dia Tor 5No


Ast =
Area provided

Ac =

30

15.71
25

0.85

X
415

=
314.16

1.536

Sqcm

25

1570.80

>

Sqcm

13.261

(13 - 1)

Tensile stress in concrete =

Sqcm

X 15.71 =
9945.71
938.5

938.52

Kg/Sqm

10.60kg/sqcm

<

12 kg/Sqm

Hence safe
Minimum Shear reinforcement
As per IS-456-1975 Class 25.5.1.6
Minimum shear reinforcement

Asv

0.4
fy

bsv

Asv

Sv

= Total cross sectional area of stirrups legs effective in shear

sv
b

= stirrup spacing along the length of the member


=
Breadth of beam

fy

Asv X
0.4 x

fy
b

Characteristic strength of the stirrup reinforcement in N/ Sqmm which shall not be taken
greater than 415 N/Sqmm

Then spacing Sv

If we adopt 8mm Two legged stirrup .


=

X
0.4

0.5
X

X
30

415

34.58

Cm C/C

Hence provide 8mm Stirrup at 300 mm C/C

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Design of Circular wall


Material to be M 20Grade concrete
Tor steel Fe 415 N/Sqmm
Thickness of wall shall not be less than
(I) 15Cm(minimum)
(ii) 3Cm per M depth + 5Cm =14Cm
Adopt 20Cm thick wall
As the roof dome is designed on Membrane theory , the tank is assumed free at top and fixed at base
H2
Dt

32

6.75 x

0.2

6.67

Refer IS 3370 part IV table 9


Case 1
Critical condition when tank Is full, No soil out side
P = wh
=

1000
H2
Dt

Maximum hoop tension for

3000

6.67

Kg/Sqm
=

Coefficient

WXH

D
2
.

Maximum hoop stress accures at 0.6H


By inter pollution

H2
Dt

6.0

Coefficient 0.362

H2
Dt

Coefficient 0.429

Coefficient for hoop tension =


For

H2
=
Dt

(0.575 -

1)

0.670

s st

Ast minimum

Spacing of 10 mm dia bar

10

1.000

10125

kg

1500

provided on both face

10125

Ast Minimum %

6.75

20 X
6.75
2

0.7854

100

=
X
25

1000 X

6.75
2

Sqcm

( 0.3 0.35

0.3 -

0.2 )

0.000000
100

0.1

X 0.8 =

0.00 Sqcm

0.000000

on both face 2.17 Sqcm

3.38 Sqcm
100

3.14 Sqcm

###

Provide 10mm dia bar at 25 cm C/C on both faces in the form of horizontal ring up to 2 M from Top (Steel provided
6.28 sqcm)and provide 8mm Dia tar at 20 cm C/C both faces up to 1m Height from bottom(Ast provided 5 sqcm)
The minimum Ast provided from both portion =
2
X5
X 0.5
= ### >

Detailed Scheme Report

1.000

6.67

Maximum hoop tension

Ast =

0.514 +

0.00

Sqm

Niketan Consultants

Jal Nirmal Project

Check for tensile Stress in Concrete


Equivalent Area

100 X

20

Tensile stress in concrete

+ (13

-1 )

6.28

10125
2075.36

4.88

2075.36 Sqcm

Kg/Sqcm

<

12 Kg/Sqcm

Design for Bending Moment


Refer table -10 or Refer table 5. And 6 of book design of reinforced concrete structures ,page no .528.
Maximum
-Ve BM
=
Co efficient X W X H3
for

H2
Dt

= 6.67

(0.0187 -

0.0146 +

=
Maximum

0)

+Ve BM

0 X

1000 X

0.0

0.670

0.00000

0.670

0.0000

33

KgM

Occurs at 0.7 H
=

Co efficient X W X H3

(0.0051 -

0.0038 +

0.00000

Thickness of Wall required for (-) BM


Required as per IS 3370-Part iv

0)

1000

33

Kg/M
0 X
100 X
17 X 1500

0.00

Cm

Provide thickness of wall 20 cm > 0.00 Cm


Ast for (-) Ve BM

Ast for +Ve BM


Minimum % of Steel

0.0
0.87

X
(20 -

100
5 ) X 1500

0.00 Sqcm

261.9
X
0.87
(20 -

100
5 ) X 1500

1.34 Sqcm

0.00

Sqcm

& on each face

Sqcm

Provide 10mm Tor steel at 15cm c/c on inner face as vertical reinforcement from base and curtail alternate
bar above 1.5m and provide 8mm tor at 30 cm c/c on
=
outerface wall as vertical bars.
Ast provide

6.91

>

Sqcm

4.34

Sqcm

Check for Shear


Shear force at base when tank is full and no soil out side
P

Shear stress

=
0.87

% of Steel provided

Detailed Scheme Report

3000
100 X( 20 -

5)
6.91
15

1000 X 3.0 =

=
x 100
x 100

3000

Sqcm

2.299 Kg/Sqcm

0.46 %

Niketan Consultants

Jal Nirmal Project

Permissible shear stress for


As per IS 456

0.46%

of steel
( 2.9 - 2.2 )
0.25

2.2 +
=

X3

12.80

>

Kg/Sqcm

2.299

Kg/Sqcm

Hence Safe

when no water inside and soil is outside


the earth pressure from out side cause hoop compression
P=
Assume =
Angle of repose =

2000

rst =

1- sin
1+sin
Saturated density of soil =

rst X h

)
2000

Kg/Cum

20o
X

Hoop compression

1- sin 20o

( 1+sin 20o

= P

X (

2941.88 X (

=
Compression stress developed
due to hoop compression

)=

6000 x

1 1 +

0.342
0.342

2941.88 kg/Sqm

D + 2t)

2941.88 x
=

7 +

2x

7.4

21770
100 X 20

0.2 )
21769.912
=

10.89

kg
Kg/Sqcm

<

50

Kg/Sqcm

Hence concrete alone takes the hoop compression


Minimum % of steel already provided
Hence safe
Design of base slab

Detailed Scheme Report

Niketan Consultants

Jal Nirmal Project

Check stability

(Considering water inside and no soil outside)

Assume thickness of slab as


30
& Length Toe =
50
cm
& Length heel =
75
cm
Moment at base of wall due to water
pressure

cm

0.0

Kgmt

Taking moment about point "A"

Sl
No
1 W-1

0.20(

3.3 -

0.35 ) x

W-2

0.75(

3x

W-3

0.30(

1.45 x

W-4
=

Particulars of force in kg
2500

Lever arm in mt

Moment in
Kg/M
885

1475

0.6

1000

2250

1.075

2419

2500

1087.5

0.725

788.4

(Vertical Thurst from spherical dome)


spherical area
Circumference

3.142
5

in kg

X thickness X 2500

39.58
X
6.95

X 0.15X

2500

679.7

0.6

Moment at base due to Water pressure

W =
X =

b
2

b
6

1.45
6

-0.00

M = + 4500.01

5492.2 kg
4500.01
5492.2

407.82

0.8193

0.2417

Maximum pressure at toe

1.45
2

>
=

-0.28

1 =

-0.28

Hence safe

5492.2
1.45

(1+

6425.5
1.45

(1+

-704.59 Kg/Sqm

Maximum pressure at heel

Maximum BM at toe

6425.5
1.45

(1-

6425.5
1.45

9567.35 kg/mt

-704.59

6X

-0.280
)
1.45

-1.159l )

6X

-0.280
1.45

Detailed Scheme Report

9567.35

2.159

(0.5)2

2
Maximum BM at heel

Kgm

(0.75)2
2

-88.0738 Kg/mt

2690.82

Kg/mt

Niketan Consultants

Jal Nirmal Project

Thickness of base slab required


2690.8171875
17

30.8172

100
100

X6

But provided 30 cm Hence Safe

Ast required at Toe =

-88.07375
X
x (30 - 5 ) x

100
1500

-0.27

Sqcm

2690.8171875
X
0.87
x (30 - 5 ) x

100
1500

8.25

Sqcm

( 0.3 - 0.2 )
0.35

0.2

100 =

0.00

0.87
Ast required at heel =

X
X

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

30

0.8

0.000

Sqcm

Provide 10 mm tor at 20Cm C/C both top & Bottom


Ast provided

7.85 Sqcm > 5.82 Sqcm Hence safe


For Central portion of slab provide nominal thickness of 20 cm with minimum % of steel required

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

( 0.3 - 0.2 )
0.35
X

20

0.1

100=

0.00

Sqcm

>

0.8

0.000

Sqcm

Provide 8 mm tor steel bothway in two layers at top & bottom at 20 cm C/C
Ast provided =

Detailed Scheme Report

0.5

4.34 Sqcm

Hence safe

Niketan Consultants

Jal Nirmal Project

Design of Pure water SUMP at Sarwad for A.Sngapur and Dadamatti


Storage Capacity
=
75 Cum
Circular tank With Average Water depth of
.' .

Surface area of tank =

Dia of tank

75
3

as planed

25.00

25.00

Sqm

3.142

5.64

Provide 5.75 m tank

0.30mt Free board

5.75 m
3.0mt

Design of top dome


Thickness of the dome normally varies between 10 Cm to 15Cm .
For our design let us adopt 15 Cm thick dome,
Loads
Self weight of dome =
0.15
X
2500
Live load

375

Kg/Sqm

150
525

Kg/Sqm
Kg/Sqm

Total
1
1
to
4
6
Radius of dome can be calculated by equation

Rise of dome =

D
2

r (2R-r) =
0.9583

Of span

0.958

r
R
D
=

5.75
6

0.95833

=
Rise
=
Radius of dome
=
Dia of tank
5.75 2
22

2R = 2.9

+
0.96

0.96

4.8

mt

SAY 4.80 mt
Sin f

D/2
=
R

2.875
4.80
f

0.599

36o 47'

<

50o

Hence dome is under compression


Use M20 Grade Concrete,Steel-Fe 415
Permissible stress in concrete .

Detailed Scheme Report

s cbc
s st

70

1500

Kg/Sqcm
Kg/Sqcm

Niketan Consultants

Jal Nirmal Project

Hoop stress at any angle given by

Maximum hoop stress occurs when


s=

525

WR

4.8
0.15

8400

kg/Sqm

or

0.84

kg/Sqcm

(Cos f2

t(1

+
+

Cos
Cos

+
1

1
+

<

12

kg/Sqcm

f
f)

1)

(Even if thickness of dome slab is taken as 10 cm then stress work out 2.73 kg/Sqcm )
Maximum meridional stress occurs at 36o 38'

525

=
=

12

WR

1-

0.15

Cos

(1-

Cos

f)

Sin2

36o 47'

(Sin 36o47')2

525

X 12
0.15
= 23021.12

( 0.599 )

0.8

kg/Sqm

= 2.302

<

kg/Sqcm

12

kg/Sqcm

Hence safe
If thickness of dome slab taken as 10 cm then Stress work out to 2.71 Kg/Sqcm < 12 kg/Sqcm)
Hence to make it more safe 15 cm thick dome slab has been adopted.
0.3
0.2
0.3
X
0.05
(
)
0.35

Minimum % of Steel =

Ast

0.23

=
X

100
100

0.23 %
X
15

3.45

X 0.8

Sqcm

Hence minimum Reinforcement of 0.23% of gross sectional area is provided


Provide 10mm Dia at 20cm c/c(Ast provided 3.925 Sqcm) in each principal direction.
Design of Ring beam
Meridional thrust per M length

23021.12

15
100

3453.17

kg/M

the ring beam to resist the horizontal component of meridional thurst at the end of the dome.
The ring beam is subjected to hoop tension.
Horizontal Component of meridional thrust

Hoop tension

=
=
=

D
2

=
=

Provide beam size(assumed)


Ast required

30
X
25
Cm
8199.4211285
=
=
10.933
750
For beam minimum reinforcement as per IS_456-1978 page no 71 - Class 25.5.1.1

Minimum reinforcement for beam

As

Detailed Scheme Report

Cos f
3453.17 X Cos 36o80'
2851.9725665 Kg/M
5.75
2851.9725665
X
2
8199.4211285
Kg
T

=
As
bd

Sqcm

As
=

0.85
fy

Minimum area of reinforcement

Niketan Consultants

Ch
ara
cte
rist
ic
str
b
= en
Breadth of beam
d
= gth
Effective depth
of
fy = Rei
nfo
This should not be greater than maximum
=
rce Reinforcement
inforcement
As
=
me
nt
in
=
N/
Sq
m
=
m
providing 20 mm dia Tor 5No
314.16
Ast =
1570.80
Area provided

Ac =

30

15.71
25

Sqcm

>

10.933

(13 - 1)

Tensile stress in concrete =

Jal Nirmal Project

0.04
0.85

bd
X

bd

0.85

X
415

30

1.536

Sqcm

fy
X

25

Sqcm

X 15.71 =
8199.42
938.5

938.52

Kg/Sqm

8.74kg/sqcm

<

12 kg/Sqm

Hence safe
Minimum Shear reinforcement
As per IS-456-1975 Class 25.5.1.6
Minimum shear reinforcement

Asv

0.4
fy

bsv

Asv

Sv

= Total cross sectional area of stirrups legs effective in shear

sv
b

= stirrup spacing along the length of the member


=
Breadth of beam

fy

Asv X
0.4 x

fy
b

Characteristic strength of the stirrup reinforcement in N/ Sqmm which shall not be taken
greater than 415 N/Sqmm

Then spacing Sv

Detailed Scheme Report

If we adopt 8mm Two legged stirrup .


=

X
0.4

0.5
X

X
30

415

34.58

Cm C/C

Niketan Consultants

Jal Nirmal Project

Hence provide 8mm Stirrup at 300 mm C/C

Design of Circular wall


Material to be M 20Grade concrete
Tor steel Fe 415 N/Sqmm
Thickness of wall shall not be less than
(I) 15Cm(minimum)
(ii) 3Cm per M depth + 5Cm =14Cm
Adopt 20Cm thick wall
As the roof dome is designed on Membrane theory , the tank is assumed free at top and fixed at base
H2
Dt

32

5.75 x

0.2

7.83

Refer IS 3370 part IV table 9


Case 1
Critical condition when tank Is full, No soil out side
P = wh
=

1000
H2
Dt

Maximum hoop tension for

3000

7.83

Kg/Sqm
=

Coefficient

WXH

D
2
.

Maximum hoop stress accures at 0.6H


By inter pollution

Detailed Scheme Report

H2
Dt

6.0

Coefficient 0.362

H2
Dt

Coefficient 0.429

Niketan Consultants

Jal Nirmal Project

Coefficient for hoop tension =


For

H2
=
Dt

1)

1.830

1.000

7.83

Maximum hoop tension

Ast =

(0.575 -

0.514 +

s st

1.000

8625

kg

8625

1500

Ast Minimum %

Ast minimum

provided on both face

Spacing of 10 mm dia bar

10

5.75

20 X
5.75
2

0.7854

100

=
X
25

5.75
2

1000 X

Sqcm

( 0.3 0.35

0.3 -

0.2 )

0.1

0.000000
100

X 0.8 =

0.00 Sqcm

0.000000

on both face 2.17 Sqcm

2.88 Sqcm
100

###

3.14 Sqcm

Provide 10mm dia bar at 25 cm C/C on both faces in the form of horizontal ring up to 2 M from Top (Steel provided
6.28 sqcm)and provide 8mm Dia tar at 20 cm C/C both faces up to 1m Height from bottom(Ast provided 5 sqcm)
The minimum Ast provided from both portion =
2
X5
X 0.5
= ### >

0.00

Sqm

Check for tensile Stress in Concrete


Equivalent Area

100 X

Tensile stress in concrete

20
=

+ (13

-1 )

6.28

8625
2075.36

4.16

2075.36 Sqcm

Kg/Sqcm <

12 Kg/Sqcm

Design for Bending Moment


Refer table -10 or Refer table 5. And 6 of book design of reinforced concrete structures ,page no .528.
Co efficient X W X H3
Maximum
-Ve BM
=
for

H2
Dt

= 7.83

0.0146 +

(0.0187 -

=
Maximum

+Ve BM

0)

0 X

1000 X

0.0

1.830

0.00000

1.830

0.0000

33

KgM

Occurs at 0.7 H
=

Co efficient X W X H3

0.0038 +

Detailed Scheme Report

0.00000

(0.0051 -

0)

1000

33

Kg/M

Niketan Consultants

Jal Nirmal Project

Thickness of Wall required for (-) BM


Required as per IS 3370-Part iv

0 X
100 X
17 X 1500

0.00

Cm

Provide thickness of wall 20 cm > 0.00 Cm


Ast for (-) Ve BM

Ast for +Ve BM


Minimum % of Steel

0.0
0.87

X
(20 -

100
5 ) X 1500

0.00 Sqcm

261.9
X
0.87
(20 -

100
5 ) X 1500

1.34 Sqcm

0.00

Sqcm

& on each face

Sqcm

Provide 10mm Tor steel at 15cm c/c on inner face as vertical reinforcement from base and curtail alternate
bar above 1.5m and provide 8mm tor at 30 cm c/c on
=
outerface wall as vertical bars.
Ast provide

6.91

>

Sqcm

4.34

Sqcm

Check for Shear


Shear force at base when tank is full and no soil out side
P

Shear stress

=
0.87

3000
100 X( 20 -

% of Steel provided

5)
6.91
15

Permissible shear stress for


As per IS 456

1000 X 3.0 =

0.46%
2.2 +

Sqcm

2.299 Kg/Sqcm

x 100
x 100

of steel
( 2.9 - 2.2 )
0.25

3000

X4

0.46 %

16.40

Kg/Sqcm

2.299

>

Kg/Sqcm

Hence Safe

when no water inside and soil is outside


the earth pressure from out side cause hoop compression
P=
Assume =
Angle of repose =

2000

Hoop compression

rst =

)
2000

Kg/Cum

20o
X

1- sin 20o

( 1+sin 20o

= P

X (

2941.88 X (

Detailed Scheme Report

1- sin
1+sin
Saturated density of soil =

rst X h

)=

6000 x

1 1 +

0.342
0.342

2941.88 kg/Sqm

D + 2t)

2941.88 x

6 +

2x

6.4

0.2 )
18828.032

kg

Niketan Consultants

Jal Nirmal Project

Compression stress developed


due to hoop compression

18828
100 X 20

9.41

Kg/Sqcm

<

50

Kg/Sqcm

Hence concrete alone takes the hoop compression


Minimum % of steel already provided
Hence safe
Design of base slab

Check stability

(Considering water inside and no soil outside)

Assume thickness of slab as


30
& Length Toe =
50
cm
& Length heel =
75
cm
Moment at base of wall due to water
pressure

cm

0.0

Kgmt

Taking moment about point "A"

Sl
No
1 W-1

0.20(

3.3 -

0.35 ) x

W-2

0.75(

3x

W-3

0.30(

1.45 x

W-4
=

Particulars of force in kg
2500

Lever arm in mt

Moment in
Kg/M
885

1475

0.6

1000

2250

1.075

2419

2500

1087.5

0.725

788.4

(Vertical Thurst from spherical dome)


spherical area
Circumference

3.142
5

in kg

28.90
X
5.95

X thickness X 2500

X 0.15X

2500

Moment at base due to Water pressure

Detailed Scheme Report

579.7

0.6

347.82

-0.00

Niketan Consultants

Jal Nirmal Project

W =
X =

M = + 4440.01

5392.2 kg
4440.01
5392.2

b
2

b
6

1.45
6

Kgm

0.8234

0.2417

Maximum pressure at toe

1.45
2

>

-0.28

1 =

-0.28

Hence safe

5392.2
1.45

(1+

6425.5
1.45

(1+

-704.59 Kg/Sqm

Maximum pressure at heel

Maximum BM at toe

6425.5
1.45

(1-

6425.5
1.45

9567.35 kg/mt

-704.59

6X

-0.280
)
1.45

-1.159l )

6X

-0.280
1.45

2.159

(0.5)2

2
Maximum BM at heel

9567.35

(0.75)2
2

2690.8171875
17

X
X

100
100

-88.0738 Kg/mt

2690.82

Kg/mt

Thickness of base slab required

But provided 30 cm Hence Safe

30.8172

Ast required at Toe =

-88.07375
X
x (30 - 5 ) x

100
1500

-0.27

Sqcm

2690.8171875
X
0.87
x (30 - 5 ) x

100
1500

8.25

Sqcm

( 0.3 - 0.2 )
0.35

0.2

100 =

0.00

0.87
Ast required at heel =

X6

Minimum Ast required =

Minimum Ast required =

0.3 -

0.000
100

30

0.8

0.000

Sqcm

Provide 10 mm tor at 20Cm C/C both top & Bottom


Ast provided

Detailed Scheme Report

7.85 Sqcm > 5.82 Sqcm Hence safe

Niketan Consultants

Jal Nirmal Project

For Central portion of slab provide nominal thickness of 20 cm with minimum % of steel required

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

( 0.3 - 0.2 )
0.35
X

20

0.1

100=

0.00

Sqcm

>

0.8

0.000

Sqcm

Provide 8 mm tor steel bothway in two layers at top & bottom at 20 cm C/C
Ast provided =

Detailed Scheme Report

0.5

4.34 Sqcm

Hence safe

Niketan Consultants

Design of Pure water SUMP OF 50000LTR CAPACITY


Storage Capacity
=
50 Cum
Circular tank With Average Water depth of
.' .

Surface area of tank =

Dia of tank

50
3

as planed

16.67

16.67

Sqm

3.142

4.61

Provide 4.75 m tank

0.30mt Free board

4.75 m
3.0mt

Design of top dome


Thickness of the dome normally varies between 10 Cm to 15Cm .
For our design let us adopt 15 Cm thick dome,
Loads
Self weight of dome =
0.15
X
2500
Live load

375

Kg/Sqm

150
525

Kg/Sqm
Kg/Sqm

Total
1
1
to
4
6
Radius of dome can be calculated by equation

Rise of dome =

D
2

r (2R-r) =
0.7917

2R =

2.4

0.792

Of span

r
R
D
=

=
Rise
=
Radius of dome
=
Dia of tank
4.75 2
22

+
0.79

0.79

4.0

mt

SAY 4.00 mt
Sin f

D/2
=
R

2.375
4.00
f

0.594

36o 26'

<

50o

4.75
6

0.79167

Hence dome is under compression


Use M20 Grade Concrete,Steel-Fe 415

s cbc
s st

Permissible stress in concrete .

Hoop stress at any angle given by

Maximum hoop stress occurs when


s=

525

70

1500

WR

4
0.15

7000

kg/Sqm

or

0.7

kg/Sqcm

Kg/Sqcm
Kg/Sqcm

(Cos f2

t(1

+
+

Cos
Cos

+
1

1
+

<

12

kg/Sqcm

(1-

Cos

f)

Sin

1)

f
f)

(Even if thickness of dome slab is taken as 10 cm then stress work out 2.73 kg/Sqcm )
Maximum meridional stress occurs at 36o 38'

=
=

525

12

WR

1-

0.15

Cos

36o 47'

(Sin 36 47')
o

525

X 12
0.15
= 23410.31

( 0.594 )

0.8

kg/Sqm

= 2.341

<

kg/Sqcm

12

kg/Sqcm

Hence safe
If thickness of dome slab taken as 10 cm then Stress work out to 2.71 Kg/Sqcm < 12 kg/Sqcm)
Hence to make it more safe 15 cm thick dome slab has been adopted.
0.3
0.2
0.3
X
0.05
(
)
0.35

Minimum % of Steel =

Ast

0.23

=
X

100
100

0.23 %
X
15

3.45

X 0.8

Sqcm

Hence minimum Reinforcement of 0.23% of gross sectional area is provided


Provide 10mm Dia at 20cm c/c(Ast provided 3.925 Sqcm) in each principal direction.
Design of Ring beam
Meridional thrust per M length

23410.31

15
100

the ring beam to resist the horizontal component of meridional thurst at the end of the dome.

3511.55

kg/M

The ring beam is subjected to hoop tension.


Horizontal Component of meridional thrust

Hoop tension

=
=
=

D
2

=
=

Provide beam size(assumed)

30
X
25
Cm
6911.3726955
=
=
9.215
750
For beam minimum reinforcement as per IS_456-1978 page no 71 - Class 25.5.1.1

Ast required

Ch
Minimum reinforcement for beam
=
As
ara
As
cte
=
bd
rist
ic
As = str
Minimum area of reinforcement
b
= en
Breadth of beam
d
= gth
Effective depth
of
fy = Rei
nfo
This should not be greater than maximum
=
rce Reinforcement
inforcement
As
=
me
nt
in
=
N/
Sq
m
=
m
providing 20 mm dia Tor 3No
314.16
Ast =
942.48
Area provided
Ac =

Cos f
3511.55 X Cos 36o80'
2910.0516612 Kg/M
4.75
2910.0516612
X
2
6911.3726955
Kg
T

=
30

9.42
25

Tensile stress in concrete =

Sqcm

>

9.215

(13 - 1)

0.85
fy

0.04
0.85

bd
X

bd

0.85

X
415

30

1.536

Sqcm

fy
X

25

Sqcm

X 9.42 =
6911.37
863.0

863.04

Kg/Sqm

8.01kg/sqcm

<

12 kg/Sqm

Hence safe
Minimum Shear reinforcement
As per IS-456-1975 Class 25.5.1.6
Minimum shear reinforcement

Asv
bsv

Asv

Sqcm

0.4
fy

= Total cross sectional area of stirrups legs effective in shear

sv
b

= stirrup spacing along the length of the member


=
Breadth of beam

fy

Characteristic strength of the stirrup reinforcement in N/ Sqmm which shall not be taken
greater than 415 N/Sqmm

Sv

Asv X
0.4 x

fy
b

If we adopt 8mm Two legged stirrup .

Then spacing Sv

X
0.4

0.5
X

X
30

415

34.58

Cm C/C

Hence provide 8mm Stirrup at 300 mm C/C

Design of Circular wall


Material to be M 20Grade concrete
Tor steel Fe 415 N/Sqmm
Thickness of wall shall not be less than
(I) 15Cm(minimum)
(ii) 3Cm per M depth + 5Cm =14Cm
Adopt 20Cm thick wall
As the roof dome is designed on Membrane theory , the tank is assumed free at top and fixed at base
H2
Dt

32

4.75 x

0.2

9.47

Refer IS 3370 part IV table 9


Case 1
Critical condition when tank Is full, No soil out side
P = wh
=

Maximum hoop tension for

1000
H2
Dt

3000

9.47

Kg/Sqm
=

Coefficient

WXH

D
2
.

Maximum hoop stress accures at 0.6H


By inter pollution

H2
Dt

8.0

Coefficient 0.362

H2
Dt

10

Coefficient 0.429

Coefficient for hoop tension =


For

H2
=
Dt

1)

1.470

1.000

9.47

Maximum hoop tension

Ast =

(0.608 -

0.575 +

s st

1.000

7125

kg

7125

Ast minimum

provided on both face

10

1500

Ast Minimum %

Spacing of 10 mm dia bar

4.75

20 X
=

4.75
2

0.7854

Sqcm

( 0.3 0.35

0.3 -

100 X

=
X
25

4.75
2

1000 X

0.2 )

0.1

0.000000
100

X 0.8 =

0.00 Sqcm

0.000000

on both face 2.17 Sqcm

2.38 Sqcm
100

6.28 Sqcm

3.14 Sqcm

Provide 10mm dia bar at 25 cm C/C on both faces in the form of horizontal ring up to 2 M from Top (Steel provided
6.28 sqcm)and provide 8mm Dia tar at 20 cm C/C both faces up to 1m Height from bottom(Ast provided 5 sqcm)
The minimum Ast provided from both portion =
2
X5
X 0.5
= ### >

0.00

Sqm

Check for tensile Stress in Concrete


Equivalent Area

100 X

Tensile stress in concrete

20
=

+ (13

-1 )

6.28

7125
2075.36

3.43

2075.36 Sqcm

Kg/Sqcm

<

12 Kg/Sqcm

Design for Bending Moment


Refer table -10 or Refer table 5. And 6 of book design of reinforced concrete structures ,page no .528.
Maximum
-Ve BM
=
Co efficient X W X H3
for

H2
Dt

= 9.47

0.0122 +

(0.0146 -

0)
1

1.470

0.00000

=
Maximum +Ve BM

0 X

1000 X

0.0

33

KgM

Occurs at 0.7 H
=

Co efficient X W X H3

(0.0038 -

0.0029 +

0.00000

Thickness of Wall required for (-) BM


Required as per IS 3370-Part iv

0)

1000

1.470

33

Kg/M
0 X
100 X
17 X 1500

0.00

Provide thickness of wall 20 cm > 0.00 Cm


Ast for (-) Ve BM

Ast for +Ve BM


Minimum % of Steel

0.0
0.87

X
(20 -

100
5 ) X 1500

0.00 Sqcm

261.9
X
0.87
(20 -

100
5 ) X 1500

1.34 Sqcm

0.00

Sqcm

& on each face

Sqcm

Provide 10mm Tor steel at 15cm c/c on inner face as vertical reinforcement from base and curtail alternate
bar above 1.5m and provide 8mm tor at 30 cm c/c on
=
outerface wall as vertical bars.
Ast provide

6.91

>

Sqcm

4.34

Sqcm

Check for Shear


Shear force at base when tank is full and no soil out side
P

Shear stress

=
0.87

3000
100 X( 20 -

% of Steel provided

0.46%
2.2 +
=

6.91
15

Permissible shear stress for


As per IS 456

1000 X 3.0 =

5)

0.0000

3000

Sqcm

2.299 Kg/Sqcm

x 100
x 100

of steel
( 2.9 - 2.2 )
0.25

X5

0.46 %

20.00

Kg/Sqcm

2.299
Hence Safe

>

Kg/Sqcm

Cm

when no water inside and soil is outside


the earth pressure from out side cause hoop compression
P=
Assume =
Angle of repose =

2000

rst =

1- sin
1+sin
Saturated density of soil =

rst X h

)
2000

20o
X

Hoop compression

1- sin 20o

( 1+sin 20o

= P

X (

2941.88 X (

=
Compression stress developed
due to hoop compression

)=

6000 x

1 1 +

0.342
0.342

2941.88 kg/Sqm

D + 2t)

2941.88 x
=

5 +

2x

5.4

0.2 )
15886.152

15886
100 X 20

Hence concrete alone takes the hoop compression


Minimum % of steel already provided
Hence safe
Design of base slab

Check stability

Kg/Cum

(Considering water inside and no soil outside)

7.94

kg
Kg/Sqcm

<

50

Kg/Sqcm

Assume thickness of slab as


30
& Length Toe =
50
cm
& Length heel =
75
cm
Moment at base of wall due to water
pressure

cm

0.0

Kgmt

Taking moment about point "A"

Sl
No
1 W-1

0.20(

3.3 -

0.35 ) x

W-2

0.75(

3x

W-3

0.30(

1.45 x

W-4
=

Particulars of force in kg
2500

Lever arm in mt

Moment in
Kg/M
885

1475

0.6

1000

2250

1.075

2419

2500

1087.5

0.725

788.4

(Vertical Thurst from spherical dome)


spherical area
Circumference

3.142
5

in kg

X thickness X 2500

19.90
X
4.95

X 0.15X

2500

479.8

0.6

Moment at base due to Water pressure

W =
X =

b
2

b
6

1.45
6

Kgm

0.8276

0.2417

Maximum pressure at toe

1.45
2

>
=

-0.28

1 =

-0.28

Hence safe

5292.3
1.45

(1+

6425.5
1.45

(1+

-704.59 Kg/Sqm

Maximum pressure at heel

Maximum BM at toe

-0.00

M = + 4380.07

5292.3 kg
4380.07
5292.3

287.88

6425.5
1.45

(1-

6425.5
1.45

9567.35 kg/mt

-704.59

X
2

6X

-0.280
)
1.45

-1.159l )

6X

-0.280
1.45

2.159

(0.5)2

-88.0738 Kg/mt

Maximum BM at heel

9567.35

(0.75)2
2

2690.82

Kg/mt

Thickness of base slab required


2690.8171875
17

30.8172

100
100

X6

But provided 30 cm Hence Safe

Ast required at Toe =

-88.07375
X
x (30 - 5 ) x

100
1500

-0.27

Sqcm

2690.8171875
X
0.87
x (30 - 5 ) x

100
1500

8.25

Sqcm

( 0.3 - 0.2 )
0.35

0.2

100 =

0.00

0.87
Ast required at heel =

X
X

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

30

0.8

0.000

Sqcm

Provide 10 mm tor at 20Cm C/C both top & Bottom


Ast provided

7.85 Sqcm > 5.82 Sqcm Hence safe


For Central portion of slab provide nominal thickness of 20 cm with minimum % of steel required

Minimum Ast required =

0.3 -

Minimum Ast required =

0.000
100

( 0.3 - 0.2 )
0.35
X

20

0.1

100=

0.00

Sqcm

>

0.8

0.000

Sqcm

Provide 8 mm tor steel bothway in two layers at top & bottom at 20 cm C/C
Ast provided =

0.5

4.34 Sqcm

Hence safe