ITF Headquarters Office Complex Extension

ITEM

DESCRIPTION
ITF HEADQUARTERS OFFICE COMPLEX
EXTENSION

QTY

BILL NO 2
DEMOLITION WORKS
DEMOLITION OF EXISTING FUEL DUMP
EXISTING BUILDING

Rads Quants Associates

NOTE THE FOLLOWING


A

Prior to commencement of demolition works on site


the contractor shall accompany the supervising
consultants around the area of the proposed work
and agree with the supervising consultants a survey
of existing conditions of the aforesaid area. Any
damages occasioned thereafter, will be deemed to
be the Contractor's responsibility, and be made good
to the supervising Consultants' satisfaction at the
Contractors' expense

During tendering the Tenderer is once again strongly


advised to visit the site and ascertain the work to be
done before putting a sum of money to cover each
item of work described below

All debris and articles arising from demolitions and


excavation where not described as to be set aside for
re-use or handed over to the employer are to be got
out and cleared away from site

Allow for careful demolition of existing sales


office building and cart away debris as directed

sum

Allow for removal of all electrical installations,


pipework, fuel pumps, canopies and cart
away as directed

sum

Fence
F

Allow for careful demolition of perimeter fencing


around the fuel dump and cart away debris
from site (Approx Area 240 sq.m

sum

Remove existing metal gate and cart away


as directed

sum

BILL NO. 2
Demolition Works

ITF/DEM/1

UNIT

RATE

ITF Headquarters Office Complex Extension

ITEM
A

Carried to Collection
DESCRIPTION

QTY

Allow for digging around buried fuel tanks (3Nr),


exhume tanks and cart away as directed

sum

Breaking of Oversite Concrete


B

Allow for breaking of oversite concrete and


cartaway debris from site (Approx area
800sq.m)

Rads Quants Associates

DEMOLITION OF EXISTING FUEL DUMP


Carried to Collection

COLLECTION

PAGE NO.

ITF/ DEM/1

PAGE NO.

ITF/ DEM/2

BILL NO. 2
Demolition Works

ITF/DEM/2

sum

UNIT

RATE

ITF Headquarters Office Complex Extension

DEMOLITION WORKS
Carried to Summary

BILL NO. 2
Demolition Works

ITF/DEM/3

ITF Headquarters Office Complex Extension

AMOUNT

500,000.00

312,500.00

165,000.00

15,000.00

BILL NO. 2
Demolition Works

ITF/DEM/4

ITF Headquarters Office Complex Extension

992,500.00
AMOUNT

562,500.00

937,500.00

1,500,000.00

992,500.00

1,500,000.00

BILL NO. 2
Demolition Works

ITF/DEM/5

ITF Headquarters Office Complex Extension

2,492,500.00

BILL NO. 2
Demolition Works

ITF/DEM/6

ITF Headquarters Office Complex Extension

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT

ITF HEADQUARTERS OFFICE COMPLEX


EXTENSION
BILL NO. 10
REMEDIAL WORKS
REHABILITATION OF ACCESS ROAD
ADJACENT ITF BOUNDARY FENCE
[PROVISIONAL]
A

Scarify existing road surface and verges to a depth


not exceeding 400mm shape and compact to 100
B.S. compaction as sub grade

4,100

sq.m

350.00

1,435,000.00

300mm average thickness laterite fill 30%


soaked CBR value spread and compacted to
100% WAS compaction

1,230

cub.m

3,656.00

4,496,880.00

150mm thick laterite base 80% soaked CBR


Value (min) spread and compacted to 100%
WAS. Compaction

4,100

sq.m

550.00

2,255,000.00

Provide and lay prime coat using cut back bitumen


MC 1 at the rate of 1.1 litres/m 2 including blinding
with sand or quarry fines.

4,100

sq.m

600.00

2,460,000.00

Provide and lay second coat bituminous surface


dressing using Emulsion bitumen with 12mm single
size crushed stone chippings (haulage inclusive)

4,100

sq.m

600.00

2,460,000.00

Adjustment of items E & F for increasing or


decreasing rate of spread of bitumen by oil litres
per sq.m (Provisional sum)

4,100

sq.m

600.00

2,460,000.00

Provide equipment to site and remove on


completion of works

sum

Allow for making good all work disturbed

sum

REHABILITATION OF ACCESS ROAD ADJACENT


Bill No. 10
Remedial Works

ITF/REM/7

1,500,000.00

500,000.00

ITF Headquarters Office Complex Extension

ITF BOUNDARY FENCE


Carried to Collection
ITEM
DESCRIPTION

QTY

UNIT

RATE

17,566,880.00
AMOUNT

Existing Storm Water Drain Along The


Access Road
A

Allow for the reconstruction of damaged drain


including blockwork, rendering, concrete
copping to make up level of road where
necessary

sum

312,500.00

Allow for making good all work described

sum

300,000.00

Existing Storm Water Drain Along The


Access Road
Carried to Collection

612,500.00

COLLECTION

Bill No. 10
Remedial Works

PAGE NO.

ITF/ REM/1

17,566,880.00

PAGE

ITF/ REM/ 2

612,500.00

NO

ITF/REM/8

ITF Headquarters Office Complex Extension

REHABILITATION OF ACCESS ROAD


ADJACENT ITF BOUNDARY FENCE
Carried to Summary

Bill No. 10
Remedial Works

18,179,380.00

ITF/REM/9

Proposed residential development


ITEM

for

DESCRIPTION

Mr.Henry Ugwuadu
QTY

UNIT

RATE

PROPOSED RESIDENTIAL DEVELOPMENT FOR MR.


HENRY UGWUADU AT OKPO -OBA UMUCHOKO
EMEKUKU, OWRRI NORTH LGA IMO STATE
SUBSTRUCTURE [ALL PROVISIONAL]
Site Preparation
A

Clear site of all shrubs, ant hills, bushes, under growth,


small trees not exceeding 600mm girth, large stone ,rubbish
debris etc and remove from site

217

50.00

Excavation
B

Excavate trench for foundation maximum depth not


exceeding 2.00m commencing from stripped level

40

cub.m

650.00

Ditto pit for column bases not exceeding 2.00m

63

cub.m

650.00

Apply "Dieldrex" anti-termite treatment to sides and bottom


of excavation

222

sq.m

100.00

Remove surplus excavated materials from site

38

cub.m

210.00

Backfill with selected excavated materials around foundation


trenches
65

cub.m

250.00

Hardcore filling
G

300mm approved rock laterite hardcore filling

158

sq.m

760.00

450mm Approved laterite earth filling to make up level under


floor slab, well compacted and consolidated in 150mm
layers.
71

cub.m

2,500.00

CONCRETE WORK
Plain in- situ concrete [ 1:3:6-38mm aggregate ]
developing minimum 15m/sq.mm works strength
at 28 days
J

50mm thick [1:10-all in aggregate] blinding

114

sq.m

1,050.00

Foundation footing

10

cub.m

25,000.00

Reinforced in-situ concrete [ 1:2:4-20mm aggregate ]


grade 25 with a minimum cement content of 350kg/m3
and works strength of 25N/sq.mm at 28 days
L

Column bases

28

cub.m

28,000.00

Columns

cub.m

28,000.00

Concrete oversite

32

cub.m

28,000.00

BILL NO. 1
Main Building

PRP/DUP/HUU/10

Proposed residential development

ITEM

for

Carried to collection
DESCRIPTION

Mr.Henry Ugwuadu

QTY

UNIT

RATE

1,686

kg

280.00

185

sq.m

810.00

185

sq.m

350.00

REINFORCEMENT (PROVISIONAL)
High yield tensile steel bars to BS 4449 in straight and
bent positions in columns bases, columns
A

8 -16mm diameter bar

BRC square mesh fabric reinforcement to BS 4483 Ref A


193 lapped 200mm at all joints in concrete slab
DAMP PROOF MEMBRANE
Visqueen 1200 guage polythene sheet 150mm welted
joints and sealing laps with double side single layer
damping horizontal to fall over 300mm wide

Approved damp proof membrane laid


FORMWORK
Sawn formwork to :

Edges of slab not exceeding 250mm high

59

lin.m

300.00

Sides of columns

25

sq.m

2,000.00

122

sq.m

3,800.00

BLOCK WALLS
Hollow sandcrete block work filled with weak concrete in
cement mortar [ 1 : 3 ]

225mm wall

Carried to Collection Below

COLLECTION
PRP/DUP/HUU/ 1.
PRP/DUP/HUU/ 2

BILL NO. 1
Main Building

PRP/DUP/HUU/11

Proposed residential development

for

ELEMENT NO 1 SUBSTRUCTURE
Carried to General Summary
ITEM
DESCRIPTION
ELEMENT NO. 2

Mr.Henry Ugwuadu

QTY

UNIT

RATE

FRAMES

CONCRETE WORK
Reinforced in-situ concrete [1:2:4-20mm aggregate]
grade 25 with a minimum cement content of 350kg/m3
and works strength of 25N/sq.mm at 28 days

Columns

cub.m

28,000.00

Ditto circular Columns

cub.m

28,000.00

Beams

cub.m

28,000.00

150mm thick suspended slab

30

cub.m

28,000.00

5,946

kg

REINFORCEMENT (PROVISIONAL)
High yield tensile steel bars to BS 4449 in straight and
bent positions in columns , slab and beams

10 - 16mm diameter bar

280.00

Formwork
Provide formwork to:F

Sides of Circular Columns

53

sq.m

2,000.00

Ditto retangular columns attach to wall

113

sq.m

2,000.00

Sides and soffit of beam

122

sq.m

2,000.00

Soffit of suspended slab

172

sq.m

2,000.00

Edge of suspended slab 150mm high

66

lin.m

300.00

BILL NO. 1
Main Building

PRP/DUP/HUU/12

Proposed residential development

for

ELEMENT NO 2. FRAMES
Carried to Summary
ITEM
DESCRIPTION

Mr.Henry Ugwuadu

QTY

UNIT

RATE

ELEMENT NO 3
STAIRCASE
CONCRETE WORK
Reinforced in-situ concrete [1:2:4-20mm aggregate]
grade 25 with a minimum cement content of 350kg/m3
and works strength of 25N/sq.mm at 28 days

Concrete footing/Landing beam

cub.m

28,000.00

Waist

cub.m

28,000.00

Steps

cub.m

28,000.00

Landing

cub.m

28,000.00

376

kg

REINFORCEMENT (PROVISIONAL)
High yield tensile steel bars to BS 4449 in straight and
bent positions in staircase
E

10-16mm diameter bars

280.00

Formwork
Sawn formwork to:F

Sloping soffit of staircase

11

sq.m

2,000.00

Soffit of landing

sq.m

2,000.00

Edges of Landing 150mm high

lin.m

300.00

Edge of risers 150mm high

37

lin.m

300.00

Edge of waist 175mm high

14

lin.m

300.00

BILL NO. 1
Main Building

PRP/DUP/HUU/13

Proposed residential development

for

ELEMENT NO 3 STAIRCASE
Carried to Summary
ITEM
DESCRIPTION

Mr.Henry Ugwuadu

QTY

UNIT

RATE

11

cub.m

28,000.00

154

sq.m

2,000.00

1,371

kg

ELEMENT NO.4
EXTERNAL AND INTERNAL WALLS
CONCRETE WORK
Reinforced in-situ concrete [1:2:4-20mm aggregate]
grade 25 with a minimum cement content of 350kg/m3
and works strength of 25N/sq.mm at 28 days
A

Lintel
Formwork
Provide formwork to

Sides and soffit of lintel


REINFORCEMENT (PROVISIONAL)
High yield tensile steel bars to BS 4449 in lintel.

10-12mm diameter bars

280.00

BLOCK WORK
Hollow sandcrete blockwork in cement and sand
mortar ( 1 : 4 )
D

225mm thick wall

503

sq.m

3,500.00

150mm thick wall

32

sq.m

2,850.00

BILL NO. 1
Main Building

PRP/DUP/HUU/14

Proposed residential development

for

ELEMENT NO. 4 EXTERNAL AND INTERNAL WALLS


Carried to Summary
ITEM
DESCRIPTION
ELEMENT NO. 5

Mr.Henry Ugwuadu

QTY

UNIT

RATE

ROOF

CONCRETE WORK
Reinforced in-situ concrete [1:2:4-20mm aggregate]
grade 25 with a minimum cement content of 350kg/m3
and works strength of 25N/sq.mm at 28 days
A

Roof beams

cub.m

28,000.00

Fascia concrete

10

cub.m

28,000.00

1,764

kg

REINFORCEMENT (PROVISIONAL)
High yield tensile steel bars to BS 4449 in staight and
bent positions placed into formwork in roof beam and
fascia
C

10-16 mm diameter bars

280.00

Formwork
Sawn formwork to:
D

Sides and soffit of roof beams

122

sq.m

2,000.00

Sides of fascia

44

sq.m

2,000.00

ROOF TRUSSES
The following in sawn and treated hardwood
timber roof trusses in
F

50 x 100mm Rafter

198

lin.m

350.00

50 x 150mm tie beam

160

lin.m

400.00

50 x 100mm struts

670

lin.m

350.00

50 x 75mm purlins

350

lin.m

300.00

50 x 50mm Noggins

632

lin.m

200.00

50 x 75mm wall plate

59

lin.m

280.00

ROOF COVERING
BILL NO. 1
Main Building

PRP/DUP/HUU/15

Proposed residential development

for

Mr.Henry Ugwuadu

0.7mm metro tiles roofing sheet fixed to timber purling


with alocrom finish fixed in accordance with
manufactural's instructions
M

Roofing

291

sq.m

4,500.00

Ridge capping 600mm girth

67

lin.m

1,900.00

QTY

UNIT

RATE

ELEMENT NO 5 ROOF

Carried to summary
ITEM

DESCRIPTION
ELEMENT NO 6

METAL WORK
WINDOWS
Supply and fix silver anodized Aluminium casement
window with 5mm thick tinted glass ,fixed light, fly screen
bottom fixed including cutting and pinning lugs to
concrete or block work surrounded and bedded frame in
cement and sand mortar (1:6) and pointing internally and
externally as per Architect's schedule

Window size 1200mm x 3900mm high

nr

51,000.00

Window size 1200mm x 2000mm high

nr

30,000.00

Window size 1200mm x 1500mm high

20

nr

30,000.00

Window size 600mm x 600mm high

nr

10,000.00

Fabricate and fix burglar proof using 50 x 50mm hollow pipe


frame and 25 x 50mm for horizontal stiffeners 16mm diamet
bars, for vertical bracing at 150mm centres in accordance
to Architect's schedule

Window size 1200mm x 3900mm high

nr

18,000.00

Window size 1200mm x 2000mm high

nr

14,000.00

Window size 1200mm x 1500mm high

20

nr

12,000.00

Window size 600mm x 600mm high

nr

9,000.00

D1

Nr

220,000.00

D2i

Nr

80,000.00

DOORS
Supply and fix the following approved imported steel
panel Turkish door complete with 9'' wide frame and
lock fixed to wall
L

Turkish Door sizes 1200 x 2100mm high


Panel Door sizes 900 x 2100mm high

BILL NO. 1
Main Building

PRP/DUP/HUU/16

Proposed residential development

for

Mr.Henry Ugwuadu

Panel Door sizes 900 x 2100mm high

D2

12

Nr

80,000.00

Panel Door sizes 900 x 2100mm high

D3

Nr

80,000.00

Nr

48,000.00

QTY

UNIT

Supply and fix the following approved hard wooden


doors complete with frame and ock catcher
M

Ditto size 900mm x 2100mm high

D4

ELEMENT NO. 6 WINDOWS AND DOORS


Carried to Summary
ITEM
DESCRIPTION

RATE

ELEMENT NO. 7 FITTINGS AND FIXTURES


A

Supply and fix chrome aluminium handrail in stair casee


and balconies ,1000mm high with 100mm embedded
concrete, as shown in Architectural details

35

35,000.00

Construct kitchen cabinet as per Architect's approval

Allow for construction of wardrobe

Nr

150,000.00

Supply and fix decorative column casing complete with


ornamental design head size 6900mm long by 600mm
diameter

Nr

15,000.00

BILL NO. 1
Main Building

PRP/DUP/HUU/17

sum

Proposed residential development

for

ELEMENT NO.7 FITTINGS AND FIXTURES


Carried to Summary
ITEM
DESCRIPTION
ELEMENT NO. 8
FINISHINGS

Mr.Henry Ugwuadu

QTY

UNIT

RATE

1,070

sq.m

600.00

172

sq.m

600.00

WALL FINISHINGS
15mm thick cement and sand (1:3) rendering smooth
and finished fair on:
A

Walls Internally and Externally

Soffit of Suspended Concrete slab

Soffit of staircase

11

sq.m

600.00

Soffit of Landing

sq.m

600.00

Edge of waist 175mm high

14

lin.m

200.00

Side of facia concrete

44

sq.m

600.00

Sides of reveal not exceeding 100mm wide

156

lin.m

200.00

50mm thick POP wall molding

274

lin.m

1,000.00

UNGLAZED CERAMIC TILES


250x 300 x 8mm white Unglazed ceramic wall tiles
J

Toilet and Kitchen Walls

166

sq.m

3,000.00

Reveals, not exceeding 100mm wide

14

lin.m

450.00

75

sq.m

4,000.00

FACING SLIPS (STONE EFFECT)


L

Supply and fix scotch tiles on wall faces


Beds and Backings

12mm screeded backing (1:3) for tiles

241

sq.m

600.00

Ditto reveal not exceeding 100mm wide

14

lin.m

200.00

FLOOR FINISHINGS
BILL NO. 1
Main Building

PRP/DUP/HUU/18

Proposed residential development

for

Mr.Henry Ugwuadu

600 x 300 x 8mm Glazed Vitrified italian ceramic floor


tiles bedded in cement mortar (1:3) and pointed in
match cement on screeded bed (measured separately)
N

Floors

255

sq.m

3,700.00

Staircase

15

sq.m

3,700.00

Skirting

60

lin.m

555.00

Unglazed Vitrified ceramic floor tiles in


R

Kitchen and toilets

49

sq.m

3,000.00

Skirting

113

lin.m

450.00

Carried to collection
DESCRIPTION

QTY

UNIT

ITEM

RATE

( Floor finish cont'd )


Beds and Backings
A

50mm thick screeded bed

304

sq.m

700.00

Ditto in staircase

15

sq.m

700.00

Ditto in skirting 75mm high

173

lin.m

200.00

344

sq.m

3,800.00

CEILING FINISHINGS
POP screeding Ceiling on ceiling surfaces generally
applied fixed according to manufactural's instruction
D

Soffit of suspended ceiling and ceiling generally

Carried to Collection

BILL NO. 1
Main Building

PRP/DUP/HUU/19

Proposed residential development

for

Mr.Henry Ugwuadu

PRP/DUP/HUU/9
PRP/DUP/HUU/10

ELEMENT NO 8.FINISHES
Carried to summary
ITEM
DESCRIPTION
ELEMENT NO 9

QTY

ELECTRICAL INSTALLATIONS

Allow a provisional sum of 2,000,000 .00 naira for


the installation of mechanical and electricals

allow for builder's work ( 5%)

ELEMENT NO 9 ELECTRICAL INSTALLATIONS


Carried to summary

ELEMENT NO 10

MECHANICAL INSTALLATIONS

Allow a provisional sum of 1,800,000 .00 naira for


the installation of mechanical and electricals

Allow for builder's work ( 5%)

BILL NO. 1
Main Building

PRP/DUP/HUU/20

UNIT

RATE

Proposed residential development

for

ELEMENT NO 10 MECHANICAL INSTALLATION


Carried to summary
ITEM
DESCRIPTION
ELEMENT NO 11.

Mr.Henry Ugwuadu

QTY

UNIT

RATE

1,070

sq.m

400.00

sq.m

400.00

156

lin.m

150.00

PAINTING AND DECORATING

Prepare and apply POP screed slurry on rendered


surfaces
A

Walls Internally and externally

Soffit of landing

Side of reveal not exceeding 100mm wide

Ditto slopping soffit of staircase

11

sq.m

400.00

Egdes of waist

14

lin.m

150.00

Side of concrete fascia

44

sq.m

400.00

Sides and soffit of exposed beams

122

sq.m

400.00

1,070

sq.m

1,100.00

sq.m

1,100.00

156

lin.m

200.00

Prepare and apply one undercoat and two finishing


coats of high quality screeded magic painting on
H

Walls Internally and externally

Soffit of landing

Side of reveal not exceeding 100mm wide

Ditto slopping soffit of staircase

11

sq.m

1,100.00

Sides of circular columns, 300mm diameter

sq.m

1,100.00

Side of concrete fascia

44

sq.m

1,100.00

BILL NO. 1
Main Building

PRP/DUP/HUU/21

Proposed residential development

for

Mr.Henry Ugwuadu

Prepare and apply one finishing coat of white


emulsion paint on P O P
Q

Soffit of ceiling generally

344

PAINTING AND DECORATING


Carried to Summary
SUMMARY

ELEMENT NO. 1

SUBSTRUCTURE

ELEMENT NO 2

FRAMES

ELEMENT NO 3

STAIRCASE

ELEMENT NO. 4

EXTERNAL AND INTERNAL


WALLS

ELEMENT NO.5

ROOF

ELEMENT NO. 6

WINDOWS AND DOORS

ELEMENT NO. 7

FITTINGS AND FIXTURES

BILL NO. 1
Main Building

PRP/DUP/HUU/22

sq.m

400.00

Proposed residential development

for

ELEMENT NO. 8

FINISHINGS

ELEMENT NO. 9

ELECTRICAL INSTALLATIONS

ELEMENT NO. 10

MECHANICAL INSTALLATIONS

ELEMENT NO. 11 PAINTING AND DECORATING

MAIN BUILDING
Carried to General Summary

BILL NO. 1
Main Building

PRP/DUP/HUU/23

Mr.Henry Ugwuadu

Proposed residential development

BILL NO. 1
Main Building

for

PRP/DUP/HUU/24

Mr.Henry Ugwuadu

Proposed residential development

for

AMOUNT

10,850.00

26,000.00
40,950.00

22,200.00
7,980.00

16,250.00

120,080.00

177,500.00

119,700.00
250,000.00

784,000.00
56,000.00
896,000.00

BILL NO. 1
Main Building

PRP/DUP/HUU/25

Mr.Henry Ugwuadu

Proposed residential development

for

2,527,510.00
AMOUNT

472,080.00

149,850.00

64,750.00

17,700.00
50,000.00

463,600.00

1,217,980.00

2,527,510.00
1,217,980.00

BILL NO. 1
Main Building

PRP/DUP/HUU/26

Mr.Henry Ugwuadu

Proposed residential development

for

3,745,490.00
AMOUNT

182,000.00
168,000.00
252,000.00
840,000.00

1,664,880.00

106,000.00
226,000.00
244,000.00
344,000.00
19,800.00

BILL NO. 1
Main Building

PRP/DUP/HUU/27

Mr.Henry Ugwuadu

Proposed residential development

for

4,046,680.00
AMOUNT

28,000.00
28,000.00
28,000.00
28,000.00

105,280.00

22,000.00
6,000.00
2,100.00
11,100.00
4,200.00

BILL NO. 1
Main Building

PRP/DUP/HUU/28

Mr.Henry Ugwuadu

Proposed residential development

for

262,680.00
AMOUNT

308,000.00

308,000.00

383,880.00

1,760,500.00
91,200.00

BILL NO. 1
Main Building

PRP/DUP/HUU/29

Mr.Henry Ugwuadu

Proposed residential development

for

2,851,580.00
AMOUNT

252,000.00
280,000.00

493,920.00

244,000.00
88,000.00

69,300.00
64,000.00
234,500.00
105,000.00
126,400.00
16,520.00

BILL NO. 1
Main Building

PRP/DUP/HUU/30

Mr.Henry Ugwuadu

Proposed residential development

for

1,309,500.00
127,300.00

3,410,440.00
AMOUNT

102,000.00
60,000.00
600,000.00
60,000.00

36,000.00
28,000.00
240,000.00
54,000.00

440,000.00
80,000.00

BILL NO. 1
Main Building

PRP/DUP/HUU/31

Mr.Henry Ugwuadu

Proposed residential development

for

960,000.00
400,000.00

48,000.00

3,108,000.00
AMOUNT

1,225,000.00

350,000.00

600,000.00

90,000.00

BILL NO. 1
Main Building

PRP/DUP/HUU/32

Mr.Henry Ugwuadu

Proposed residential development

for

2,265,000.00
AMOUNT

642,000.00
103,200.00
6,600.00
1,800.00
2,800.00
26,400.00
31,200.00
274,000.00

498,000.00
6,300.00

300,000.00

144,600.00
2,800.00

BILL NO. 1
Main Building

PRP/DUP/HUU/33

Mr.Henry Ugwuadu

Proposed residential development

for

943,500.00
55,500.00
33,300.00

147,000.00
50,850.00
3,269,850.00
AMOUNT

212,800.00
10,500.00
34,600.00

1,307,200.00

1,565,100.00

BILL NO. 1
Main Building

PRP/DUP/HUU/34

Mr.Henry Ugwuadu

Proposed residential development

for

3,269,850.00
1,565,100.00

4,834,950.00
AMOUNT

1,200,000.00

60,000.00

1,260,000.00

1,800,000.00

90,000.00

BILL NO. 1
Main Building

PRP/DUP/HUU/35

Mr.Henry Ugwuadu

Proposed residential development

for

1,890,000.00
AMOUNT

428,000.00
1,200.00
23,400.00
4,400.00
2,100.00
17,600.00
48,800.00

1,177,000.00
3,300.00
31,200.00
12,100.00
7,700.00
48,400.00

BILL NO. 1
Main Building

PRP/DUP/HUU/36

Mr.Henry Ugwuadu

Proposed residential development

for

137,600.00

1,942,800.00

3,745,490.00

4,046,680.00

262,680.00

2,851,580.00

3,410,440.00

3,108,000.00

2,265,000.00

BILL NO. 1
Main Building

PRP/DUP/HUU/37

Mr.Henry Ugwuadu

Proposed residential development

for

4,834,950.00

1,260,000.00

1,890,000.00

1,942,800.00

29,617,620.00

BILL NO. 1
Main Building

PRP/DUP/HUU/38

Mr.Henry Ugwuadu

Proposed residential development

for

###

BILL NO. 1
Main Building

PRP/DUP/HUU/39

Mr.Henry Ugwuadu

Proposed residential development


ITEM

for

DESCRIPTION

Mr.Henry Ugwuadu
PAGE NO

AMOUNT

GENERAL SUMMARY

BILL NO: 1

MAIN BUILDING

BILL NO : 2

PRELIMINARIES ( 2.5%)

29,617,620.00

740,440.50

SUB TOTAL

30,358,060.50

CONTINGENCIES
Allow a Provisional sum of 1,500,000.00 Naira Only for
contingencies to be expended complete as directed if not
if not expended shall be returned in whole or in part to the client

SUB TOTAL

1,500,000.00

31,858,060.50

ADD
VALUE ADDED TAX ( VAT 5%)

1,592,903.03

GRAND TOTAL COST


Carried to Form of Tender

33,450,963.53

Name of Tenderer .

Address..
.
Time of Completion : Within.....weeks of official taking over site
Signature of Employer Date:....

General summary

GS

Proposed residential development

for

Signature of Contractor:.

General summary

GS

Mr.Henry Ugwuadu

Date:..

Proposed residential development

for

Mr.Henry Ugwuadu

.
..

General summary

GS

Proposed residential development

for

General summary

GS

Mr.Henry Ugwuadu