1. Which of the following is considered a major process flow structure?

Lead Time
Fabrication

Lean Manufacturing

Project
Find the final exam answers here OPS 571 Final Exam

2. ISO audits result in certifications that are done by first, second, or third parties.
Which of the following result in the best certification of a firm?

Certification is sought by any firm assuming they pay annual dues.


2nd Party where a customer audits its supplier

3rd Party where a qualified national or international standards/certifying agency


serves as an auditor
1st Party where a firm audits itself against ISO standards

3. Which of the following is ISO 14000 primarily concerned with?

Quality management
Time management

Continuous improvement management

Environmental management
4. Which is the one correct value stream principle?

Look for efficiencies in the factory, office, physical, procedural, and technical
operations.
Eliminate waste that stops, slows down, or diverts the value stream.
Concentrate on speeding up value-adding operations rather than removing

waste.

Keep the value stream moving at minimum velocity.


Want to download the Complete Assignment..?? Click OPS 571 Week 1 Quiz
(Latest)

5. What is the starting point in developing a capacity plan for a health care
operation?

Determining the effective capacity over time

Estimating design capacity

Forecasting patient demand for a reasonable length of time

Discovery of the bottleneck operation


6. Which of the following is considered an organizational blueprint, which
prescribes the quantity and time frame for when each end product will be
assembled?

MRP (Material Requirements Plan)


ERP (Enterprise Resource Planning)

MPS (Master Production Schedule)

WBS (Work Breakdown Structure)


Download Complete Answers OPS 571 Week 1 Complete

7. Which of the following is an element that addresses elimination of waste under


lean production?

Kanban production control system

Production ahead of demand

Minimized run times

Group plant loading technology


8. In most cases, demand for products or services can be broken into several
components. Which of the following is considered a component of demand?

Level elements
Future elements

Past elements

Cyclical elements
9. Design for manufacturing and assembly delivers product improvements by
emphasizing which of the following:

Reducing product quality during the assembly process


Designing products so they can be manufactured by a virtual factory

Reducing equipment in the production process

Simplification of the product by reducing the number of separate parts


Click here to download Complete Answers of OPS 571
10. Which of the following is one of the principles of reengineering?

Quality at the source


Do not select suppliers on the basis of price alone.

Have those who use the output of a process perform the process.

Leverage high cost employees with lower cost employees.


11. Which of the following is a characteristic that can be used to guide the design
of service systems?

Services are all similar.

Services businesses are inherently entrepreneurial.

Quality work means quality service.

Services cannot be inventoried.


12. Considering Hau Lees uncertainty framework for classifying supply chains,
which of the following is given to a supply chain which has an evolving supply
process based on functional products?

Risk hedging

Forward looking

Efficient

Agile
To download the complete paper click OPS 571 Week 2 Quiz (Latest)

13. There are many applications of poka-yokes in service organizations. Which of


the following is one of the three-T's used to classify poka-yokes?

Trust
Teamwork

Task

Time
14. Which of the following is a major factor that distinguishes service design and
development from manufacturing design and development?
The service package has the same legal protection available to manufactured

goods.

Manufacturing is far more capital intensive than services.

The service process and service product can be developed independently.

The service package is the major output of the development process.


To download the complete answer check OPS 571 Week 2 Complete

15. A project can be segmented into which of the following?

Events
Sub-jobs

Work packages

Success markers
16. Which of the following is a cost impact and payoff analysis tool from the
operations consulting tool kit?

Statistical tools

Decision trees

Work sampling

Gap analysis
17. According to the theory of constraints, which of the following can be a
capacity-constrained resource (CCR)?

Product design
Inoperable equipment

An employee

A customer
Quiz Answers just a click away OPS 571 Week 3 Quiz (Latest)

18. The ability to rapidly and inexpensively switch production from one product to
another enables which of the following:

Economies of shape
Economies of size

Economies of scale

Economies of scope
19. According to the theory of constraints, which of the following financial
measurements can be used to measure the firm's ability to make money?

Operating expenses
Dividends

Sales

Return on investment
Complete Answers just a click away OPS 571 Week 3 Complete

20. Demings PDCA (plan, do, check, and act) cycle underlies what inherent Six
Sigma principle?

Continuous improvement

Control charting

Standard deviation

Project management
21. Which of the following is usually included as an inventory holding cost?

Order placing
Quantity discounts

Breakage

Typing up an order
Want help? Click to download OPS 571 Week 4 Quiz (Latest)

22. Which production process term best describes the situation when activities in
a stage of production must stop because there is no work?

Blocking

Starving

Staging

Buffering
23. In a Gantt chart the vertical axis represents which of the following?

Time
Revenue

Tasks

Cost
Click here and download OPS 571 Week 4 Complete

24. The Shingo system states that the way to prevent defects from coming out at
the end of a process is to do which of the following:

Redesign the process in order to mitigate the bottlenecks.


Utilize SQC (statistical quality control).

Introduce controls within the process.

Slow down production rates until the process is in control.


25. Which of the following terms describes the time a unit spends actually being
worked on together with the time spent waiting in a queue?

Flow time

Build time

Cycle time

Run time
Find the quiz answers here OPS 571 Week 5 Quiz (Latest)

26. Which of the following is one of Dr. Eli Goldratt's rules of production
scheduling for optimized production technology?

An hour saved at a bottleneck operation does not increase the process flow.
If you lose an hour at a bottleneck it is better than making scrap.

Do not allow bottlenecks to govern the flow of the line.

Utilization and activation of a resource are not the same.


27. During the implementation of a project, which of the following should be the
primary focus of a consulting firm?

The correct project software


Application of the learning curve theory

Tools and materials availability

People management skills


Download for answers OPS 571 Week 5 Complete

28. Which of the following is an analytical tool used in Six-Sigma quality


improvement programs?

Gantt charts

Pareto charts

Tree charts

Pedigree charts
29. A project manager must consider several components when overseeing the
planning process of aggregate operations; specifically, whether such
components are factors that are internal or external to the organization. Which of
the following factors would be classified as an internal component for an
organization?

Inventory levels and economic conditions


Market demand and subcontractor capacity

Current physical capacity and current workforce

Competitor behavior and current workforce


Want more details? Download now OPS 571 Week 6 Quiz (Latest)

30. Which of the following is the net requirement using an MRP program if the
gross requirement is 10,000 and the inventory on hand is 4,000?

10,000
14,000

6,000

4,000

About Author
This article covers the topic for the University Of Phoenix OPS 571 Final Exam. The
author is working in the field of education from last 5 years. This article covers the basic
of OPS 571 Final Exam Assignment from UOP. Other topics in the class are as follows:
OPS 571 Week 1 DQ 1
OPS 571 Week 1 DQ 2
OPS 571 Week 1 DQ 3
OPS 571 Week 1 DQ 4
OPS 571 Week 1 Process Design Matrix and Summary
OPS 571 Week 1 Quiz (Latest)
OPS 571 Week 1 Complete
OPS 571 Week 2 DQ 1
OPS 571 Week 2 DQ 2
OPS 571 Week 2 DQ 3
OPS 571 Week 2 DQ 4
OPS 571 Week 2 Process Designs and Supply Chains
OPS 571 Week 2 Quiz (Latest)
OPS 571 Week 2 Complete
OPS 571 Week 3 DQ 1
OPS 571 Week 3 DQ 2
OPS 571 Week 3 DQ 3

OPS 571 Week 3 DQ 4


OPS 571 Week 3 DQ 5
OPS 571 Week 3 Process Designs and Supply Chains Part II
OPS 571 Week 3 Quiz (Latest)
OPS 571 Week 3 Complete
OPS 571 Week 4 DQ 1
OPS 571 Week 4 DQ 2
OPS 571 Week 4 DQ 3
OPS 571 Week 4 DQ 4
OPS 571 Week 4 Supply Chain Design Paper
OPS 571 Week 4 Quiz (Latest)
OPS 571 Week 4 Complete
OPS 571 Week 5 DQ 1
OPS 571 Week 5 DQ 2
OPS 571 Week 5 DQ 3
OPS 571 Week 5 DQ 4
OPS 571 Week 5 Project Management Recommendation
OPS 571 Week 5 Quiz (Latest)
OPS 571 Week 5 Complete
OPS 571 Week 6 DQ 1
OPS 571 Week 6 DQ 2
OPS 571 Week 6 DQ 3
OPS 571 Week 6 DQ 4
OPS 571 Week 6 Process Improvement Presentation
OPS 571 Week 6 Quiz (Latest)
OPS 571 Week 6 Complete
OPS 571 Final Exam (Latest)

Want to check other classes..?? Visit: www.transwebetutors.com

You might also like