1.Responsibilities/Liabilities
Principal, contractor
social
2. Settlement of claims
obligations
responsibilities
Contract
Administration
1.
2.
3.
team.
permissions.
Contd
Contd
time extension.
Compliance
with
statutory
requirements
and
social
responsibility / obligations.
contd
Procurement of materials, labor at reasonable cost, ensuring
their proper usage and storage.
Controlling the wastage
vii) Planning and organizing the execution of work. Providing
designs of those minor works for which the Principal has not
provided the designs.
viii) Maintenance of construction equipment and machinery.
ix) Labor safety and welfare.
Contd
x) Providing assistance to the Principal for supervision,
monitoring, quality checking, measurements, etc..
xi) Submitting all claims in time.
xii) Site clearance and handing over possession of works after
completion.
SETTLEMENT OF CLAIMS
a) Claims for advances:Contractors will have a need for large amount of money before
commencement of the execution of works for
execution of works.
Following
Advance
against materials
Advance
contract value.
Where the work is of specialized nature and mobilization expenses are likely
to exceed 10% of the contract value, additional advance may be made
available through a specific enabling clause in the contract conditions.
Mobilization advance
basis.]
Mobilization Advance
Guarantee to be provided:This advance will be given against a bank guarantee to be
furnished by the contractor.
The principal will be entitled to make sure that the mobilization
advance released to the contractor is utilized for the particular
contract for which it has been given. The bank guarantee can be
encashed if the contractor fails to properly account for the
ii) Advance against machinery and equipment:Purpose:- to remunerate the contractor for his investments on
plant, machinery, equipment, tools etc..
Conditions:
to the site for use in the execution of works under the contract
can be given for both new purchases for the contract as well as
the existing, deployed at the site.
Contd.
by the contractor.
Contd
Guarantee to be provided:
hypothecation.
Contd.
Conditions:- these advances are provided under the following termsi) Advance is granted up to 75% of actual cost of materials purchased
iii) The contractor must provide adequate storage and protection for
these materials against damage by weather/ other causes and
pilferage.
advance payments.
RECOVERY OF ADVANCES:The recovery of advances should be so regulated that it does not hinder the
availability of funds to the contractor.
Therefore recovery of funds can commence after at least work of the value
equal to 10% of the contract value is completed and paid to the contractor.
The recoveries are made in such a phased manner that the total
principal amount against all types of advance granted to the contractor
together with interest ( if any ) there on is fully recovered by the time
80% of the value of the work under the contract is completed and within a
suitable timeframe that is not exceeding 90% of the originally scheduled
completion time in the contract.
Contd
If
resulting in disputes.
Contd
90% of the bill amount may be paid pending settlement of the final
bill.
MEASUREMENT OF WORKS:
Contd..
Each set of measurements should include the following:i) name of the work / contract , its reference code number
ii) name of the contractor
iii) date of agreement and date of commencement of work
Suspension of works
NOTE:-
interim
partial
payments,
Entire/partial
by giving :
a specified date for completion
number of calendar months
number of weeks from the date of commencement within which the
works should be completed.
Contd..
5. Delays due to extra items of work or variations in quantities of
the items of work, beyond specified limits.
6. Delay in checking contractors work and giving the clearance
to proceed with the work.
Contd
will be granted.
Contd
Contd
A maximum limit for L.D. is specified in the contracts
usually 10% to 15% of the total contract value and if
L.D. reaches this limit, it constitutes a fundamental
breach by the contractor and at the option of the
Contd
Contd
The rates and quantity of such items of work shall be got approved
charge and the contractor then the matter will have to be settled
through the dispute settlement process specified in the contract.
Construction progress
Record of staff, labor, equipment, etc., deployed at the site by the contractor.
B.
C.
D.
Job conferences
Statutory requirements
Joint responsibility
Some of the commonly required facilities/ measures for a large project in a remote area
are listed below, and the responsibilities of the Principal, Contractors for their provision
are discussed.
1.
Approach Roads:
The main approach road to the site and the major roads within the site which are
likely to be used by many contractors are constructed and maintained by the
Principal.
The subsidiary(or internal) roads within the contractors work area and from the
colonies of the contractors personal, his stores, offices etc., are constructed and
maintained by the contractor.
2.
These include houses for staff, labour, colonies, site offices, stores etc.,
These facilities are to be provided by the contractor for his staff and
labour and by the principal for his personnel.
3.
4.
Contractor can avail these facilities by paying the applicable user charges.
5.
Tender documents should clearly indicate the provision made with regard to
these facilities and its applicable usage charges, their location, transport
arrangements that are made available.
6.