- The Design Unit is assigned by LILAMA 18 JSC. - to be charge of management of the design & doc
- Chief Design Engineer has the responsibility to review the technical documents and design consulta
2.3
Site Manager:
- The Site Manager is the head of the project management team at site. The Site Manager is responsib
management review, ensuring that the quality system is effective and valid for the project, that non-co
and acted and that all personnel performing Work affecting quality are qualified for the task. The revie
however the results of the review are brought back to Site Manager for action.
- He shall coordinate with Owner representatives & concerning Parties at site to check up the time sch
approved by the Owner and quality of on-going works.
2.4
- With direct authority from the Site Manager, is responsible for all fabrication and construction activi
utilized within the project and convening weekly progress meeting with the project team to review sta
engineering and drawing production, procurement and delivery schedule, safety and other associated p
2.5
- Responsibilities for the implementation of the quality assurance plan and for the activities affecting
scope of works. Prepares the internal Audits schedule and works with others to identify and control no
up the project QA/QC team and takes necessary action to ensure the proper co-ordination of project qu
- The QCR monitors the point of receipt for engineering information received from Owners Enginee
received is scheduled and issued to the appropriate section of Owners Engineer.
2.6
- Implementing the HSE Plan and reviewing safety performance on the project. Maintain a safety pro
activities at the Shop Fabrication and in site installation.
- Preventing and stopping any unsafe practice in the yard and setting up safety standards procedures w
the level of safety awareness in any area within the construction facility.
2.7
Supervisor:
- The Supervisor will instruct & manage The works directly to working teams, he shall assign The wo
control what they have performed or not yet done and help them in technical matters. he shall work wi
and foreign specialist to execute The work properly as required by design drawings, prepare quantity a
The Owner for payment, make report to Site Manager frequently so that he can adjust The planning if
of completion The project timely and with high quality of work.
2.8
QC Supervisor:
- QC Engineer has responsibilities for the coordination of the QA/QC surveillance effort at the faciliti
with correspondence and queries arising forms these activities. In addition he prepares the Shop Inspe
the procured materials and equipment.
3
The working relation between the managing office and the managing work at the Site.
- The Departments at the Head Office of LILAMA 18, LILAMA 45.4 should support the Site constru
demand from them quickly and effectively concerning to man power, material supply, working machin
- The concerning department will base on the requisition sheet sent from the working site to solve the
requisitions have been prepared in advanced before or right after starting work so that the company ca
material, labor, machinery etc from the site.
- All relating manager shall contact with the Site Manager permanently to know what is going on and
execution of the Contract will always be controlled well.
responsible for all fabrication and construction activity. Control the manpower
progress meeting with the project team to review status of project schedule
nt and delivery schedule, safety and other associated project issues.
quality assurance plan and for the activities affecting quality within the project
edule and works with others to identify and control non-conforming product. Heads
action to ensure the proper co-ordination of project quality activities.
ineering information received from Owners Engineer and ensures that information
te section of Owners Engineer.
orks directly to working teams, he shall assign The work even to each worker and
e and help them in technical matters. he shall work with The Owner representatives
rly as required by design drawings, prepare quantity acceptance report to submit to
nager frequently so that he can adjust The planning if necessary to reach The target
quality of work.
ination of the QA/QC surveillance effort at the facilities of vendors and for dealing
hese activities. In addition he prepares the Shop Inspection and Test Plan (SITP) for
MA 18, LILAMA 45.4 should support the Site construction team to solve any
rning to man power, material supply, working machinery & tools
quisition sheet sent from the working site to solve the matter. Normally, the
ore or right after starting work so that the company can fulfill the request of
Manager permanently to know what is going on and what the site need so that the
ed well.
Site Manager
LILAMA 18
Purchasing of Steel PenStock
Fabrication of Steel PenStock
Sand blasting & Painting Work for Steel
PenStock
ENTURE
LILAMA 45.4
Purchasing and Logistics of
Equipments
Fabrication of Equipments
Transportation, Installation &
Adjustment Work
Sand blasting & Painting Work for
Equipments
Commisioning Work
Design at IHR
Works design
Mechanical Design
Design and fabricate the hydro- mechanical equipment and intake water
gate and gate of plant downstream suction chamber
At Site
Inspect document
Supervising
VENTURE
Design at Site
T VENTURE
Administration Dept.
Const. Machinery Dept.
Scaffolding Team
Scaff. Supervisor: 01 per.
Safety officer: 01 per.
Foremen: 01 per.
Worker: 20 per.
7th
8th
9th
10th
11th
12th
13th
14th
Time Schedule
15th
16th
17th
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
1 Head office
1.1 Project Manager
###
###
###
###
###
###
###
###
###
###
###
###
1
1
1
1
1
1
###
###
1
1
###
###
1
1
1
1
###
###
1
1
1
1
###
###
1
1
1
1
###
###
###
###
###
###
###
###
1
2
4
4
4
4
5
1
2
4
4
6
8
7
1
2
4
4
8
11
10
1
2
4
4
8
11
12
###
###
###
###
###
###
###
1
2
4
4
8
11
12
1
2
4
4
8
11
12
###
###
###
###
###
###
###
1
2
4
4
8
11
12
1
2
4
4
7
11
8
###
###
###
###
###
1
2
3
4
7
1
2
3
4
7
8
8
No.
1.3
1.4
1.5
1.6
1.7
2
2.1
2.2
2.4
2.5
2.6
2.7
2.8
Description
Technical Management
Specialist
HSE Manager
QA/QC Manager
Purchasing and Logistics
Manager
Chief Design Enginner
Construction Site
Site manager
Deputy Site manager
Chief Site Engineer
QA/QC Supervisor
Safety officer
Supervisor
Foremen
###
###
###
###
###
11
12
Dec-16
8
###
18th
19th
Jan-17
Feb-17
###
8
No.
Description
6th
7th
8th
9th
10th
11th
12th
13th
14th
Time Schedule
15th
16th
17th
18th
19th
VENTURE
Time Schedule
20th
21st
22nd
23rd
24th
25th
26th
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Aug-17
Sep-17
###
###
###
###
###
###
###
###
###
1
1
###
###
1
1
###
###
1
1
1
1
###
###
###
###
###
###
###
###
1
2
3
4
7
8
8
###
###
###
###
###
###
###
1
2
3
4
7
8
8
###
###
###
###
###
###
###
1
2
3
4
7
8
8
1
1
3
4
3
3
5
###
###
###
###
###
###
###
Remark
Time Schedule
20th
21st
22nd
23rd
24th
25th
Date:
Company: LILAMA 18 Joint Stock Company.
Company Stamp:
26th
Remark