You are on page 1of 15

Technical Support Team

E-mail: topcontech@fajerest.ae
Fax : 04-2868016

TOPCON (GTS – 230 N) QUICK MANUAL


CENTERING AND LEVELING:

Set the instrument on the


tripod and press the power
STEP-1 button.

Press the star key for initial


STEP-2 settings.

Press the up & down arrow


for contrast adjustment of
STEP-3a the display.

Press (F1) for turn on the


backlight of the display
STEP-3b screen.

Press (F2) for setting the


STEP-3c tilt correction

Press (F3) for turn on the


STEP-3d laser pointer. (optional)

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

Press (F4) for adjusting the


prism constant, temp&
pressure value etc.
STEP-3e Again,
Press F1for (Prism Con.)
Press F3for (Temp-Preas)

Once you are complete the


leveling and centering, press
STEP-3f (Esc) button for exit.

********************************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

MAKING A NEW JOB:

STEP-1 Press the menu button.

Press (F1) for data collect.


STEP-2 Data collect is the detail
survey menu.

Press [F1] for inputting a new


job name or press [F2] for
STEP-3 selecting an existing job from
the list.
If you want to type the alpha
numeric characters, again
STEP-4 press [F1] and input that.Then
Press [F4] to accept the job.

NOTE: If you want to do both the topography and setting out exercises, please
select the same jobs in DATA COLLECT menu & LAYOUT menu.

********************************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

CO-ORDINATES INPUTTING:

Press menu button to get the


STEP-1 main menu. Press F3 to select
the memory manager.

STEP-2 Press F4 for the next page.

STEP-3 Press F1 to input co ordinates.

Press F2 for getting the


STEP-4 created job list (if you know
the job name, you can type it
directly).

STEP-5 To select the job with up &


down arrow keys.

STEP-6 Then Press F4

STEP-7 Press [F1], for your co-


ordinate entry

Continues on NEXT PAGE


Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

Type the point ID


If
STEP-8 Press F1-Alpha numeric
Press F2-space
Press F3-clear screen

After typing you can


STEP-9 press [F4] or [enter]

STEP-10 Input the co-ordinates

STEP-11 You should type your


point name here.

STEP-12 After the inputting press


[F4] or [Enter]

This shows your input is


STEP-13 recorded to the memory.

NOTE: It is better to make a Control Point data sheet given below. This is
very useful for the surveyors on job handover situations.

JOB NAME Point.ID Northing Easting Elevation Code Name


AL FAJER 1 10.000 10.000 10.000 CP1
AL FAJER 4 2787545.098 5037555.088 10.400 DM1
AL FAJER 5 2787523.776 5037560.001 12.333 DM2
**********************************************************
Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

STATION SETTING

`
Press your MENU button and
STEP-1 Press (F1) for data collect.
(Data collect is the detail
survey menu.)

Press [F2] for selecting your


STEP-2 job from the list. And press
[F4] to set the job.

Press [F1]
for OCC.PT# INPUT
STEP-3
(occupied point is your
instrument’s station point )

After inputing the station’s


STEP-4 point ID, Instrument hight
etc. Then Press [F4]

Check your station co-


ordinates. If it is correct
STEP-5
Press [F3] and go to STEP-9,
else Press [F4]

Press [F4] to check the co-


STEP-6
ordinates entry.

Check the point Id and


STEP-7
Press [F4]

Check the recorded co-


STEP-8
ordinates and Press [F3]

Continues on NEXT PAGE

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

STEP-9 Press [F3]

STEP-10 Press [F3]

This screen displays your


STEP-11
station is completed.

**********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

BACK STATION ORIENTATION:


NOTE: For Back orientation you can choose 3 ways.
1. Whole Circle Bearing ZERO SET.
2. Known W.C.Bearing SET.
3. Back Station Co-ordinate SET.

 BACK STATION BY WHOLE CIRCLE BEARING ZERO SET:

After the station set up, orient


the telescope to the Back
STEP-1 station point. Then Press [F2]
for start the Back sighting.

STEP-2 Press [F2] for ZERO set

Now you should get this


STEP-3
message on the screen.

STEP-4 Press [F3] for start measuring

Press [F3] for start


STEP-5 co-ordinate measuring

Once the machine starts the


measuring, quickly press ESC
button. Because now your
STEP-6 bearing is set as ZERO. Again
press ESC button and start the
survey works.
NOTE: If you want to know the co-ords of the BS point, wait upto the complete
measurement. For recording that data, Press [F3]
**********************************************************
Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

 BACK STATION BY KNOWN W.C.BEARING SET:

After the station set up, orient


the telescope to the Back
STEP-1 station point. Then Press [F2]
for start the Back sighting.

STEP-2 Press [F4] for BS inputting.

STEP-3 Press [F3]

STEP-4 Press [F3]

Press [F1] for Azimuth


STEP-5
inputting.

Type your W.C.B on this


STEP-6 window.
(12.0259 means 12° 2’ 59”)

Now you should get this


STEP-7
message on the screen.

STEP-8 Press [F3] for start measuring

Continues on NEXT PAGE

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

Press [F3] for start


STEP-9 co-ordinate measuring

Once the machine starts the


measuring, quickly press ESC
STEP-10 button. Because now your
bearing is set as ZERO. Again
press ESC button and start the
survey works.

NOTE: If you want to know the co-ords of the BS point, wait upto the complete
measurement. For recording that data, Press [F3] .
**********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

 BACK STATION BY CO-ORDINATE SET:

After the station set up, orient


the telescope to the Back
STEP-1 station point. Then Press [F2]
for start the Back sighting.

Press [F1] and input the back


station point id, PCODE, and
STEP-2 Reflector Height. Then
Press [F3] for confirmation.

Press [F3] for starting the


STEP-3
co-ordinate measure.

Now you should get this


STEP-4 message on the screen.

After checking the co-ords


STEP-5 Press [F3] for recording the
co-ordinate measurement.

Now you should get this


STEP-6 message on the screen.

Now you should get this


message on the screen. This
STEP-7 shows your Back station is set
properly.

**********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

TOPOGRAPHIC SURVEYING

Press [F1] for preparing a


STEP-1 detail survey.

After completing the station


& B/S set up orient the
STEP-2 telescope to the prism. Then
Press [F3] to start detail
surveying.

Input the starting point no,


STEP-3 code, and reflector height.
Then Press [F4]

Press [F3] to prepare the


STEP-4 measurement.

Press [F3] to start the co-


STEP-5 ordinate measurement.

Then you should see this


STEP-6 message

Confirm your co- ordinate and


STEP-7
Press [F3] to record this data.

After record, your point Id


STEP-8 will be increasing
automatically.

**********************************************************
Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

NOTE: If you want to record the data with same code and same reflector height,
you have to do shown on below.

STEP-1 Press [F4] to start measuring

Then you should see this


STEP-2 message

Confirm your co- ordinate and


STEP-3
Press [F3] to record this data.

This message shows that your


STEP-4 data has recorded to the
memory.

**********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

TOPOGRAPHIC SURVEYING WITH OFFSET MEASUREMENT

Input the starting point no,


STEP-1 code, and reflector height.
Then Press [F3]

Press [F4] for choosing next


STEP-2 page.

Press [F1] for choosing


STEP-3
OFFSET menu.

Most commonly using offset


STEP-4 system is the 2nd one. So Press
[F2]

NOTE: This offset function


is working as per this figure.
Here, the telescopic line
between building corner and
the instrument is obstructed
by a tree. Before inputting,
please confirm the offset
lengths from the chainman
side. Now your required
point (Building Corner) is
2m forward and 1m left of
the actual observed
point (prizm).

Input your Left (-) or Right


(+) offset. Here your offset is
STEP-5
1m left. So input -1 and
Press [F4] for enter.
Continues on NEXT PAGE

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.
Technical Support Team
E-mail: topcontech@fajerest.ae
Fax : 04-2868016

Input your forward (+) or


Backward (-) offset. Here
STEP-6 your offset is 1m forward. So
input 2m and Press [F4] to
enter.

Press [F3] to start co-ordinate


STEP-7 measuring

This screen shows, the


STEP-8
machine is measuring.

This is the calculated co-


STEP-9 ordinates and if you want
record Press [F3].

This screen shows your data


STEP-10
has recorded to the memory.

This screen shows your


STEP-11 instrument is ready for next
observation.

**********************************************************

Authors: Jobin & Vishnu, Tech. Support team (Topcon), Al Fajer Establishment, Dubai.

You might also like